Scheduling method and device of photovoltaic energy storage system

By dividing typical operating scenarios and selecting optimization targets in photovoltaic energy storage systems, and utilizing the DBSCAN algorithm and data augmentation technology, the problem of low scheduling efficiency in photovoltaic energy storage systems was solved, and efficient scheduling optimization was achieved.

CN118899879APending Publication Date: 2024-11-05国网河北省电力有限公司营销服务中心 +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410944466.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

Existing photovoltaic energy storage systems suffer from reduced scheduling efficiency due to excessive optimization items during the scheduling process.

Method used

Based on the structural parameters and historical operating data of photovoltaic energy storage systems, typical operating scenarios are divided, and the scheduling optimization objective function with the greatest optimization value is determined. The DBSCAN algorithm is used for clustering and data augmentation to select the most suitable scheduling optimization objective and construct the objective function for optimized scheduling.

Benefits of technology

This approach ensures the optimization effect of the photovoltaic energy storage system and improves scheduling efficiency with lower computational load and scheduling time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899879A_ABST
    Figure CN118899879A_ABST
Patent Text Reader

Abstract

The invention provides a photovoltaic energy storage system scheduling method and device, and belongs to the technical field of photovoltaic scheduling. The method comprises the steps of determining a typical operation scene corresponding to a target photovoltaic energy storage system based on structure parameters and historical operation data of the target photovoltaic energy storage system; wherein each typical operation scene corresponds to one scheduling optimization objective function, each scheduling optimization objective function has at least one optimization objective, and the scheduling optimization objective functions are different; based on the typical operation scene corresponding to the target photovoltaic energy storage system, determining a scheduling optimization objective function corresponding to the target photovoltaic energy storage system; and performing optimization scheduling on the target photovoltaic energy storage system based on the scheduling optimization objective function corresponding to the target photovoltaic energy storage system. According to the method, the target photovoltaic energy storage system can be scheduled with relatively low scheduling calculation amount and scheduling time, and the optimization effect is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic scheduling, and in particular to a scheduling method and device for a photovoltaic energy storage system. Background Art

[0002] In the field of renewable energy, especially in the management and operation of photovoltaic energy storage systems, energy dispatch strategies play a vital role. Effective energy dispatch can not only optimize energy utilization, but also enhance the stability and reliability of the system. At present, many photovoltaic energy storage systems rely on energy allocation strategies based on historical data and prediction models to optimize the economy, safety, flexibility and other characteristics.

[0003] However, adding too many optimization items to the optimization objective will increase the computational complexity of the optimization process and reduce scheduling efficiency. Summary of the invention

[0004] The embodiments of the present invention provide a scheduling method and device for a photovoltaic energy storage system to solve the problem that too many optimization items in scheduling a photovoltaic energy storage system lead to reduced scheduling efficiency.

[0005] In a first aspect, an embodiment of the present invention provides a scheduling method for a photovoltaic energy storage system, comprising:

[0006] Based on the structural parameters and historical operation data of the target photovoltaic energy storage system, determine the typical operation scenario corresponding to the target photovoltaic energy storage system; wherein each typical operation scenario corresponds to a scheduling optimization objective function, each scheduling optimization objective function has at least one optimization objective, and each scheduling optimization objective function is different;

[0007] Based on the typical operation scenario corresponding to the target photovoltaic energy storage system, determine the dispatch optimization objective function corresponding to the target photovoltaic energy storage system;

[0008] The target photovoltaic energy storage system is optimally scheduled based on the scheduling optimization objective function corresponding to the target photovoltaic energy storage system.

[0009] In a possible implementation, before determining a typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system, the method further includes:

[0010] Clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems to obtain multiple typical operation scenarios; each typical operation scenario corresponds to a set of historical operation data;

[0011] For each typical operation scenario, based on the historical operation data corresponding to the typical operation scenario, determine the quantitative value of the time impact and the quantitative value of the effect impact of each scheduling optimization target under the typical operation scenario;

[0012] For each typical operation scenario, based on the quantified value of the time impact and the quantified value of the effect impact of each scheduling optimization target under the typical operation scenario, each scheduling optimization target is screened, and the objective function corresponding to the typical operation scenario is constructed based on the screened scheduling optimization targets.

