Tennis ball processing system and processing method
By designing automatic rotary grinding and glue coating devices, the problems of low grinding efficiency and untimely dust cleaning in tennis processing are solved, and the processing efficiency and ball quality are improved.
Patent Information
- Application Number
- CN202410981495.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-08
AI Technical Summary
In the existing tennis processing technology, low grinding efficiency, untimely dust cleaning, and low processing efficiency, resulting in poor roundness of the sphere and poor adhesion quality.
A tennis processing system is designed, including a processing table, supporting rotary device, grinding device and glue coating device. The automatic rotation and dust cleaning of the hemispherical shell is realized through components such as rotating electric machines, hydraulic columns and jet heads, and automatically after grinding. Glue application operation.
It improves polishing smoothness, cleanliness and processing efficiency, reduces the amount of manual labor, and ensures the roundness and adhesion quality of the sphere.
Smart Images

Figure CN118905801A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tennis ball processing, in particular to a tennis ball processing system and a processing method. Background Art
[0002] Tennis is a kind of ball sports. It is composed of two parts: inner rubber and outer felt. The inner spherical rubber of tennis is first produced into a hemispherical shell shape during manufacturing, and then the two hemispherical shells are glued together, and then the felt is glued to the outside of the rubber shell.
[0003] The utility model patent with patent number CN202320844407.7 provides an automatic edge grinding machine, which relates to the field of tennis production technology, including: a mounting mechanism; a rotating mechanism is installed above the mounting mechanism. The edge grinding machine solves the problem that the ball bladder is currently mostly polished manually, the ball bladder is spherical as a whole, which is very inconvenient to hold, and it is easy to cause uneven force during polishing, resulting in low production efficiency and high defective rate.
[0004] However, in the actual production process, only one ball shell can be polished at a time, and the polishing efficiency is low. In addition, the polishing is performed along the axial direction of the ball shell, resulting in poor polishing flatness of the end face of the ball shell. Poor polishing flatness will lead to poor roundness of the sphere after bonding. In severe cases, it may even cause air leakage in the ball shell, affecting the quality of the tennis ball. The dust generated during polishing cannot be cleaned in time, affecting the subsequent gluing and bonding work. In addition, when bonding after polishing, it is usually necessary to manually move the ball shell to the gluing process for processing, resulting in poor processing continuity and low processing efficiency. Summary of the invention
[0005] 1. Technical issues to be solved
[0006] In view of the deficiencies in the prior art, the present invention provides a tennis ball processing system and method, which solve the problems of poor grinding effect, inability to clean dust during grinding and low processing efficiency.
[0007] (II) Technical solution
[0008] To achieve the above objectives, the present invention is implemented through the following technical solutions: a tennis ball processing system, including a processing table and a supporting rotating device, a supporting tripod is installed at the bottom of the processing table, a supporting rotating device for driving a placement rack to move is arranged at the top and in the middle of the processing table, the placement rack is arranged above the supporting rotating device, and an opening for clamping a tennis ball shell is opened on the top of the placement rack, a supporting unloading device for pushing the tennis ball shell to deflect is arranged at the top and near the front side of the processing table, a grinding device for grinding the end face of the tennis ball shell is arranged at the top and near the right side of the processing table, and a gluing device for applying glue to the end face of the tennis ball shell is arranged at the top and near the left side of the processing table.
[0009] Preferably, the supporting rotating device includes a movable supporting pile, a meshing tooth head, a rotating motor, a side supporting frame and a supporting frame, the movable supporting pile is movably plugged into the top of the processing table and at a middle position, the bottom end of the movable supporting pile extends to the bottom of the processing table, and a hydraulic column is installed under the processing table to push the movable supporting pile to move up and down, the meshing tooth head is opened on the outer wall of the movable supporting pile and is located at a position above the processing table, the rotating motor is installed at the top of the processing table and at a position outside the movable supporting pile, the bottom of the rotating motor passes through the processing table and is installed at the bottom of the processing table, a gear is installed at the output end of the rotating motor, the gear is meshed with the meshing tooth head, the side supporting frame is installed with the outer wall of the movable supporting pile and at a position above the meshing tooth head, the supporting frame for supporting the placing frame is installed with an end of the side supporting frame away from the movable supporting pile, and a slot matching the placing frame is opened at the top of the supporting frame.
[0010] Preferably, the supporting unloading device includes a unloading supporting base and an upper push rod, the unloading supporting base is installed at the top of the processing table and is located at the front side, and the upper push rod is installed at the top of the unloading supporting base.
[0011] Preferably, the grinding device includes a grinding support frame, a grinding control hydraulic column, a grinding installation top seat, a pressing positioning rod, an elastic support seat, a grinding block, a pressurization chamber, a jet head, an exhaust chamber, an exhaust connecting pipe, an exhaust chamber cover, an exhaust pipe, a grinding installation base, a positioning chamber, a support ball, a rotating support seat, a synchronous gear, a bottom protection cover and a grinding motor. The grinding support frame is installed on the top of the processing table and is located on the right side. The grinding control hydraulic column is installed on the top of the grinding support frame. The bottom end of the grinding control hydraulic column passes through the processing table and extends to the bottom of the grinding support frame. The grinding installation top seat The bottom end of the grinding control hydraulic column is installed, the pressing and positioning rod is installed with the bottom of the grinding mounting top seat, the elastic support seat is installed with the bottom of the grinding mounting top seat and is located outside the pressing and positioning rod, the grinding block is installed with the bottom of the elastic support seat, the boost chamber is opened inside the grinding mounting top seat, the jet head is installed at the bottom of the grinding mounting top seat and is located inside the elastic support seat, the top end of the jet head is connected with the inside of the boost chamber, the exhaust chamber is opened inside the grinding mounting top seat, the exhaust connecting pipe is connected with the bottom of the grinding mounting top seat and is located outside the elastic support seat Installation, the top of the exhaust connecting pipe passes through the polished installation top seat and extends into the interior of the exhaust chamber, the exhaust chamber cover for sealing the exhaust chamber is installed with the top of the polished installation top seat by bolts, the bottom of the polished installation top seat and an elastic sealing cover is installed at a position outside the elastic support seat, and a groove for the bottom end of the elastic sealing cover to be clamped is provided on the top of the placement frame, the exhaust pipe is installed with the top of the exhaust chamber cover, there are two exhaust pipes, the bottom ends of the two exhaust pipes respectively pass through the exhaust chamber cover and are connected with the boost chamber and the exhaust chamber, the bottom protective cover is installed with the bottom of the polished installation base, and the bottom protective cover is connected to the boost chamber The top of the workbench is installed at a position below the grinding support frame, the positioning cavity is opened at the top of the grinding mounting base, the supporting ball is movably embedded in the inner wall of the positioning cavity and is located near the top, the rotating support seat is rotatably installed through the bearing and the bottom inner wall of the pressing positioning rod, the bottom end of the rotating support seat penetrates the grinding mounting base and extends to the bottom of the grinding mounting base, the synchronous gear is installed with the bottom end of the rotating support seat, adjacent synchronous gears are meshed with each other, the grinding motor is installed with the bottom of the bottom protective cover, and the output end of the grinding motor penetrates the bottom protective cover and is installed with the bottom of the synchronous gear.
