Electric locomotive safe operation method in power-grid-free area based on shunting monitoring system

Through the method based on the shunting monitoring system, the status of the electric locomotive is judged and the protection distance is calculated to ensure that the electric locomotive does not enter the gridless area, solving the problem of safety hazards of the shunting operation of the electric locomotive in the gridless area, and improving the operating efficiency and safety .

CN118907183APending Publication Date: 2024-11-08CASCO SIGNAL LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411129822.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the gridless area, there are safety hazards for shunting operations of electric locomotives. The traditional 'long rod fishing' method is not only unsafe, but also increases shunting operations time and reduces work efficiency.

Method used

Using a method based on shunting monitoring system, we can judge the type of locomotive and obtain the gridless protection point, automatically judge the traction or push status of the electric locomotive, calculate the protection distance, ensure that the electric locomotive does not enter the gridless area, and prompt the driver to be in front of it through the on-board display screen. Power grid area to reduce manual misoperation.

Benefits of technology

Effectively prevent electric locomotives from entering the gridless area, improve the safety and efficiency of shunting operations, reduce the possibility of misjudgment, and shorten the shunting operation time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118907183A_ABST
    Figure CN118907183A_ABST
Patent Text Reader

Abstract

The invention provides a shunting monitoring system-based safe operation method for an electric locomotive in a power-grid-free area, which comprises the following steps of: S1, judging whether the locomotive is an electric locomotive or not, and if so, acquiring a power-grid-free protection point of a station yard; s2, searching an access road of the electric locomotive, if the access road is arranged to the power-grid-free area, setting an access road parking point as a power-grid-free protection point, cutting off the access road, and controlling the train set to be parked at a safe parking position; s3, judging whether the electric locomotive is in a traction state or a pushing state before parking; if so, allowing the driver to unlock the non-power-grid protection point; s4, after the driver executes unlocking operation, the shunting monitoring system calculates a protection distance; and the electric locomotive pushes the vehicle to run towards the power-grid-free area for a protection distance, so that the vehicle enters the power-grid-free area for operation. A plurality of sections of isolation vehicles do not need to be arranged between the electric locomotive and the pushed vehicle, and when the vehicle is pushed to the power-grid-free area for operation, the electric locomotive does not enter the power-grid-free area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of rail transit technology, and in particular to a method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system. Background Art

[0002] At present, some sections of the station lines and dedicated lines of electrified railway stations in my country are not hung with overhead wires. For example, freight lines (lines with funnels) that use various cross-line and side-mounted cranes for loading and unloading operations, and oil depot lines to prevent sparks between the pantograph of the electric locomotive and the overhead wire that endanger safety, are not electrified. For these lines without overhead wires, diesel locomotives are currently usually used for shunting operations. When there are no diesel locomotives to deploy, electric locomotives are also used for shunting operations. When electric locomotives push vehicles into the powerless area for unhooking and matching cargo positions, the "long rod fishing" method is currently used. That is, the electric locomotive carries a certain number of vehicles as "isolation vehicles" to ensure that the electric locomotive can complete the unhooking and matching cargo position operations without entering the power grid. The "long pole fishing" method is a physical isolation method, which requires a sufficient number of vehicles as isolation vehicles to ensure that when the isolation vehicle enters the no-power area for operation, there is a safe distance of at least 1-2 vehicles between the electric locomotive and the contact network end mark or dividing insulator. At the same time, the driver is reminded by marking the words "no-power area" in the notes column of the shunting operation order.

[0003] The above traditional methods are not safe. Due to the driver's misoperation or failure to see the "no power zone" reminder in the note column of the work order, or the wrong route to the no power grid area, it is easy for the driver to drive the electric locomotive into the no power grid area, causing equipment damage and casualties and other safety accidents. At the same time, "long rod fishing" increases the number of locomotives in shunting operations, prolongs the shunting operation time, and reduces work efficiency. Summary of the invention

[0004] The purpose of the present invention is to provide a method for safe operation of electric locomotives in a grid-free area based on a shunting monitoring system. First, the type of locomotive is determined. If it is an electric locomotive, the grid-free protection point of the station is obtained, and the approach parking point of the electric locomotive is set to the grid-free protection point, and the train is controlled to stop at a safe parking position. Then, it is automatically determined whether the electric locomotive is in a traction state or a push state. For an electric locomotive in a push state, the driver is allowed to unlock the grid-free protection point. After unlocking, the approach is extended from the grid-free protection point to a protection distance (calculated). In the case where no isolation vehicle is set between the electric locomotive and the pushed vehicle, the vehicle is pushed to the grid-free area for operation, and the electric locomotive will not enter the grid-free area.

