A device for testing the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel

By designing an automated spray casting strength detection device for the arch waist triangular area of ​​the continuous arch tunnel, the large error problem caused by manual operation is solved, the automatic push and vertical positioning of the rebound meter are realized, and the detection efficiency and accuracy are improved.

CN118896866BActive Publication Date: 2024-12-03CHINA RAILWAY DEV INVESTMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411397034.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-12-03
Estimated Expiration
2044-10-09

AI Technical Summary

Technical Problem

In the detection of sprayed concrete, the manual operation strength is high during rebound measurement, resulting in large errors.

Method used

A spray casting strength detection device for arch waist triangular area of ​​the continuous arch tunnel was designed, including a rebound meter, pushing mechanism, mounting bracket, adjustment mechanism and moving mechanism, and the automatic pushing of the rebound meter is realized through electric push rods and angle adjustment components. and vertical positioning to reduce manual operation errors.

Benefits of technology

It reduces the error and working intensity of manual operation, improves the detection efficiency, ensures that the rebound instrument is always perpendicular to the construction surface, reduces data errors, and improves the accuracy of the detection results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896866B_ABST
    Figure CN118896866B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of shotcrete detection, and in particular to a shotcrete casting strength detection device for the arch waist triangle area of ​​a multi-arch tunnel, comprising a rebound hammer, a pushing mechanism for pushing the rebound hammer, a mounting bracket for mounting the pushing mechanism, an adjusting mechanism for adjusting the inclination angle and the height of the mounting bracket, and a moving mechanism for supporting the adjusting mechanism; the rebound hammer is fixed on an L-shaped plate by a fixing component, and the rebound hammer is pushed to move by the pushing component, thereby replacing manual reciprocating pressing of the rebound hammer, which reduces the error of manual operation on the one hand, and reduces the labor intensity of manual operation on the other hand, and the detection personnel only need to record data, thereby improving the detection efficiency; the adjusting mechanism can not only adjust the height of the mounting bracket and the rebound hammer, but also adjust the angle of the mounting bracket, so that the rebound hammer always points vertically to the corresponding construction surface, and compared with manual operation, the error is smaller and the result is more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shotcrete detection, in particular to a device for detecting the shotcrete pouring strength of a triangle zone in an arch waist of a multi-arch tunnel. Background Art

[0002] When a highway passes through an area with obvious topographical features such as mountainous areas, the route selection is often restricted by geological, topographical and other natural factors. Especially when passing through an area with a shallow burial depth, the construction method of a continuous arch tunnel is more advantageous than other solutions such as cuttings or small-spacing separated tunnels.

[0003] When pouring concrete on the inner wall of the tunnel, the pre-mixed concrete is pumped to the spray gun through a high-pressure pump, and then mixed with the accelerator at the nozzle of the spray gun before being sprayed at high speed onto the construction surface, i.e. the triangular area of ​​the tunnel arch. During the spraying process, the concrete is tightly combined with the construction surface to form a solid concrete layer. The concrete layer after spraying should be subject to quality inspection, including thickness, strength, flatness, etc., to ensure that it meets the design requirements.

[0004] There are several detection methods for concrete layer detection: rebound method, on-site coring method, ultrasonic rebound method, pull-out method, etc.; the rebound hammer widely used in China at present is a pointer-type reading rebound hammer, which is widely used in the construction process of building construction, municipal engineering and road and bridge construction. Concrete compressive strength detection, but because it has no data recording and processing functions, it is necessary for operators to complete the detection and recording work during use. The inspector holds the rebound hammer perpendicular to the construction surface, presses the rebound hammer against the construction surface and then releases it. This detection method requires a lot of data support, so a lot of manual operation is required. Because the construction surface is a curved surface, and manual operation is different, it cannot be guaranteed that it can be completely perpendicular to the construction surface every time, resulting in large data errors and high manual detection intensity. Summary of the invention

[0005] The present invention provides a device for detecting the grouting strength of the triangle area of ​​the arch waist of a multi-arch tunnel, so as to solve the problems in the related art that the manual detection strength is large when the rebound method is used to measure the grouting strength and the error is large when the rebound instrument is manually operated.