[0012] Preferably, the glue coating device includes a glue coating support frame, a glue coating control hydraulic column, a glue coating installation top seat, a coating cloth, a glue storage box and a glue injection port. The glue coating support frame is installed at the top of the processing table and is located on the left side. The glue coating control hydraulic column is installed at the top of the glue coating support frame. The output end of the glue coating control hydraulic column passes through the glue coating support frame and extends to the bottom of the glue coating support frame. The glue coating installation top seat is installed at the bottom end of the glue coating control hydraulic column. The coating cloth is installed at the bottom of the glue coating installation top seat. The glue storage box is installed at the top of the glue coating installation top seat and is located outside the glue coating control hydraulic column. The glue injection port for injecting glue into the glue storage box is installed at the top of the glue storage box. The glue coating support plate is installed at the top of the processing table and is located below the glue coating support frame.
[0013] Preferably, each time the rotary motor is started, the movable support pile is driven to rotate 120° through the cooperation of the gear and the meshing tooth head. There are three side support frames and three support frames each and they are arranged in a circular array on the outside of the movable support pile.
[0014] Preferably, the distance between the placement rack and the glue-coated support plate is smaller than the radius of the tennis ball hemisphere shell.
[0015] Preferably, the top end of the exhaust connecting pipe extends into the exhaust cavity and then extends upward to the middle height position of the exhaust cavity.
[0016] Preferably, a connecting capillary is installed at the bottom of the glue storage box, the bottom end of the connecting capillary passes through the glue coating mounting top seat and extends into the interior of the coating cloth. The coating cloth is made of cotton textile fabric, and the part of the surface of the connecting capillary that extends into the interior of the coating cloth is provided with small holes.
[0017] A processing method of a tennis ball processing system comprises the following steps:
[0018] The first step: connect the top of the exhaust pipe connected to the inside of the boost chamber to the boost fan through a pipeline, connect the top of the exhaust pipe connected to the inside of the exhaust chamber to the negative pressure exhaust fan through a pipeline, and install a filtering device for filtering dust generated by grinding at the air inlet of the negative pressure exhaust fan, and pour the glue to be applied into the glue storage box through the glue injection port;
[0019] Step 2: Place the hemispherical shells to be polished and glued inside the opening above the placement rack. There are multiple placement racks available. During the subsequent polishing and gluing process, workers can visit the hemispherical shells on the spare placement racks without affecting the normal operation of the machine. Before starting the machine, place the placement rack full of hemispherical shells on the support frame at the front side to complete the preparation work;
[0020] Step 3: Control the support rotation device to work, the support rotation device drives the placement rack to lift up and then rotate, so that the placement rack placed on the front side rotates and moves, when the placement rack moves to the position above the grinding device, the support rotation device drives the placement rack to descend, the placement rack falls above the grinding installation base, and the hemispherical shell clamped inside the placement rack falls into the interior of the positioning cavity;
[0021] The fourth step: control the grinding and control hydraulic column to drive the grinding and installation top seat to move downward, and the grinding and installation top seat drives the grinding block to move downward through the elastic support seat, and the grinding block is pressed on the top of the hemispherical shell to press the top of the hemispherical shell, so that the hemispherical shell is deflected to a horizontal state inside the positioning cavity, and then the grinding and installation top seat continues to press down, increasing the pressing force of the elastic support seat and the grinding block on the end face of the hemispherical shell, and the pressing positioning rod is extended downward to the inside of the hemispherical shell to contact the bottom inner wall of the hemispherical shell, and the hemispherical shell is pressed and fixed on the top of the rotating support seat by pressing the positioning rod. At this time, the outer wall of the hemispherical shell is in contact with the supporting ball, and then the grinding motor is started, and the synchronous gear is driven to rotate by the grinding motor, and the synchronous gear drives the rotating support seat to rotate, and the rotating support seat drives the hemispherical shell to rotate, and the hemispherical shell rotates and its top end rubs against the bottom of the grinding block, thereby grinding the bonding end face of the spherical shell;
[0022] Step 5: After the grinding is completed, the grinding control hydraulic column is controlled to retract, and the grinding control hydraulic column drives the grinding installation top seat to move upward, and the grinding installation top seat drives the elastic support seat and the grinding block to move upward, releasing the contact with the top of the hemispherical shell, and the elastic sealing cover is extended to maintain the sealing state to the inside, and at the same time, the surface of the hemispherical shell is blown by the cooperation of the booster fan and the negative pressure fan to clean the surface of the hemispherical shell and collect the dust;
[0023] Step 6: After polishing and cleaning, control the polishing control hydraulic column to retract, and then control the support rotating device to work again to drive the hemispherical shell above the placement rack to move to the bottom of the gluing device, control the gluing control hydraulic column to extend, and the gluing control hydraulic column drives the gluing installation top seat to move down, and the gluing installation top seat drives the coating cloth to move down, and the coating cloth contacts the circular end face on the top of the hemispherical shell to perform gluing on the subsequent bonding position of the hemispherical shell. After the gluing is completed, control the gluing control hydraulic column to retract, and then drive the placement rack to rotate to the front position through the support rotating device to unload and replace the new spherical shell for polishing and gluing.
