Shelving method of marine full-rotation hoisting pile driver at sea

By arranging a single shelf on the offshore hull and connecting the boom and pile frames with sliding boots and rollers, and configuring an automatic load distribution system, the problems of inefficiency and large deck occupancy in the prior art are solved, and the compression of the deck area is achieved and Material saving improves the efficiency and safety of pile driving operations.

CN118911137APending Publication Date: 2024-11-08SHANGHAI ZHENHUA HEAVY IND +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411313276.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The shelving method of existing full-rotary crane pile drivers is inefficient, occupies a large deck area, and is prone to leakage when disassemblying, causing environmental pollution.

Method used

A method of shelving for marine full-rotary crane pile driver is adopted. By arranging a shelf on the hull, the boom and pile frame are placed inclined, the sliding boots and roller devices are connected, the load automatic distribution system is configured, and the hydraulic pile driving system is fixed. , reduce steel plate use and deck occupation.

Benefits of technology

It effectively compresses the hull deck area, reduces the production materials, saves the cost of steel plate production and construction, and improves the efficiency and safety of pile driving operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911137A_ABST
    Figure CN118911137A_ABST
Patent Text Reader

Abstract

The invention discloses a shelving method for a marine full-rotation hoisting pile driver on the sea. A shelving frame is arranged on a ship body; an arm frame is obliquely placed towards the shelving frame, and the position, close to the top, of the arm frame is placed on the top of the shelving frame; a pile frame is obliquely placed towards the shelving frame, and a main body structure on the pile frame is connected with the position, close to the top, of the arm frame through a sliding shoe; a main hook on a crane is fixed to the position, close to the front end, of the pile frame; a hydraulic hose on a hydraulic piling system is fixed to the upper surface of the pile frame; and a pile hammer on the hydraulic pile driving system is matched with the closure gap structure of the pile frame through the clamping groove of the pulley box, and is fixed on the pile frame. The ship deck area is effectively compressed, ship manufacturing materials are reduced, and the production and construction cost of steel plates is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a laying technology of a pile driver, and more particularly to a laying method of a fully-rotating crane pile driver for offshore vessels. Background Art

[0002] Offshore pile foundation engineering is a platform for the construction of various types of offshore engineering facilities. Therefore, whether it is an offshore urban high-pile platform in shallow coral reef geological conditions, an offshore wind farm construction, or a cross-sea bridge and port terminal construction, offshore piling operations are required. Offshore piling operations generally use large crane ships or large floating platforms as carriers, and use the cranes carried by them to construct offshore wind power high-pile cap piles, pipe frame piles, and large bridge pile foundations by hydraulic hammer. The placement of the pile driver on a large ship or platform is also crucial. This is related to the overall layout of the full-rotation pile driver. The guide pile frame can be tilted forward and backward, and can drive vertical piles or inclined piles; the guide pile frame is over 100 meters high, and the guide pile frame is installed and piled with the main hook, auxiliary hook, miscellaneous hook and fork pile frame. The requirements of high-efficiency offshore piling operations must be met through the optimization and innovation of various systems such as structure, mechanism, winding and electro-hydraulic drive control.

[0003] The existing lifting pile driver is placed as follows:

[0004] The boom and pile frame of the full-revolving crane pile driver need to be separately laid out. At least three racks need to be arranged on the hull for laying the boom (1) and pile frames (2) respectively. The wire rope and hydraulic oil pipe on the pile frame need to be disassembled as the boom and pile frame are separated. The laying work before the pile driver is towed is time-consuming, labor-intensive and inefficient. In addition, the hydraulic oil pipe leaks when it is disassembled, causing environmental pollution. The three racks and the deck occupy a large area, and the valuable area of ​​the deck cannot be fully utilized. Summary of the invention

[0005] In view of the defects existing in the prior art, the purpose of the present invention is to provide a method for laying down a fully rotating crane pile driver for an offshore ship, which effectively compresses the hull deck area, reduces the hull manufacturing materials, and saves the production and construction costs of steel plates.