[0006] The present invention provides a device for detecting the strength of shotcrete casting in the triangular area of ​​the arch waist of a multi-arch tunnel, comprising a rebound tester. The detection device also comprises a pushing mechanism for pushing the rebound tester, a mounting bracket for mounting the pushing mechanism, an adjusting mechanism for adjusting the inclination angle and the height of the mounting bracket, and a moving mechanism for supporting the adjusting mechanism; a No. 1 electric push rod is fixedly mounted on the top of the moving mechanism, a lifting plate is fixed to the top of the No. 1 electric push rod, an upper surface of the lifting plate is provided with an angle adjustment component, and a mounting bracket is provided on the angle adjustment component.

[0007] There are two mounting brackets distributed in front and back, and the mounting brackets include a first oblique rod and two second oblique rods fixed on the front and rear sides of the first oblique rod, the two second oblique rods have the same angle with the first oblique rod and are in opposite directions, and a third oblique rod is installed at the ends of the first oblique rod and the second oblique rod, the first oblique rod and the third oblique rod are perpendicular to each other, and two positioning components are installed on the side of the third oblique rod facing the tunnel.

[0008] The positioning assembly includes a U-shaped frame, a hinge shaft is fixedly connected between the front and rear side walls of the U-shaped frame, the outer wall of the hinge shaft is rotatably sleeved with two V-shaped plates distributed front and back, and rollers are rotatably installed between the two V-shaped plates, wherein the number of rollers is two and they are respectively located at the two ends of the V-shaped plate.

[0009] The pushing mechanism includes an L-shaped plate fixed between two first inclined rods, the inclination direction of the L-shaped plate is consistent with the first inclined rod, an arc-shaped limit groove is provided on the upper surface of the L-shaped plate, and the rebound hammer is placed in the arc-shaped limit groove. The L-shaped plate is also provided with a fixing component for fixing the rebound hammer and a pushing component for pushing the rebound hammer.

[0010] In one possible implementation, the moving mechanism includes a base plate and self-locking universal wheels installed at the four corners of the bottom of the base plate, armrests are installed on the front side wall and the left side wall of the base plate, and a No. 1 electric push rod is fixed on the upper surface of the armrests. Guide rods are vertically fixed at the four corners of the upper surface of the base plate, and the guide rods slide through the upper surface of the lifting plate.

[0011] In one possible implementation, the angle adjustment assembly includes two vertical plates fixed vertically on the top of the lifting plate, two mounting brackets are located between the two vertical plates, the top of the vertical plates are rotatably connected to the end of the first diagonal rod via a rotating shaft, the angle adjustment assembly also includes a No. 2 electric push rod fixed to the top of the lifting plate, the top of the No. 2 electric push rod is fixedly connected to a supporting plate, a concave seat is horizontally limited and slidably installed on the upper surface of the supporting plate, and the front and rear vertical sections of the concave seat are rotatably connected to the third diagonal rod in the two mounting brackets via a rotating shaft.

[0012] In one possible implementation, the positioning assembly also includes a steering locking member connected to the third diagonal rod, the steering locking member includes a spring telescopic rod connected to the third diagonal rod, the end of the spring telescopic rod is fixedly connected to an outer ring, the inner rotation of the outer ring is connected to an inner rotating column, and the end of the outer ring away from the spring telescopic rod is open, an arc-shaped through groove is opened on the circumferential surface of the outer ring, a magnet plate passing through the arc-shaped through groove is fixedly connected to the outer wall of the inner rotating column, and the U-shaped frame is connected to the inner rotating column.

[0013] In a possible implementation, the fixing assembly includes two circular frames distributed on the front and rear sides of the rebound hammer, and two arc-shaped clamping plates are arranged on the sides of the two circular frames close to each other, and the arc-shaped clamping plates on the two circular frames are symmetrically arranged.

[0014] In one possible implementation, a wedge plate is fixedly installed inside the circular frame, the upper surface of the wedge plate is a slope, and the height of the wedge plate gradually decreases from the side close to the arc-shaped clamping plate to the side away from the arc-shaped clamping plate, and there is a gap between the side of the wedge plate away from the arc-shaped clamping plate and the inner wall of the circular frame, and the fixing component includes a gantry across the top of the rebound tester, two vertical sections of the gantry pass through the gap between the wedge plate and the inner wall of the circular frame, and the length of the gantry is less than the length of the circular frame, and the vertical sections of the gantry are integrally formed with an extension plate on the side away from each other, and a No. 3 electric push rod is connected between the extension plate and the upper surface of the L-shaped plate.

