Installation device for blast furnace gas pipeline

By designing automated lifting and welding components, the problem of manual operation inconvenient during lifting and welding of blast furnace gas pipelines is solved, an efficient and safe welding process is achieved, and the welding quality and safety is improved.

CN118905546APending Publication Date: 2024-11-08HEBEI JIN XIGANG TIE JITUAN DAFANG ZHONGGONG SCI & TECHNOL

Patent Information

Application Number
CN202411390574.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The blast furnace gas pipeline is inconvenient to rely on manual operation during lifting and welding, which leads to difficult to control the welding quality and great safety risks.

Method used

An installation device including lifting components and welding components is designed, and the fixing ring, support frame and adjustment mechanism are used to realize automatic alignment and circumferential welding of the welding mechanism, instead of manual welding, reduce manual labor intensity and improve welding quality and safety.

Benefits of technology

Through the automated welding process, the welding quality and safety are improved, the complexity and safety risks of manual operation are reduced, and efficient lifting and welding of blast furnace gas pipelines are achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118905546A_ABST
    Figure CN118905546A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of blast furnace pipeline installation, and particularly provides a blast furnace gas pipeline installation device which comprises a hoisting assembly and a welding assembly, the hoisting assembly is used for hoisting a blast furnace gas pipeline to a pipeline support, the welding assembly comprises a fixing ring, a supporting frame, an adjusting mechanism and a welding mechanism, and the fixing ring is arranged on the periphery of the gas pipeline in a sleeving mode; the supporting frame can conduct circular motion around the pipeline welding seam along the first track, during the moving period of the supporting frame, the welding mechanism can conduct circular welding on the whole pipeline welding seam, and the hoisting assembly and the welding assembly act jointly so that the two gas pipelines can be welded into a whole. By arranging the fixing ring, the supporting frame and the adjusting frame, the welding mechanism can conduct welding operation on a pipeline welding seam, the manual welding operation mode is replaced, the labor intensity of workers is reduced, the gas pipeline is clamped through the fixing ring, welding dead corners do not exist, the welding quality is easier to control, and safety is higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of blast furnace pipeline installation, and in particular relates to an installation device for a blast furnace gas pipeline. Background Art

[0002] Blast furnace gas is the gas produced during the smelting process of the blast furnace in the steel plant. Its main components are carbon monoxide and other gases. After purification and treatment, blast furnace gas can be used for heating, power generation, reduction of iron ore, etc. Blast furnace gas is transported through gas pipelines. For large steel plants, the total length of the gas pipeline can reach several kilometers or even tens of kilometers. According to the needs of spatial layout, the installation methods of blast furnace gas pipelines are divided into two types: underground and overhead. Among them, the overhead installation method is to erect the gas pipeline in the air, which can avoid problems caused by the pipeline being affected by the ground. In addition, the overhead pipeline is directly exposed to the outside world, and regular inspection and repair can be carried out, and maintenance and maintenance are relatively convenient.

[0003] At present, the basic steps for the overhead installation of blast furnace gas pipelines in steel plants are as follows: First, weld and install steel structure brackets according to the gas transmission line. The steel structure brackets are used to support the gas pipelines. After the steel structure brackets are welded and fixed, one or more gas pipelines are welded together, and the welded pipelines are hoisted to the steel structure brackets by cranes in sequence, and finally welded together into gas transmission pipelines. During the installation of the gas pipeline, the movement of the pipeline depends on the crane lifting, with manual hand-held alignment, and welding is mainly done manually. The welding quality is not easy to control. When welding to the weld facing downward, it is inconvenient to weld with a manual hand-held welding gun due to the angle problem, which is prone to safety accidents. Summary of the invention

[0004] The invention provides a blast furnace gas pipeline installation device, aiming to solve the problem in the prior art that the gas pipeline relies on manual welding during hoisting and welding, which is inconvenient to operate.