[0024] (III) Beneficial effects
[0025] The present invention provides a tennis ball processing system and a processing method, which have the following beneficial effects:
[0026] 1. The end of the hemispherical shell is polished by a polishing device, and before polishing, the hemispherical shell is pressed and positioned by the cooperation of the elastic support seat and the polishing block, so that the hemispherical shell can be placed horizontally inside the positioning cavity, and then the polishing motor drives the synchronous gear and the rotating support seat to rotate, and the rotating support seat drives the hemispherical shell to rotate. The hemispherical shell rotates and contacts with the bottom of the polishing block for polishing. The hemispherical shell is fixed after leveling and positioning in advance, and then polished by rotary polishing, thereby improving the polishing flatness.
[0027] 2. The grinding device will seal the grinding space during grinding to prevent dust generation, and collect the dust generated by grinding through air flow during grinding, thereby improving the cleanliness of the processing environment. The surface of the hemispherical shell can also be cleaned to prevent dust residue on the circular end face of the hemispherical shell from affecting the subsequent bonding process.
[0028] 3. The gluing device can quickly apply adhesive glue to the circular end surface of the polished hemispherical shell. Compared with the manual application method, it greatly improves the efficiency of application and the processing efficiency.
[0029] 4. The processes of grinding and gluing the hemispherical shell and the conversion and handover between the two are all completed automatically, thus reducing the manual labor and improving the processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the structure of the present invention;
[0031] Figure 2 For the present invention Figure 1 A magnified view of the structure at center;
[0032] Figure 3 It is a partial structural schematic diagram of the supporting rotating device of the present invention;
[0033] Figure 4 This is a schematic diagram of the structure of the supporting unloading device of the present invention;
[0034] Figure 5 This is a schematic diagram of the polishing and installation top seat structure of the present invention;
[0035] Figure 6 This is a schematic diagram of the cross-sectional structure of the polishing and mounting top seat of the present invention;
[0036] Figure 7 For the present invention Figure 6 A magnified view of the structure at B in the middle;
[0037] Figure 8 This is a schematic diagram of the cross-sectional structure of the grinding mounting seat of the present invention;
[0038] Fig. 9 For the present invention Figure 8 A magnified view of the structure at C in the middle;
[0039] Fig.10 This is a schematic diagram of the structure of the glue coating device of the present invention;
[0040] Among them, 1. Processing table; 2. Supporting foot frame; 3. Supporting rotating device; 31. Movable supporting pile; 32. Engaging gear head; 33. Rotating motor; 34. Side supporting frame; 35. Support frame; 4. Support unloading device; 41. Unloading supporting base; 42. Upper push rod; 5. Grinding device; 51. Grinding supporting frame; 52. Grinding control hydraulic column; 53. Grinding installation top seat; 54. Press positioning rod; 55. Elastic supporting seat; 56. Grinding block; 57. Pressurizing chamber; 58. Spray Air head; 59, exhaust chamber; 60, exhaust connecting pipe; 61, exhaust chamber cover; 62, exhaust pipe; 63, grinding installation base; 64, positioning chamber; 65, support ball; 66, rotating support seat; 67, synchronous gear; 68, bottom protection cover; 69, grinding motor; 7, glue coating device; 71, glue coating support frame; 72, glue coating control hydraulic column; 73, glue coating installation top seat; 74, coating cloth; 75, glue storage box; 76, glue injection port; 77, glue coating tray; 8, placement rack. DETAILED DESCRIPTION
[0041] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0042] See also Figure 1-Figure 10 The present invention provides a technical solution: a tennis ball processing system, comprising a processing table 1 and a supporting rotating device 3, a supporting tripod 2 is installed at the bottom of the processing table 1, a supporting rotating device 3 for driving a placement rack 8 to move is arranged at the top and in the middle of the processing table 1, the placement rack 8 is arranged above the supporting rotating device 3, and an opening for clamping a tennis ball shell is opened on the top of the placement rack 8, a supporting unloading device 4 for pushing the tennis ball shell to deflect is arranged at the top and in the front side of the processing table 1, a grinding device 5 for grinding the end surface of the tennis ball shell is arranged at the top and in the right side of the processing table 1, and a gluing device 7 for applying glue to the end surface of the tennis ball shell is arranged at the top and in the left side of the processing table 1.
[0043] In this embodiment, the supporting rotating device 3 includes a movable supporting pile 31, an engaging tooth head 32, a rotating motor 33, a side supporting frame 34 and a supporting frame 35. The movable supporting pile 31 is movably plugged into the top and middle position of the processing table 1. The bottom end of the movable supporting pile 31 extends to the bottom of the processing table 1. A hydraulic column for pushing the movable supporting pile 31 to move up and down is installed under the processing table 1. The engaging tooth head 32 is opened on the outer wall of the movable supporting pile 31 and is located on the upper side of the processing table 1. The top and A rotating motor 33 is installed at a position outside the movable supporting pile 31. The bottom of the rotating motor 33 passes through the processing table 1 and is installed at the bottom of the processing table 1. A gear is installed at the output end of the rotating motor 33, and the gear is meshed with the meshing tooth head 32. The side support frame 34 is installed on the outer wall of the movable supporting pile 31 and is located on the upper side of the meshing tooth head 32. The support frame 35 for supporting the placement rack 8 is installed on the end of the side support frame 34 away from the movable supporting pile 31, and a slot compatible with the placement rack 8 is opened at the top of the support frame 35.
