By supplying purge gas into the process chamber of the substrate processing apparatus to form a downward airflow, the problem of foreign matter entering during gate opening and closing is solved, thereby improving the cleanliness of the substrate.
Patent Information
- Application Number
- CN202410357030.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2023-05-02
- Filing Date
- 2024-03-27
- Publication Date
- 2024-11-05
AI Technical Summary
When the gate is opened and closed between the process chamber and the transfer chamber of the substrate processing apparatus, foreign objects such as particles can easily flow into the inner side of the process chamber through the opening, causing substrate contamination or damage.
Purge gas is supplied through nozzles in the process chamber, forming a downward airflow. The purge gas supply starts or stops when the gate opens or closes. Combined with the raising and lowering operation of the heater, a strong downward airflow is formed to expel foreign objects.
It effectively reduces the adhesion of foreign matter such as particles to the substrate, improves the cleanliness of the substrate, and reduces the risk of substrate contamination and damage.
Smart Images

Figure CN118899241A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a substrate processing device and a substrate processing method, and more specifically to a substrate processing device and a substrate processing method that can reduce foreign matter such as particles attached to a substrate when the substrate is introduced into a process chamber of the substrate processing device or taken out of the process chamber. Background Art
[0002] Generally, a substrate processing apparatus may include a process chamber for performing various processing processes on a substrate and a transfer chamber connected to the process chamber to supply unprocessed substrates and further extract processed substrates. The process chamber and the transfer chamber may be connected via a gate valve having a gate.
[0003] However, in the above-described structure, when the gate moves for opening and closing, foreign matter such as particles attached to the periphery of the gate or the periphery of the opening of the process chamber may flow into the inside of the process chamber through the opening.
[0004] The particles and the like that flow into the process chamber in this way may adhere to the upper surface of the substrate, thereby contaminating the substrate or causing damage to the substrate. Summary of the invention
[0005] In order to solve the above-mentioned problems, the present invention aims to provide a substrate processing device which can reduce foreign matters such as particles attached to a substrate when the substrate is introduced into or taken out of a process chamber of the substrate processing device.
[0006] The object of the present invention as described above is achieved through a substrate processing method, which is characterized in that the substrate processing method includes: a step of opening a gate connecting a transfer chamber and a process chamber; a step of supplying a purge gas through a nozzle in the process chamber; a step of introducing a substrate into the process chamber and placing the substrate on a heater inside the process chamber; a step of closing the gate and interrupting the supply of the purge gas; a step of supplying a process gas through the nozzle; and a step of raising the heater and performing a process on the substrate.
[0007] Here, the substrate processing method may then perform a process on the substrate including: a step of lowering the heater and interrupting the supply of the process gas; a step of opening the gate; a step of supplying a purge gas through a nozzle in the process chamber; a step of leading out a substrate on which the process has been completed and introducing a substrate on which no process has been performed and placing it on the heater; and a step of closing the gate and interrupting the supply of the purge gas.
[0008] In addition, it may be that the purge gas starts to be supplied through the nozzle when the gate is opened, and the purge gas supply through the nozzle is interrupted when the gate is closed.
[0009] Furthermore, it may be that, at a first time before the gate is opened, the purge gas starts to be supplied through the nozzle.
[0010] In addition, the supply of the purge gas through the nozzle may be interrupted after the gate is closed and the second time has passed.
[0011] On the other hand, the purge gas may be started to be supplied through the showerhead at a third time when the heater is lowered or before the heater is lowered.
[0012] In this case, the pressure inside the process chamber may be maintained at a level lower than the pressure of the transfer chamber even when the purge gas is supplied.
[0013] On the other hand, the purpose of the present invention as described above may be achieved by a substrate processing device, characterized in that the substrate processing device comprises: at least one process chamber, which is connected to a transfer chamber for conveying a substrate and provides a processing space for the substrate; a nozzle, which is arranged at an upper part of the processing space and supplies a process gas or a purge gas toward the substrate; a heater, which is arranged at a lower part of the processing space so as to be able to rise and fall and to place the substrate; an exhaust part, which is connected to a lower part of the process chamber and exhausts the gas inside the chamber to generate a downward airflow inside the process chamber; and a gate, which is arranged between the transfer chamber and the process chamber, and supplies a purge gas through the nozzle in response to the opening and closing operation of the gate.
