Overground and underground linkage slurry mixing and conveying method
Through the slurry mixing and transport method linked to the well and the underground, the gravity potential energy and admixtures are used to solve the problems of low slurry conveying efficiency and insufficient early strength in the cementing and filling process, and the efficient fluidity and filling strength of the slurry are achieved. The risk of plugging pipes and filling costs are reduced.
Patent Information
- Application Number
- CN202411275546.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-08
AI Technical Summary
The existing cementing and filling process has low conveying efficiency and insufficient early strength of the slurry, resulting in a reduced coal mining efficiency. The slurry is prone to blocking the pipe during long-distance transportation, making it difficult to take into account both fluidity and early strength.
The slurry mixing and conveying method that is linked to the well and the underground well are used. The slurry is discharged and mixed in the surface station through the silo and added suspending agent and water reducing agent. The gravity potential energy is used to transport it to the underground empty mixing station, and then the early is added to the underground well. The strong agent and the quick-coagulant are delivered by pressurized through the filling pump to form a filling body, adjusting the power of the filling pump to control the delivery efficiency.
It improves the fluidity and early strength of the slurry, reduces the probability of pipe blocking, reduces the filling cost, meets the filling efficiency requirements of the working face, and extends the investment payback period.
Smart Images

Figure CN118906248A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine filling mining, and in particular to a method for mixing and conveying slurry in a coordinated manner above and below the mine. Background Art
[0002] Backfill coal mining technology is widely used in "three-down" coal mining due to its high resource recovery rate and high degree of environmental protection. The cemented backfill process has a stronger ability to resist deformation than the overburden deformation control ability of solid backfill, making it the preferred process in ecologically sensitive areas.
[0003] At present, the conveying efficiency of the cementing filling process is far lower than the coal mining efficiency, the early strength of the filling body, and the setting time are long, which leads to a significant reduction in coal mining efficiency and even pipe blockage. The early strength of the filling body does not meet the control requirements, the filling support cannot be moved forward, and the coal mining process is shelved. After the early strength of the filling body is improved, the final setting strength will increase accordingly, far exceeding the deformation control requirements of the overburden, and the filling cost will increase sharply. In response to the above problems, high-power filling pumps are often used to improve the slurry conveying efficiency, but the initial investment cost is significantly increased and the investment recovery period is greatly extended. In addition, the basic properties of the slurry are improved by adding admixtures, but for long-distance transportation, it is difficult to solve the contradiction between the fluidity of the slurry and the early strength. Therefore, the slurry conveying method can be changed to adapt to the slurry fluidity requirements of long-distance transportation and avoid slurry pipe blockage; by reasonably adjusting the slurry ratio, the early strength can be improved under the condition that the final setting strength of the filling body remains unchanged. Summary of the invention
[0004] The purpose of the present invention is to provide a method for mixing and conveying slurry in a linked manner above and below the well, which can solve the problem of pipe blockage caused by filling slurry and take into account the requirements of slurry fluidity and filling body strength.
[0005] The present invention discloses a method for mixing and conveying slurry in an uphole and downhole manner, comprising the steps of mixing slurry in an uphole and downhole. When mixing slurry in an uphole, a filling station 3 on the ground surface discharges materials through a silo 2 to mix the slurry, and adds admixtures such as a suspending agent and a water reducing agent, and conveys the slurry to an underground empty-field mixing station 5 through a filling pipeline 4 by utilizing gravitational potential energy. When mixing slurry in the downhole, admixtures such as an early strength agent and a quick-setting agent are added to the slurry, which is pressurized by a filling pump and conveyed to a working face through a filling pipeline to form a filling body 6.
[0006] Beneficial effects of the present invention: Compared with the existing related inventions, the present invention has the following advantages: (1) According to the height difference between the surface filling station and the underground empty field mixing station, and according to the filling multiple line requirements under the condition of no filling pump, the lateral relative position of the empty field mixing station is established, and the gravitational potential energy is fully utilized, the use of filling pumps is reduced, and the filling cost is reduced; (2) When the slurry is mixed on the well, a suspending agent and a water reducing agent are added to improve the fluidity of the slurry. When the slurry is mixed underground, an early strength agent and an accelerated setting agent are added to shorten the setting time of the slurry, improve the early strength of the filling body, and solve the contradiction between the fluidity and early strength of the slurry; (3) By mixing twice on the well and underground, the segregation and sedimentation of the slurry during long-distance transportation can be avoided, and the probability of pipe blockage can be greatly reduced; (4) The slurry transportation efficiency can be controlled by adjusting the filling pump power to meet the filling efficiency requirements of the working face. BRIEF DESCRIPTION OF THE DRAWINGS
[0007] Figure 1 It is a schematic diagram of slurry preparation and transportation; Figure 2 This is a schematic diagram of an empty batching station.
