Template climbing positioning control and maintenance monitoring device and method for ultrahigh pier building machine
The infrared transmitting and receiving device and humidity sensor are used to achieve rapid positioning and automatic maintenance of ultra-high bridge pier formwork, which solves the problems of inaccurate positioning and poor maintenance timeliness in traditional construction, improves construction efficiency and safety, and ensures construction quality.
Patent Information
- Application Number
- CN202410985432.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-08
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the construction of ultra-high bridge piers, the positioning control of traditional formwork is inaccurate, resulting in low construction efficiency, high safety risks, and timely maintenance, which affects the construction quality.
The infrared transmitting and receiving device and humidity sensor are used to quickly position the template through infrared measurement, reduce the number of fine adjustments, and monitor the surface humidity of the bridge pier in real time, and automatically maintain it.
The positioning efficiency and accuracy of formwork construction is improved, costs are reduced, construction safety is ensured, and construction quality is ensured.
Smart Images

Figure CN118911015A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of bridge pier construction, and in particular to a device and method for controlling the climbing positioning and maintenance of a template of a super-high bridge pier construction machine. Background Art
[0002] When controlling the positioning of the template for super-high pier construction, the traditional approach is as follows:
[0003] 1. Set reference mark points: Set reference marks at the bottom of the template as a mark for the template to climb into place;
[0004] 2. The template slowly climbs to the marking line: The entire template slowly climbs to the marking line through the hydraulic system;
[0005] 3. Fine-tune: Use a total station to measure the template height and use a ruler to fine-tune. After the template is slowly lifted to the marked line, use a total station to measure the template elevation to ensure that it meets the design size requirements. At the same time, you can check by measuring the height difference from the top of the template to the top of the poured concrete section to ensure that the pouring height of each section meets the design requirements.
[0006] Disadvantages of this method:
[0007] 1. Because the top elevation of the poured concrete section is uneven, it is difficult to ensure that the four corners are at the same level, so the marking reference is often inaccurate and requires multiple fine adjustments;
[0008] 2. It is difficult to ensure that the lifting is just to the marked line position. In actual operation, the lifting may exceed the marked line, and the hydraulic system needs to be retracted, which poses certain safety hazards.
[0009] 3. The template needs to be fine-tuned several times before it can be initially positioned, which requires a large investment in personnel and machinery costs, affecting the efficiency of template construction and positioning.
[0010] When constructing super-high bridge piers and maintaining the pier body, the traditional practices are as follows:
[0011] Within a certain height range from the ground, plastic film or geotextile is used for moisture preservation. For super-high piers, as the construction height of the pier body increases, it is impossible to maintain them by sprinkling water on the bottom of the pier. A water tank is often placed on the pier construction machine for spraying maintenance.
[0012] Disadvantages of this method: ground maintenance and water tank maintenance by construction machine are basically manual judgment operations, and the timeliness of maintenance is difficult to ensure, which is not conducive to the control of construction quality. Summary of the invention
[0013] The purpose of the present invention is to provide a super-high pier construction machine template climbing positioning control and maintenance monitoring device and method to solve the problems existing in the above-mentioned prior art, which can realize the rapid positioning of the template, improve the positioning efficiency and accuracy, ensure construction safety, and can monitor the surface humidity of the pier in real time, so as to carry out maintenance in time and ensure the construction quality.
[0014] To achieve the above object, the present invention provides the following solutions:
[0015] The present invention provides a template climbing positioning control and maintenance monitoring device for a super-high pier construction machine, comprising a plurality of infrared emitting and receiving devices arranged around the bottom of the pier construction machine, a plurality of infrared reflecting devices arranged on the outside of the contact surface between the bottom of the pier body and the foundation and corresponding to each of the infrared emitting and receiving devices, and a humidity sensor arranged on the pier construction machine, wherein the humidity sensor is used for monitoring the humidity of the pier surface below the template.
[0016] Preferably, one infrared transmitting and receiving device is disposed at each of the four corners of the bottom of the pier construction machine.
[0017] Preferably, the infrared reflecting device is buried in the top surface of the support platform.