[0013] In one possible implementation, the structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to obtain multiple typical operation scenarios, including:

[0014] Based on the DBSCAN algorithm, the structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to obtain multiple clusters, and the cluster center of each cluster is taken as a typical operation scenario.

[0015] In a possible implementation, after clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems based on the DBSCAN algorithm to obtain multiple clusters, and taking the cluster center of each cluster as a typical operation scenario, it also includes:

[0016] For each typical operation scenario, data enhancement is performed on the historical operation data of each photovoltaic energy storage system in the cluster where the typical operation scenario is located to obtain the historical operation data corresponding to the typical operation scenario.

[0017] In a possible implementation, based on the historical scheduling optimization data corresponding to the typical operation scenario, determining the time impact quantification value of each scheduling optimization target in the typical operation scenario includes:

[0018] For each scheduling optimization target under the typical operation scenario, the calculation time changes of multiple groups of objective functions corresponding to the scheduling optimization target are calculated to obtain multiple calculation time changes, and the average value of each calculation time change is used as the quantitative value of the time impact of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the calculation time change is the difference between the scheduling time corresponding to the first objective function and the scheduling time corresponding to the second objective function.

[0019] In a possible implementation, based on the historical scheduling optimization data corresponding to the typical operation scenario, determining the quantitative value of the effect of each scheduling optimization target in the typical operation scenario includes:

[0020] For each scheduling optimization target under the typical operation scenario, the scheduling effect change of multiple groups of objective functions corresponding to the scheduling optimization target is calculated to obtain multiple scheduling effect change amounts, and the average value of each scheduling effect change amount is used as the quantitative value of the effect impact of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the scheduling effect change amount is the difference between the scheduling optimization target value corresponding to the first objective function and the scheduling optimization target value corresponding to the second objective function.

[0021] In a possible implementation, each scheduling optimization target is screened based on the time impact quantified value and effect impact quantified value of each scheduling optimization target in the typical operation scenario, including:

[0022] For each scheduling optimization target under the typical operation scenario, the score of the scheduling optimization target is calculated based on the time impact quantification value, time weight, effect impact quantification value and effect weight of the scheduling optimization target, and each scheduling optimization target is screened based on the score of each scheduling optimization target under the typical operation scenario.

[0023] In a possible implementation, based on the structural parameters and historical operation data of the target photovoltaic energy storage system, a typical operation scenario corresponding to the target photovoltaic energy storage system is determined, including:

[0024] Based on the structural parameters and historical operation data of the target photovoltaic energy storage system, the similarity between multiple typical operation scenarios and the target photovoltaic energy storage system is calculated;

[0025] The typical operation scenario with the highest similarity to the target photovoltaic energy storage system is used as the typical operation scenario corresponding to the target photovoltaic energy storage system.

[0026] In a second aspect, an embodiment of the present invention provides a scheduling device for a photovoltaic energy storage system, comprising:

[0027] A matching module is used to determine a typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system; wherein each typical operation scenario corresponds to a scheduling optimization objective function, each scheduling optimization objective function has at least one optimization objective, and each scheduling optimization objective function is different;

[0028] A determination module, used to determine a scheduling optimization objective function corresponding to the target photovoltaic energy storage system based on a typical operation scenario corresponding to the target photovoltaic energy storage system;

[0029] The scheduling module is used to optimize the scheduling of the target photovoltaic energy storage system based on the scheduling optimization objective function corresponding to the target photovoltaic energy storage system.

[0030] The embodiment of the present invention provides a scheduling method and device for a photovoltaic energy storage system, which divides typical operation scenarios of the photovoltaic energy storage system by structural parameters and historical operation data, determines the optimization item with the most optimization value in each typical operation scenario, and then uses the structural parameters and historical operation data of the target photovoltaic energy storage system to determine the corresponding typical operation scenario, selects the most suitable objective function for the target photovoltaic energy storage system, and can schedule the target photovoltaic energy storage system with a lower scheduling calculation amount and scheduling time, and ensure the optimization effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 is a flow chart of an implementation of a scheduling method for a photovoltaic energy storage system provided by an embodiment of the present invention;

[0033] Figure 2 It is a structural schematic diagram of a scheduling device for a photovoltaic energy storage system provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0034] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.