[0005] To achieve the above object, the technical solution adopted by the present invention is: to provide an installation device for a blast furnace gas pipeline, comprising a hoisting assembly and a welding assembly, wherein the hoisting assembly is used to hoist the gas pipeline, and the welding assembly comprises: A fixed ring, comprising two fixed half rings arranged opposite to each other, wherein the two fixed half rings are matched to form a first clamping space for the gas pipeline to pass through, and a semi-circular first slide rail is provided on one side of the fixed half ring, wherein the first slide rails of the two fixed half rings are matched to form a circular first track; A support frame is slidably matched with the first track, the support frame is provided with a linear second track, the support frame is provided with a plurality of first moving wheels at one end of the second track, and the plurality of first moving wheels are arranged at intervals along the circumference of the gas pipeline; an adjusting mechanism, comprising an adjusting frame and a first driving member, wherein the adjusting frame is slidably matched with the second track, a plurality of second moving wheels are arranged on the adjusting frame, the plurality of second moving wheels are arranged at intervals along the circumference of the gas pipeline, a second clamping space for the gas pipeline to pass through is formed between the second moving wheels and the first moving wheels, and the first driving member is arranged on the supporting frame, and is used to drive the adjusting frame to move along the second track; and The welding mechanism is arranged on the supporting frame and has a welding end facing the pipeline weld.

[0006] In a possible implementation manner, a second driving member is further provided on the support frame, and the second driving member is used to drive at least one of the first moving wheels to rotate.

[0007] In a possible implementation, the installation device of the blast furnace gas pipeline also includes a plurality of clamping mechanisms, wherein the clamping mechanisms are arranged on the corresponding fixed half rings, and the clamping mechanisms are located on the side of the fixed half ring away from the first slide rail. The plurality of clamping mechanisms are arranged at intervals along the circumferential direction, and the clamping mechanisms have clamping ends that can be extended and retracted along the radial direction of the fixed half ring, and the clamping ends are used to abut against the outer wall of the gas pipeline.

[0008] In a possible implementation, one end of the two fixed half rings is hinged, and the other end is detachably connected via a fastener.

[0009] In a possible implementation, the welding mechanism is movably disposed on the support frame along the length direction of the second track.

[0010] In a possible implementation, the first driving member includes a driving screw disposed on the second track, and a screw motor drivingly connected to the driving screw, and the adjustment frame is threadedly matched with the driving screw.

[0011] In a possible implementation, the hoisting assembly includes: Hanging plate, used for connection with lifting equipment; Two clamping jaws are arranged opposite to each other at the bottom of the hanging plate, the upper parts of the clamping jaws are hinged to the hanging plate, and a third clamping space for the gas pipeline to pass through is formed between the two clamping jaws; and The third driving member is arranged on the hanging plate and is used for driving the two clamping jaws to rotate around their own rotation axes.

[0012] In a possible implementation, two hanging assemblies are provided, and the two hanging assemblies are spaced apart along the axial direction of the gas pipeline.

[0013] In a possible implementation, the inner wall of the third clamping space formed by the clamping jaws is provided with an adjusting roller and a fourth driving member, the rotation axis of the adjusting roller is perpendicular to the axis of the gas pipeline, and the fourth driving member is used to drive the adjusting roller to rotate around its own axis.

[0014] In a possible implementation, the hanging plate includes a rotating seat, the upper end of the clamping jaw is hinged to the rotating seat, and the hanging assembly also includes a fifth driving member, and the fifth driving member is used to drive the rotating seat to rotate around a vertical axis.

[0015] Compared with the prior art, the installation device for blast furnace gas pipeline provided by the present invention has the following beneficial effects: The installation device of the blast furnace gas pipeline provided by the present invention comprises a hoisting assembly and a welding assembly. The hoisting assembly is used to hoist the blast furnace gas pipeline to a suitable height and place it on the pipeline support. After the front and rear pipelines are axially aligned and abutted, a pipeline weld is formed between the two gas pipelines. The welding assembly is used to weld the pipeline weld so that the two gas pipelines are welded into a long pipeline.

