Vibration-free self-compacting construction method and device for inclined concrete filled steel tubular column with rotary frame

By using the casting conduit and guide mechanism in the concrete column of the inclined steel pipe, the bottom-up pouring of concrete is realized, and the overflow holes and water-exposed holes are used to ensure compactness, which solves the problems of difficulty in pouring concrete and poor density in the rotating frame structure. , improve construction efficiency and safety.

CN118911428APending Publication Date: 2024-11-08YUNJIAN GREEN CONCRETE KUNMING GREEN BUILDING MATERIALS CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411314778.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In super-high-rise buildings, in the construction of inclined steel pipe concrete columns with rotary frame structures, the inclination angle of the annular ribs leads to difficulty in pouring concrete, poor density and high construction safety risks, and the existing technology is difficult to effectively solve these problems.

Method used

The concrete column of the inclined steel pipe is implemented by using a rotating frame structure, without vibration, self-secret implementation method and device. By setting up a casting conduit and a guide mechanism in the inclined steel pipe, the concrete is poured from the bottom from the bottom to ensure compactness by using overflow holes and water-exposed holes. Steady casting is achieved through the guide mechanism to avoid vibration operation.

Benefits of technology

It improves the density and construction efficiency of concrete, reduces construction difficulty and safety risks, is suitable for high-altitude working environments, and is especially suitable for concrete pouring with transverse stiffening plate steel pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911428A_ABST
    Figure CN118911428A_ABST
Patent Text Reader

Abstract

The invention provides a vibration-free self-compacting construction method for a rotary frame inclined steel pipe concrete column, which comprises the following steps of: S1, hoisting and mounting an inclined steel pipe on a support frame of a construction building through a tower crane, enabling the inclined steel pipe to be in an inclined state, and checking and cleaning residual sundries; s2, the pouring guide pipe is inserted into the inclined steel pipe from the upper end of the inclined steel pipe after being lifted, and during lifting installation, the pouring guide pipe and the inclined steel pipe have the same inclination angle, so that the pouring guide pipe can be conveniently installed into the inclined steel pipe, S3, a tower crane unloads concrete into a discharging hopper at the upper end of the pouring guide pipe through a lifting hopper, and the concrete is directly poured into the bottom of the inclined steel pipe through the pouring guide pipe; the pouring guide pipe is lifted upwards in the inclined direction of the inclined steel pipe through a crane, concrete is poured automatically from bottom to top, and the concrete is denser; concrete pouring is conducted on the steel pipe through the pouring guide pipe, concrete is poured from the bottom of the steel pipe from bottom to top, and the advantage of being good in compactness is achieved; and vibration is not needed, and the pouring efficiency and the pouring quality are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete construction, and in particular to an inclined steel tube concrete column with a rotating frame structure and a vibration-free self-compacting construction method and device. Background Art

[0002] Concrete-Filled Steel Tube (CFST) structure is a composite structure in which concrete is filled in a steel tube and the two are jointly subjected to force. CFST can combine the advantages of both in structure, and has structural properties such as high bearing capacity, high rigidity, good ductility and good seismic resistance. It is widely used in actual projects such as super high-rise structures and large heavy-load structure vertical load-bearing columns. Nowadays, many super high-rise buildings have special-shaped steel tube concrete column structures due to their unique appearance design. On the basis of conventional construction technology, it also brings construction difficulties such as ensuring the density of concrete, difficulty in concrete pumping and pouring, and safety of high-altitude operations.

[0003] Steel tube concrete pouring can generally be done by pumping and lifting pouring, vibrating pouring, high-position throwing without vibration, etc. For the inclined steel tube 1 column of the super-high-rise rotating frame structure, the steel tube column has a certain inclination angle, and an annular rib 4 is provided inside the steel tube. First, when pouring concrete by pumping and lifting, the annular rib 4 on the inner wall of the steel tube will produce a large resistance to lifting and pouring due to its non-horizontal direction. The lifting process will increase the pumping pressure loss. At the same time, the concrete is not easy to fill at the inclined angle of the annular rib 4, resulting in hollowing, and the pumping and lifting construction process is relatively complicated; and if the high-throw method is used for pouring, due to the inclination angle, the concrete will fall to the inner wall and rib of the middle part of the steel tube, and form a barrier to the concrete, which is easy to cause segregation; in addition, there is no special pouring operation platform during the concrete construction of the super-high-rise rotating frame structure, and the suspended working environment makes it difficult to vibrate the concrete, and the operation safety risk is relatively large.