[0035] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.

[0036] Figure 1 The implementation flow chart of the scheduling method of the photovoltaic energy storage system provided by the embodiment of the present invention is detailed as follows:

[0037] Step 101, based on the structural parameters and historical operation data of the target photovoltaic energy storage system, determine the typical operation scenario corresponding to the target photovoltaic energy storage system; wherein each typical operation scenario corresponds to a scheduling optimization objective function, each scheduling optimization objective function has at least one optimization objective, and each scheduling optimization objective function is different.

[0038] In this embodiment, the structural parameters of the photovoltaic energy storage system may include parameters describing the system topology of the photovoltaic energy storage system, such as photovoltaic equipment model, photovoltaic equipment capacity, photovoltaic equipment location, energy storage equipment model, energy storage equipment capacity, energy storage equipment location, and the connection relationship between each photovoltaic equipment and energy storage identification. The historical operation data of the photovoltaic energy storage system may include data describing the operation status of the photovoltaic energy storage system, such as photovoltaic power generation, grid-connected power, abandoned power, load, charging power and discharging power of energy storage equipment at multiple historical moments. Each typical operation scenario can describe the operation mode of a type of photovoltaic energy storage system. Based on the structural parameters and historical operation data, the typical operation scenario closest to the operation mode of the target photovoltaic energy storage system can be determined.

[0039] Step 102: Determine a scheduling optimization objective function corresponding to the target photovoltaic energy storage system based on a typical operation scenario corresponding to the target photovoltaic energy storage system.

[0040] In this embodiment, the optimization target for scheduling the target photovoltaic energy storage system can be determined based on the typical operation scenario corresponding to the target photovoltaic energy storage system. By combining the optimization target with the structural parameters of the target photovoltaic energy storage system, a scheduling optimization objective function corresponding to the target photovoltaic energy storage system can be constructed.

[0041] Step 103 , optimizing the scheduling of the target photovoltaic energy storage system based on the scheduling optimization objective function corresponding to the target photovoltaic energy storage system.

[0042] In this embodiment, a scheduling optimization objective function corresponding to each typical operation scenario includes an optimization objective with the greatest optimization value for the typical operation scenario, that is, a combination of optimization objectives with high scheduling effect and short scheduling time.

[0043] The dispatch optimization objective function corresponding to the target photovoltaic energy storage system determined based on the above steps can achieve better dispatch optimization effect with lower dispatch time.

[0044] The embodiment of the present invention divides the typical operation scenarios of the photovoltaic energy storage system by structural parameters and historical operation data, determines the optimization item with the greatest optimization value in each typical operation scenario, and then uses the structural parameters and historical operation data of the target photovoltaic energy storage system to determine the corresponding typical operation scenarios, and selects the objective function that best suits the target photovoltaic energy storage system. The target photovoltaic energy storage system can be scheduled with a lower scheduling calculation amount and scheduling time, and the optimization effect can be guaranteed.

[0045] In a possible implementation, before determining a typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system, the method further includes:

[0046] Clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems to obtain multiple typical operation scenarios; each typical operation scenario corresponds to a set of historical operation data;

[0047] For each typical operation scenario, based on the historical operation data corresponding to the typical operation scenario, determine the quantitative value of the time impact and the quantitative value of the effect impact of each scheduling optimization target under the typical operation scenario;

[0048] For each typical operation scenario, based on the quantified value of the time impact and the quantified value of the effect impact of each scheduling optimization target under the typical operation scenario, each scheduling optimization target is screened, and the objective function corresponding to the typical operation scenario is constructed based on the screened scheduling optimization targets.

[0049] In this embodiment, the structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to determine a variety of typical operation scenarios, and then the optimization value of each scheduling optimization target in different typical operation scenarios is evaluated by the time impact quantification value and the effect impact quantification value, so as to select the most suitable scheduling optimization target for optimization for each typical operation scenario, and avoid setting too many scheduling optimization targets, which will result in excessive scheduling time and little improvement in scheduling effect.

[0050] In one possible implementation, the structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to obtain multiple typical operation scenarios, including:

[0051] Based on the DBSCAN algorithm, the structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to obtain multiple clusters, and the cluster center of each cluster is taken as a typical operation scenario.