[0018] The present invention also provides a method for climbing positioning control and maintenance monitoring of a template of a super-high pier construction machine, based on the above-mentioned super-high pier construction machine template climbing positioning control and maintenance monitoring device, including a method for climbing positioning control of a template of a super-high pier construction machine and a method for maintenance monitoring of a super-high pier;
[0019] The super-high pier construction machine template climbing positioning control method comprises the following steps:
[0020] S1: The infrared reflector is buried on the top surface of the cap: one infrared reflector is respectively arranged at the four corners outside the contact surface between the bottom of the pier and the cap;
[0021] S2: The infrared emitting and receiving device is installed on the bridge pier construction machine: one infrared emitting and receiving device is installed at each of the four corners of the bottom of the bridge pier construction machine, and each infrared emitting and receiving device corresponds to each infrared reflecting device one by one;
[0022] S3: Infrared control of design elevation of template lifting: During the process of the frame and template of the pier construction machine climbing, infrared rays are emitted from time to time through the infrared emitting and receiving device, and the design height is measured by infrared rays until the template climbs to the design height, thereby realizing rapid positioning;
[0023] S4: Template fine-tuning: Use the total station to fine-tune the template elevation and size;
[0024] The super-high pier maintenance monitoring method comprises the following steps: using the humidity sensor to detect the humidity of the pier surface below the template in real time, and when the humidity is lower than 60%, spraying water from the top of the pier below the template for maintenance.
[0025] Preferably, when the bridge piers below the formwork are sprayed with water for maintenance, water in the ground pool is pumped into a water tank placed on the bridge pier construction machine by a water pump, and then the water in the water tank is sprayed onto the bridge piers.
[0026] Preferably, the humidity sensor monitors the humidity on the surface of the bridge pier 1 meter below the bottom of the template in real time.
[0027] Compared with the prior art, the present invention has achieved the following technical effects:
[0028] The device and method for climbing positioning control and maintenance monitoring of the template of the super-high pier construction machine provided by the present invention can dynamically monitor and control the lifting height of the template through infrared emission and reception during the lifting process, can realize rapid positioning of the template, and can avoid retracting the hydraulic system due to jacking exceeding the designed height. It has a high degree of intelligence, improves construction safety, reduces the number of template fine-tuning times, improves template construction positioning efficiency, and reduces construction costs; the humidity of the pier surface can be monitored in real time through the humidity sensor, and maintenance can be carried out in time to ensure construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0030] Figure 1 A schematic diagram of the structure of the template climbing positioning control and maintenance monitoring device for the super-high pier construction machine provided by the present invention;
[0031] Figure 2 for Figure 1 A partial enlarged schematic diagram of part I;
[0032] Figure 3 for Figure 1 A partial enlarged schematic diagram of part II.
[0033] In the figure: 1-bridge pier construction machine, 2-infrared transmitting and receiving device, 3-pier body, 4-capping platform, 5-infrared reflecting device, 6-climbing frame of bridge pier construction machine, A-infrared transmission path. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] The purpose of the present invention is to provide a super-high pier construction machine template climbing positioning control and maintenance monitoring device and method to solve the problems existing in the prior art, which can realize the rapid positioning of the template, improve the positioning efficiency and accuracy, ensure construction safety, and can monitor the surface humidity of the pier in real time, so as to carry out maintenance in time and ensure the construction quality.
[0036] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0037] like Figure 1-Figure 3 As shown, this embodiment provides a template climbing positioning control and maintenance monitoring device for a super-high pier construction machine, including a plurality of infrared emitting and receiving devices 2 arranged around the bottom of the pier construction machine 1, a plurality of infrared reflecting devices 5 arranged at the outside of the contact surface between the bottom of the pier body 3 and the base 4 and corresponding to each infrared emitting and receiving device 2, and a humidity sensor arranged on the pier construction machine 1, the humidity sensor is used to monitor the humidity of the pier surface below the template.
[0038] In this embodiment, an infrared emitting and receiving device 2 is provided at each of the four corners of the bottom of the pier construction machine 1. Specifically, each infrared emitting and receiving device 2 is connected to the four corners of the bottom of the pier construction machine climbing frame 6. The infrared ray emitted by the infrared emitting and receiving device 2 is reflected back by the infrared reflecting device 5 and received by the infrared emitting and receiving device 2. The infrared ray propagation path A is shown in the figure.
[0039] In this embodiment, the infrared reflecting device 5 is buried in the top surface of the support platform 4 , and one infrared reflecting device 5 is buried in each of the four corners of the top surface of the support platform 4 .