[0015] In one possible implementation, the pushing assembly includes a No. 4 electric push rod horizontally fixed on an L-shaped plate, the telescopic end of the No. 4 electric push rod is fixedly connected to a strip plate, the strip plate is in sliding contact with the upper surface of the L-shaped plate, a T-shaped groove is provided on the side of the strip plate facing the rebound tester, and two T-shaped sliders are slidably installed in the T-shaped groove, the two T-shaped sliders are respectively fixedly connected to the corresponding circular frames, and the two T-shaped sliders are connected by a connecting spring.

[0016] In one possible implementation, a plurality of T-shaped guide rails extending in the left-right direction are installed on the top of the support plate, and a T-shaped avoidance groove is provided at the horizontal part of the concave seat corresponding to the position of the T-shaped guide rail, and the T-shaped guide rail and the T-shaped avoidance groove are slidably matched.

[0017] In a possible implementation, the rotation range of the magnet plate is 90 degrees, and when the magnet plate is rotated to any end of the arc-shaped through slot, it is magnetically fixed to the end wall of the arc-shaped through slot.

[0018] In a possible implementation, a receiving groove is provided at a position of the third oblique rod corresponding to the positioning assembly, and an end of the spring telescopic rod is fixedly connected to the bottom of the receiving groove.

[0019] The above one or more technical solutions in the embodiments of the present invention have at least one of the following technical effects: 1. The rebound test hammer is fixed on the L-shaped plate by a fixing component, and the rebound test hammer is pushed to move by a pushing component, thereby replacing the manual reciprocating pressing of the rebound test hammer. On the one hand, it reduces the error of manual operation, and on the other hand, it reduces the manual work intensity. The inspection personnel only need to record the data, thereby improving the inspection efficiency.

[0020] 2. The adjustment mechanism can not only adjust the height of the mounting bracket and the rebound tester, but also adjust the angle of the mounting bracket so that the rebound tester always points vertically to the corresponding construction surface. Compared with manual operation, the error is smaller and the result is more accurate.

[0021] 3. The roller can be turned by the steering locking piece so that the circumferential surface of the roller is no longer tangent to the arc-shaped construction surface, thereby preventing the roller from rolling along the arc-shaped construction surface after positioning, thereby improving the stability of the rebound tester after positioning. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the detection device for detecting the shotcrete pouring strength of the triangular area of ​​the arch waist of a multi-arch tunnel.

[0023] Figure 2 It is a schematic diagram of the first-person perspective stereoscopic structure of the detection device.

[0024] Figure 3 It is a schematic diagram of the third perspective structure of the detection device.

[0025] Figure 4 It is a structural schematic diagram of the mounting bracket.

[0026] Figure 5 yes Figure 2 Magnified view of area A.

[0027] Figure 6 It is a three-dimensional structural schematic diagram of the steering locking member.

[0028] Figure 7 It is a structural diagram of the pushing mechanism and the rebound tester.

[0029] Figure 8 It is a structural diagram of the driving mechanism from another perspective.

[0030] Fig. 9 yes Figure 8 Magnified view of area B.

[0031] In the figure: 1. moving mechanism; 2. adjusting mechanism; 3. mounting bracket; 4. rebound tester; 5. pushing mechanism; 11. bottom plate; 12. handrail; 13. self-locking universal wheel; 21. lifting plate; 22. No. 1 electric push rod; 23. guide rod; 24. vertical plate; 25. No. 2 electric push rod; 26. supporting plate; 27. concave seat; 28. T-shaped guide rail; 31. first oblique rod; 32. second oblique rod; 33. third oblique rod; 34. positioning assembly; 341. U-shaped frame; 342. hinge shaft; 343. V-shaped plate; 344. Roller; 345, steering locking piece; 346, spring telescopic rod; 347, outer ring; 3471, arc-shaped through groove; 348, inner rotating column; 349, magnet dial plate; 51, L-shaped plate; 511, arc-shaped limit groove; 52, fixing component; 521, arc-shaped clamping plate; 522, circular frame; 523, wedge-shaped plate; 524, door frame; 525, No. 3 electric push rod; 53, pushing component; 531, No. 4 electric push rod; 532, strip plate; 533, T-shaped slot; 534, T-shaped slider; 535, connecting spring. DETAILED DESCRIPTION

[0032] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described below, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific embodiments disclosed below.