[0004] Therefore, according to the structural characteristics of the rotating frame inclined steel tube 1 column and the high-altitude construction conditions, it is of great practical significance to develop a construction method for steel tube concrete columns that overcomes the internal structural difficulties of the inclined steel tube 1 column and achieves self-compacting without vibration. Summary of the invention

[0005] Due to the above-mentioned defects in the prior art, the present invention provides a vibration-free self-compacting construction method and device for a rotating frame inclined steel tube concrete column, so as to solve the problem that after the annular ribs 4 are set on the inner wall of the rotating inclined steel tube 1 concrete column, conventional jacking and pouring construction and vibration pouring are difficult to meet the concrete construction needs, and concrete hollowing and poor density are prone to occur at the angle of the annular ribs 4, and the construction is relatively inconvenient. The present invention provides a vibration-free self-compacting construction method for an inclined steel tube 1 concrete column of a rotating frame structure, so that the concrete does not need to be vibrated to fill the rotating inclined steel tube 1 column, so as to achieve the purpose of compacting the internal structure of the steel tube, and the construction method is relatively simple. It can not only effectively improve the density of concrete pouring in the steel tube, but also reduce the difficulty of construction and improve construction efficiency. It is particularly suitable for concrete pouring construction of existing steel tubes with transverse stiffening plates.

[0006] In order to achieve the above object, the present invention provides the following technical solutions: A rotating frame inclined steel tube concrete column construction device, the rotating frame structure inclined steel tube 1 concrete column construction device comprises an inclined steel tube 1, and a casting conduit 2 installed in the inclined steel tube 1; the inner wall of the inclined steel tube 1 is evenly provided with vertical ribs 3 and horizontal annular ribs 4, the annular ribs 4 are provided with circular overflow holes 5, and the inner wall of the steel tube above the annular ribs 4 and the upper end side wall of the inclined steel tube 1 are provided with weeping holes 6; the inclined steel tube 1 is obliquely installed on the support frame of the construction building by means of a corbel 7 using bolts; the casting conduit 2 is obliquely inserted in the inclined steel tube 1, and the upper end of the casting conduit 2 is provided with an open lower hopper 8 for pouring concrete, and the plane of the upper end of the lower hopper 8 is horizontally set.

[0007] Preferably, four vertical ribs 3 are provided, and two annular ribs 4 are provided, which are respectively provided at the positions of the corbels 7 provided on the outer wall of the steel pipe, and each annular rib 4 is provided with three layers of annular ribs 4 parallel to each other.

[0008] Preferably, the inner hole diameter of the annular rib plate 4 is 400 mm.

[0009] Preferably, a guide mechanism 9 is installed on the upper end of the inclined steel pipe 1 through bolts and is supported on the outer wall of the casting conduit 2 for guiding the movement of the casting conduit 2. The guide mechanism 9 is provided with an arc plate 91, and support rollers 92 are evenly installed on the inner wall of the arc plate 91; the support rollers 92 are supported on the side wall of the casting conduit 2; two guide mechanisms 9 are provided, and the support rollers 92 of the two guide mechanisms 9 are respectively supported on both sides of the casting conduit 2.

[0010] A vibration-free self-compacting construction method for a rotating frame inclined steel tube concrete column, the steps of which are as follows: S1. The inclined steel pipe 1 is hoisted and installed on the support frame of the construction building by a tower crane. The inclined steel pipe 1 is in an inclined state, and residual debris is checked and cleaned.

[0011] S2. Lift the casting conduit 2 and insert it into the inclined steel pipe 1 from the upper end of the inclined steel pipe 1. During lifting and installation, the casting conduit 2 and the inclined steel pipe 1 have the same inclination angle, which facilitates the installation of the casting conduit 2 into the inclined steel pipe 1. Install the two guide mechanisms 9 on the upper end of the inclined steel pipe 1 by bolts, and support rollers 92 to support and clamp the side wall of the casting conduit 2.

[0012] S3. The tower crane unloads the concrete into the lower hopper 8 at the upper end of the pouring conduit 2 through the bucket. The concrete is poured directly into the bottom of the inclined steel pipe 1 through the pouring conduit 2. The pouring conduit 2 is lifted upward along the inclined direction of the inclined steel pipe 1 by the crane. The concrete is automatically poured from bottom to top. The pouring conduit 2 moves upward along the supporting roller 92 of the guide mechanism 9, so that the pouring is more stable and uniform, and the concrete is more compact. When pouring to the position of the weeping hole 6 at the top of the inclined steel pipe 1, the floating slurry overflows from the surface of the concrete to form a concrete construction joint. The remaining section of concrete at the top of the inclined steel pipe 1 is constructed together with the concrete of the lower section of the steel pipe column so as to form a connection with the lower section of the steel pipe column.