[0052] In this embodiment, density-based spatial clustering of noise applications (DBSCAN) is an unsupervised ML clustering algorithm. Before clustering, the structural parameters of each photovoltaic energy storage system can be normalized, and the historical operation data of each photovoltaic energy storage system can be normalized to avoid the clustering results being affected by extreme data values.

[0053] In a possible implementation, after clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems based on the DBSCAN algorithm to obtain multiple clusters, and taking the cluster center of each cluster as a typical operation scenario, it also includes:

[0054] For each typical operation scenario, data enhancement is performed on the historical operation data of each photovoltaic energy storage system in the cluster where the typical operation scenario is located to obtain the historical operation data corresponding to the typical operation scenario.

[0055] In this embodiment, the Monte Carlo method can be used to sample the system state according to the structural parameters of each photovoltaic energy storage system in the cluster where the typical operation scenario is located, so as to increase the amount of historical operation data and improve the effect of subsequent calculation time impact quantification value and effect impact quantification value.

[0056] In a possible implementation, based on the historical scheduling optimization data corresponding to the typical operation scenario, determining the time impact quantification value of each scheduling optimization target in the typical operation scenario includes:

[0057] For each scheduling optimization target under the typical operation scenario, the calculation time changes of multiple groups of objective functions corresponding to the scheduling optimization target are calculated to obtain multiple calculation time changes, and the average value of each calculation time change is used as the quantitative value of the time impact of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the calculation time change is the difference between the scheduling time corresponding to the first objective function and the scheduling time corresponding to the second objective function.

[0058] In this embodiment, the difference between the first objective function and the second objective function in a set of objective functions corresponding to each scheduling optimization objective is only whether the scheduling optimization objective is included. For example, when it is necessary to determine the quantitative value of the time impact of the scheduling optimization objective of reliability, the first objective function in a set of objective functions can be set to consider flexibility and reliability, and the second objective function can be set to consider flexibility only, or the first objective function in another set of objective functions can be set to consider reliability, and the second objective function can be set to not consider reliability.

[0059] By taking the average value of multiple calculation time changes as the quantitative value of the time impact of the scheduling optimization target in the typical operation scenario, the impact of the scheduling optimization target on the scheduling calculation time in the typical operation scenario can be quantified. The smaller the quantitative value of the time impact, the lower the calculation cost of the scheduling optimization target, and the greater the optimization value.

[0060] In a possible implementation, based on the historical scheduling optimization data corresponding to the typical operation scenario, determining the quantitative value of the effect of each scheduling optimization target in the typical operation scenario includes:

[0061] For each scheduling optimization target under the typical operation scenario, the scheduling effect change of multiple groups of objective functions corresponding to the scheduling optimization target is calculated to obtain multiple scheduling effect change amounts, and the average value of each scheduling effect change amount is used as the quantitative value of the effect impact of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the scheduling effect change amount is the difference between the scheduling optimization target value corresponding to the first objective function and the scheduling optimization target value corresponding to the second objective function.

[0062] In this embodiment, the scheduling optimization target value corresponding to a certain scheduling optimization target refers to the index value of the scheduling optimization target in the photovoltaic energy storage system after the photovoltaic energy storage system is scheduled. For example, when the scheduling optimization target is reliability, the scheduling optimization target value corresponding to the scheduling optimization target is the reliability index value after the photovoltaic energy storage system is scheduled and optimized.

[0063] By taking the average value of multiple scheduling effect changes as the scheduling optimization target value of the scheduling optimization target in the typical operation scenario, the scheduling optimization effect produced by the scheduling optimization target in the typical operation scenario can be quantified. The larger the scheduling optimization target value, the better the scheduling optimization effect of the scheduling optimization target, and the more optimization value it has.

[0064] In a possible implementation, each scheduling optimization target is screened based on the time impact quantified value and effect impact quantified value of each scheduling optimization target in the typical operation scenario, including:

[0065] For each scheduling optimization target under the typical operation scenario, the score of the scheduling optimization target is calculated based on the time impact quantification value, time weight, effect impact quantification value and effect weight of the scheduling optimization target, and each scheduling optimization target is screened based on the score of each scheduling optimization target under the typical operation scenario.