[0014] Here, it is possible that the purge gas starts to be supplied through the shower head when the gate is opened, and the purge gas supply through the shower head is interrupted when the gate is closed.
[0015] Alternatively, the purge gas may be supplied through the nozzle at the first time before the gate is opened.
[0016] Furthermore, the supply of the purge gas through the nozzle may be interrupted after the gate is closed and the second time has passed.
[0017] On the other hand, the purge gas may be started to be supplied through the showerhead at a third time when the heater is lowered or before the heater is lowered.
[0018] In addition, the purge gas may be supplied and interrupted through the nozzle corresponding to the process plan for the substrate, or the substrate processing device may include a sensor for sensing the opening and closing of the gate, and the purge gas may be supplied and interrupted through the nozzle according to the gate opening and closing signal of the sensor.
[0019] According to the present invention having the aforementioned structure, when a gate between a transfer chamber and a process chamber is opened and closed in order to introduce a substrate into a process chamber of a substrate processing device or to lead a substrate out of the process chamber, a strong downward airflow can be formed by supplying a purge gas through a nozzle inside the process chamber.
[0020] In this case, even if foreign matter such as particles flows into the process chamber, the particles and the like cannot be attached to the substrate due to the aforementioned downward airflow and are exhausted to the outside of the process chamber through the exhaust portion. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 is a plan view showing a substrate processing apparatus according to an embodiment of the present invention,
[0022] Figure 2 is a side cross-sectional view showing a process chamber connected to a transfer chamber,
[0023] Figure 3 is a graph showing the opening and closing of the gate, the supply of process gas and purge gas through the showerhead, and the lifting and lowering of the heater in a process for a substrate in a process chamber according to an embodiment,
[0024] Figures 4 to 6 is a graph showing a process sequence according to another embodiment,
[0025] Figure 7 This is a side cross-sectional view schematically showing the flow of gas inside the process chamber when the purge gas is supplied through the shower head in response to the opening and closing operation of the gate.
[0026] (Explanation of Reference Numerals)
[0027] 100: Transition chamber
[0028] 110: Second gate valve
[0029] 200: Process chamber
[0030] 210: Chamber body
[0031] 212: Processing Space
[0032] 220: Nozzle
[0033] 230: Heater
[0034] 240: Opening
[0035] 244: Sealing parts
[0036] 252: Gate
[0037] 250: First gate valve
[0038] 400: Transfer chamber
[0039] 1000: Substrate processing equipment Specific implementation methods
[0041] A substrate processing apparatus according to an embodiment of the present invention will be described in detail below with reference to the accompanying drawings.
[0042] Figure 1 FIG. 1 is a plan view showing a substrate processing apparatus 1000 according to an embodiment of the present invention.
[0043] Reference Figure 1 The substrate processing apparatus 1000 may include: at least one process chamber 200A-200F, providing a substrate S (refer to Figure 2 ) processing space 212 (refer to Figure 2 ) to carry out a processing process for the substrate S; a transfer chamber 400 is connected to the process chambers 200A to 200F to transfer the substrate S. The transfer chamber 400 may be connected to the transition chamber 100 at the other side.
[0044] The transfer chamber 400 and the process chambers 200A to 200F may be connected by a first gate valve 250 . Similarly, the transfer chamber 400 and the transition chamber 100 may be connected by a second gate valve 110 .
[0045] A transfer arm unit 420 for transferring the substrate S may be disposed inside the transfer chamber 400 . Therefore, the substrate S that has not been processed through the transition chamber 100 may be transferred to the transfer chamber 400 and transferred to the process chambers 200A to 200F through the transfer arm unit 420 .
[0046] In addition, the substrate S processed in the process chambers 200A to 200F may be taken out through the transfer arm unit 420 of the transfer chamber 400 and carried out through the transition chamber 100 .
[0047] On the other hand, when the substrate S is introduced from the transfer chamber 400 into the process chambers 200A to 200F or when the substrate S is led out from the process chambers 200A to 200F to the transfer chamber 400, the gate 252 (refer to Figure 2 ) is turned on.
[0048] Figure 2 FIG. 4 is a side cross-sectional view showing a process chamber 200A connected to the transfer chamber 400 .