[0005] In order to achieve the above object, the present invention provides a method for safe operation of an electric locomotive in a non-grid area based on a shunting monitoring system, comprising the steps of:

[0006] S1. Determine whether the locomotive is an electric locomotive; if it is an electric locomotive, obtain the off-grid protection point of the station; the off-grid protection point is the boundary point between the off-grid area and the grid area;

[0007] S2, searching for the approach of the electric locomotive, if the approach of the electric locomotive is arranged to the non-grid area, setting the approach stop point of the electric locomotive to the non-grid protection point, cutting off the approach, and controlling the train to stop at a safe parking position; the train includes a locomotive and a vehicle connected to the locomotive; when the train is in the safe parking position, the train is located in the grid area and has a preset safety distance from the non-grid protection point;

[0008] S3, determining whether the electric locomotive is in a traction state or a push state before stopping; if it is in a push state, allowing the driver to unlock the off-grid protection point;

[0009] S4. After the driver performs the unlocking operation, the shunting monitoring system calculates the protection distance; the electric locomotive pushes the vehicle to travel the protection distance toward the non-grid area, so that the vehicle enters the non-grid area to operate.

[0010] Optionally, in step S3, determining whether the electric locomotive is in a traction state or a push state before stopping includes the following steps:

[0011] S31, the shunting monitoring system preliminarily determines whether the electric locomotive is in a pushing state or a traction state according to the acquired horizontal shunting information; if it is in a pushing state, the first state identifier is set to 1;

[0012] S32, based on the latitude and longitude information obtained by the on-board satellite positioning antenna of the electric locomotive and the electronic map, calculate the position information of the head of the electric locomotive; obtain the installation position of the satellite positioning antenna on the electric locomotive; calculate the position information of the head of the train according to the red light band; calculate the length of the vehicle based on the position information of the head of the electric locomotive, the installation position and the position information of the head of the train; the head of the train faces the non-grid area, and the tail of the train is away from the non-grid area, when pushing, the tail of the vehicle is connected to the head of the electric locomotive, and when pulling, the head of the vehicle is connected to the tail of the electric locomotive;

[0013] S33, if the vehicle length is greater than the set length threshold, the shunting monitoring system again determines that the electric locomotive is in a push state, and sets the second state identifier to 1;

[0014] S34. If the first state identifier and the second state identifier are both 1, the shunting monitoring system finally determines that the electric locomotive is in a pushing state.

[0015] Optionally, in step S31, the shunting monitoring system obtains shunting information through the on-board train operation monitoring device. If the shunting information of push, ten-car, five-car, and three-car is received in sequence, and the electric locomotive has not stopped, it is preliminarily judged that the electric locomotive is in a pushing state.

[0016] Optionally, step S32 includes:

[0017] S321, the shunting monitoring system calculates the first section where the electric locomotive is located and the first distance between the on-board satellite positioning antenna and the insulating joint by using the acquired latitude and longitude information and the electronic map; the insulating joint is located between the on-board satellite positioning antenna and the area without power grid;

[0018] S322, reading the locomotive information configuration file stored in the shunting monitoring system, and obtaining a second distance between the on-board satellite positioning antenna and the driver's cabin I of the locomotive;

[0019] S323, the shunting monitoring system obtains the second section where the head of the train is located according to the red light band, and calculates the distance traveled by the head of the train in the second section;

[0020] S324, let Trainlen represent the length of the vehicle;

[0021] If the first section and the second section are not the same section, and the second section is ahead of the first section on the route of the electric locomotive, Trainlen=m+t+q1-n;

[0022] If the first segment and the second segment are the same segment, Trainlen=m+t-q2-n;

[0023] Among them, m is the first distance, n is the second distance, q1 is the distance between the first section and the second section; q2 is the length of the first section, and t is the distance traveled by the head of the train in the second section where the head of the train is currently located according to the red light band tracking.

[0024] Optionally, in step S324, if the first section and the second section are not the same section, and the first section is ahead of the second section on the route of the electric locomotive, the vehicle length is not calculated.

[0025] Optionally, in step S4, the shunting monitoring system calculates the protection distance including the following steps:

[0026] The shunting monitoring system searches for the next target point from the off-grid protection point and calculates the third distance between the vehicle head and the next target point; let x represent the protection distance, s represent the third distance, x=min(s, Trainlen); the next target point is a conventional protection point on the station yard, including: one of a closed signal, an earth barrier, a station boundary marker, a first-order parking point, and a derailer.

[0027] Optionally, in step S1, the grid-free protection point of the station is obtained from a station information configuration file stored in the shunting vehicle monitoring system.

