Culvert project quantity calculation system
The data acquisition, model building, and calculation modules of the culvert engineering quantity calculation system solve the problems of time-consuming, labor-intensive, and inaccurate calculations in traditional methods, and enable the provision of efficient and accurate culvert engineering quantity calculations and design schemes.
Patent Information
- Application Number
- CN202410963203.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-05
AI Technical Summary
Traditional methods for calculating quantities in culvert engineering rely on engineers' experience, which is time-consuming and laborious, and it is difficult to guarantee the accuracy and precision of the calculation results, making it difficult to provide suitable culvert engineering solutions.
A culvert engineering quantity calculation system is adopted, which includes modules for data acquisition, model building, quantity calculation, output, verification, and adaptation. It generates parameters through a 3D model and performs quantity calculation, outputs a total price report, and improves the accuracy and adaptability of the results through verification and adaptation modules.
It improves the efficiency of quantity calculation for culvert engineering, reduces human error, ensures the accuracy of calculation results, and provides scientific and reasonable design references.
Smart Images

Figure CN118898531A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of culvert engineering quantity calculation, and in particular to a culvert engineering quantity calculation system. Background Art
[0002] In the current civil engineering field, culvert engineering is an indispensable part of infrastructure construction such as transportation and water conservancy, and the complexity and importance of its design and construction are becoming increasingly prominent. Culvert engineering not only needs to meet basic functions such as drainage and passage, but also needs to consider factors such as material quantity list, construction quantity statistics, material unit price and additional fees. Traditional culvert engineering quantity calculation methods often rely on engineers' experience and manual calculations. This method is not only time-consuming and labor-intensive, but also difficult to ensure the accuracy and precision of engineering quantity calculation results, and it is difficult to provide a suitable pre-culvert engineering plan, and it is difficult to provide a successful case of culvert engineering for reference. Therefore, a culvert engineering quantity calculation system is proposed to solve the above problems. Summary of the invention
[0003] In view of this, an object of the present invention is to provide a culvert engineering quantity calculation system to at least solve the above problems.
[0004] The technical solution adopted by the present invention is as follows:
[0005] A culvert engineering quantity calculation system, the system comprises a data acquisition module, a model building module, a quantity calculation module, a quantity output module, a calculation module and an adaptation module, the system is used to execute a culvert engineering quantity calculation method, the method comprises the following steps:
[0006] S1. Collect basic data of culvert engineering through data acquisition module;
[0007] S2. A three-dimensional model of the culvert project is constructed through the model construction module. The data acquisition module inputs the collected basic data of the culvert project into the three-dimensional model of the culvert project, and the three-dimensional model of the culvert project generates various parameters required for quantity calculation;
[0008] S3. The quantity calculation module calculates the various parameters of the generated quantity according to its own preset algorithm and obtains the total price report of the quantity;
[0009] S4, the calculation output module outputs the calculation total price report;
[0010] S5. The calculation module calculates the outputted total price report and obtains the calculation result;
[0011] S6. The adaptation module adapts the calculation results stored in itself with the calculation results obtained by the calculation module. If the adaptation is successful, the culvert engineering plan corresponding to the calculation results stored in the adaptation module is obtained.
[0012] Furthermore, the basic data of culvert projects include project name, material quantity list, construction quantity statistics, material unit price and additional fees.
[0013] Furthermore, in step S3, the following sub-steps are also included:
[0014] S31. If the quantity calculation module has obtained the total price report of the quantity calculation, but the parameters required for the quantity calculation generated by the three-dimensional model of the culvert project include the additional fee, the quantity calculation module opens an additional fee queue block;
[0015] S32, the additional fee queue is stored in the order of time when the amount calculation module receives the additional fees, and the later additional fees are included in the earlier additional fees;
[0016] S33, the quantity calculation module adds the subsequent additional fee based on the total quantity price report obtained.
[0017] Further, in step S4, the calculation output module outputs the calculation total price report as follows:
[0018] The calculation output module first marks the output calculation total price report with the additional fee;
[0019] The quantity calculation output module performs a second mark on the outputted quantity calculation total price report.
[0020] Furthermore, in step S5, the calculation module calculates the outputted total price report, and obtains the calculation result as follows:
[0021] The accounting module analyzes the first marked total price report, and the analysis process is as follows: the accounting module obtains the accounting increase fee electronic signature and the accounting basic electronic signature through a set image acquisition technology to obtain a first accounting result;
[0022] The accounting module analyzes the second marked total price report, and the analysis process is: the accounting module obtains the basic accounting electronic signature through the set image acquisition technology to obtain the second accounting result.