[0049] Reference Figure 2 The process chamber 200A may include a chamber body 210 on the inner side thereof, which provides a processing space 212 for the substrate S. The chamber body 210 is shown as a component in the figure, but is not limited thereto and is provided in the form of an opening on the upper side of the chamber body, and may also include a detachable chamber cover (not shown) on the upper side of the opening of the chamber body.
[0050] A shower head 220 for supplying a process gas or a purge gas toward the substrate S may be provided inside the chamber body 210 .
[0051] The shower head 220 may be disposed at an upper portion of the processing space 212 and supply a process gas or a purge gas toward the substrate S at a lower portion of the processing space 212 .
[0052] On the other hand, the processing space 212 may be provided with a heater 230 for placing the substrate S. The heater 230 heats and supports the substrate S. The heater 230 is configured to be able to be raised and lowered, so that it is lowered when the substrate S is carried in and out, and is raised to a process position when the substrate S is processed.
[0053] In addition, an exhaust unit 260 for exhausting the internal gas of the chamber body 210 may be provided below the chamber body 210. The exhaust unit 260 may be connected to an exhaust pump (not shown) and the like to exhaust the internal gas of the chamber body 210 to generate a downward airflow inside the chamber body 210.
[0054] On the other hand, one side of the chamber body 210 may be connected to the transfer chamber 400 through the first gate valve 250 as described above.
[0055] In this case, an opening 240 for carrying the substrate S in and out may be formed at one side of the chamber body 210 , that is, a side wall connected to the first gate valve 250 .
[0056] A gate 252 for opening and closing the opening 240 may be provided inside the first gate valve 250. The gate 252 may be disposed between the transfer chamber 400 and the process chamber 200A. The gate 252 may be moved up and down to open and close the opening 240, for example. In this case, a sealing member 244 may be disposed at the edge of the opening 240.
[0057] The lifting operation of the heater 230 , the supply of gas through the showerhead 220 , and the operation of the gate 252 may be controlled by a control unit (not shown).
[0058] On the other hand, in the aforementioned structure, when the gate 252 moves to open and close the opening 240 , foreign matter P such as particles attached to the periphery of the opening 240 or the sealing member 244 may flow into the inner side of the chamber body 210 through the opening 240 .
[0059] The opening 240 has a smaller cross-sectional area than the chamber body 210 or the first gate valve 250 . Therefore, when the opening 240 is opened or closed, foreign matter P may flow into the inner side of the process chamber 200A through a venturi effect.
[0060] In particular, when the pressure inside the process chamber 200A is lower than that of the transfer chamber 400 , the Venturi effect is increased, so that the foreign matter P can easily flow into the inside of the process chamber 200A.
[0061] The foreign matter P that has flowed into the process chamber 200A may adhere to the substrate S and may cause contamination such as damage to the substrate S.
[0062] In addition, the opening and closing of the gate 252 corresponds to the loading and unloading of the substrate S, so the heater 230 is in a lowered state. In this case, the upper surface of the heater 230 can be lower than the opening 240. Therefore, foreign matter P flowing in through the opening 240 can easily adhere to the substrate S above the heater 230.
[0063] In order to solve the aforementioned problem in the present invention, the purge gas may be supplied through the nozzle 220 in response to the opening and closing operation of the gate 252 .
[0064] That is, the control unit may supply a purge gas such as N2 or Ar through the nozzle 220 when the gate 252 is opened or closed. In this case, the exhaust unit 260 may continue to be driven. Therefore, the purge gas supplied through the nozzle 220 may be moved to the lower part of the processing space 212 by the downward airflow of the exhaust unit 260 and discharged through the exhaust unit 260. In this case, foreign matter P such as particles flowing into the inner side of the processing space 212 may also be moved to the lower part together with the downward airflow of the purge gas and discharged through the exhaust unit 260. A detailed observation is made below.
[0065] Figure 3 2 is a graph showing the opening and closing of the gate 252, the supply of the process gas and the purge gas through the showerhead 220, and the lifting and lowering of the heater 230 in the process of the substrate S in the process chamber 200A. Figure 3 The middle horizontal axis shows the time for the process, and the vertical axis shows, starting from the top, the opening and closing of the gate 252, the supply of process gas through the nozzle 220, the lifting and lowering of the heater 230, and the supply of purge gas through the nozzle 220.