[0016] The welding assembly includes a fixed ring, a support frame, an adjustment mechanism and a welding mechanism. The fixed ring includes two fixed half rings that can be opened and closed. When in use, the two fixed half rings are opened, and the fixed ring can be sleeved on the outer periphery of the gas pipeline. The adjustment frame can move back and forth along the second track. After the fixed ring is installed and fixed, the adjustment frame is moved so that the second moving wheel and the first moving wheel are respectively abutted against the outer wall of the gas pipeline. At this time, the welding end of the welding mechanism is aligned with the pipeline weld. Then the support frame is controlled to move in a circle around the pipeline weld along the first track. During the movement of the support frame, the welding mechanism can perform circumferential welding on the entire pipeline weld. The lifting assembly and the welding assembly work together to lift and weld the gas pipeline, so that the two gas pipelines are welded into one. After the welding is completed, the fixed ring and the support frame are removed from the gas pipeline, moved to the end of the next pipeline, and the above lifting and welding operations are repeated to complete the installation of the blast furnace gas pipeline.

[0017] The present invention provides a fixing ring, a supporting frame and an adjusting frame, so that the welding mechanism can move in a circle around the pipeline weld with the supporting frame, and perform welding operations on the pipeline weld during the movement, thereby replacing the manual welding operation mode and reducing the labor intensity. The fixing ring is used to clamp the gas pipeline, and there is no welding dead angle, so the welding quality is easier to control and the safety is higher. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 A schematic diagram of the use of a blast furnace gas pipeline installation device provided in one embodiment of the present invention; Figure 2Schematic diagram of the use of a welding assembly in one embodiment of the present invention Figure 1 ; Figure 3 Schematic diagram of the use of a welding assembly in one embodiment of the present invention Figure 2 ; Figure 4 A schematic diagram of the structure of a welding assembly in one embodiment of the present invention; Figure 5 A schematic diagram of the structure of a lifting assembly in one embodiment of the present invention Figure 1 ; Figure 6 A schematic diagram of the structure of a lifting assembly in one embodiment of the present invention Figure 2 ; Description of reference numerals: 1. Hoisting assembly; 2. Welding assembly; 3. Crane; 4. Gas pipeline; 5. Pipeline support; 6. Pipeline weld; 10. Fixed ring; 11. Fixed half ring; 111. First slide rail; 20. Support frame; 21. First moving wheel; 22. Second driving member; 30. Adjusting mechanism; 31. Adjusting frame; 311. Second moving wheel; 32. Screw motor; 40. Welding mechanism; 41. Welding machine; 42. Welding end; 50. Clamping mechanism; 51. Clamping end; 60. Hanging plate; 61. Rotating seat; 62. Fifth driving member; 70. Clamping claw; 71. Adjusting roller; 80. Third driving member; DETAILED DESCRIPTION In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0019] It should be noted that when an element is referred to as being "fixed to", "fixed" or "fixedly disposed" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" or "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. When an element is referred to as being "set to" or "disposed on" another element, it may be directly on the other element or there may be a central element. "Multiple" refers to two or more quantities. "At least one" refers to one or more quantities. "Several" refers to one or more quantities.

[0020] Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs.

[0021] Please also read Figures 1 to 6 , the installation device of the blast furnace gas pipeline provided by the embodiment of the present invention is described below.

[0022] See also Figures 1 to 4 The embodiment of the present invention provides an installation device for a blast furnace gas pipeline, including a hoisting assembly 1 and a welding assembly 2. The hoisting assembly 1 is used to hoist the gas pipeline, and the welding assembly 2 includes a fixing ring 10, a support frame 20, an adjustment mechanism 30 and a welding mechanism 40. The fixing ring 10 includes two fixing half rings 11 arranged opposite to each other. The two fixing half rings 11 are matched to form a first clamping space for the gas pipeline to pass through. A semi-circular first slide rail 111 is provided on one side of the fixing half ring 11. The first slide rails 111 of the two fixing half rings 11 are matched to form a circular first track; the support frame 20 is slidably matched with the first track, and the support frame 20 is provided with a straight second track. The support frame 20 is provided with a plurality of first moving wheels 21 at one end of the second track. The plurality of first moving wheels 21 are arranged along the circumferential direction of the gas pipeline. The adjusting mechanism 30 includes an adjusting frame 31 and a first driving member. The adjusting frame 31 is slidably matched with the second track. A plurality of second moving wheels 311 are provided on the adjusting frame 31. The plurality of second moving wheels 311 are arranged at intervals along the circumference of the gas pipeline. A second clamping space for the gas pipeline to pass through is formed between the second moving wheels 311 and the first moving wheels 21. The first driving member is provided on the supporting frame 20 for driving the adjusting frame 31 to move along the second track. The welding mechanism 40 is provided on the supporting frame 20 and has a welding end 42 facing the pipeline weld 6.