[0023] Further, in step S6, the adaptation module adapts the calculation result stored in itself with the calculation result obtained by the calculation module. If the adaptation is successful, the culvert engineering scheme corresponding to the calculation result stored in the adaptation module is obtained as follows:
[0024] Only when the first accounting result contains the electronic signature of the accounting increase fee and the basic accounting electronic signature, the adaptation module will adapt the project name, material quantity list, and material unit price stored in the accounting result with the project name, material quantity list, and material unit price in the accounting result obtained by the accounting module. If any two of the corresponding adaptations are successful, the culvert engineering plan corresponding to the accounting result stored in the adaptation module is obtained;
[0025] Only when the second accounting result contains the basic accounting electronic signature, the adaptation module will match the project name, material quantity list, and material unit price in the accounting result stored in itself with the project name, material quantity list, and material unit price in the accounting result obtained by the accounting module. If any two of the corresponding adaptations are successful, the culvert engineering plan corresponding to the accounting result stored in the adaptation module will be obtained.
[0026] Further, if the accounting module fails to obtain the accounting increase fee electronic signature and the accounting basic electronic signature, the accounting module sends the first marked total quantity price report to the quantity calculation module for recalculation;
[0027] If the accounting module fails to obtain the basic accounting electronic signature, the accounting module sends the second marked total price report to the quantity calculation module for recalculation.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] The present invention provides a culvert engineering quantity calculation system, which can improve the calculation efficiency of culvert engineering quantity calculation and effectively reduce human errors.
[0030] The present invention proposes a culvert engineering quantity calculation system, which can accurately calculate the results and help reduce the cost waste caused by human design errors.
[0031] The present invention proposes a culvert engineering quantity calculation system, which can provide abundant references based on stored culvert schemes, and then adapt the schemes to improve the scientificity and rationality of culvert design. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only preferred embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0033] Figure 1 It is a schematic diagram of the overall structure of a culvert engineering quantity calculation system proposed in an embodiment of the present invention.
[0034] Figure 2 It is a schematic diagram of the overall process of a culvert engineering quantity calculation method implemented in a culvert engineering quantity calculation system proposed in an embodiment of the present invention. DETAILED DESCRIPTION
[0035] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The enumerated embodiments are only used to explain the present invention and are not used to limit the scope of the present invention.
[0036] Reference Figure 1 and Figure 2 The present invention provides a culvert engineering quantity calculation system, the system includes a data acquisition module, a model building module, a quantity calculation module, a quantity output module, a calculation module and an adaptation module, the system is used to execute a culvert engineering quantity calculation method, the method includes the following steps:
[0037] S1. Collect basic data of culvert engineering through data acquisition module;
[0038] S2. A three-dimensional model of the culvert project is constructed through the model construction module. The data acquisition module inputs the collected basic data of the culvert project into the three-dimensional model of the culvert project, and the three-dimensional model of the culvert project generates various parameters required for quantity calculation;
[0039] S3. The quantity calculation module calculates the various parameters of the generated quantity according to its own preset algorithm and obtains the total price report of the quantity;
[0040] S4, the calculation output module outputs the calculation total price report;
[0041] S5. The calculation module calculates the outputted total price report and obtains the calculation result;
[0042] S6. The adaptation module adapts the calculation results stored in itself with the calculation results obtained by the calculation module. If the adaptation is successful, the culvert engineering plan corresponding to the calculation results stored in the adaptation module is obtained.
[0043] Exemplarily, in order to obtain the accuracy and precision of the engineering quantity calculation results, and to obtain a suitable previous culvert engineering plan, so as to provide a successful case of the culvert engineering for reference, the basic data of the culvert engineering can be collected through the data acquisition module, and the collected basic data can be input into the three-dimensional model of the culvert engineering constructed by the model construction module, which generates various parameters required for the quantity calculation. The quantity calculation module performs quantity calculation based on various parameter data and obtains a total price report for the quantity calculation. The total price report for the quantity calculation can be output by the quantity calculation output module. In order to ensure accuracy, the output total price for the quantity calculation can be calculated by the accounting module to obtain the accounting result. The accounting result can be adapted by the adaptation module to obtain the corresponding culvert engineering plan, which can be used as a plan guide to improve the implementation efficiency of the culvert engineering.
[0044] The basic data of culvert projects include project name, material usage list, construction quantity statistics, material unit price and additional fees.