[0066] Reference Figure 3 , it may be that the control unit starts to supply the purge gas through the nozzle 220 when the gate 252 is opened (T1), and interrupts the supply of the purge gas through the nozzle 220 when the gate is closed (T2).
[0067] The control unit may first open the gate 252 and then supply the purge gas through the showerhead 220 in the process chamber 200A.
[0068] In this case, at the time point T1 when the gate 252 is opened for the process on the substrate S, the purge gas may be simultaneously supplied through the shower head 220 .
[0069] When the gate 252 is opened, the heater 230 remains in a lowered state, so that the substrate S introduced through the opening 240 is placed on the heater 230 .
[0070] Next, the gate 252 is closed ( T2 ), and the supply of the purge gas through the showerhead 220 may also be interrupted when the gate 252 is closed.
[0071] After the gate 252 is closed, a process gas is supplied toward the substrate S through the shower head 220 ( T3 ).
[0072] After the process gas is supplied, when the environment inside the chamber body 210 meets the process conditions for the substrate S, the heater 230 is raised to the process height (T4). Then, the process for the substrate S is performed.
[0073] If the process for the substrate S is completed, the supply of the process gas through the shower head 220 is interrupted, and the heater 230 is lowered (T5). In addition, at this time point T5, the gate 252 is opened and the purge gas can be supplied again through the shower head 220 at the same time.
[0074] When the gate 252 is open, the substrate S that has completed the process is led out through the opening 240, and the substrate that has not been processed can be introduced into the process chamber 200A through the opening 240 and placed in the heater 230. Then, the gate 252 is closed (T6) and the supply of the purge gas through the shower head 220 can also be interrupted when the gate 252 is closed. When the substrate that has not been processed is placed in the heater 230, the aforementioned steps, i.e., the step of supplying the process gas through the shower head 220 and the steps thereafter, can be repeated.
[0075] On the other hand, the exhaust unit 260 may be continuously driven in the aforementioned process.
[0076] Therefore, in the present embodiment, the purge gas is supplied through the showerhead 220 in response to the opening and closing of the gate 252, and a strong downward airflow is generated inside the chamber body 210 through the exhaust unit 260. In particular, in the present invention, the pressure inside the process chamber 200A is kept below the pressure of the transfer chamber 400 even when the purge gas is supplied as described above. Therefore, it is possible to suppress the foreign matter P flowing in through the opening 240 from being attached to the substrate S and to exhaust it through the exhaust unit 260.
[0077] on the other hand, Figure 4 is a graph showing a process sequence according to another embodiment.
[0078] Reference Figure 4 In the case of this embodiment, the control unit can supply the purge gas through the nozzle 220 during the first time T1 ′ to T1 and T5 ′ to T5 before opening the gate 252 .
[0079] That is, in order to perform a process on the substrate S, the purge gas may be supplied through the shower head 220 at a time point T1 ′ before the time point T1 at which the gate 252 is opened.
[0080] In addition, if the process for the substrate S is completed, the supply of the process gas through the shower head 220 is interrupted and the heater 230 descends (T5). In addition, the gate 252 is opened at this time point T5. In this case, the purge gas can be supplied through the shower head 220 at a time point T5' before the time point T5 when the gate 252 is opened or before the time point T5 when the heater 230 descends.
[0081] Here, in Figure 4The time point T5' before the time point T5 of the heater 230 being lowered and the time point T5' before the time point T5 of the gate 252 being opened are shown as the same time point, but may also be implemented at another time point. That is, the control unit may supply the purge gas through the nozzle 220 at a third time before the heater 230 is lowered. Here, the third time is determined to be the same time as the aforementioned first time or may also be determined to be another time.
[0082] On the other hand, Figure 4 In the embodiment, the purge gas supply through the showerhead 220 can be interrupted at the time points T2 and T6 when the gate 252 is closed.
[0083] As a result, the purge gas is pre-supplied through the nozzle 220 before the gate 252 is opened to generate a downward airflow, so that even if foreign matter P flows in with the opening of the gate 252, the foreign matter P can be effectively discharged through the exhaust part 260.
[0084] on the other hand, Figure 5 is a graph showing a process sequence according to yet another embodiment.
[0085] Reference Figure 5 In the case of this embodiment, the control unit may interrupt the supply of the purge gas through the nozzle 220 after closing the gate 252 and the second time T2 to T2' and T6 to T6'.