[0023] Compared with the prior art, the beneficial effects of the installation device for the blast furnace gas pipeline provided by the embodiment of the present invention are: The installation device of the blast furnace gas pipeline provided by the embodiment of the present invention comprises a hoisting assembly 1 and a welding assembly 2. The hoisting assembly 1 is used to hoist the blast furnace gas pipeline 4 to a suitable height and place it on the pipeline support 5. After the front and rear pipelines are axially aligned and abutted, a pipeline weld 6 is formed between the contact surfaces of the two gas pipelines. The welding assembly 2 is used to weld the pipeline weld 6 so that the two gas pipelines 4 are welded into a long pipeline.

[0024] The welding assembly 2 includes a fixing ring 10, a support frame 20, an adjustment mechanism 30 and a welding mechanism 40. The fixing ring 10 includes two fixing half rings 11 that can be opened and closed. When in use, the two fixing half rings 11 are opened, and the fixing ring 10 can be sleeved on the outer periphery of the gas pipeline. The adjustment frame 31 can reciprocate along the second track. After the fixing ring 10 is installed and fixed, the adjustment frame 31 is moved so that the second moving wheel 311 and the first moving wheel 21 are respectively abutted against the outer wall of the gas pipeline. At this time, the welding end 42 of the welding mechanism 40 is aligned with the pipeline weld 6. Then the support frame 20 is controlled to perform a circular motion around the pipeline weld 6 along the first track. During the movement of the support frame 20, the welding mechanism 40 can perform a circular welding on the entire pipeline weld 6. The hoisting assembly 1 and the welding assembly 2 work together to hoist and weld the gas pipeline, so that the two gas pipelines 4 are welded into one. After the welding is completed, the fixing ring 10 and the supporting frame 20 are removed from the gas pipeline and moved to the end of the next pipeline, and the above-mentioned lifting and welding operations are repeated to complete the installation of the blast furnace gas pipeline.

[0025] The embodiment of the present invention provides a fixing ring 10, a support frame 20 and an adjustment frame 31, so that the welding mechanism 40 can move in a circle around the pipe weld 6 with the support frame 20, and perform welding operations on the pipe weld 6 during the movement, thereby replacing the manual welding operation form and reducing the labor intensity. The fixing ring 10 is used to clamp the gas pipeline, and there is no welding dead angle, so the welding quality is easier to control and the safety is higher.

[0026] In the embodiment of the present invention, the hoisting assembly 1 is used to hoist the gas pipeline 4 and place it on the pipe support 5, so that the two pipes are aligned and abutted against each other for subsequent welding. The pipe support 5 is usually made of steel structure or concrete column. In order to save construction time, the pipe support 5 is usually pre-welded and fixed on the factory floor in advance to support the gas pipeline 4. The hoisting assembly 1 can be selected from common mechanical equipment for lifting pipes such as crane 3, overhead crane, electric hoist, and lifting forklift.

[0027] The fixing ring 10 includes two fixing half rings 11, which are designed to be openable and closable and are used to clamp and fix on the gas pipeline 4 that has been installed and fixed by the pipeline support 5. When the two fixing half rings 11 are opened, they can be sleeved on the outer periphery of the gas pipeline 4, and then the two fixing half rings 11 are closed, and the fixing ring 10 is fixed on the gas pipeline 4.