[0033] See also Figure 1 , Figure 2 and Figure 3 A device for detecting the strength of shotcrete pouring in the triangular area of ​​the arch waist of a multi-arch tunnel includes a rebound tester 4 and a pushing mechanism 5 for pushing the rebound tester 4. The detection device also includes a mounting bracket 3 for installing the pushing mechanism 5, an adjusting mechanism 2 for adjusting the inclination angle and height of the mounting bracket 3, and a moving mechanism 1 for supporting the adjusting mechanism 2.

[0034] See also Figure 2The moving mechanism 1 includes a base plate 11 and self-locking universal wheels 13 installed at the four corners of the bottom of the base plate 11. The front side wall and the left side wall of the base plate 11 are both installed with handrails 12. The base plate 11 is driven to move left and right or forward and backward by manually pushing the handrails 12; the adjusting mechanism 2 includes a No. 1 electric push rod 22 fixed on the upper surface of the base plate 11 and a lifting plate 21 fixed on the top of the No. 1 electric push rod 22. Guide rods 23 are vertically fixed at the four corners of the upper surface of the base plate 11. The guide rods 23 slide through the upper surface of the lifting plate 21. The No. 1 electric push rod 22 is used to extend and retract to drive the lifting plate 21 to rise and fall, thereby driving the mounting bracket 3, the rebound tester 4 and the pushing mechanism 5 to rise and fall synchronously.

[0035] See also Figure 2 and Figure 4 , an angle adjustment component is provided on the upper surface of the lifting plate 21, and a mounting bracket 3 is provided on the angle adjustment component. There are two mounting brackets 3 distributed in the front and rear, and the mounting bracket 3 includes a first oblique rod 31 and two second oblique rods 32 fixed on the front and rear sides of the first oblique rod 31. The two second oblique rods 32 have the same angle as the first oblique rod 31 and are in opposite directions. The ends of the first oblique rod 31 and the second oblique rod 32 are jointly installed with a third oblique rod 33, and the first oblique rod 31 and the third oblique rod 33 are perpendicular to each other; the angle adjustment component includes two vertical plates 24 vertically fixed to the top of the lifting plate 21, and the two mounting brackets 3 are located between the two vertical plates 24. The top of the vertical plate 24 is rotatably connected to the end of the first oblique rod 31 through a rotating shaft. The angle adjustment component also includes a No. 2 electric push rod fixed to the top of the lifting plate 21 Rod 25, the top of the No. 2 electric push rod 25 is fixedly connected to a supporting plate 26, and a concave seat 27 is horizontally slidably installed on the upper surface of the supporting plate 26. The front and rear vertical sections of the concave seat 27 are rotatably connected to the third inclined rods 33 in the two mounting brackets 3 through a rotating shaft. A plurality of T-shaped guide rails 28 extending in the left and right directions are installed on the top of the supporting plate 26, and a T-shaped avoidance groove is provided at the horizontal part of the concave seat 27 corresponding to the position of the T-shaped guide rail 28. The T-shaped guide rail 28 slides with the T-shaped avoidance groove to avoid longitudinal separation between the concave seat 27 and the supporting plate 26. The supporting plate 26 is lifted and lowered by the extension and retraction of the No. 2 electric push rod 25, and then the mounting bracket 3 is driven to rotate around the rotating shaft at the top of the vertical plate 24 through the concave seat 27, so as to adjust the inclination direction of the third inclined rod 33.