[0045] For example, by dividing the culvert engineering quantity into project name, material quantity list, construction quantity statistics, material unit price and additional fee, the total price of the culvert engineering quantity can be calculated conveniently. For example, for a concrete project, the concrete material quantity is 30 cubic meters, the concrete construction quantity is one day, and the concrete unit price is 350 yuan / cubic meter. The total price of the culvert engineering concrete project for one day is: 30*350=10,500 yuan. The additional fee is the actual additional cost incurred. For example, if the additional fee is 1,000 yuan, the total price of the culvert engineering quantity including the additional fee is 10,500+1,000=11,500 yuan.
[0046] In step S3, the sub-steps are also included:
[0047] S31. If the quantity calculation module has obtained the total price report of the quantity calculation, but the parameters required for the quantity calculation generated by the three-dimensional model of the culvert project include the additional fee, the quantity calculation module opens an additional fee queue block;
[0048] S32, the additional fee queue is stored in the order of time when the amount calculation module receives the additional fees, and the later additional fees are included in the earlier additional fees;
[0049] S33, the quantity calculation module adds the subsequent additional fee based on the total quantity price report obtained.
[0050] For example, in order to accurately calculate the total price of the quantity calculation project, the additional fees may be increased multiple times. The additional fees can be stored in the order of the time when the quantity calculation module receives the additional fees, and the later additional fees are included in the previous additional fees. The total quantity calculation price report is obtained by adding the later additional fees to the total quantity calculation price report. For example, the additional fee at 15:20 is 500 yuan, and the additional fee at 15:50 is 700 yuan, then the total additional fee is 1200 yuan.
[0051] In step S4, the calculation output module outputs the calculation total price report as follows:
[0052] The calculation output module first marks the output calculation total price report with the additional fee;
[0053] The quantity calculation output module performs a second mark on the outputted quantity calculation total price report.
[0054] Exemplarily, in order to distinguish different quantity calculation total price reports, the quantity calculation total price report with additional fees can be marked with a first mark through the quantity calculation output module, and the output quantity calculation total price report without additional fees can be marked with a second mark, thereby facilitating the rapid calculation of the accounting module and avoiding the problem of repeated calculation.
[0055] In step S5, the calculation module calculates the outputted total price report, and obtains the calculation result as follows:
[0056] The accounting module analyzes the first marked total price report, and the analysis process is as follows: the accounting module obtains the accounting increase fee electronic signature and the accounting basic electronic signature through a set image acquisition technology to obtain a first accounting result;
[0057] The accounting module analyzes the second marked total price report, and the analysis process is: the accounting module obtains the basic accounting electronic signature through the set image acquisition technology to obtain the second accounting result.
[0058] Exemplarily, in order to ensure the accuracy of the calculated first marked total price report, when the first marked total price report is calculated correctly, the first marked total price report will be signed with the accounting increase electronic signature and the accounting basic electronic signature, and the first accounting result will be obtained; when the second marked total price report is calculated correctly, the second marked total price report will be signed with the accounting basic electronic signature, and the passing of the accounting increase electronic signature and the accounting basic electronic signature indicates that the first accounting result is correct, and the passing of the accounting basic electronic signature indicates that the second accounting result is correct.
[0059] In step S6, the adaptation module adapts the calculation result stored in itself with the calculation result obtained by the calculation module. If the adaptation is successful, the culvert engineering scheme corresponding to the calculation result stored in the adaptation module is obtained as follows:
[0060] Only when the first accounting result contains the electronic signature of the accounting increase fee and the basic accounting electronic signature, the adaptation module will adapt the project name, material quantity list, and material unit price stored in the accounting result with the project name, material quantity list, and material unit price in the accounting result obtained by the accounting module. If any two of the corresponding adaptations are successful, the culvert engineering plan corresponding to the accounting result stored in the adaptation module is obtained;
[0061] Only when the second accounting result contains the basic accounting electronic signature, the adaptation module will match the project name, material quantity list, and material unit price in the accounting result stored in itself with the project name, material quantity list, and material unit price in the accounting result obtained by the accounting module. If any two of the corresponding adaptations are successful, the culvert engineering plan corresponding to the accounting result stored in the adaptation module will be obtained.
[0062] For example, in order to improve the construction quality and efficiency of culvert projects, the culvert project plan corresponding to the calculation results stored in the adaptation module can be referred to, so that when implementing a new culvert project, the basic data in the first calculation result and the second calculation result can be used as a reference.
[0063] If the accounting module fails to obtain the accounting increase fee electronic signature and the accounting basic electronic signature, the accounting module sends the first marked total price report to the quantity calculation module for recalculation;
[0064] If the accounting module fails to obtain the basic accounting electronic signature, the accounting module sends the second marked total price report to the quantity calculation module for recalculation.