[0086] That is, for the process for the substrate S, the gate 252 is opened and the substrate S is introduced and the gate 252 is closed (T2). In this case, the purge gas supply through the showerhead 220 continues to supply the purge gas during a predetermined time and is interrupted instead of being interrupted immediately (T2').
[0087] In addition, if the process for the substrate S is completed, the supply of the process gas through the shower head 220 is interrupted and the heater 230 is lowered (T5). In addition, at this time point T5, the gate 252 is opened.
[0088] When the gate 252 is opened, the substrate S is led out through the opening 240 and an unprocessed substrate is introduced. Then, the gate 252 is closed (T6). In this case, the purge gas supply through the shower head 220 continues to supply the purge gas during a predetermined time period and is interrupted instead of being interrupted immediately (T6').
[0089] On the other hand, Figure 5 In the embodiment, the purge gas supply through the showerhead 220 can be started at the time points T1 and T5 when the gate 252 is opened.
[0090] As a result, the purge gas is supplied during a preset time period to maintain the downward airflow instead of closing the gate 252 and immediately interrupting the supply of the purge gas through the nozzle 220, so that foreign matter P that may remain inside the chamber body 210 can be discharged through the exhaust part 260.
[0091] on the other hand, Figure 6 is a graph showing a process sequence according to yet another embodiment.
[0092] Reference Figure 6 In the case of this embodiment, the control unit can supply the purge gas through the nozzle 220 during the first time T1'~T1, T5'~T5 before opening the gate 252, and further, after closing the gate 252 and the second time T2~T2', T6~T6', the supply of the purge gas through the nozzle 220 can be interrupted.
[0093] That is, the situation of this embodiment is equivalent to combining the aforementioned Figure 3 as well as Figure 4 The situation of the embodiment.
[0094] For example, in order to perform a process on the substrate S, the purge gas may be supplied through the shower head 220 at a time point T1 ′ before the time point T1 at which the gate 252 is opened.
[0095] In addition, when the substrate S is introduced and the gate 252 is closed (T2), the purge gas supply through the shower head 220 continues to supply the purge gas during a predetermined time and is interrupted instead of being interrupted immediately (T2').
[0096] In addition, if the process for the substrate S is completed, the supply of the process gas through the shower head 220 is interrupted and the heater 230 descends (T5). In addition, the gate 252 is opened at this time point T5. In this case, the purge gas can be supplied through the shower head 220 at a time point T5' before the time point T5 when the gate 252 is opened or before the time point T5 when the heater 230 descends.
[0097] On the other hand, when the gate 252 is opened, the substrate S is led out through the opening 240 and an unprocessed substrate is introduced. Then, the gate 252 is closed (T6). In this case, the purge gas supply through the shower head 220 continues to supply the purge gas during a predetermined time period and is interrupted (T6') instead of being interrupted immediately (T6').
[0098] on the other hand, Figure 7It is a schematic diagram showing the above Figures 3 to 6 2 is a side cross-sectional view of the flow of gas inside the process chamber 200A when the purge gas is supplied through the showerhead 220 in response to the opening and closing operation of the gate 252. Figure 7 For the sake of convenience, the gate 252 is opened and the substrate S is placed on the heater 230 of the process chamber 200A.
[0099] Reference Figure 7 The purge gas supplied through the showerhead 220 forms a strong downward flow toward the lower portion of the processing space 212 as shown by the dotted line. This is because the gas in the processing space 212 is exhausted through the exhaust unit 260 connected to the lower portion of the process chamber 200A.
[0100] Therefore, even if foreign matter P such as particles attached to the gate 252 and the sealing part 244 flows into the interior of the process chamber 200A through the opening 240, the foreign matter P cannot approach the substrate S and is unable to descend downward through the downward airflow of the purge gas and is discharged through the exhaust part 260.
[0101] The inventor conducted tests using a 300 mm diameter substrate and found that approximately 2.08 particles were attached to each substrate when using a substrate processing device according to the prior art, whereas approximately 0.75 particles were attached to each substrate when using the substrate processing device according to the present invention, thereby confirming a particle reduction effect of more than 64%.
[0102] On the other hand, in the substrate processing apparatus 1000 , the control unit may execute the supply and interruption of the purge gas through the shower head 220 according to a process plan, or may actively execute the supply and interruption according to a sensed value of a sensor.