[0066] In this embodiment, the time weight and effect weight can be set according to actual needs. By adding and multiplying the time impact quantization value and effect impact quantization value of the scheduling optimization target by weight, the optimization value of the scheduling optimization target can be comprehensively evaluated, so as to compare and screen multiple scheduling optimization targets.

[0067] The rule for screening each scheduling optimization target may be to select a preset number of scheduling optimization targets with the highest scores for constructing the objective function, or to retain scheduling optimization targets with scores greater than a threshold for constructing the objective function. Specific screening rules may also be set according to actual needs.

[0068] In a possible implementation, based on the structural parameters and historical operation data of the target photovoltaic energy storage system, a typical operation scenario corresponding to the target photovoltaic energy storage system is determined, including:

[0069] Based on the structural parameters and historical operation data of the target photovoltaic energy storage system, the similarity between multiple typical operation scenarios and the target photovoltaic energy storage system is calculated;

[0070] The typical operation scenario with the highest similarity to the target photovoltaic energy storage system is used as the typical operation scenario corresponding to the target photovoltaic energy storage system.

[0071] In this embodiment, the DBSCAN algorithm can be used to calculate the distance between each typical operation scenario and the target photovoltaic energy storage system as the similarity. The greater the similarity between a typical operation scenario and the target photovoltaic energy storage system, the more similar the operation mode of the target photovoltaic energy storage system is to the typical operation scenario.

[0072] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.

[0073] The following is an embodiment of the device of the present invention. For details not described in detail therein, reference may be made to the corresponding method embodiment described above.

[0074] Figure 2 The schematic diagram of the structure of the scheduling device of the photovoltaic energy storage system provided by the embodiment of the present invention is shown. For the convenience of explanation, only the part related to the embodiment of the present invention is shown, which is described in detail as follows:

[0075] like Figure 2 As shown, the scheduling device 2 of the photovoltaic energy storage system includes:

[0076] A matching module 21 is used to determine a typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system; wherein each typical operation scenario corresponds to a scheduling optimization objective function, each scheduling optimization objective function has at least one optimization objective, and each scheduling optimization objective function is different;

[0077] A determination module 22 is used to determine a scheduling optimization objective function corresponding to the target photovoltaic energy storage system based on a typical operation scenario corresponding to the target photovoltaic energy storage system;

[0078] The scheduling module 23 is used to optimize the scheduling of the target photovoltaic energy storage system based on the scheduling optimization objective function corresponding to the target photovoltaic energy storage system.

[0079] In a possible implementation, the determination module 23 is further configured to:

[0080] Before determining a typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system, clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems to obtain multiple typical operation scenarios; wherein each typical operation scenario corresponds to a set of historical operation data;

[0081] For each typical operation scenario, based on the historical operation data corresponding to the typical operation scenario, determine the quantitative value of the time impact and the quantitative value of the effect impact of each scheduling optimization target under the typical operation scenario;

[0082] For each typical operation scenario, based on the quantified value of the time impact and the quantified value of the effect impact of each scheduling optimization target under the typical operation scenario, each scheduling optimization target is screened, and the objective function corresponding to the typical operation scenario is constructed based on the screened scheduling optimization targets.

[0083] In a possible implementation, the determination module 23 is specifically configured to:

[0084] Based on the DBSCAN algorithm, the structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to obtain multiple clusters, and the cluster center of each cluster is taken as a typical operation scenario.

[0085] In a possible implementation, the determination module 2 is further configured to:

[0086] After clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems based on the DBSCAN algorithm to obtain multiple clusters, and taking the cluster center of each cluster as a typical operation scenario, for each typical operation scenario, data enhancement is performed on the historical operation data of each photovoltaic energy storage system in the cluster where the typical operation scenario is located to obtain the historical operation data corresponding to the typical operation scenario.

[0087] In a possible implementation, the determination module 23 is specifically configured to:

[0088] For each scheduling optimization target under the typical operation scenario, the calculation time changes of multiple groups of objective functions corresponding to the scheduling optimization target are calculated to obtain multiple calculation time changes, and the average value of each calculation time change is used as the quantitative value of the time impact of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the calculation time change is the difference between the scheduling time corresponding to the first objective function and the scheduling time corresponding to the second objective function.