[0013] S4, hoist and connect the next section of inclined steel pipe 1, and pour concrete through the pouring guide tube 2 in the same way until the construction of the entire steel tube concrete column is completed.

[0014] Preferably, the pouring conduit 2 is pulled upward at a speed of 5 mm / s-20 mm / s during pouring.

[0015] Preferably, when the casting conduit 2 is lifted upward, when the lower end of the casting conduit 2 passes through each layer of annular ribs 4, the casting conduit 2 stays for 30s-60s, so that the space below each layer of annular ribs 4 can be filled with concrete, thereby avoiding the situation where the pouring conduit 2 is lifted too quickly and the space below the annular ribs 4 is not filled yet, and the overflow hole 5 is blocked by filling concrete above the annular ribs 4, resulting in the air below the annular ribs 4 being unable to be discharged and a cavity being formed.

[0016] Preferably, the pouring conduit 2 is pulled upward at a speed of 8 mm / s-15 mm / s during pouring.

[0017] The beneficial effects of the present invention are as follows: the overflow holes arranged on the annular ribs in the inclined steel pipes of the rotating frame structure can allow the air and concrete at the inclined angle of the annular ribs to overflow upward through the overflow holes when the concrete is poured, so that the annular ribs are filled up, avoiding the formation of cavities between the ribs and the inner wall of the steel pipe, making the concrete more compact, and the weeping holes facilitate the discharge of water seeping from the concrete surface.

[0018] Concrete is poured into the steel pipe through a pouring conduit, so that the concrete is poured from the bottom of the steel pipe from bottom to top, which avoids the concrete falling directly from the top of the steel pipe and being blocked by the annular ribs, resulting in cavities under the annular ribs and reducing the density of the concrete. This pouring method has the advantage of good density; it also avoids the problems of large resistance and low pouring efficiency of the jacking pouring method. This pouring method pours more smoothly and improves the pouring efficiency; this pouring method pours slowly upward from the bottom of the steel pipe, can be automatically compacted, does not require vibration, and improves the pouring efficiency and pouring quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the inclined steel pipe.

[0020] Figure 2 It is a schematic diagram of the three-dimensional structure of the casting conduit.

[0021] Figure 3 It is a schematic diagram of a partially cutaway three-dimensional structure of the inclined steel pipe.

[0022] Figure 4 It is a structural schematic diagram of the guide mechanism.

[0023] Figure 5 It is a schematic diagram of the coordinated construction of the casting conduit and the inclined steel pipe. DETAILED DESCRIPTION

[0024] In order to make the objectives, technical solutions and beneficial effects of the present invention more clear, preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings to facilitate understanding by technicians.

[0025] Example 1 like Figure 1-5 As shown, the present invention provides a rotating frame inclined steel tube concrete column construction device, the rotating frame structure inclined steel tube concrete column construction device comprises an inclined steel tube 1, a casting conduit 2 installed in the inclined steel tube 1; the inner wall of the inclined steel tube 1 is evenly provided with vertical ribs 3 and horizontal annular ribs 4, the annular ribs 4 are provided with circular overflow holes 5, the inner wall of the steel tube above the annular ribs 4 and the upper side wall of the inclined steel tube 1 are provided with weeping holes 6; the inclined steel tube 1 is obliquely installed on the support frame of the construction building through the bracket 7 using bolts; the casting conduit 2 is obliquely inserted in the inclined steel tube 1, and the upper end of the casting conduit 2 is provided with an open lower hopper 8 for pouring concrete, and the upper plane of the lower hopper 8 is horizontally set. By setting the overflow hole 5, when pouring concrete, the air and concrete at the inclined angle of the annular rib 4 can overflow upward through the overflow hole 5 to avoid the formation of a cavity between the rib and the inner wall of the steel tube, and the weeping hole 6 is convenient for the discharge of weeping water on the concrete surface.

[0026] The vertical ribs 3 are provided in four pieces, and the annular ribs 4 are provided in two pieces, which are respectively provided at the positions of the corbels 7 provided on the outer wall of the steel pipe, and each of the annular ribs 4 is provided with three layers of annular ribs 4 which are parallel to each other.