[0008] Explanation of the accompanying drawings: filling body 1, silo 2, filling station 3, pipeline 4, open-field mixing station 5, mixing silo No. 1 6, mixing silo No. 2 7, mixing silo No. 3 8, filling pump 9. DETAILED DESCRIPTION
[0009] The present invention is further described below in conjunction with the accompanying drawings and specific implementation examples, which are only used to disclose the present invention and are not limited to the examples. After reading the present invention, all equivalent substitutions and modifications made within the principles of the present invention belong to the protection scope of the present invention.
[0010] The working principle of the present invention is as follows: (1) Independent control of the above-ground and underground conveying systems: The slurry mixing and conveying mechanisms above-ground and underground are different. The slurry is prepared at the above-ground filling station and the mixing is relatively sufficient. The slurry is conveyed by relying on gravitational potential energy. The conveying efficiency is controlled by adjusting the conveying aperture of the filling station. The underground mixing station is an auxiliary mixing station with a relatively small degree of mixing. The conveying efficiency is adjusted by the filling pump power. The above-ground and underground slurry conveying efficiencies are regulated by independent systems; (2) Matching of the above-ground and underground slurry conveying efficiencies: By adjusting the conveying efficiencies of the two conveying systems, the continuous operation of the filling station is achieved, and empty field mixing is achieved. The station is equipped with three mixing bins. Mixing bin No. 1 stores the slurry transported from the well and prepares the material for adding admixtures to the No. 2 slurry mixing bin. Mixing bin No. 3 stores the slurry after the second slurry mixing in mixing bin No. 2 and prepares the material for underground transportation. The filling pump power is adjusted to make the transportation efficiency of mixing bin No. 3 equal to the storage efficiency of mixing bin No. 1. (3) Solve the contradiction between the fluidity and early strength of the slurry: When preparing the slurry at the well filling station, suspending agent and water reducing agent are added to improve the fluidity of the slurry. When the underground empty-field mixing station mixes the slurry for the second time, early strength agent and accelerator are added to shorten the setting time of the slurry and improve the initial setting strength of the filling body.
[0011] like Figure 1 , 2 As shown, the method for mixing and conveying slurry in linkage with the underground includes the steps of mixing slurry in the hole and mixing slurry in the hole. When mixing slurry in the hole, the slurry is mixed by feeding the slurry through the silo 2 at the filling station 3 on the surface, and admixtures such as suspending agent and water reducing agent are added, and the slurry is conveyed to the underground empty mixing station 5 through the filling pipeline 4 by utilizing the gravitational potential energy. When mixing slurry in the hole, admixtures such as early strength agent and quick setting agent are added to the slurry, which is pressurized by the filling pump and conveyed to the working face through the filling pipeline to form a filling body 6.
[0012] like Figure 1 As shown, the slurry is made by mixing gangue, fly ash, cement and water. The slurry concentration is higher than 80%. The strength of the filling body after initial setting is higher than 2MPa, and the strength of the filling body after final setting is higher than 6MPa.
[0013] like Figure 1 As shown, the admixtures include suspending agent, water reducing agent, early strength agent and accelerating setting agent; the suspending agent is rich in sodium polyacrylate and polyethyleneimine; the water reducing agent is rich in lignin sulfonate; the accelerating setting agent is rich in aluminate and carbonate; the early strength agent is rich in sulfate.
[0014] like Figure 1 , 2 As shown, the open-field mixing station 5 includes three mixing bins, mixing bin No. 1 6 is used for preparing materials and storing slurry transported from the well, mixing bin No. 2 7 is used for adding admixtures such as early strength agent and quick setting agent and fully mixing, and mixing bin No. 3 8 is used for preparing materials for underground transportation; the positions of the three mixing bins are stepped down, with mixing bin No. 1 6 at the highest position and mixing bin No. 3 8 at the lowest position, and the three are connected by pipelines; the slurry transported from the well is stored in mixing bin No. 1 6, then input into mixing bin No. 2 7, and admixtures are added, and after being fully mixed, it enters into mixing bin No. 3 8.
[0015] like Figure 1 As shown, the location of the empty-field mixing station 5 needs to be selected in combination with the location of the filling station 3 on the ground surface and the filling multiple, and the filling multiples of the filling station 3 and the empty-field mixing station 5 are less than 5.
[0016] like Figure 1 As shown, the filling pump 9 adopts a plunger filling pump, and its power is determined according to the filling amount of the working surface and the uphole conveying efficiency. The pumping efficiency of the plunger pump is higher than the uphole slurry conveying efficiency.