[0028] Considering that the installation of the fixing ring 10 needs to be done manually, when the pipeline support 5 is high, the operator needs to perform high-altitude operations, and the operation method should meet the requirements of high-altitude operations. The operator can reach the specified height with the help of a scissor lift.

[0029] The support frame 20 is slidably matched with the first track. The support frame 20 can slide along the circumference of the first track under the drive of itself or external force, thereby driving the welding mechanism 40 to perform welding operations on the entire circular pipe weld 6. The specific shape and structure of the support frame 20 are not limited, and it only needs to provide stable installation and support for the adjustment frame 31, welding mechanism 40, etc. installed thereon.

[0030] A plurality of first moving wheels 21 are provided at one end of the support frame 20. Two, three or more first moving wheels 21 can be provided as needed. The first moving wheels 21 abut against the outer wall of the gas pipeline to provide auxiliary support for the support frame 20 to prevent the support frame 20 from sliding or tilting when moving.

[0031] The adjusting frame 31 is slidably matched with the second track. The adjusting frame 31 has a second moving wheel 311. The adjusting frame 31 is designed to be slidable, and its purpose is to allow the gas pipeline to be accommodated in the second clamping space. When the fixing ring 10 and the supporting frame 20 are installed in place, the adjusting frame 31 is controlled to move along the second track until the second moving wheel 311 abuts against the outer wall of the gas pipeline. The second moving wheel 311 and the first moving wheel 21 are arranged relative to the gas pipeline, and their function is to assist in supporting the adjusting frame 31. Two, three or more second moving wheels 311 can be provided as needed.

[0032] After the fixing ring 10, the support frame 20 and the adjustment frame 31 are installed and moved into place, the welding end 42 of the welding mechanism 40 just corresponds to the pipe weld 6. The welding mechanism 40 includes a welding machine 41 and a welding end 42. The welding mechanism 40 moves with the support frame 20, and the welding end 42 can weld the pipe. There is no restriction on the specific specifications and working mode of the welding machine 41. Common pipe welding methods such as laser welding, argon arc welding, and plasma welding can be used as long as they can meet the use requirements.

[0033] See also Figure 2 and Figure 4 In some possible embodiments, a second driving member 22 is further provided on the support frame 20, and the second driving member 22 is used to drive at least one first moving wheel 21 to rotate.

[0034] In this embodiment, the second driving member 22 can be a driving motor or a hydraulic motor that can output a rotational motion, and is connected to the rotating shaft of at least one first moving wheel 21 through a gear box, a chain drive, a belt drive, etc. The second driving member 22 can drive the corresponding first moving wheel 21 to rotate, and the first moving wheel 21 serves as a driving wheel, and when rotating, it can drive the support frame 20 to move along the first track, thereby realizing the automatic movement of the support frame 20.

[0035] The outer peripheral wall of the first moving wheel 21 and the second moving wheel 311 can be provided with a rubber layer, and the rubber layer has anti-skid grooves, and its structure and function are similar to tires. It can be understood that in order to prevent slipping, there should be a certain pressure between the first moving wheel 21 and the gas pipeline, and between the second moving wheel 311 and the gas pipeline to ensure that there is sufficient friction between the two. The size of the pressure can be adjusted by the first driving member driving the adjustment frame 31 to move along the second track.

[0036] In order to visualize the pressure, pressure sensors can be installed on the mounting shafts of the first moving wheel 21 and the second moving wheel 311 to monitor the pressure on different moving wheels. The pressure value can be displayed on the controller screen. When the gas pipeline, the support frame 20 and the adjustment frame 31 are not aligned, the pressure of the first moving wheel 21 and the second moving wheel 311 will also be different. The operator can also judge whether the gas pipeline, the support frame 20 and the adjustment frame 31 are aligned in the center by checking the pressure value.