[0089] In a possible implementation, the determination module 23 is specifically configured to:

[0090] For each scheduling optimization target under the typical operation scenario, the scheduling effect change of multiple groups of objective functions corresponding to the scheduling optimization target is calculated to obtain multiple scheduling effect change amounts, and the average value of each scheduling effect change amount is used as the quantitative value of the effect impact of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the scheduling effect change amount is the difference between the scheduling optimization target value corresponding to the first objective function and the scheduling optimization target value corresponding to the second objective function.

[0091] In a possible implementation, the determination module 23 is specifically configured to:

[0092] For each scheduling optimization target under the typical operation scenario, the score of the scheduling optimization target is calculated based on the time impact quantification value, time weight, effect impact quantification value and effect weight of the scheduling optimization target, and each scheduling optimization target is screened based on the score of each scheduling optimization target under the typical operation scenario.

[0093] In a possible implementation, the matching module 21:

[0094] Based on the structural parameters and historical operation data of the target photovoltaic energy storage system, the similarity between multiple typical operation scenarios and the target photovoltaic energy storage system is calculated;

[0095] The typical operation scenario with the highest similarity to the target photovoltaic energy storage system is used as the typical operation scenario corresponding to the target photovoltaic energy storage system.

[0096] The embodiment of the present invention divides the typical operation scenarios of the photovoltaic energy storage system by structural parameters and historical operation data, determines the optimization item with the greatest optimization value in each typical operation scenario, and then uses the structural parameters and historical operation data of the target photovoltaic energy storage system to determine the corresponding typical operation scenarios, and selects the objective function that best suits the target photovoltaic energy storage system. The target photovoltaic energy storage system can be scheduled with a lower scheduling calculation amount and scheduling time, and the optimization effect can be guaranteed.

[0097] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0098] Those of ordinary skill in the art will appreciate that the templates, units, and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0099] If the module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, it can implement the steps of the above-mentioned scheduling method embodiments of each photovoltaic energy storage system. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device that can carry the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory, random access memory, electrical carrier signal, telecommunication signal and software distribution medium.

[0100] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.

Claims

1. A scheduling method for a photovoltaic energy storage system, characterized in that: include: Based on the structural parameters and historical operation data of the target photovoltaic energy storage system, determine the typical operation scenario corresponding to the target photovoltaic energy storage system; wherein each typical operation scenario corresponds to a scheduling optimization objective function, each scheduling optimization objective function has at least one optimization objective, and each scheduling optimization objective function is different; Based on a typical operation scenario corresponding to the target photovoltaic energy storage system, determining a scheduling optimization objective function corresponding to the target photovoltaic energy storage system; The target photovoltaic energy storage system is optimally scheduled based on the scheduling optimization objective function corresponding to the target photovoltaic energy storage system.

2. The scheduling method of the photovoltaic energy storage system according to claim 1, characterized in that: Before determining the typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system, the method further includes: Clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems to obtain multiple typical operation scenarios; each typical operation scenario corresponds to a set of historical operation data; For each typical operation scenario, based on the historical operation data corresponding to the typical operation scenario, determine the quantitative value of the time impact and the quantitative value of the effect impact of each scheduling optimization target under the typical operation scenario; For each typical operation scenario, based on the quantified value of the time impact and the quantified value of the effect impact of each scheduling optimization target under the typical operation scenario, each scheduling optimization target is screened, and the objective function corresponding to the typical operation scenario is constructed based on the screened scheduling optimization targets.

3. The scheduling method of the photovoltaic energy storage system according to claim 2, characterized in that: The structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to obtain multiple typical operation scenarios, including: Based on the DBSCAN algorithm, the structural parameters and historical operation data of multiple photovoltaic energy storage systems are clustered to obtain multiple clusters, and the cluster center of each cluster is taken as a typical operation scenario.

4. The scheduling method of the photovoltaic energy storage system according to claim 3, characterized in that: After clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems based on the DBSCAN algorithm to obtain multiple clusters, and taking the cluster center of each cluster as a typical operation scenario, the method further includes: For each typical operation scenario, data enhancement is performed on the historical operation data of each photovoltaic energy storage system in the cluster where the typical operation scenario is located to obtain the historical operation data corresponding to the typical operation scenario.