[0036] See also Figure 2 , Figure 5 and Figure 6Two positioning assemblies 34 are installed on the side of the third oblique rod 33 facing the tunnel. The positioning assembly 34 includes a steering locking member 345 connected to the third oblique rod 33. The steering locking member 345 includes a spring telescopic rod 346 connected to the third oblique rod 33. The third oblique rod 33 is provided with a receiving groove at a position corresponding to the positioning assembly 34. The end of the spring telescopic rod 346 is fixedly connected to the bottom of the receiving groove. The end of the spring telescopic rod 346 is fixedly connected to an outer sleeve ring 347. The outer sleeve ring 347 is fixedly connected to the outer sleeve ring 348. The inner rotation of the ring 347 is connected to the inner rotating column 348, and the end of the outer ring 347 away from the spring telescopic rod 346 is open, and an arc-shaped through groove 3471 is opened on the circumferential surface of the outer ring 347, and the outer wall of the inner rotating column 348 is fixedly connected to a magnet plate 349 that passes through the arc-shaped through groove 3471, wherein the rotation range of the magnet plate 349 is 90 degrees. When the magnet plate 349 rotates to the two ends of the arc-shaped through groove 3471, it will be magnetically fixed to the end wall of the arc-shaped through groove 3471.

[0037] See also Figure 2 and Figure 5 The positioning assembly 34 also includes a U-shaped frame 341 connected to the inner rotating column 348, and a hinge shaft 342 is fixedly connected between the front and rear side walls of the U-shaped frame 341. The outer wall of the hinge shaft 342 is rotatably sleeved with two V-shaped plates 343 distributed front and back, and a roller 344 is rotatably installed between the two V-shaped plates 343, wherein the number of rollers 344 is two and they are respectively located at both ends of the V-shaped plate 343. When the No. 1 electric push rod 22 adjusts the height of the mounting bracket 3 and the angle adjustment assembly adjusts the tilt direction of the mounting bracket 3, the rollers 344 will gradually fit with the tunnel. When the four rollers 344 on one mounting bracket 3 are all in contact with the tunnel, When fitting, the spring telescopic rod 346 is forced to shrink, and then the magnet plate 349 is manually moved until it fits with the inner wall of the other end of the arc-shaped through groove 3471. At this time, the inner rotating column 348 rotates ninety degrees, and the corresponding U-shaped frame 341 will drive the roller 344 to rotate 90 degrees, and continue to move the mounting bracket 3 toward the arch triangle area of ​​the tunnel until the spring telescopic rod 346 can no longer be compressed. At this time, the positioning component 34 is pressed against the tunnel, that is, the position of the positioning component 34 is fixed, and the corresponding inclination direction of the third inclined rod 33 and the inclination direction of the first inclined rod 31 are fixed. At this time, the first inclined rod 31 is perpendicular to the inner arc surface of the tunnel.

[0038] See also Figure 2 , Figure 7 , Figure 8 and Fig. 9The pushing mechanism 5 includes an L-shaped plate 51 fixed between the two first oblique rods 31. The inclination direction of the L-shaped plate 51 is consistent with the first oblique rods 31. The upper surface of the L-shaped plate 51 is provided with an arc-shaped limit groove 511. The rebound hammer 4 is placed in the arc-shaped limit groove 511. The L-shaped plate 51 is also provided with a fixing component 52 for fixing the rebound hammer 4 and a pushing component 53 for pushing the rebound hammer 4. The fixing component 52 includes two circular frames 522 distributed on the front and rear sides of the rebound hammer 4. The two rebound frames 522 are provided on the upper surface of the L-shaped plate 51. Two arc-shaped clamping plates 521 are arranged on the sides of the two circular frames 522 close to each other, and the arc-shaped clamping plates 521 on the two circular frames 522 are arranged symmetrically, and the arc-shaped clamping plates 521 are fitted with the outer wall of the rebound tester 4. A wedge plate 523 is fixedly installed inside the circular frame 522, and the upper surface of the wedge plate 523 is a slope, and the height of the wedge plate 523 gradually decreases from the side close to the arc-shaped clamping plate 521 to the side away from the arc-shaped clamping plate 521. The side of the wedge plate 523 away from the arc-shaped clamping plate 521 There is a gap between the inner wall of the rebound frame 522 and the fixing assembly 52, the fixing assembly 52 comprises a gantry 524 across the top of the rebound hammer 4, the two vertical sections of the gantry 524 penetrate the gap between the wedge plate 523 and the inner wall of the rebound frame 522, and the length of the gantry 524 is less than the length of the rebound frame 522, the upper surface of the L-shaped plate 51 is provided with a slot corresponding to the vertical section of the gantry 524, the vertical section of the gantry 524 is inserted into the slot after being lowered, and the vertical sections of the gantry 524 on the side away from each other are all integrated An extension plate is formed, and a No. 3 electric push rod 525 is connected between the extension plate and the upper surface of the L-shaped plate 51. The No. 3 electric push rod 525 drives the gantry 524 to rise and fall. When the vertical section of the gantry 524 conflicts with the upper surface of the wedge plate 523, the gantry 524 will gradually press the wedge plate 523 during the descent process, and the circular frame 522 drives the arc clamping plate 521 to approach the rebound instrument 4 until the gantry 524 is inserted into the slot. At this time, the four arc clamping plates 521 clamp the rebound instrument 4 and fix it.