[0037] See also Figure 3 In some possible embodiments, the installation device of the blast furnace gas pipeline also includes a plurality of clamping mechanisms 50, which are arranged on the corresponding fixed half ring 11, and the clamping mechanism 50 is located on the side of the fixed half ring 11 away from the first slide rail. The plurality of clamping mechanisms 50 are arranged at intervals along the circumferential direction, and the clamping mechanism 50 has a clamping end 51 that can be extended and retracted along the radial direction of the fixed half ring 11, and the clamping end 51 is used to abut against the outer wall of the gas pipeline.

[0038] In this embodiment, a clamping mechanism 50 is provided on the fixed half ring 11, and the expansion and contraction amounts of the multiple clamping mechanisms 50 are the same when working, so as to ensure that the fixed ring 10 and the gas pipeline are coaxially aligned. The clamping mechanism 50 can be a nut and screw mechanism, a telescopic cylinder, an electric telescopic rod, etc., and a pressure block for abutting against the outer wall of the pipeline is provided at the end of the clamping end 51. The fixed ring 10 is fixed on the gas pipeline through the clamping mechanism 50. The expansion and contraction amount of the telescopic end of the clamping mechanism 50 is adjustable, which can adapt to different pipeline sizes, thereby improving the versatility and adaptability of the equipment.

[0039] In some possible embodiments, one end of the two fixed half rings 11 is hinged, and the other end is detachably connected by a fastener. Alternatively, both ends of the two fixed half rings 11 are detachably connected by a fastener. Both of the above two structural forms meet the use requirements, and the user can choose according to the needs.

[0040] In some possible embodiments, taking into account that the diameters of gas pipes may be different, in order to enable the position of the welding mechanism 40 to adapt to the diameters of different gas pipes, the welding mechanism 40 is movably provided on the support frame 20 along the length direction of the second track, so that the position of the welding mechanism 40 can be adjusted as needed.

[0041] The movement of the welding mechanism 40 can be adjusted manually or automatically by an electric telescopic rod, a telescopic cylinder, or the like.

[0042] See also Figure 4 In some possible embodiments, the first driving member includes a driving screw disposed on the second track, and a screw motor 32 connected to the driving screw, and the adjusting frame 31 is threadedly engaged with the driving screw. The screw motor 32 drives the driving screw to rotate forward or reverse, and the adjusting frame 31 can reciprocate along the axial direction of the driving screw.

[0043] In order to ensure that the welding end 42 is always aligned with the pipeline weld 6, the welder 41 is always located in the middle position between the first moving wheel 21 and the second moving wheel 311. In order to adapt to different gas pipeline diameters, the welder 41 also needs to be movably arranged. In some possible embodiments, the welding mechanism 40 is driven by the above-mentioned driving screw. Specifically, the driving screw has a first thread segment and a second thread segment arranged in sequence along its own axial direction, and the pitch of the first thread segment is half of the pitch of the second thread segment. The welder 41 of the welding mechanism 40 is threadedly matched with the first thread segment, and the adjustment frame 31 is threadedly matched with the second thread segment.

[0044] This embodiment uses a driving screw to drive the welding mechanism 40 and the adjusting frame 31 to move, and can ensure that the moving distance of the welding machine 41 mechanism is half of the moving distance of the adjusting frame 31, so that the welding mechanism 40 is always located in the middle position between the first moving wheel 21 and the second moving wheel 311.

[0045] See also Figure 5 and Figure 6 In some possible embodiments, the hoisting assembly 1 includes a hanging plate 60, a clamping claw 70 and a third driving member 80. The hanging plate 60 is used to connect with the lifting equipment; two clamping claws 70 are arranged at the bottom of the hanging plate 60, and the upper part of the clamping claw 70 is hinged to the hanging plate 60, and a third clamping space for the gas pipeline to pass through is formed between the two clamping claws 70; the third driving member 80 is arranged on the hanging plate 60, and is used to drive the two clamping claws 70 to rotate around their own rotation axis.

[0046] The hanging plate 60 of the hanging assembly 1 in this embodiment can be installed on a power mechanical device capable of vertical lifting such as a crane 3, a lifting frame or even a lifting forklift. The hanging plate 60 can be installed on the above-mentioned power mechanical device through a hanging rope or a mechanical arm. The clamping claw 70 is V-shaped, and the third driving member 80 can drive the two clamping claws 70 to gather or open to complete the grabbing and releasing operations of the gas pipeline 4.