[0028] Optionally, in step S1, a locomotive type field is obtained from a locomotive information configuration file stored in the shunting monitoring system, and whether the locomotive is an electric locomotive is determined based on the locomotive type field.

[0029] Optionally, in step S1, if the locomotive is determined to be a non-electric locomotive and is not affected by the no-grid protection point, the route search continues when encountering the no-grid protection point, and the route search ends at the conventional protection point on the station yard; the non-electric locomotive does not need to be protected from the no-grid, and the non-electric locomotive is protected based on the conventional protection point; the conventional protection point includes: one of a closed signal, an earth barrier, a station boundary marker, a first-order stopping point, and a derailer.

[0030] Optionally, in step S2, the shunting monitoring system generates a speed limit curve corresponding to the route of the electric locomotive, and triggers emergency braking based on the speed limit curve and the actual speed of the electric locomotive.

[0031] Optionally, in step S2, when the vehicle train stops at the safe parking position, an indication signal of "no grid area" is displayed in the "front signal" column on the on-board display screen.

[0032] Optionally, in step S2, the safety distance is 20 meters.

[0033] Optionally, the length threshold in step S33 is 10 meters to 20 meters.

[0034] Optionally, in step S4, when the electric locomotive pushes the vehicle to travel the protection distance toward the area without power grid, an indication signal of "area without power grid" is displayed in the "signal ahead" column on the on-board display screen.

[0035] Optionally, the on-board display screen includes a display screen and a DMI of a train operation monitoring device.

[0036] Optionally, the driver performs an unlocking operation on the operating interface of the train operation monitoring device; if the driver performs an unlocking operation when the electric locomotive is in traction state, the shunting monitoring system determines that the unlocking operation is invalid and does not unlock the off-grid protection point.

[0037] Compared with the prior art, the present invention has the following beneficial effects:

[0038] 1) The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system of the present invention first determines the type of locomotive. If it is an electric locomotive, the non-grid protection point of the station is obtained, and the approach parking point of the electric locomotive is set to the non-grid protection point, thereby effectively preventing the approach of the electric locomotive from being arranged in the non-grid area and avoiding the occurrence of safety accidents. Then, it is automatically determined whether the electric locomotive is in a traction state or a push state. For an electric locomotive in a push state, the train (including the locomotive and the working vehicle connected to the locomotive) is controlled to stop at a safe parking position, and the driver is allowed to unlock the non-grid protection point. After unlocking, the approach is extended from the non-grid protection point to the protection distance (calculated), and when no isolation vehicle is set between the electric locomotive and the pushed vehicle (no need to adopt the "long rod fishing" method), the vehicle is pushed to the non-grid area for operation, and the electric locomotive will not enter the non-grid area. The present invention greatly shortens the shunting operation time and improves work efficiency.

[0039] 2) In the present invention, the shunting monitoring system receives the horizontal adjustment information sent by the shunting team members through the horizontal adjustment handheld console from the train operation monitoring device (LKJ), and preliminarily determines whether the electric locomotive is in a push state based on the horizontal adjustment information. The shunting monitoring system also calculates the vehicle length based on multi-source information such as the installation position of the satellite positioning antenna, the electric locomotive head position information obtained by the satellite positioning antenna, and the train head position information calculated based on the red light band tracking, and again determines whether the electric locomotive is in a push state based on the calculated vehicle length. If the results of the initial judgment and the second judgment are both that the electric locomotive is in a push state, the shunting monitoring system finally determines that the electric locomotive is in a push state. The electric locomotive push traction state judgment method of the present invention greatly improves the judgment accuracy, reduces the possibility of misjudgment, and reduces the reliance on manual judgment.

[0040] 3) The present invention comprehensively considers the situations where the head of the electric locomotive and the head of the vehicle are located in the same section or in different sections, calculates the length of the vehicle connected to the electric locomotive, and provides an accurate data basis for how long the approach can be continued after the electric locomotive pushes the vehicle into the non-grid area for operation. By extending the approach of the electric locomotive from the non-grid protection point by the length of the protection distance (obtained by clear calculation), when no isolation vehicle is set between the electric locomotive and the pushed vehicle, the vehicle can be pushed to the non-grid area for operation, and it is ensured that the electric locomotive will not enter the non-grid area.