[0044] Specifically, the hemispherical shell is driven to move between different processes by supporting the rotating device 3 .
[0045] In this embodiment, the supporting unloading device 4 includes a unloading supporting base 41 and an upper push rod 42. The unloading supporting base 41 is installed at the top of the processing table 1 and is located at the front side. The upper push rod 42 is installed at the top of the unloading supporting base 41.
[0046] Specifically, the installation position of the upper push rod 42 is offset from the center of the top opening of the placement rack 8, so that when the placement rack 8 moves downward, the upper push rod 42 will lift the hemispherical shell inside it to one side, thereby facilitating the removal of the hemispherical shell and preventing the hemispherical shell from being stuck in the opening of the placement rack 8 and causing inconvenience in unloading.
[0047] In this embodiment, the grinding device 5 includes a grinding support frame 51, a grinding control hydraulic column 52, a grinding installation top seat 53, a pressing positioning rod 54, an elastic support seat 55, a grinding block 56, a pressurization chamber 57, a jet head 58, an exhaust chamber 59, an exhaust connecting pipe 60, an exhaust chamber cover 61, an exhaust pipe 62, a grinding installation base 63, a positioning chamber 64, a support ball 65, a rotating support seat 66, a synchronous gear 67, a bottom protection cover 68 and a grinding motor 69. The grinding support frame 51 is installed at the top of the processing table 1 and is located on the right side. The grinding control hydraulic column 52 is installed at the top of the grinding support frame 51. The bottom end of the grinding control hydraulic column 52 passes through the processing table 1 and extends to the grinding support. Below the support frame 51, the grinding installation top seat 53 is installed with the bottom end of the grinding control hydraulic column 52, the pressing and positioning rod 54 is installed with the bottom of the grinding installation top seat 53, the elastic support seat 55 is installed with the bottom of the grinding installation top seat 53 and is located at the outside of the pressing and positioning rod 54, the grinding block 56 is installed with the bottom of the elastic support seat 55, the boost chamber 57 is opened inside the grinding installation top seat 53, the jet head 58 is installed at the bottom of the grinding installation top seat 53 and is located inside the elastic support seat 55, the top of the jet head 58 is connected with the inside of the boost chamber 57, the exhaust chamber 59 is opened inside the grinding installation top seat 53, and the exhaust connecting pipe 60 is connected with the bottom of the grinding installation top seat 53 and is located at the elastic support seat 55. The top of the exhaust connecting pipe 60 passes through the polished mounting top seat 53 and extends into the exhaust chamber 59. The exhaust chamber cover 61 for sealing the exhaust chamber 59 is installed with the top of the polished mounting top seat 53 through bolts. An elastic sealing cover is installed at the bottom of the polished mounting top seat 53 and located outside the elastic support seat 55. A groove is provided on the top of the placement frame 8 for the bottom end of the elastic sealing cover to be clamped. The exhaust pipe 62 is installed with the top of the exhaust chamber cover 61. There are two exhaust pipes 62. The bottom ends of the two exhaust pipes 62 pass through the exhaust chamber cover 61 and are connected with the inside of the supercharging chamber 57 and the exhaust chamber 59 respectively. The bottom protection cover 68 is installed with the bottom of the polished mounting base 63. The protective cover 68 is installed at the top of the processing table 1 and below the grinding support frame 51. The positioning cavity 64 is opened at the top of the grinding mounting base 63. The supporting ball 65 is movably embedded in the inner wall of the positioning cavity 64 and is located near the top. The rotating support seat 66 is rotatably installed through the bearing and the bottom inner wall of the pressing positioning rod 54. The bottom end of the rotating support seat 66 penetrates the grinding mounting base 63 and extends to the bottom of the grinding mounting base 63. The synchronous gear 67 is installed at the bottom end of the rotating support seat 66, and the adjacent synchronous gears 67 are meshed with each other. The grinding motor 69 is installed at the bottom of the bottom protective cover 68, and the output end of the grinding motor 69 penetrates the bottom protective cover 68 and is installed at the bottom of the synchronous gear 67.
[0048] Specifically, the end of the hemispherical shell is polished by the polishing device 5, and before polishing, the hemispherical shell is pressed and positioned by the cooperation of the elastic support seat 55 and the polishing block 56, so that the hemispherical shell can be placed horizontally inside the positioning cavity 64, and then the polishing motor 69 drives the synchronous gear 67 and the rotating support seat 66 to rotate, and the rotating support seat 66 drives the hemispherical shell to rotate, and the hemispherical shell rotates and contacts with the bottom of the polishing block 56 for polishing. The hemispherical shell is fixed after leveling and positioning in advance, and then polished by rotary polishing, which improves the polishing effect.
[0049] In this embodiment, the glue coating device 7 includes a glue coating support frame 71, a glue coating control hydraulic column 72, a glue coating installation top seat 73, a coating cloth 74, a glue storage box 75 and a glue injection port 76. The glue coating support frame 71 is installed at the top of the processing table 1 and is located on the left side. The glue coating control hydraulic column 72 is installed at the top of the glue coating support frame 71. The output end of the glue coating control hydraulic column 72 passes through the glue coating support frame 71 and extends to the bottom of the glue coating support frame 71. The glue coating installation top seat 73 is installed at the bottom end of the glue coating control hydraulic column 72. The coating cloth 74 is installed at the bottom of the glue coating installation top seat 73. The glue storage box 75 is installed at the top of the glue coating installation top seat 73 and is located outside the glue coating control hydraulic column 72. The glue injection port 76 for injecting glue into the glue storage box 75 is installed at the top of the glue storage box 75. The glue coating support plate 77 is installed at the top of the processing table 1 and is located below the glue coating support frame 71.
[0050] Specifically, the adhesive glue can be quickly applied to the circular end surface of the polished hemispherical shell through the glue coating device 7, which greatly improves the coating efficiency and the processing efficiency compared with the manual coating method.