[0040] A method for climbing and positioning control and maintenance monitoring of a template of a super-high pier construction machine, based on the above-mentioned device for climbing and positioning control and maintenance monitoring of a template of a super-high pier construction machine, comprises a method for climbing and positioning control of a template of a super-high pier construction machine and a method for maintenance monitoring of a super-high pier;
[0041] The super-high pier construction machine template climbing positioning control method comprises the following steps:
[0042] S1: An infrared reflecting device 5 is buried on the top surface of the cap 4: an infrared reflecting device 5 is respectively arranged at the four corners outside the contact surface between the bottom of the pier body 3 and the cap 4;
[0043] S2: An infrared emitting and receiving device 2 is set on the bridge pier construction machine 1: An infrared emitting and receiving device 2 is set at each of the four corners of the bottom of the bridge pier construction machine 1, and each infrared emitting and receiving device 2 corresponds to each infrared reflecting device 5 one by one;
[0044] S3: Infrared control of design elevation of template lifting: During the process of the frame and template of the pier construction machine 1 climbing, infrared rays are emitted from time to time through the infrared emitting and receiving device 2, and the design height is measured by infrared rays until the template climbs to the design height, thereby realizing rapid positioning;
[0045] S4: Template fine-tuning: Use the total station to fine-tune the template elevation and size;
[0046] The super-high pier maintenance monitoring method comprises the following steps: using a humidity sensor to detect the humidity of the pier surface below the template in real time. Specifically, the humidity sensor monitors the humidity of the pier surface 1 meter below the bottom of the template in real time. When the humidity is lower than 60%, the pier below the template is maintained by spraying water from the top.
[0047] When spraying water to maintain the bridge piers below the formwork, water from the ground pool is pumped into a water tank placed on the pier construction machine through a water pump, and then the water in the water tank is sprayed onto the bridge piers.
[0048] The present invention can dynamically monitor and control the lifting height of the template through infrared emission and reception, can realize rapid positioning of the template, and can avoid retracting the hydraulic system due to jacking exceeding the designed height. It has a high degree of intelligence, improves construction safety, reduces the number of template fine-tuning times, improves template construction positioning efficiency, and reduces construction costs. The humidity of the pier surface can be monitored in real time through the humidity sensor, so that maintenance can be carried out in time to ensure construction quality.
[0049] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A template climbing positioning control and maintenance monitoring device for a super-high pier construction machine, characterized in that: It includes a plurality of infrared emitting and receiving devices arranged around the bottom of the pier construction machine, a plurality of infrared reflecting devices arranged on the outside of the contact surface between the bottom of the pier body and the foundation and corresponding to each of the infrared emitting and receiving devices, and a humidity sensor arranged on the pier construction machine, wherein the humidity sensor is used to monitor the humidity of the pier surface below the template.
2. The template climbing positioning control and maintenance monitoring device for super-high bridge pier construction machine according to claim 1 is characterized in that: An infrared transmitting and receiving device is respectively arranged at the four corners of the bottom of the pier construction machine.
3. The template climbing positioning control and maintenance monitoring device for super-high bridge pier construction machine according to claim 1 is characterized in that: The infrared reflection device is buried in the top surface of the support platform.
4. A method for the climbing positioning control and maintenance monitoring of a template of a super-high pier construction machine, characterized in that: The super-high pier construction machine template climbing positioning control and maintenance monitoring device based on any one of claims 1 to 3 includes a super-high pier construction machine template climbing positioning control method and a super-high pier maintenance monitoring method; The super-high pier construction machine template climbing positioning control method comprises the following steps: S1: The infrared reflector is buried on the top surface of the cap: one infrared reflector is respectively arranged at the four corners outside the contact surface between the bottom of the pier and the cap; S2: The infrared emitting and receiving device is installed on the bridge pier construction machine: one infrared emitting and receiving device is installed at each of the four corners of the bottom of the bridge pier construction machine, and each infrared emitting and receiving device corresponds to each infrared reflecting device one by one; S3: Infrared control of design elevation of template lifting: During the process of the frame and template of the pier construction machine climbing, infrared rays are emitted from time to time through the infrared emitting and receiving device, and the design height is measured by infrared rays until the template climbs to the design height, thereby realizing rapid positioning; S4: Template fine-tuning: Use the total station to fine-tune the template elevation and size; The super-high pier maintenance monitoring method comprises the following steps: using the humidity sensor to detect the humidity of the pier surface below the template in real time, and when the humidity is lower than 60%, spraying water from the top of the pier below the template for maintenance.
5. The method for climbing positioning control and maintenance monitoring of the template of the super-high pier construction machine according to claim 4 is characterized in that: When spraying water to maintain the bridge piers below the formwork, water from the ground pool is pumped into a water tank placed on the pier construction machine through a water pump, and then the water in the water tank is sprayed onto the bridge piers.
6. The method for climbing positioning control and maintenance monitoring of the template of the super-high bridge pier construction machine according to claim 4 is characterized in that: The humidity sensor monitors the humidity on the surface of the bridge pier 1 meter below the bottom of the template in real time.
Citation Information
Patent Citations
Synchronous lifting system and method for multi-pier-column construction platform
CN116971287A
Intelligent formwork sliding and lifting system for thin-wall hollow high pier construction
CN117364645A
The utility model discloses a hollow pier slip form construction contraction and division spatial position control device
CN208869943U
Pier column concrete curing device and pier column concrete curing system
CN214737402U
KR20230016890A