[0041] 4) In the present invention, when the electric locomotive approaches the no-grid area and the vehicle being pushed enters the no-grid operation, the on-board display screen always displays the "no-grid area" indication signal to remind the driver that there is a no-grid area ahead, and the driver no longer needs to check the "no-grid" reminder in the work order. The present invention uses the no-grid protection point as a parking point for protection, ensuring that the electric locomotive cannot cross the no-grid area, and there is no need to worry about the driver mistakenly operating and entering the no-grid area, which greatly improves the safety of operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solution of the present invention, the following briefly introduces the drawings required for the description. Obviously, the drawings described below are an embodiment of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work:

[0043] Figure 1 It is a flow chart of a method for safe operation of electric locomotive in a non-grid area based on a shunting monitoring system of the present invention;

[0044] Figure 2 This is a schematic diagram of calculating the vehicle length when the first section and the second section are different sections in the first embodiment of the present invention;

[0045] Figure 3 This is a schematic diagram of calculating the vehicle length when the first section and the second section are the same section in the first embodiment of the present invention;

[0046] Figure 4 This is a flow chart of determining whether a locomotive is in a traction state or a push state in Embodiment 2 of the present invention;

[0047] Figure 5 This is a flow chart of safety protection of an electric locomotive in an area without a power grid in the second embodiment of the present invention. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] It should be understood that when used in this specification and the appended claims, the term "comprising" indicates the presence of described features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof.

[0050] It should also be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the application. As used in this application specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.

[0051] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0052] As used in this specification and the appended claims, the term "if" may be interpreted as "when" or "upon" or "in response to determining" or "in response to detecting," depending on the context. Similarly, the phrases "if it is determined" or "if [described condition or event] is detected" may be interpreted as meaning "upon determination" or "in response to determining" or "upon detection of [described condition or event]" or "in response to detecting [described condition or event]," depending on the context.

[0053] In addition, in the description of the present application, the terms "first", "second", "third", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0054] Embodiment 1

[0055] This embodiment provides a method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system. Figures 1 to 3 As shown, the method comprises the steps of:

[0056] S1. Determine whether the locomotive is an electric locomotive; if it is an electric locomotive, obtain the off-grid protection point of the station. The off-grid protection point is the boundary point between the off-grid area and the grid area.

[0057] In this embodiment, the off-grid protection point of the station is obtained by reading the off-grid information field in the station information configuration file stationcfg.ini stored in the shunting monitoring system. The station information configuration file stationcfg.ini can be generated according to the "Station Operation Work Regulations" and the data collected by on-site surveying and mapping. In this embodiment, the locomotive type field is obtained from the locomotive information configuration file trainInfo.txt stored in the shunting monitoring system, and the locomotive is judged to be an electric locomotive or a non-electric locomotive (for example, a diesel locomotive) based on the locomotive type field.

[0058] If the locomotive is determined to be a non-electric locomotive and is not affected by the off-grid protection point, the route search will continue when encountering the off-grid protection point, and the route search will end at the conventional protection point on the station yard; the non-electric locomotive does not need off-grid protection, and the non-electric locomotive is protected based on the conventional protection point; the conventional protection point includes: one of the closed signal, earth barrier, station boundary marker, one-time parking point, and derailer.

[0059] S2. Search the route of the electric locomotive. If the route of the electric locomotive is arranged to the non-grid area, set the route stop point of the electric locomotive to the non-grid protection point, cut off the route, and control the train to stop at a safe parking position. The train includes an electric locomotive and a vehicle connected to the electric locomotive; when the train is in the safe parking position, the train is located in the grid area and has a preset safety distance from the non-grid protection point.

[0060] When the shunting monitoring system searches for the approach of each locomotive, if it encounters a point without power grid protection, the approach will be cut off for electric locomotives, and the approach stop point will be set as a point without power grid protection. For non-electric locomotives, they will not be affected by the area without power grid and will continue to search for the approach.

[0061] By setting the electric locomotive's approach parking point as a no-grid protection point to cut off the approach (using the no-grid protection point as a parking point for protection), it is ensured that the electric locomotive cannot cross the no-grid area, and there is no need to worry about the driver's mistaken operation into the no-grid area, which greatly improves the safety of operation and avoids the occurrence of safety accidents. The safety distance can be set according to actual conditions, usually equal to the length of 1-2 cars, and the safety distance in this embodiment is 20 meters (this is only an example and not a limitation of the present invention).

[0062] In a preferred embodiment, the shunting monitoring system also generates a speed limit curve corresponding to the route of the electric locomotive, and triggers emergency braking based on the speed limit curve and the actual speed of the electric locomotive. The horizontal axis of the speed limit curve is the distance between the train and the no-grid protection point, and the vertical axis is the maximum speed of the electric locomotive. When the actual speed of the electric locomotive reaches the maximum speed, emergency braking is triggered to effectively ensure driving safety.