[0051] In this embodiment, each time the rotating motor 33 is started, the movable support pile 31 is driven to rotate 120° through the cooperation of the gear and the meshing tooth head 32. There are three side support frames 34 and three support frames 35 each and they are arranged in a circular array on the outside of the movable support pile 31.
[0052] Specifically, the angle between the support unloading device 4, the grinding device 5 and the gluing device 7 is 120°. The placement frame 8 is driven by the rotating motor 33 to rotate to perform different processing steps, so that the grinding and gluing processes of the hemispherical shell and the conversion and handover process between the two are automatically completed, thereby reducing manual labor and improving processing efficiency.
[0053] In this embodiment, the distance between the placement rack 8 and the glue-coated support plate 77 is smaller than the radius of the tennis ball hemisphere shell.
[0054] Specifically, when the supporting rotating device 3 moves to above the glue coating support plate 77 and then moves downward, the hemispherical shell stuck in the opening on the surface of the placement rack 8 moves upward under the obstruction of the glue coating support plate 77, so that the top of the hemispherical shell is separated from the top surface of the placement rack 8.
[0055] In this embodiment, the top end of the exhaust connecting pipe 60 extends into the exhaust cavity 59 and then extends upward to the middle height position of the exhaust cavity 59 .
[0056] Specifically, after the dust enters the exhaust cavity 59 along the exhaust connecting pipe 60 and flows horizontally, a portion of the dust will settle at the bottom of the exhaust cavity 59 to assist in storing the dust.
[0057] In this embodiment, a connecting capillary is installed at the bottom of the glue storage box 75, and the bottom end of the connecting capillary passes through the glue coating mounting top seat 73 and extends into the interior of the coating cloth 74. The coating cloth 74 is made of cotton fabric, and the part of the surface where the connecting capillary extends into the interior of the coating cloth 74 is provided with small holes.
[0058] Specifically, the glue in the glue storage box 75 enters into the coating cloth 74 along the capillary tube, infiltrates the cotton textile with the glue, and then infiltrates the coating cloth 74 and the end of the hemispherical shell with the glue.
[0059] A processing method of a tennis ball processing system comprises the following steps:
[0060] The first step: connect the top of the exhaust pipe 62 connected to the inside of the boost chamber 57 to the boost fan through a pipeline, connect the top of the exhaust pipe 62 connected to the inside of the exhaust chamber 59 to the negative pressure exhaust fan through a pipeline, and install a filtering device for filtering dust generated by grinding at the air inlet of the negative pressure exhaust fan, and pour the glue to be applied into the glue storage box 75 through the glue injection port 76;
[0061] Step 2: Place the hemispherical shells to be polished and glued inside the opening above the placement rack 8. There are multiple placement racks 8 available. During the subsequent polishing and gluing process, workers can visit the hemispherical shells on the spare placement racks 8 without affecting the normal operation of the machine. Before starting the machine, place the placement rack 8 full of hemispherical shells on the support frame 35 at the front side to complete the preparation work.
[0062] Step 3: Control the support rotating device 3 to work, the support rotating device 3 drives the placement rack 8 to be lifted up and then rotated, so that the placement rack 8 placed on the front side is rotated and moved, and when the placement rack 8 moves to the position above the grinding device 5, the support rotating device 3 drives the placement rack 8 to descend, and the placement rack 8 falls on the top of the grinding installation base 63, and the hemispherical shell clamped inside the placement rack 8 falls into the interior of the positioning cavity 64;
[0063] Step 4: Control the grinding. The hydraulic column 52 drives the grinding installation top seat 53 to move downward. The grinding installation top seat 53 drives the grinding block 56 to move downward through the elastic support seat 55. The grinding block 56 presses on the top of the hemispherical shell, presses the top of the hemispherical shell, and deflects the hemispherical shell to a horizontal state inside the positioning cavity 64. Then the grinding installation top seat 53 continues to press downward, increasing the pressing force of the elastic support seat 55 and the grinding block 56 on the end face of the hemispherical shell, and makes the pressing positioning rod 54 extend downward to the inside of the hemispherical shell and contact with it. The bottom inner wall of the hemispherical shell is in contact with the inner wall of the bottom, and the hemispherical shell is pressed and fixed on the top of the rotating support seat 66 by pressing the positioning rod 54. At this time, the outer wall of the hemispherical shell is in contact with the supporting ball 65, and then the grinding motor 69 is started, and the synchronous gear 67 is driven by the grinding motor 69 to rotate, and the synchronous gear 67 drives the rotating support seat 66 to rotate, and the rotating support seat 66 drives the hemispherical shell to rotate, and the top of the hemispherical shell rotates and rubs against the bottom of the grinding block 56, so as to grind the bonding end face of the spherical shell;
[0064] Step 5: After the grinding is completed, the grinding control hydraulic column 52 is controlled to retract, and the grinding control hydraulic column 52 drives the grinding installation top seat 53 to move upward, and the grinding installation top seat 53 drives the elastic support seat 55 and the grinding block 56 to move upward, and the contact with the top of the hemispherical shell is released, and the elastic sealing cover is extended to maintain the sealing state to the inside, and at the same time, the surface of the hemispherical shell is blown by the cooperation of the booster fan and the negative pressure fan to clean the surface of the hemispherical shell and collect the dust;
[0065] Step 6: After polishing and cleaning, control the polishing control hydraulic column 52 to retract, and then control the support rotating device 3 to work again to drive the hemispherical shell above the placement rack 8 to move to the bottom of the gluing device 7, control the gluing control hydraulic column 72 to extend, and the gluing control hydraulic column 72 drives the gluing installation top seat 73 to move down, and the gluing installation top seat 73 drives the coating cloth 74 to move down, and the coating cloth 74 contacts the circular end surface on the top of the hemispherical shell, so as to perform gluing on the subsequent bonding position of the hemispherical shell. After the gluing is completed, control the gluing control hydraulic column 72 to retract, and then drive the placement rack 8 to rotate to the frontmost position through the support rotating device 3 to unload and replace the new spherical shell for polishing and gluing.