[0047] See also Figure 1In some possible embodiments, two hoisting assemblies 1 are provided, and the two hoisting assemblies 1 are spaced apart along the axial direction of the gas pipeline. The two hoisting assemblies 1 can independently adjust their respective hoisting heights. By fine-tuning the heights of the two hoisting assemblies 1, the vertical inclination angle of the gas pipeline can be adjusted, so that the gas pipeline can be horizontal or inclined at an appropriate angle to the horizontal plane to meet the installation requirements of the gas pipeline in various situations.

[0048] In the existing technology, most of the gas pipeline hoisting work relies on cranes and lifting ropes, which can accurately control the height of the pipeline, but cannot accurately control the axial position, horizontal and vertical angles of the pipeline. In actual operation, it is necessary to manually align the mouth of the pipe to be welded with the mouth of the target pipe, and then slowly adjust it by crane until the two pipes are aligned. This construction method is relatively backward and has low precision. The welding construction error is large, and the angle and horizontality of the pipeline installation are difficult to meet the requirements. Due to the heavy mass and large inertia of the pipeline, it is easy to bump when it is moved manually, and the construction process is relatively dangerous.

[0049] To improve the ease of pipe alignment and installation safety, please refer to Figure 5 and Figure 6 In some possible embodiments, the inner wall of the third clamping space formed by the clamping jaw 70 is provided with an adjusting roller 71 and a fourth driving member. The rotation axis of the adjusting roller 71 is perpendicular to the axis of the gas pipeline. The fourth driving member is used to drive the adjusting roller 71 to rotate around its own axis. The fourth driving member can be a motor or other rotating driving member, and power transmission can be achieved through key connection, gear transmission, etc.

[0050] In this embodiment, the lower end of the clamp 70 (i.e., one end for supporting the gas pipeline) is provided with an adjusting roller 71, which is located below the gas pipeline and is used to support the gas pipeline. When the gas pipeline is hoisted in place, the adjusting roller 71 can be driven to rotate by the fourth driving member to drive the gas pipeline to move axially so that the ends of the two gas pipelines are abutted. By providing the adjusting roller 71 and the fourth driving member, the problems of inconvenience in adjusting the position and posture of the pipeline by hoisting with the crane 3 and the hoisting rope, poor safety of manual alignment, and low adjustment efficiency are solved.

[0051] For further information, see Figure 5 and Figure 6 In some possible embodiments, the hanging plate 60 includes a rotating seat 61, the upper end of the clamping jaw 70 is hinged to the rotating seat 61, and the hanging assembly 1 also includes a fifth driving member 62, which is used to drive the rotating seat 61 to rotate around the vertical axis.

[0052] In this embodiment, the fifth driving member 62 can be a rotating power device such as a driving motor, a hydraulic rotary motor, etc. The fifth driving member 62 can drive the rotating seat 61 to rotate and adjust the horizontal angle of the gas pipeline 4. Compared with the method of adjusting by the crane 3 rope, it is more efficient, more accurate and safer.

[0053] It can be understood that the various parts in the above-mentioned embodiments can be freely combined or deleted to form different combination embodiments. The specific contents of each combination embodiment will not be repeated here. After this description, it can be considered that the specification of the present invention has recorded various combination embodiments and can support different combination embodiments.