5. The scheduling method of the photovoltaic energy storage system according to claim 2, characterized in that: Based on the historical scheduling optimization data corresponding to the typical operation scenario, determine the quantitative value of the time impact of each scheduling optimization target under the typical operation scenario, including: For each scheduling optimization target under the typical operation scenario, the calculation time changes of multiple groups of objective functions corresponding to the scheduling optimization target are calculated to obtain multiple calculation time changes, and the average value of each calculation time change is used as the time impact quantification value of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the calculation time change is the difference between the scheduling time corresponding to the first objective function and the scheduling time corresponding to the second objective function.

6. The scheduling method of the photovoltaic energy storage system according to claim 2, characterized in that: Based on the historical scheduling optimization data corresponding to the typical operation scenario, determine the quantitative value of the effect of each scheduling optimization target under the typical operation scenario, including: For each scheduling optimization target under the typical operation scenario, the scheduling effect change of multiple groups of objective functions corresponding to the scheduling optimization target is calculated to obtain multiple scheduling effect change amounts, and the average value of each scheduling effect change amount is used as the quantitative value of the effect impact of the scheduling optimization target under the typical operation scenario; wherein, each group of objective functions includes a first objective function that includes the scheduling optimization target in the optimization item, and a second objective function that does not include the scheduling optimization target in the optimization item, and the scheduling effect change amount is the difference between the scheduling optimization target value corresponding to the first objective function and the scheduling optimization target value corresponding to the second objective function.

7. The scheduling method of the photovoltaic energy storage system according to claim 2, characterized in that: The screening of each scheduling optimization target based on the time impact quantization value and effect impact quantization value of each scheduling optimization target in the typical operation scenario includes: For each scheduling optimization target under the typical operation scenario, the score of the scheduling optimization target is calculated based on the time impact quantification value, time weight, effect impact quantification value and effect weight of the scheduling optimization target, and each scheduling optimization target is screened based on the score of each scheduling optimization target under the typical operation scenario.

8. The scheduling method for a photovoltaic energy storage system according to any one of claims 1 to 7, characterized in that: The determining of a typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system includes: Based on the structural parameters and historical operation data of the target photovoltaic energy storage system, calculating the similarity between a plurality of typical operation scenarios and the target photovoltaic energy storage system; The typical operation scenario with the highest similarity to the target photovoltaic energy storage system is used as the typical operation scenario corresponding to the target photovoltaic energy storage system.

9. A scheduling device for a photovoltaic energy storage system, characterized in that: include: A matching module, used to determine a typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system; wherein each typical operation scenario corresponds to a scheduling optimization objective function, each scheduling optimization objective function has at least one optimization objective, and each scheduling optimization objective function is different; A determination module, used to determine a scheduling optimization objective function corresponding to the target photovoltaic energy storage system based on a typical operation scenario corresponding to the target photovoltaic energy storage system; The scheduling module is used to optimize the scheduling of the target photovoltaic energy storage system based on the scheduling optimization objective function corresponding to the target photovoltaic energy storage system.

10. The dispatching device of the photovoltaic energy storage system according to claim 9, characterized in that: The determining module is also used for: Before determining the typical operation scenario corresponding to the target photovoltaic energy storage system based on the structural parameters and historical operation data of the target photovoltaic energy storage system, clustering the structural parameters and historical operation data of multiple photovoltaic energy storage systems to obtain multiple typical operation scenarios; wherein each typical operation scenario corresponds to a set of historical operation data; For each typical operation scenario, based on the historical operation data corresponding to the typical operation scenario, determine the quantitative value of the time impact and the quantitative value of the effect impact of each scheduling optimization target under the typical operation scenario; For each typical operation scenario, based on the quantified value of the time impact and the quantified value of the effect impact of each scheduling optimization target under the typical operation scenario, each scheduling optimization target is screened, and the objective function corresponding to the typical operation scenario is constructed based on the screened scheduling optimization targets.

Citation Information

Cited By

  • Optical storage integrated intelligent scheduling system

    CN120582263A

  • A method, device, medium and equipment for scheduling a light storage and charging system

    CN122801452A