[0066] The working principle and use process of the present invention are as follows: the top end of the exhaust pipe 62 connected to the inside of the boost chamber 57 is connected to the boost fan through a pipeline, and the top end of the exhaust pipe 62 connected to the inside of the exhaust chamber 59 is connected to the negative pressure exhaust fan through a pipeline, and a filtering device for filtering dust generated by grinding is installed at the air inlet position of the negative pressure exhaust fan. There are a total of several placement racks 8. The ball shell of the semi-spherical shell tennis ball after manufacturing is placed in the opening on the surface of the placement rack 8, and then the hydraulic column at the bottom of the movable support pile 31 drives the movable support pile 31 to rise upward, and then the rotating motor 33 is started to drive the movable support pile 31 to rotate through the meshing tooth head 32, so that the movable support pile 31 drives the placement rack 8 on the front side to rotate to the side support frame 34 and the support frame 35. The inside of the grinding device 5 on the right side, and then the hydraulic column drives the movable support pile 31 to move downward, and the movable support pile 31 drives the placement frame 8 to move downward through the side support frame 34 and the support frame 35, and the placement frame 8 falls on the top of the grinding installation base 63, and the hemispherical shell clamped inside the placement frame 8 falls into the interior of the positioning cavity 64, and then the grinding control hydraulic column 52 drives the grinding installation top seat 53 to move downward, and the grinding installation top seat 53 drives the grinding block 56 to move downward through the elastic support seat 55, and the grinding block 56 is pressed on the top of the hemispherical shell to press the top of the hemispherical shell, so that the hemispherical shell is deflected to a horizontal state inside the positioning cavity 64, and then the grinding installation top seat 53 continues to press downward, increasing the pressure of the elastic support seat 55 and the grinding block 56 on the end face of the hemispherical shell. The pressure is applied, and the pressing and positioning rod 54 is extended downward into the interior of the hemispherical shell to contact the bottom inner wall of the hemispherical shell. The hemispherical shell is pressed and fixed on the top of the rotating support seat 66 by pressing the positioning rod 54. At this time, the outer wall of the hemispherical shell contacts the supporting ball 65, and then the grinding motor 69 is started. The synchronous gear 67 is driven to rotate by the grinding motor 69, and the synchronous gear 67 drives the rotating support seat 66 to rotate. The rotating support seat 66 drives the hemispherical shell to rotate. The hemispherical shell rotates and its top end rubs against the bottom of the grinding block 56, thereby grinding the bonding end surface of the spherical shell to prevent the uneven end surface from affecting the quality of the subsequent bonding and molding of the two hemispherical shells. At the same time, the elastic sealing cover on the outside of the grinding and mounting top seat 53 is snapped into the groove on the top of the placement rack 8. The grinding area is sealed and the grinding control hydraulic column 52 is controlled to contract. The grinding control hydraulic column 52 drives the grinding installation top seat 53 to move upward, and the grinding installation top seat 53 drives the elastic support seat 55 and the grinding block 56 to move upward, releasing the contact with the top of the hemispherical shell. The elastic sealing cover is extended to maintain the sealing state of the inner side, and the booster fan and the negative pressure exhaust fan are started at the same time, so that the high-pressure airflow enters the booster chamber 57 and then is sprayed downward through the jet head 58, and the grinding dust adhered to the inner surface of the hemispherical shell is blown out. At the same time, the airflow will also clean the dust on the end of the hemispherical shell when it flows outward. At the same time, the dust above the grinding installation base 63 is sucked into the exhaust chamber 59 along the exhaust connecting pipe 60 through the negative pressure inside the exhaust chamber 59.After the dust enters the exhaust chamber 59, part of it will settle at the bottom of the exhaust chamber 59, and part of it will be extracted along the exhaust pipe 62. The extracted dust will be filtered by the filtering equipment, thereby completing the grinding and dust removal work; after the grinding is completed, the grinding control hydraulic column 52 is controlled to continue to contract, and the grinding installation top seat 53 is driven to a position close to the bottom of the grinding support frame 51 through the grinding control hydraulic column 52, and then the support rotating device 3 is controlled to lift and rotate again, so that the grinded hemispherical shell moves to the top of the gluing device 7. When the support rotating device 3 moves to the top of the gluing support plate 77 and then moves downward, the hemispherical shell stuck in the opening on the surface of the placement frame 8 moves upward under the obstruction of the gluing support plate 77, so that the top of the hemispherical shell is separated from the top surface of the placement frame 8, and then the gluing control hydraulic column 72 is controlled to extend, and the gluing control hydraulic column 72 drives the gluing installation top seat 7 3 moves downward, the glue installation top seat 73 drives the coating cloth 74 to move downward, and the coating cloth 74 contacts the circular end surface of the top of the hemispherical shell, so as to perform the glue application work on the subsequent bonding position of the hemispherical shell. After the glue application is completed, the glue application control hydraulic column 72 is controlled to contract, and the glue application control hydraulic column 72 drives the glue application installation top seat 73 to move upward and reset, and then the support rotation device 3 is controlled to rotate again, so that the support rotation device 3 drives the placement rack 8 and the hemispherical shell above it to rotate above the unloading support base 41, and when the placement rack 8 falls, the hemispherical shell clamped inside the placement rack 8 is lifted up by the upper push rod 42, so as to facilitate the unloading of the hemispherical shell clamped inside the placement rack 8. After the grinding and gluing are completed, the hemispherical shell is lifted up together with the placement rack 8, and then a new set of placement racks 8 are replaced and clamped and placed above the support frame 35 for grinding and gluing.