[0054] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A blast furnace gas pipeline installation device, characterized in that: It includes a hoisting assembly and a welding assembly. The hoisting assembly is used to hoist the gas pipeline. The welding assembly includes: A fixed ring, comprising two fixed half rings arranged opposite to each other, wherein the two fixed half rings are matched to form a first clamping space for the gas pipeline to pass through, and a semi-circular first slide rail is provided on one side of the fixed half ring, wherein the first slide rails of the two fixed half rings are matched to form a circular first track; A support frame is slidably matched with the first track, the support frame is provided with a linear second track, one end of the support frame is provided with a plurality of first moving wheels, and the plurality of first moving wheels are arranged at intervals along the circumference of the gas pipeline; an adjusting mechanism, comprising an adjusting frame and a first driving member, wherein the adjusting frame is slidably matched with the second track, a plurality of second moving wheels are arranged on the adjusting frame, the plurality of second moving wheels are arranged at intervals along the circumference of the gas pipeline, a second clamping space for the gas pipeline to pass through is formed between the second moving wheels and the first moving wheels, and the first driving member is arranged on the supporting frame, and is used to drive the adjusting frame to move along the second track; and The welding mechanism is arranged on the supporting frame and has a welding end facing the pipeline weld.

2. The installation device for blast furnace gas pipeline according to claim 1, characterized in that: The support frame is also provided with a second driving member, and the second driving member is used to drive at least one of the first moving wheels to rotate.

3. The installation device for blast furnace gas pipeline according to claim 1, characterized in that: The installation device of the blast furnace gas pipeline also includes a plurality of clamping mechanisms, which are arranged on the corresponding fixed half ring and located on the side of the fixed half ring away from the first slide rail. The plurality of clamping mechanisms are arranged at intervals along the circumferential direction of the fixed half ring. The clamping mechanism has a clamping end that can be extended and retracted along the radial direction of the fixed half ring, and the clamping end is used to abut the outer wall of the gas pipeline.

4. The installation device for blast furnace gas pipeline according to claim 1, characterized in that: One end of the two fixed half rings is hinged, and the other end is detachably connected by a fastener.

5. The installation device for blast furnace gas pipeline according to claim 1, characterized in that: The welding mechanism is movably arranged on the supporting frame along the length direction of the second track.

6. The installation device for blast furnace gas pipeline according to claim 5, characterized in that: The first driving member includes a driving screw rod disposed on the second track, and a screw rod motor drivingly connected to the driving screw rod, and the adjusting frame is threadedly matched with the driving screw rod.

7. The installation device for blast furnace gas pipeline according to claim 1, characterized in that: The hoisting assembly comprises: Hanging plate, used for connection with lifting equipment; Two clamping jaws are arranged opposite to each other at the bottom of the hanging plate, the upper parts of the clamping jaws are hinged to the hanging plate, and a third clamping space for the gas pipeline to pass through is formed between the two clamping jaws; and The third driving member is arranged on the hanging plate and is used for driving the two clamping jaws to rotate around their own rotation axes.

8. The installation device for blast furnace gas pipeline according to claim 7, characterized in that: There are two hanging assemblies, and the two hanging assemblies are spaced apart along the axial direction of the gas pipeline.

9. The installation device for blast furnace gas pipeline according to claim 7, characterized in that: The inner wall of the clamping jaw forming the third clamping space is provided with an adjusting roller and a fourth driving member, the rotation axis of the adjusting roller is perpendicular to the axis of the gas pipeline, and the fourth driving member is used to drive the adjusting roller to rotate around its own axis.

10. The installation device for blast furnace gas pipeline according to claim 7, characterized in that: The hanging plate includes a rotating seat, the upper end of the clamping claw is hinged to the rotating seat, and the hanging assembly also includes a fifth driving member, and the fifth driving member is used to drive the rotating seat to rotate around a vertical axis.

Citation Information

Patent Citations

  • Rotary type plasma removing system for flash butt welding seam burrs outside pipes

    CN105798442A

  • Clamp

    CN107673192A

  • Full-automatic welding machine for steel gas pipeline

    CN111136411A

  • Welding device used for pipeline and using method of welding device

    CN112846771A

  • Maintenance welding device based on industrial robot

    CN113953737A

Cited By

  • Welding device for gas pipeline construction

    CN121223353A

  • Multi-angle turnover supporting device for assisting welding of special-shaped steel structure

    CN121245377A

  • A multi-angle flipping support device for welding auxiliary of irregular steel structures

    CN121245377B

  • Spherical hinge type pipe fitting clamping jaw

    CN224674935U