[0006] To achieve the above object, the present invention adopts the following technical solutions:

[0007] A method for laying down a fully-rotating crane pile driver for offshore vessels:

[0008] Arrange a shelf on the hull;

[0009] The arm support is placed obliquely toward the shelf, and a position close to the top of the arm support is placed on the top of the shelf;

[0010] The pile frame is placed obliquely toward the shelf frame, and the main structure on the pile frame is connected to a position near the top of the arm frame through a sliding shoe;

[0011] Fixing the main hook on the crane to the front end of the pile frame;

[0012] Fixing the hydraulic hose on the hydraulic piling system to the upper surface of the pile frame;

[0013] The pile hammer on the hydraulic pile driving system is fixed on the pile frame through the cooperation between the clamping groove of the pulley box and the dragon mouth structure of the pile frame.

[0014] Preferably, a stopper is provided at the top outer side of the shelf.

[0015] Preferably, a roller device is provided between the arm and the shelf.

[0016] Preferably, a vertical concave structure is provided in the middle of the shelf;

[0017] An automatic load distribution system is configured in the concave structure.

[0018] Preferably, the automatic load distribution system uses 4 sets of high-frequency fixed-load buffers;

[0019] The pile frame is placed at the top position of the high-frequency fixed load buffer.

[0020] The method for laying down a fully-rotating crane pile driver for an offshore ship provided by the present invention requires only one laying rack to be arranged on the hull, thereby effectively compressing the hull deck area, reducing hull manufacturing materials, and saving the production and construction costs of steel plates. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the arrangement of the method for laying down the full-rotation crane pile driver for offshore vessels of the present invention;

[0022] Figure 2 It is a schematic diagram of the pile frame and the arm frame being connected by sliding shoes in the method for laying down the offshore ship-use full-rotation crane pile driver of the present invention;

[0023] Figure 3 It is a schematic diagram of a laying frame in a laying method of a marine full-rotation crane pile driver of the present invention;

[0024] Figure 4 yes Figure 3 Schematic diagram of the A direction;

[0025] Figure 5 yes Figure 3 Schematic diagram of the middle B direction;

[0026] Figure 6yes Figure 3 Schematic diagram of the CC direction. DETAILED DESCRIPTION

[0027] In order to better understand the above technical solution of the present invention, the technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0028] Combination Figures 1 to 6 As shown, the present invention provides a method for laying down a marine full-rotation crane pile driver:

[0029] A shelf 2 is arranged on the hull 1 .

[0030] First, the arm 3 is tilted toward the shelf 2 and then the arm 3 is placed near the top on the top of the shelf 2, so that the vertical deadweight and acceleration are transmitted through the box structure of the shelf 2.

[0031] The pile frame 4 is also tilted toward the shelf frame 2, and the main structure on the pile frame 4 is connected to the arm frame 3 near the top through the sliding shoe 5, so that part of the deadweight and all-directional acceleration of the pile frame 4 is transferred to the arm frame 3 through the sliding shoe 5, and the arm frame 3 then transfers the load to the hull 1 through the shelf frame 2.

[0032] A roller device 7 is provided between the arm 3 and the shelf 2 to release the structural deformation caused by towing.

[0033] A stopper 9 is provided at the top outer side of the shelf 2 to resist the horizontal load caused by the rolling of the hull during towing.

[0034] A slide groove 51 is provided at the bottom of the slide shoe 5 , and the slide groove 51 is connected to the track 41 on the pile frame 4 . The upper part of the slide shoe 5 is connected to the head structure of the arm frame 3 through a pin shaft 6 .

[0035] A vertical concave structure 21 is set in the middle position of the shelf 2, and an automatic load distribution system 8 is configured in the concave structure 21. The automatic load distribution system 8 adopts 4 groups of high-frequency fixed-load buffers 81. The high-frequency fixed-load buffers 81 are used to offset part of the vertical acceleration load and deadweight of the pile frame 4, and release the internal stress caused by the incoordination between the deformation of the pile frame 4 and the deformation of the shelf 2 during towing, effectively reducing the stress of the pile frame 4 during towing, and ensuring the safety and reliability of the whole machine during towing.