[0067] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tennis ball processing system, comprising a processing table (1) and a supporting rotating device (3), characterized in that: A supporting foot frame (2) is installed at the bottom of the processing table (1); a supporting rotating device (3) for driving a placement rack (8) to move is provided at the top and in the middle of the processing table (1); the placement rack (8) is provided above the supporting rotating device (3); an opening for clamping a tennis shell is provided at the top of the processing table (1); a supporting unloading device (4) for pushing the tennis shell to deflect is provided at the top and in the front side of the processing table (1); a grinding device (5) for grinding the end face of the tennis shell is provided at the top and in the right side of the processing table (1); and a gluing device (7) for applying glue to the end face of the tennis shell is provided at the top and in the left side of the processing table (1).
2. A tennis ball processing system according to claim 1, characterized in that: The supporting rotating device (3) comprises a movable supporting pile (31), an engaging tooth head (32), a rotating motor (33), a side supporting frame (34) and a supporting frame (35); the movable supporting pile (31) is movably plugged into the top and middle position of the processing table (1); the bottom end of the movable supporting pile (31) extends below the processing table (1); a hydraulic column for pushing the movable supporting pile (31) to move up and down is installed below the processing table (1); the engaging tooth head (32) is provided on the outer wall of the movable supporting pile (31) and is located on the upper side of the processing table (1); the top and the processing table (1) are located A rotating motor (33) is installed at a position outside the movable support pile (31), the bottom of the rotating motor (33) passes through the processing table (1) and is installed at the bottom of the processing table (1), a gear is installed at the output end of the rotating motor (33), and the gear is engaged with the meshing tooth head (32), the side support frame (34) is installed at a position above the meshing tooth head (32) and the outer wall of the movable support pile (31), and a support frame (35) for supporting the placement rack (8) is installed at one end of the side support frame (34) away from the movable support pile (31), and a slot adapted to the placement rack (8) is provided at the top of the support frame (35).
3. The tennis ball processing system according to claim 1, characterized in that: The supporting unloading device (4) comprises a unloading supporting base (41) and an upper push rod (42); the unloading supporting base (41) is installed at the top of the processing table (1) and at a position close to the front side; the upper push rod (42) is installed at the top of the unloading supporting base (41).
4. The tennis ball processing system according to claim 1, wherein: The polishing device (5) comprises a polishing support frame (51), a polishing control hydraulic column (52), a polishing mounting top seat (53), a pressing positioning rod (54), an elastic support seat (55), a polishing block (56), a pressurizing chamber (57), an air jet head (58), an exhaust chamber (59), an exhaust connecting pipe (60), an exhaust chamber cover (61), an exhaust pipe (62), a polishing mounting base (63), a positioning chamber (64), a supporting ball (65), a rotating support seat (66), a synchronous gear (67), a bottom protective cover (68) and a polishing motor (69). The polishing support frame (51) is installed at a position close to the right side of the top of the processing table (1), and the polishing control hydraulic column (52) and the polishing support frame (51) are connected to each other. ), the bottom end of the grinding control hydraulic column (52) passes through the processing table (1) and extends to the bottom of the grinding support frame (51), the grinding installation top seat (53) is installed with the bottom end of the grinding control hydraulic column (52), the pressing positioning rod (54) is installed with the bottom of the grinding installation top seat (53), the elastic support seat (55) is installed with the bottom of the grinding installation top seat (53) and is located at the outside of the pressing positioning rod (54), the grinding block (56) is installed with the bottom of the elastic support seat (55), the boost chamber (57) is opened inside the grinding installation top seat (53), the jet head (58) is installed at the bottom of the grinding installation top seat (53) and is located inside the elastic support seat (55), The top of the jet head (58) is connected to the inside of the boost chamber (57), and the exhaust chamber (59) is opened inside the polishing installation top seat (53). The exhaust connecting pipe (60) is installed at the bottom of the polishing installation top seat (53) and at a position outside the elastic support seat (55). The top of the exhaust connecting pipe (60) passes through the polishing installation top seat (53) and extends into the inside of the exhaust chamber (59). The exhaust chamber cover (61) for sealing the exhaust chamber (59) is installed with the top of the polishing installation top seat (53) by bolts. An elastic sealing cover is installed at the bottom of the polishing installation top seat (53) and at a position outside the elastic support seat (55). A groove for the bottom end of the elastic sealing cover to be clamped is opened on the top of the placement frame (8). The exhaust pipe (62) is installed on the top of the exhaust chamber cover (61). There are two exhaust pipes (62). The bottom ends of the two exhaust pipes (62) respectively pass through the exhaust chamber cover (61) and are connected to the inside of the supercharging chamber (57) and the exhaust chamber (59). The bottom protective cover (68) is installed on the bottom of the grinding mounting base (63). The bottom protective cover (68) is installed on the top of the processing table (1) and is located below the grinding support frame (51). The positioning cavity (64) is opened on the top of the grinding mounting base (63). The support ball (65) is movably embedded in the inner wall of the positioning cavity (64) and is located near the top. The rotating support seat (66) is rotatably installed through the bearing and the bottom inner wall of the pressing positioning rod (54).The bottom end of the rotating support seat (66) passes through the grinding mounting base (63) and extends to the bottom of the grinding mounting base (63). The synchronous gear (67) is installed with the bottom end of the rotating support seat (66). Adjacent synchronous gears (67) are meshed with each other. The grinding motor (69) is installed with the bottom of the bottom protective cover (68). The output end of the grinding motor (69) passes through the bottom protective cover (68) and is installed with the bottom of the synchronous gear (67).
5. The tennis ball processing system according to claim 1, characterized in that: The glue coating device (7) comprises a glue coating support frame (71), a glue coating control hydraulic column (72), a glue coating installation top seat (73), a coating cloth (74), a glue storage box (75) and a glue injection port (76). The glue coating support frame (71) is installed at a position close to the left side of the top of the processing table (1). The glue coating control hydraulic column (72) is installed at the top of the glue coating support frame (71). The output end of the glue coating control hydraulic column (72) passes through the glue coating support frame (71) and extends to the bottom of the glue coating support frame (71). The glue coating installation top seat (73) is installed with the bottom end of the glue coating control hydraulic column (72), the smear cloth (74) is installed with the bottom of the glue coating installation top seat (73), the glue storage box (75) is installed with the top of the glue coating installation top seat (73) and is located outside the glue coating control hydraulic column (72), a glue injection port (76) for injecting glue into the glue storage box (75) is installed on the top of the glue storage box (75), and the glue coating support plate (77) is installed with the top of the processing table (1) and is located below the glue coating support frame (71).