[0063] In a preferred embodiment, when the train stops at a safe parking position, the "front signal" column on the onboard display screen of the electric locomotive displays an indication signal of "no power grid area", prompting the driver that there is no power grid area ahead, and the driver no longer needs to check the "no power grid" reminder in the work order. The onboard display screen includes the display screen of the onboard train operation monitoring device (LKJ) and the DMI (Driver Machine Interface). DMI is an important part of the train control onboard equipment, which is intended to provide a human-machine interaction interface between the driver and the train control system.

[0064] S3. Determine whether the electric locomotive is in a traction state or a push state before stopping; if it is in a push state, allow the driver to unlock the off-grid protection point.

[0065] In step S3, judging whether the electric locomotive is in a traction state or a push state before stopping includes the following steps:

[0066] S31. The shunting monitoring system preliminarily determines whether the electric locomotive is in a pushing state or a traction state based on the acquired shunting information; if it is in a pushing state, the first state identifier PushOrPullStateByPingDiao is set to 1; the default value of the first state identifier PushOrPullStateByPingDiao is 0.

[0067] In this embodiment, the shunting monitoring system obtains the shunting information sent by the shunting team through the shunting handheld console through the on-board LKJ. If the shunting information of pushing, ten cars, five cars, and three cars is received in sequence, and the electric locomotive has not stopped, it is preliminarily judged that the electric locomotive is in a pushing state.

[0068] S32. Calculate the position information of the head of the electric locomotive based on the latitude and longitude information obtained by the on-board satellite positioning antenna (such as a GPS antenna) of the electric locomotive and the electronic map; obtain the installation position of the satellite positioning antenna on the electric locomotive; calculate the position information of the head of the train according to the red light band; calculate the length of the vehicle based on the position information of the head of the electric locomotive, the installation position and the position information of the head of the train; the head of the train faces the non-grid area, and the tail of the train is away from the non-grid area; when pushing, the tail of the vehicle is connected to the head of the electric locomotive, and when pulling, the head of the vehicle is connected to the tail of the electric locomotive.

[0069] Step S32 includes:

[0070] S321, the shunting monitoring system calculates the first section A where the electric locomotive is located and the first distance between the on-board satellite positioning antenna and the insulating joint by using the acquired latitude and longitude information and the electronic map. Figure 2 , Figure 3 As shown, the first distance is recorded as m); the insulating node is located between the vehicle-mounted satellite positioning antenna and the area without power grid;

[0071] S322, read the locomotive information configuration file stored in the shunting monitoring system, and obtain the second distance between the on-board satellite positioning antenna and the driver's cabin I of the electric locomotive (such as Figure 2 , Figure 3 As shown, the second distance is recorded as n); the driver's room I is located at the head of the electric locomotive (the forward direction of the handle points to the driver's room I).

[0072] S323: The shunting monitoring system obtains the second section B where the head of the train is located according to the red light band, and calculates the distance traveled by the head of the train in the second section B (e.g. Figure 2 , Figure 3 As shown, the distance traveled is recorded as t);

[0073] In the railway control system, the line rails are used as conductors to form a track circuit. When the two tracks are short-circuited by the vehicle's wheels, they will appear as red light in the control system, indicating the position of the vehicle.

[0074] S324, let Trainlen represent the length of the vehicle;

[0075] If the first section A and the second section B are not the same section, and the second section B is ahead of the first section A on the route of the electric locomotive, Trainlen = m + t + q1 - n. Figure 2 As shown, q1 is the distance between the first section A and the second section B.

[0076] If the first segment A and the second segment B are the same segment, Trainlen = m + t - q2 - n. Figure 3 As shown, q2 is the length of the first segment A.

[0077] If the first section A and the second section B are not the same section, and the first section A is ahead of the second section B on the approach route of the electric locomotive, it means that the electric locomotive is in traction state and the vehicle length Trainlen is not calculated.

[0078] In this embodiment, when the Trainlen value cannot be determined, the system assumes that the electric locomotive is in traction state by default, and needs to continue to determine the traction push state.

[0079] S33: If the vehicle length is greater than a set length threshold (denoted as δ), the shunting monitoring system again determines that the electric locomotive is in a push state, and sets the second state identifier PushOrPullStateBySys to 1. The default value of the second state identifier PushOrPullStateBySys is 0.

[0080] The length threshold δ can be configured. In this embodiment, δ is 10 meters to 20 meters. In a preferred embodiment, δ is the length of a carriage (13 meters).

[0081] S34. If the first state identifier PushOrPullStateByPingDiao and the second state identifier PushOrPullStateBySys are both 1, the shunting monitoring system finally determines that the electric locomotive is in the pushing state.

[0082] After the final judgment is completed, the shunting monitoring system sets a clear mark of the locomotive traction and pushing state, and no longer calculates and judges the traction and pushing state until the approach parking point changes and then recalculates the traction and pushing state.