[0065] For example, if the electronic signature for accounting surcharge and the basic accounting electronic signature cannot be obtained, or the basic accounting electronic signature cannot be obtained, it means that the accounting is inaccurate. The accounting module will send the total price report of the first mark to the quantity calculation module for recalculation, or send the total price report of the second mark to the quantity calculation module for recalculation, so as to find out the cause of the error and ensure the accuracy of the culvert project quantity calculation.
[0066] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A culvert engineering quantity calculation system, characterized in that: The system includes a data acquisition module, a model building module, a quantity calculation module, a quantity output module, a calculation module and an adaptation module. The system is used to perform a culvert engineering quantity calculation method, and the method includes the following steps: S1. Collect basic data of culvert engineering through data acquisition module; S2. A three-dimensional model of the culvert project is constructed through the model construction module. The data acquisition module inputs the collected basic data of the culvert project into the three-dimensional model of the culvert project, and the three-dimensional model of the culvert project generates various parameters required for quantity calculation; S3. The quantity calculation module calculates the various parameters of the generated quantity according to its own preset algorithm and obtains the total price report of the quantity; S4, the calculation output module outputs the calculation total price report; S5. The calculation module calculates the outputted total price report and obtains the calculation result; S6. The adaptation module adapts the calculation results stored in itself with the calculation results obtained by the calculation module. If the adaptation is successful, the culvert engineering plan corresponding to the calculation results stored in the adaptation module is obtained.
2. A culvert engineering quantity calculation system according to claim 1, characterized in that: The basic data of culvert projects include project name, material usage list, construction quantity statistics, material unit price and additional fees.
3. A culvert engineering quantity calculation system according to claim 2, characterized in that: In step S3, the sub-steps are also included: S31. If the quantity calculation module has obtained the total price report of the quantity calculation, but the parameters required for the quantity calculation generated by the three-dimensional model of the culvert project include the additional fee, the quantity calculation module opens an additional fee queue block; S32, the additional fee queue is stored in the order of time when the amount calculation module receives the additional fees, and the later additional fees are included in the earlier additional fees; S33, the quantity calculation module adds the subsequent additional fee based on the total quantity price report obtained.
4. A culvert engineering quantity calculation system according to claim 3, characterized in that: In step S4, the calculation output module outputs the calculation total price report as follows: The calculation output module first marks the output calculation total price report with the additional fee; The quantity calculation output module performs a second mark on the outputted quantity calculation total price report.
5. A culvert engineering quantity calculation system according to claim 4, characterized in that: In step S5, the calculation module calculates the outputted total price report, and obtains the calculation result as follows: The accounting module analyzes the first marked total price report, and the analysis process is as follows: the accounting module obtains the accounting increase fee electronic signature and the accounting basic electronic signature through a set image acquisition technology to obtain a first accounting result; The accounting module analyzes the second marked total price report, and the analysis process is: the accounting module obtains the basic accounting electronic signature through the set image acquisition technology to obtain the second accounting result.
6. A culvert engineering quantity calculation system according to claim 5, characterized in that: In step S6, the adaptation module adapts the calculation result stored in itself with the calculation result obtained by the calculation module. If the adaptation is successful, the culvert engineering scheme corresponding to the calculation result stored in the adaptation module is obtained as follows: Only when the first accounting result contains the electronic signature of the accounting increase fee and the basic accounting electronic signature, the adaptation module will adapt the project name, material quantity list, and material unit price stored in the accounting result with the project name, material quantity list, and material unit price in the accounting result obtained by the accounting module. If any two of the corresponding adaptations are successful, the culvert engineering plan corresponding to the accounting result stored in the adaptation module is obtained; Only when the second accounting result contains the basic accounting electronic signature, the adaptation module will match the project name, material quantity list, and material unit price in the accounting result stored in itself with the project name, material quantity list, and material unit price in the accounting result obtained by the accounting module. If any two of the corresponding adaptations are successful, the culvert engineering plan corresponding to the accounting result stored in the adaptation module will be obtained.
7. A culvert engineering quantity calculation system according to claim 5, characterized in that: If the accounting module fails to obtain the accounting increase fee electronic signature and the accounting basic electronic signature, the accounting module sends the first marked total price report to the quantity calculation module for recalculation; If the accounting module fails to obtain the basic accounting electronic signature, the accounting module sends the second marked total price report to the quantity calculation module for recalculation.