6. A tennis ball processing system according to claim 2, characterized in that: Each time the rotating motor (33) is started, the movable support pile (31) is driven to rotate (120) degrees through the cooperation of the gear and the meshing tooth head (32). The side support frames (34) and the support frames (35) are each provided with three and are arranged in a circumferential array outside the movable support pile (31).
7. The tennis ball processing system according to claim 5, characterized in that: The distance between the placement rack (8) and the glue-coated support plate (77) is smaller than the radius of the tennis hemisphere shell.
8. The tennis ball processing system according to claim 4, characterized in that: The top end of the exhaust connecting pipe (60) extends into the exhaust cavity (59) and then extends upward to the middle height position of the exhaust cavity (59).
9. The tennis ball processing system according to claim 5, characterized in that: A communicating capillary tube is installed at the bottom of the glue storage box (75), and the bottom end of the communicating capillary tube penetrates the glue coating mounting top seat (73) and extends into the interior of the smearing cloth (74). The smearing cloth (74) is made of cotton textile. The surface of the portion of the communicating capillary tube extending into the interior of the smearing cloth (74) is provided with a pore.
10. A method for processing a tennis ball processing system, comprising the tennis ball processing system according to any one of claims 1 to 9, characterized in that: The following steps are involved: The first step: the top of the exhaust pipe (62) communicating with the inside of the boost chamber (57) is connected to the boost fan through a pipe, and the top of the exhaust pipe (62) communicating with the inside of the exhaust chamber (59) is connected to the negative pressure exhaust fan through a pipe, and a filter device for filtering dust generated by grinding is installed at the air inlet of the negative pressure exhaust fan, and the glue to be applied is poured into the interior of the glue storage box (75) through the glue injection port (76); Step 2: Place the hemispherical shells to be polished and glued on the opening above the placement rack (8). There are multiple placement racks (8) available. During the subsequent polishing and gluing process, workers can visit the hemispherical shells on the spare placement racks (8) without affecting the normal operation of the machine. Before starting the machine, place the placement rack (8) filled with hemispherical shells on the support frame (35) at the front side to complete the preparation work. Step 3: Control the support rotation device (3) to work, the support rotation device (3) drives the placement rack (8) to be lifted upward and then rotated, so that the placement rack (8) placed on the front side is rotated and moved, and when the placement rack (8) moves to the position above the grinding device (5), the support rotation device (3) drives the placement rack (8) to descend, and the placement rack (8) falls above the grinding installation base (63), and the hemispherical shell clamped inside the placement rack (8) falls into the interior of the positioning cavity (64); Step 4: Control the grinding control hydraulic column (52) to drive the grinding installation top seat (53) to move downward, and the grinding installation top seat (53) drives the grinding block (56) to move downward through the elastic support seat (55), and presses the top of the hemispherical shell through the grinding block (56), pressing the top of the hemispherical shell to deflect the hemispherical shell to a horizontal state inside the positioning cavity (64), and then the grinding installation top seat (53) continues to press downward, increasing the pressing force of the elastic support seat (55) and the grinding block (56) on the end face of the hemispherical shell, and causing the pressing positioning rod (54) to extend downward into the interior of the hemispherical shell. The bottom inner wall of the hemispherical shell is contacted, and the hemispherical shell is pressed by pressing the positioning rod (54) to fix the hemispherical shell on the top of the rotating support seat (66). At this time, the outer wall of the hemispherical shell is in contact with the supporting ball (65), and then the grinding motor (69) is started, and the synchronous gear (67) is driven to rotate by the grinding motor (69), and the synchronous gear (67) drives the rotating support seat (66) to rotate, and the rotating support seat (66) drives the hemispherical shell to rotate. The top of the hemispherical shell rotates and rubs against the bottom of the grinding block (56), thereby grinding the bonding end surface of the spherical shell; Step 5: After the polishing is completed, the polishing control hydraulic column (52) is controlled to retract, and the polishing control hydraulic column (52) drives the polishing installation top seat (53) to move upward, and the polishing installation top seat (53) drives the elastic support seat (55) and the polishing block (56) to move upward, thereby releasing the contact with the top of the hemispherical shell. The elastic sealing cover is extended to maintain the sealing state on the inside. At the same time, the surface of the hemispherical shell is blown by the cooperation of the booster fan and the negative pressure fan to clean the surface of the hemispherical shell and collect the dust; Step 6: After the polishing and dust cleaning is completed, the polishing control hydraulic column (52) is controlled to retract, and then the support rotation device (3) is controlled to work again to drive the hemispherical shell above the placement rack (8) to move to the bottom of the gluing device (7), and the gluing control hydraulic column (72) is controlled to extend. The gluing control hydraulic column (72) drives the gluing installation top seat (73) to move downward, and the gluing installation top seat (73) drives the coating cloth (74) to move downward. The coating cloth (74) contacts the circular end surface of the top of the hemispherical shell, thereby performing gluing work on the subsequent bonding position of the hemispherical shell. After the gluing is completed, the gluing control hydraulic column (72) is controlled to retract, and then the placement rack (8) is driven to rotate to the front position through the support rotation device (3) to unload and replace the new spherical shell for polishing and gluing.
Citation Information
Patent Citations
Automatic edge grinding machine
CN219444575U
Automatic deburring device for mechanical part machining
CN117124173A
Multi-station automatic feeding machine tool
CN118060438A
Bearing steel ball polishing device with cleaning function
CN216151948U
Ball center polishing machine
CN219599080U