[0103] For example, the control unit may supply or interrupt the purge gas through the shower head 220 corresponding to the process plan (or recipe) for the substrate S. In this case, when the process for the substrate S is determined, the supply and interruption of the purge gas may be performed at a set time according to the recipe of the determined process.
[0104] On the other hand, the substrate processing apparatus 1000 may be provided with a sensor (not shown) for sensing the opening and closing of the gate 252. When the gate 252 is opened or closed, the sensor may transmit a gate opening and closing signal to the control unit. In this case, the control unit may determine the supply and interruption of the purge gas through the showerhead 220 according to the gate opening and closing signal of the sensor.
[0105] The above description is made with reference to the preferred embodiments of the present invention, but those skilled in the art may make various modifications and changes to the present invention without departing from the concept and scope of the present invention as described in the attached claims. Therefore, if the modified implementation substantially includes the constituent elements of the claims of the present invention, it shall be deemed that all of them belong to the technical scope of the present invention.
Claims
1. A substrate processing method, characterized in that: include: The step of opening a gate connecting the transfer chamber and the process chamber; The step of supplying a purge gas through a showerhead in the process chamber; The step of introducing a substrate into the process chamber and placing the substrate on a heater inside the process chamber; The gate is closed and the supply of the purge gas is interrupted; The step of supplying a process gas through the showerhead; and The heater rises and performs a step of a process for the substrate.
2. The substrate processing method according to claim 1, characterized in that: The substrate processing method then performs a process on the substrate, comprising: The heater descends and interrupts the supply of the process gas; The gate opening step; The step of supplying a purge gas through a showerhead in the process chamber; The step of taking out the substrate that has finished the process and taking in the substrate that has not been processed and placing it on the heater; and The gate is closed and the supply of the purge gas is interrupted.
3. The substrate processing method according to claim 1 or 2, characterized in that: When the gate is opened, the purge gas is started to be supplied through the shower head, and when the gate is closed, the purge gas supply through the shower head is interrupted.
4. The substrate processing method according to claim 1 or 2, characterized in that: At a first time before the gate is opened, the purge gas is started to be supplied through the nozzle.
5. The substrate processing method according to claim 1 or 2, characterized in that: After the gate is closed and a second time has passed, the supply of purge gas through the showerhead is interrupted.
6. The substrate processing method according to claim 1 or 2, characterized in that: At a third time when the heater is lowered or before the heater is lowered, supply of the purge gas through the showerhead is started.
7. The substrate processing method according to claim 1 or 2, characterized in that: The pressure inside the process chamber is maintained at a pressure lower than the pressure of the transfer chamber even when the purge gas is supplied.
8. A substrate processing device, characterized in that: have: at least one process chamber connected to the transfer chamber for transferring the substrate and providing a processing space for the substrate; a showerhead, disposed at an upper portion of the processing space and supplying a process gas or a purge gas toward the substrate; A heater is disposed at the lower part of the processing space so as to be able to be raised and lowered and to be placed on the substrate; an exhaust portion connected to the lower portion of the process chamber and exhausting the gas inside the chamber so as to generate a downward airflow inside the process chamber; as well as a gate, arranged between the transfer chamber and the process chamber, The purge gas is supplied through the showerhead in response to the opening and closing operation of the gate.
9. The substrate processing device according to claim 8, characterized in that: When the gate is opened, the purge gas is started to be supplied through the shower head, and when the gate is closed, the purge gas supply through the shower head is interrupted.
10. The substrate processing apparatus according to claim 8, wherein: At a first time before the gate is opened, the purge gas is started to be supplied through the nozzle.
11. The substrate processing apparatus according to claim 8, wherein: After the gate is closed and a second time has passed, the supply of purge gas through the showerhead is interrupted.
12. The substrate processing apparatus according to claim 8, wherein: At a third time when the heater is lowered or before the heater is lowered, supply of the purge gas through the showerhead is started.
13. The substrate processing apparatus according to claim 8, wherein: supplying and interrupting the purge gas through the showerhead in accordance with a process plan for the substrate, Alternatively, the substrate processing apparatus includes a sensor for sensing the opening and closing of the gate, and the purge gas is supplied and interrupted through the shower head according to a gate opening and closing signal of the sensor.