[0039] See also Figure 7 , Figure 8 and Fig. 9The pushing assembly 53 includes a fourth electric push rod 531 horizontally fixed on the L-shaped plate 51, and the telescopic end of the fourth electric push rod 531 is fixedly connected to a strip plate 532, and the strip plate 532 is in sliding contact with the upper surface of the L-shaped plate 51. The strip plate 532 is provided with a T-shaped groove 533 on the side facing the rebound tester 4, and two T-shaped sliders 534 are slidably installed in the T-shaped groove 533. The two T-shaped sliders 534 are respectively fixedly connected to the corresponding circular frame 522, and the two T-shaped sliders The blocks 534 are connected by a connecting spring 535; when the two circular frames 522 approach each other, the two T-shaped sliders 534 will also approach each other, thereby compressing the connecting spring 535. When the portal frame 524 moves up and moves out from between the wedge plate 523 and the circular frame 522, the portal frame 524 no longer has a limiting effect on the circular frame 522. At this time, the T-shaped sliders 534 move away from each other under the rebound force of the connecting spring 535, thereby driving the arc clamping plate 521 to release the fixation of the rebound tester 4.

[0040] It should be noted that when the rebound tester 4 is not fixed, the two circular frames 522 are in a separated state under the action of the connecting spring 535. At this time, the vertical section of the portal frame 524 has unlimited effect on the circular frame 522, that is, the bottom end of the vertical section of the portal frame 524 will be higher than the gap between the wedge plate 523 and the inner wall of the circular frame 522, and the vertical section of the portal frame 524 will conflict with the upper surface of the wedge plate 523.

[0041] Working process: first, manually place the rebound tester 4 in the arc-shaped limit groove 511, start the No. 3 electric push rod 525, so that it drives the gantry 524 to descend, and when the bottom end of the vertical section of the gantry 524 hits the slope of the wedge plate 523, it will push the top frame 522 to approach each other, and when the vertical section of the gantry 524 passes through the gap between the wedge plate 523 and the inner wall of the frame 522, the arc-shaped clamping plate 521 clamps the rebound tester 4, and the No. 3 electric push rod 525 continues to descend until the vertical section of the gantry 524 is inserted into the slot; then, the handrail 12 is manually held to drive the bottom plate 11 to move closer to the construction surface of the tunnel, and the No. 1 electric push rod 22 is extended to drive the installation The mounting bracket 3 rises, and when the roller 344 at any end of the third inclined rod 33 contacts the construction surface, the inclination direction of the mounting bracket 3 is adjusted by the angle adjustment assembly, so that the rollers 344 at both ends of the third inclined rod 33 contact the construction surface. At this time, the spring telescopic rod 346 is slightly compressed. It should be noted that there are two rollers 344 at each end of the third inclined rod 33. No matter which roller 344 contacts the construction surface first, it will act in the opposite direction on the V-shaped plate 343, causing the V-shaped plate 343 to rotate, thereby driving the rollers 344 on the V-shaped plate 343 that are not in contact with the construction surface to gradually approach the construction surface until both rollers 344 contact the construction surface.

[0042] When the rollers 344 at both ends of the third inclined rod 33 are in contact with the construction surface, rotate the magnet plate 349 to make the inner rotating column 348 drive the U-shaped frame 341 to rotate 90 degrees, and the circumferential surface of the roller 344 is no longer tangent to the arc-shaped construction surface. Continue to move the roller 344 toward the construction surface, and the spring telescopic rod 346 is continuously under pressure. At this time, the positioning component 34 fixes the inclination angle and height of the third inclined rod 33, and the corresponding rebound tester 4 is perpendicular to the construction surface, and the end of the rebound tester 4 is in contact with the construction surface.