[0017] like Figure 1 As shown, a method for mixing and conveying slurry in a well and underground linkage, the steps are: (1) Slurry mixing on the well: The crushed gangue is transported to the filling station 3, and cement and fly ash are discharged to the filling station 3 through the silo 2. After the gangue, fly ash and cement are fully mixed, water is added according to the proportion. After the slurry is fully mixed, the suspending agent and water reducing agent are added and stirred until the slurry is uniform; (2) Slurry transportation on the well: After the slurry is evenly stirred, the slurry is transported to the well through the filling pipe; (3) Underground slurry mixing: After the slurry enters the No. 1 mixing bin 6 of the empty-field mixing station, the slurry is transported to the No. 2 mixing bin 7 through a pipeline after the material is emptied from the No. 2 mixing bin 7, and early strength agent and quick setting agent are added to the No. 2 mixing bin 7 and stirred until the slurry is uniform. After the material is emptied from the No. 3 mixing bin 8, the slurry is transported to the No. 3 mixing bin 8 through a pipeline. The three mixing bins of the empty-field mixing station realize one storage, one mixing, and one standby; (4) Underground slurry transportation: After the No. 3 mixing bin 8 is full of material and the working face is blocked, the valve of the No. 3 mixing bin 8 is opened and the slurry is transported to the filling working face under pressure through the filling pump 9; (5) Flushing pipes after filling: After the working face is filled, water is injected through filling station 3 to clean the pipes and related equipment.
Claims
1. A method for mixing and conveying slurry in a well and underground linkage, characterized in that The method comprises the steps of mixing slurry on the well and mixing slurry underground. When mixing slurry on the well, the slurry is mixed by feeding the material through the silo (2) at the filling station (3) on the surface, and admixtures such as suspending agent and water reducing agent are added. The slurry is then transported to the underground empty mixing station (5) through the filling pipeline (4) by utilizing the gravity potential energy. When mixing slurry underground, admixtures such as early strength agent and quick setting agent are added to the slurry, which is pressurized by the filling pump and transported to the working face through the filling pipeline to form a filling body (6).
2. The method for mixing and conveying slurry in a coordinated manner uphole and downhole according to claim 1, characterized in that: The slurry is prepared by mixing gangue, fly ash, cement and water. The slurry concentration is higher than 80%. The filling body strength after initial setting is higher than 2MPa, and the filling body strength after final setting is higher than 6MPa.
3. The method for mixing and conveying slurry in a coordinated manner uphole and downhole according to claim 1, characterized in that: The admixtures include suspending agent, water reducing agent, early strength agent and accelerating setting agent; the suspending agent is rich in sodium polyacrylate and polyethyleneimine; the water reducing agent is rich in lignin sulfonate; the accelerating setting agent is rich in aluminate and carbonate; and the early strength agent is rich in sulfate.
4. The method for mixing and conveying slurry in a coordinated manner uphole and downhole according to claim 1, characterized in that: The open-field mixing station (5) comprises three mixing bins, wherein the No. 1 mixing bin (6) is used for preparing materials and storing slurry transported from the well, the No. 2 mixing bin (7) is used for adding admixtures such as early strength agent and quick setting agent and fully mixing, and the No. 3 mixing bin (8) is used for preparing materials for underground transportation; the positions of the three mixing bins are stepped down, with the No. 1 mixing bin (6) being the highest and the No. 3 mixing bin (8) being the lowest, and the three are connected by pipelines; the slurry transported from the well is stored in the No. 1 mixing bin (6), then input into the No. 2 mixing bin (7), and admixtures are added, and after being fully mixed, it enters the No. 3 mixing bin (8).
5. The method for mixing and conveying slurry in a coordinated manner uphole and downhole according to claim 1, characterized in that: The position of the empty-field mixing station (5) needs to be selected in combination with the position of the filling station (3) on the ground surface and the filling multiple, and the filling multiple of the filling station (3) and the empty-field mixing station (5) is less than 5.
6. The method for mixing and conveying slurry in a coordinated manner uphole and downhole according to claim 1, characterized in that: The filling pump (9) is a plunger-type filling pump, the power of which is determined according to the filling volume of the working surface and the conveying efficiency on the well. The pumping efficiency of the plunger pump is higher than the slurry conveying efficiency on the well.
7. A method for mixing and conveying slurry in a well and underground linkage, the steps of which are: (1) Slurry mixing on the well: The crushed gangue is transported to the filling station (3), cement and fly ash are discharged to the filling station (3) through the silo (2), the gangue, fly ash and cement are fully mixed, water is added according to proportion, and after the slurry is fully mixed, a suspending agent and a water reducing agent are added and stirred until the slurry is uniform; (2) Slurry transportation on the well: After the slurry is evenly stirred, the slurry is transported to the well through the filling pipe; (3) Underground slurry mixing: After the slurry enters the No. 1 mixing bin (6) of the empty-field mixing station, the slurry is transported to the No. 2 mixing bin (7) through a pipeline after the material is emptied from the No. 2 mixing bin (7), and an early strength agent and an accelerated setting agent are added to the No. 2 mixing bin (7) and stirred until the slurry is uniform. After the material is emptied from the No. 3 mixing bin (8), the slurry is transported to the No. 3 mixing bin (8) through a pipeline. The three mixing bins of the empty-field mixing station realize one storage, one mixing, and one standby. (4) Underground slurry transportation: After the No. 3 mixing bin (8) is full of material and the working face is sealed, the valve of the No. 3 mixing bin (8) is opened and the slurry is pressurized and transported to the filling working face through the filling pump (9); (5) Flushing pipes after filling: After the working face is filled, water is injected through the filling station (3) to clean the pipes and related equipment.