[0083] In the present invention, the shunting monitoring system receives the horizontal adjustment information sent by the shunting team members through the horizontal adjustment handheld console from the train operation monitoring device (LKJ), and preliminarily determines whether the electric locomotive is in a push state based on the horizontal adjustment information. The shunting monitoring system also calculates the vehicle length based on the installation position of the satellite positioning antenna, the position information of the head of the electric locomotive obtained by the satellite positioning antenna, and the position information of the head of the train calculated based on the red light band tracking, and again determines whether the electric locomotive is in a push state based on the calculated vehicle length. If the results of the initial judgment and the second judgment are both that the electric locomotive is in a push state, the shunting monitoring system finally determines that the electric locomotive is in a push state. The method for judging the push traction state of an electric locomotive of the present invention greatly reduces the possibility of misjudgment and reduces the reliance on manual judgment.

[0084] The present invention comprehensively considers the situations where the head of the electric locomotive and the head of the vehicle are located in the same section or in different sections, and can reliably calculate the length of the vehicle connected to the electric locomotive, providing an accurate data basis for calculating the protection distance. By extending the length of the protection distance from the off-grid protection point of the electric locomotive route, when no isolation vehicle is set between the electric locomotive and the pushed vehicle, the vehicle can be pushed to the off-grid area for operation, and it is ensured that the electric locomotive will not enter the off-grid area.

[0085] S4. After the driver performs the unlocking operation, the shunting monitoring system calculates the protection distance (denoted as x); the electric locomotive pushes the vehicle to travel the protection distance toward the non-grid area, so that the vehicle enters the non-grid area to operate.

[0086] In this embodiment, the driver performs the unlocking operation on the operation interface of the LKJ. If the driver performs the unlocking operation when the electric locomotive is in the traction state, the shunting monitoring system determines that the unlocking operation is invalid and does not unlock the no-grid protection point.

[0087] In step S4, the shunting monitoring system calculates the protection distance including the following steps:

[0088] The shunting monitoring system starts searching for the next target point from the off-grid protection point and calculates the third distance (denoted as s) between the vehicle head and the next target point. x = min (s, Trainlen); the next target point is a conventional protection point on the station yard, including: one of the closed signal, earth barrier, station boundary marker, first stop point, and derailer.

[0089] In step S4, when the electric locomotive pushes the vehicle to travel the protection distance toward the off-grid area, the "front signal" column on the on-board display screen displays an indication signal of "off-grid area".

[0090] The electric locomotive safe operation method in a non-grid area based on a shunting monitoring system of the present invention does not need to set up an isolation vehicle between the electric locomotive and the pushed vehicle by "fishing with a long rod", so that the vehicle can be pushed to the non-grid area for operation, and the electric locomotive will not enter the non-grid area. The present invention ensures the safety of shunting operations, greatly shortens the shunting operation time, and improves work efficiency.

[0091] Embodiment 2

[0092] Figure 4 This is a flow chart of Example 2, in which the shunting monitoring system (hereinafter referred to as the system) combines the horizontal shunting information and the calculated vehicle length to determine whether the locomotive is in the traction state or the push state. The difference from Example 1 is that when either the first state identifier PushOrPullStateByPingDiao or the second state identifier PushOrPullStateBySys is 1, it is confirmed that the locomotive is in the push state.

[0093] In this embodiment, determining whether the locomotive is in a traction state or a push state includes the following steps:

[0094] Step 1: The system receives information from LKJ and determines whether there is leveling information from the leveling handheld station. If yes, execute step 2; otherwise, execute step 5.

[0095] Step 2: The system determines whether it has received the horizontal adjustment information of the push, tenth car, five car, and three car in sequence. If so, it executes step 3; otherwise, it executes step 5.

[0096] Step 3: Determine whether the electric locomotive is running and not stopped. If yes, execute step 4; otherwise, execute step 5.

[0097] Step 4: Set the push status and set the first status identifier PushOrPullStateByPingDiao to 1. End the process.

[0098] Step 5, set the default traction state, set the first state identifier PushOrPullStateByPingDiao to 0, and execute step 6;

[0099] Step 6. The system calculates the GPS antenna position through the electronic map and the longitude and latitude information obtained by the GPS antenna: the locomotive head is located in the first section A, and the GPS antenna is m meters away from the insulation node on the front approach of the first section A, and executes step 7;

[0100] Step 7: The system tracks the position of the head of the train according to the red light band: the head of the train moves t meters in the second section B, and then executes step 8;

[0101] Step 8, the system calculates the distance between the GPS antenna and the driver's cabin as n meters, and executes step 9;

[0102] Step 9, Is the first section A clear? If yes, go to step 10, otherwise, go to step 22;

[0103] step10. Is the distance in meters clear? If yes, go to step12; otherwise, go to step11.