[0043] Afterwards, the No. 4 electric push rod 531 extends, pushing the rebound test hammer 4 to move toward the construction surface to measure the strength of the shotcrete layer. At this time, the strip plate 532 drives the circular frame 522 to move, and the four arc-shaped clamping plates 521 clamp the rebound test hammer 4 to move. During the movement of the circular frame 522, the vertical section of the portal frame 524 guides the circular frame 522 to prevent the arc-shaped clamping plate 521 from separating from the rebound test hammer 4 during the movement. In order to reduce the friction resistance during the movement of the rebound test hammer 4, the arc-shaped limit groove 511 is set to a smooth surface. It should be noted that the rebound test hammer 4 is a prior art, so its specific measurement principle is no longer elaborated.

[0044] After the measurement of the current position is completed, the bottom plate 11 is moved along the length direction of the tunnel. Specifically, the self-locking universal wheel 13 is released, and the front handrail 12 is pushed backward to move the rebound tester 4 to the next position to continue the measurement.

[0045] In the embodiments of the present invention, unless otherwise clearly specified and limited, the first feature being "above" or "below" the second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, the first feature being "above", "above" and "above" the second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. The first feature being "below", "below" and "below" the second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0046] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "connect", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, an integral connection, or a sliding connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] The embodiments of this specific implementation method are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, all equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A device for testing the strength of shotcrete pouring in the triangular area of ​​the arch waist of a multi-arch tunnel, comprising a rebound tester (4), characterized in that: It also comprises a pushing mechanism (5) for pushing the rebound tester (4), a mounting bracket (3) for mounting the pushing mechanism (5), an adjusting mechanism (2) for adjusting the inclination angle and height of the mounting bracket (3), and a moving mechanism (1) for supporting the adjusting mechanism (2); a No. 1 electric push rod (22) is fixedly mounted on the top of the moving mechanism (1), a lifting plate (21) is fixed on the top of the No. 1 electric push rod (22), an angle adjustment component is arranged on the upper surface of the lifting plate (21), and a mounting bracket (3) is arranged on the angle adjustment component; The mounting bracket (3) is provided with two mounting brackets (3) arranged front and rear, and the two mounting brackets (3) are opposite to each other front and rear, the mounting bracket (3) comprises a first oblique rod (31) and two second oblique rods (32) fixed on the front and rear sides of the first oblique rod (31), the two second oblique rods (32) have the same angle with the first oblique rod (31) and are in opposite directions, a third oblique rod (33) is installed at the ends of the first oblique rod (31) and the second oblique rod (32), the first oblique rod (31) and the third oblique rod (33) are perpendicular to each other, and two positioning components (34) are installed on the side of the third oblique rod (33) facing the tunnel; The positioning assembly (34) comprises a U-shaped frame (341), a hinge shaft (342) is fixedly connected between the front and rear side walls of the U-shaped frame (341), the outer wall of the hinge shaft (342) is rotatably sleeved with two V-shaped plates (343) distributed front and back, and a roller (344) is rotatably installed between the two V-shaped plates (343), wherein the number of the rollers (344) is two and they are respectively located at the two ends of the V-shaped plates (343); The pushing mechanism (5) comprises an L-shaped plate (51) fixed between two first inclined rods (31); the inclination direction of the L-shaped plate (51) is consistent with that of the first inclined rods (31); an arc-shaped limiting groove (511) is provided on the upper surface of the L-shaped plate (51); the rebound hammer (4) is placed in the arc-shaped limiting groove (511); and a fixing component (52) for fixing the rebound hammer (4) and a pushing component (53) for pushing the rebound hammer (4) are also provided on the L-shaped plate (51).

2. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 1, characterized in that: The moving mechanism (1) comprises a base plate (11) and self-locking universal wheels (13) installed at four corners of the bottom of the base plate (11); the front side wall and the left side wall of the base plate (11) are both installed with handrails (12); a No. 1 electric push rod (22) is fixed on the upper surface of the base plate (11); guide rods (23) are vertically fixed at the four corners of the upper surface of the base plate (11); and the guide rods (23) slide through the upper surface of the lifting plate (21).

3. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 1, characterized in that: The angle adjustment component comprises two vertical plates (24) fixed vertically on the top of the lifting plate (21), two mounting brackets (3) are located between the two vertical plates (24), the top of the vertical plates (24) is rotatably connected to the end of the first inclined rod (31) through a rotating shaft, and the angle adjustment component also comprises a second electric push rod (25) fixed on the top of the lifting plate (21), the top of the second electric push rod (25) is fixedly connected to a supporting plate (26), a concave seat (27) is horizontally limited and slidably mounted on the upper surface of the supporting plate (26), and the front and rear vertical sections of the concave seat (27) are rotatably connected to the third inclined rod (33) in the two mounting brackets (3) through a rotating shaft.

4. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 1, characterized in that: The positioning assembly (34) also includes a steering locking member (345) connected to the third inclined rod (33), and the steering locking member (345) includes a spring telescopic rod (346) connected to the third inclined rod (33). The end of the spring telescopic rod (346) is fixedly connected to an outer ring (347), and the inner part of the outer ring (347) is rotatably connected to an inner rotating column (348), and the end of the outer ring (347) away from the spring telescopic rod (346) is open. An arc-shaped through groove (3471) is opened on the circumferential surface of the outer ring (347), and the outer wall of the inner rotating column (348) is fixedly connected to a magnet plate (349) that passes through the arc-shaped through groove (3471), and the U-shaped frame (341) is connected to the inner rotating column (348).

5. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 1, characterized in that: The fixing assembly (52) comprises two circular frames (522) distributed on the front and rear sides of the rebound hammer (4); two arc-shaped clamping plates (521) are arranged on the sides of the two circular frames (522) close to each other, and the arc-shaped clamping plates (521) on the two circular frames (522) are symmetrically arranged.

6. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 5, characterized in that: A wedge plate (523) is fixedly installed inside the circular frame (522). The upper surface of the wedge plate (523) is a slope, and the height of the wedge plate (523) gradually decreases from the side close to the arc-shaped clamping plate (521) to the side away from the arc-shaped clamping plate (521). There is a gap between the side of the wedge plate (523) away from the arc-shaped clamping plate (521) and the inner wall of the circular frame (522). The fixing component (52) includes a gantry (524) spanning the top of the rebound tester (4). The two vertical sections of the gantry (524) pass through the gap between the wedge plate (523) and the inner wall of the circular frame (522), and the length of the gantry (524) is shorter than the length of the circular frame (522). The vertical sections of the gantry (524) are both integrally formed with an extension plate on the side away from each other, and a No. 3 electric push rod (525) is connected between the extension plate and the upper surface of the L-shaped plate (51).

7. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 6, characterized in that: The pushing assembly (53) comprises a fourth electric push rod (531) horizontally fixed on the L-shaped plate (51); the telescopic end of the fourth electric push rod (531) is fixedly connected to a strip plate (532); the strip plate (532) is in sliding contact with the upper surface of the L-shaped plate (51); a T-shaped groove (533) is provided on the side of the strip plate (532) facing the rebound tester (4); and two T-shaped sliders (534) are slidably installed in the T-shaped groove (533); the two T-shaped sliders (534) are respectively fixedly connected to the corresponding circular frame (522), and the two T-shaped sliders (534) are connected via a connecting spring (535).

8. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 3, characterized in that: A plurality of T-shaped guide rails (28) extending in the left-right direction are installed on the top of the supporting plate (26); a T-shaped avoidance groove is provided at the horizontal portion of the concave seat (27) corresponding to the position of the T-shaped guide rail (28); and the T-shaped guide rail (28) is slidably matched with the T-shaped avoidance groove.

9. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 4, characterized in that: The rotation range of the magnet plate (349) is 90 degrees. When the magnet plate (349) rotates to any end of the arc-shaped through slot (3471), it is magnetically fixed to the end wall of the arc-shaped through slot (3471).

10. The device for detecting the strength of shotcrete pouring in the triangle area of ​​the arch waist of a multi-arch tunnel according to claim 4, characterized in that: The third oblique rod (33) is provided with a receiving groove at a position corresponding to the positioning assembly (34), and the end of the spring telescopic rod (346) is fixedly connected to the bottom of the receiving groove.