[0036] A bracket for placing the main hook and auxiliary hook of the piling system is arranged at the front end of the shelf 2. In this way, the main hook, auxiliary hook and wire rope do not need to be disassembled. They only need to be fastened with a windproof zipper and fixed with a lateral V-shaped groove structure to ensure the safety and reliability of the main hook and auxiliary hook of the piling system and the smoothness of the wire rope.

[0037] The main hook of the crane is fixed to the middle position of the pile frame 4 through a pin shaft without disassembly, and its wire rope is placed on the upper surface structure of the pile frame 4.

[0038] The pile hammer of the pile driving system is fixed on the pile frame 4 through the cooperation between the clamping groove of the pulley box and the dragon mouth structure of the pile frame 4 after the pulley box on the top is separated from the pile hammer body.

[0039] Example

[0040] Refer to Figures 1 to 6 , rotate the full-rotation pile driver to the required angle of the hull 1, remove the pin of the detachable section on the pile frame 4 (close to the bottom position of the pile frame 4), place the detachable section and folding section on the pile frame 4 and the pile hammer body within the required range of the hull 1, and the pulley box of the pile hammer rises to the appropriate position of the pile frame 4.

[0041] The full-rotation pile driver rotates to the direction of the shelf 2, and the main hook of the crane is raised to lift the pile frame 4 to the required position on the shelf 2 for shelving.

[0042] By telescoping the push-pull fork frame 10 of the pile driving system, the angle between the pile frame 4 and the arm frame 3 is made substantially consistent with the state when the pile frame 4 is in a shelved state.

[0043] The boom 3 and the pile frame 4 are lowered by the luffing system 11 of the crane. During this period, the main hook and the push-pull fork frame 10 of the crane are synchronously fine-tuned, and the bottom of the pile frame 4 and the hull 1 are fixed by a pin shaft.

[0044] The main hook and auxiliary hook of the pile driving are lowered to the hook placement bracket of the shelf 2, and are firmly connected to the bracket through a zipper.

[0045] The boom 3 and the pile frame 4 are continuously lowered until the shelf on the boom 3 fits with the roller device 7 on the shelf 2 , and the pile frame 4 is pressed on the top of the four groups of high-frequency fixed-load buffers 81 of the automatic load distribution system 8 .

[0046] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention, and are not intended to limit the present invention. As long as they are within the spirit of the present invention, any changes or modifications to the above embodiments will fall within the scope of the claims of the present invention.

Claims

1. A method for laying down a fully-rotating crane pile driver for an offshore ship, Features: Arrange a shelf on the hull; The arm support is placed obliquely toward the shelf, and a position close to the top of the arm support is placed on the top of the shelf; The pile frame is placed obliquely toward the shelf frame, and the main structure on the pile frame is connected to a position near the top of the arm frame through a sliding shoe; Fixing the main hook on the crane to the front end of the pile frame; Fixing the hydraulic hose on the hydraulic piling system to the upper surface of the pile frame; The pile hammer on the hydraulic pile driving system is fixed on the pile frame through the cooperation between the clamping groove of the pulley box and the dragon mouth structure of the pile frame.

2. The method for laying down a fully-rotating crane pile driver for an offshore vessel according to claim 1, Features: A stopper is arranged at the outer side of the top of the shelf.

3. The method for laying down a fully-rotating crane pile driver for an offshore vessel according to claim 1, Features: A roller device is arranged between the arm support and the shelf support.

4. The method for laying down a fully-rotating crane pile driver for an offshore vessel according to claim 1, Features: A vertical concave structure is provided in the middle of the shelf; An automatic load distribution system is configured in the concave structure.

5. The method for laying down a fully-rotating crane pile driver for an offshore vessel according to claim 4, Features: The automatic load distribution system uses 4 sets of high-frequency fixed-load buffers; The pile frame is placed at the top position of the high-frequency fixed load buffer.