[0104] Step 11, set m = 0 (safe value), and execute step 12;

[0105] step12, Is the distance t meters clear? If yes, go to step14, otherwise, go to step13;

[0106] Step 13, set t = 0 (safety value), and execute step 14;

[0107] Step 14: Is the second segment B ahead of the first segment A? If yes, go to step 16; otherwise, go to step 15;

[0108] Step 15: Are the second segment B and the first segment A the same segment? If yes, go to step 18; otherwise, go to step 23;

[0109] Step 16, calculate the total length of the segment between the second segment B and the first segment A as q1, and execute step 17;

[0110] Step 17, calculate the length of the vehicle pushed by the car as Trainlen = m + q1 + tn meters, and execute step 20;

[0111] Step 18, the system obtains the length of the first segment A / the second segment B as q2, and executes step 19;

[0112] Step 19, calculate the length of the vehicle pushed by the car as Trainlen = m + t-q2-n meters, and execute step 20;

[0113] step20, Trainlen>δ? If yes, execute step21; otherwise, execute step22;

[0114] step21. Set the push status, set the second status identifier PushOrPullStateBySys to 1, and end the process.

[0115] Step 22, set the default traction state. Since the traction push state is not clear, it is necessary to restart the logic of judging the traction push by latitude and longitude and execute step 6;

[0116] step23. Set the traction state, set the second state identifier PushOrPullStateBySys to 0, and end the process.

[0117] Figure 5 This is a flowchart of the safety protection of an electric locomotive in an area without a power grid in Embodiment 2, which specifically includes the following steps:

[0118] Step 1: The system obtains the off-grid protection point of the station through the station information configuration file stationcfg.ini, and executes step 2;

[0119] Step 2: The system reads and parses the locomotive information in trainInfo.txt to determine whether the locomotive is an electric locomotive. If so, execute step 3; otherwise, execute step 9.

[0120] Step 3: The route search ends at the point without power grid protection, and the parking point is set as the point without power grid protection, and then execute step 4;

[0121] Step 4: Determine whether there is a large unlocking operation from LKJ. If so, execute step 5; otherwise, execute step 8.

[0122] Step 5: Determine whether the locomotive is in the push state. If so, execute step 6; otherwise, execute step 8;

[0123] Step 6, continue the route, extend the route by x = min (s, Trainlen) meters, and execute step 7;

[0124] step7. The system protects the locomotive according to the off-grid protection point (parking point) after the access is renewed, and ends the process.

[0125] step8. If there is no unlocking operation or the unlocking is invalid, the system will still protect the locomotive according to the no-grid protection point and end the process.

[0126] Step 9: The route search will not end when the point without power grid protection is reached. Continue to search backward to the parking points such as closed signal machine, soil barrier, station boundary, etc., and execute step 10;

[0127] step10. The system protects the locomotive according to the parking point searched on the route and ends the process.

[0128] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.

[0129] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A method for safe operation of electric locomotives in areas without power grid based on shunting monitoring system, It is characterized in that Contains steps: S1. Determine whether the locomotive is an electric locomotive; if it is an electric locomotive, obtain the off-grid protection point of the station; the off-grid protection point is the boundary point between the off-grid area and the grid area; S2, searching for the approach of the electric locomotive, if the approach of the electric locomotive is arranged to the non-grid area, setting the approach stop point of the electric locomotive to the non-grid protection point, cutting off the approach, and controlling the train to stop at a safe parking position; the train includes a locomotive and a vehicle connected to the locomotive; when the train is in the safe parking position, the train is located in the grid area and has a preset safety distance from the non-grid protection point; S3, determining whether the electric locomotive is in a traction state or a push state before stopping; if it is in a push state, allowing the driver to unlock the off-grid protection point; S4. After the driver performs the unlocking operation, the shunting monitoring system calculates the protection distance; the electric locomotive pushes the vehicle to travel the protection distance toward the non-grid area, so that the vehicle enters the non-grid area to operate.

2. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S3, judging whether the electric locomotive is in a traction state or a push state before stopping includes the following steps: S31, the shunting monitoring system preliminarily determines whether the electric locomotive is in a pushing state or a traction state according to the acquired horizontal shunting information; if it is in a pushing state, the first state identifier is set to 1; S32, calculating the position information of the head of the electric locomotive based on the latitude and longitude information obtained by the on-board satellite positioning antenna of the electric locomotive and the electronic map; Obtaining the installation position of the satellite positioning antenna on the electric locomotive; Calculate the position information of the head of the train based on the red light band; The vehicle length is calculated based on the position information of the head of the electric locomotive, the installation position and the position information of the head of the train; the head of the train faces the area without power grid, and the tail of the train is away from the area without power grid; when pushing, the tail of the vehicle is connected to the head of the electric locomotive, and when pulling, the head of the vehicle is connected to the tail of the electric locomotive; S33, if the vehicle length is greater than the set length threshold, the shunting monitoring system again determines that the electric locomotive is in a push state, and sets the second state identifier to 1; S34. If the first state identifier and the second state identifier are both 1, the shunting monitoring system finally determines that the electric locomotive is in a pushing state.

3. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 2, It is characterized in that In step S31, the shunting monitoring system obtains shunting information through the on-board train operation monitoring device. If the shunting information of push, ten-car, five-car, and three-car is received in sequence, and the electric locomotive has not stopped, it is preliminarily determined that the electric locomotive is in a pushing state.

4. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 2, It is characterized in that Step S32 includes: S321, the shunting monitoring system calculates the first section where the electric locomotive is located and the first distance between the on-board satellite positioning antenna and the insulating joint by using the acquired latitude and longitude information and the electronic map; the insulating joint is located between the on-board satellite positioning antenna and the area without power grid; S322, reading the locomotive information configuration file stored in the shunting monitoring system, and obtaining a second distance between the on-board satellite positioning antenna and the driver's cabin I of the locomotive; S323, the shunting monitoring system obtains the second section where the head of the train is located according to the red light band, and calculates the distance traveled by the head of the train in the second section; S324, let Trainlen represent the length of the vehicle; If the first section and the second section are not the same section, and the second section is ahead of the first section on the route of the electric locomotive, Trainlen=m+t+q1-n; If the first segment and the second segment are the same segment, Trainlen=m+t-q2-n; Among them, m is the first distance, n is the second distance, q1 is the distance between the first section and the second section; q2 is the length of the first section, and t is the distance traveled by the head of the train in the second section where the head of the train is currently located according to the red light band tracking.

5. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 4, It is characterized in that In step S324, if the first section and the second section are not the same section, and the first section is ahead of the second section on the route of the electric locomotive, the vehicle length is not calculated.

6. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 4, It is characterized in that In step S4, the shunting monitoring system calculates the protection distance including the following steps: The shunting monitoring system searches for the next target point from the grid-free protection point, and calculates the third distance between the vehicle head and the next target point; let x represent the protection distance, s represent the third distance, and x=min(s, Trainlen); The next target point is a conventional protection point on the station yard, including: one of a closed signal, an earth barrier, a station boundary marker, a first stop point, and a derailer.

7. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S1, the grid-free protection point of the station is obtained from the station information configuration file stored in the shunting vehicle monitoring system.

8. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S1, a locomotive type field is obtained from a locomotive information configuration file stored in a shunting monitoring system, and based on the locomotive type field, it is determined whether the locomotive is an electric locomotive.

9. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S1, if the locomotive is determined to be a non-electric locomotive, it is not affected by the no-grid protection point, and the route search continues when the no-grid protection point is encountered, and the route search ends at the conventional protection point on the station; the non-electric locomotive does not need to be protected from the no-grid protection, and the non-electric locomotive is protected based on the conventional protection point; The conventional protection points include: one of a closed signal, an earth barrier, a station boundary marker, a first stop point, and a derailer.

10. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S2, the shunting monitoring system generates a speed limit curve corresponding to the route of the electric locomotive, and triggers emergency braking based on the speed limit curve and the actual speed of the electric locomotive.

11. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S2, when the vehicle train stops at the safe parking position, the "front signal" column on the vehicle display screen displays an indication signal of "no power grid area".

12. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S2, the safety distance is 20 meters.

13. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 2, It is characterized in that The length threshold in step S33 is 10 meters to 20 meters.

14. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 1, It is characterized in that In step S4, when the electric locomotive pushes the vehicle to travel the protection distance toward the area without power grid, the "front signal" column on the on-board display screen displays an indication signal of "area without power grid".

15. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system according to claim 11 or 14, It is characterized in that The on-board display screen includes a display screen of a train operation monitoring device and a DMI.

16. The method for safe operation of electric locomotives in a non-grid area based on a shunting monitoring system as claimed in claim 3, It is characterized in that The driver performs an unlocking operation on the operation interface of the train operation monitoring device; if the driver performs an unlocking operation when the electric locomotive is in traction state, the shunting monitoring system determines that the unlocking operation is invalid and does not unlock the off-grid protection point.