[0027] The inner hole diameter of the annular rib plate 4 is 400 mm.

[0028] The upper end of the inclined steel pipe 1 is bolted with a guide mechanism 9 supported on the outer wall of the pouring conduit 2 for guiding the movement of the pouring conduit 2. The guide mechanism 9 is provided with an arc plate 91, and support rollers 92 are evenly installed on the inner wall of the arc plate 91; the support rollers 92 are supported on the side wall of the pouring conduit 2; the guide mechanism 9 is provided with two, and the support rollers 92 of the two guide mechanisms 9 are respectively supported on both sides of the pouring conduit 2. The guide mechanism 9 can support and fix the pouring conduit 2, and when the pouring conduit 2 is pulled upward, the pouring conduit 2 moves upward along the support rollers 92, which can make the pouring conduit 2 more smoothly and stably lifted, and make the concrete pouring more uniform and dense.

[0029] A vibration-free self-compacting construction method for a rotating frame inclined steel tube concrete column, the steps of which are as follows: S1. The inclined steel pipe 1 is hoisted and installed on the support frame of the construction building by a tower crane. The inclined steel pipe 1 is in an inclined state, and residual debris is checked and cleaned.

[0030] S2. Lift the casting conduit 2 and insert it into the inclined steel pipe 1 from the upper end of the inclined steel pipe 1. During lifting and installation, the casting conduit 2 and the inclined steel pipe 1 have the same inclination angle, which facilitates the installation of the casting conduit 2 into the inclined steel pipe 1. Install the two guide mechanisms 9 on the upper end of the inclined steel pipe 1 by bolts, and support rollers 92 to support and clamp the side wall of the casting conduit 2.

[0031] S3. The tower crane unloads the concrete into the lower hopper 8 at the upper end of the pouring conduit 2 through the bucket. The concrete is poured directly into the bottom of the inclined steel pipe 1 through the pouring conduit 2. The pouring conduit 2 is lifted upward along the inclined direction of the inclined steel pipe 1 by the crane. The concrete is automatically poured from bottom to top. The pouring conduit 2 moves upward along the supporting roller 92 of the guide mechanism 9, so that the pouring is more stable and uniform, and the concrete is more compact. When pouring to the position of the weeping hole 6 at the top of the inclined steel pipe 1, the floating slurry overflows from the surface of the concrete to form a concrete construction joint. The remaining section of concrete at the top of the inclined steel pipe 1 is constructed together with the concrete of the lower section of the steel pipe column so as to form a connection with the lower section of the steel pipe column.

[0032] S4, hoist and connect the next section of inclined steel pipe 1, and pour concrete through the pouring conduit 2 until the construction of the entire steel pipe concrete column is completed. The concrete adopts self-compacting micro-expansion concrete. No manual vibration is required during the concrete pouring process. The concrete compacts the internal structure of the steel pipe by itself. Micro-expansion occurs during the concrete hardening process to resist the self-shrinkage of the concrete and prevent the concrete from peeling off from the steel pipe wall.

[0033] The pouring conduit 2 is pulled upward at a speed of 10 mm / s during pouring.

[0034] When the casting conduit 2 is lifted upward, when the lower end of the casting conduit 2 passes through each layer of annular ribs 4, the casting conduit 2 stays for 40 seconds, so that the space below each layer of annular ribs 4 can be filled with concrete, thereby avoiding the situation where the pouring conduit 2 is lifted too quickly and the space below the annular ribs 4 is not filled yet, and the overflow hole 5 is blocked by filling concrete above the annular ribs 4, resulting in the air below the annular ribs 4 being unable to be discharged and a cavity being formed. The casting method can effectively improve the compaction effect of the concrete.

[0035] Comparative Example 1 The inclined steel pipe 1 is cast by the jacking casting method, and the construction process is as follows: S1. The inclined steel pipe 1 is hoisted and installed on the support frame of the construction building by a tower crane. The inclined steel pipe 1 is in an inclined state, and residual debris is checked and cleaned.

[0036] S2. Connect the delivery pipeline to the bottom of the inclined steel pipe 1, connect the delivery pipeline to the concrete delivery pump, and pour concrete into the inclined steel pipe 1 from bottom to top through the concrete delivery pump.

[0037] Comparative Example 2 The inclined steel pipe 1 is cast by vibrating and pouring method, and the construction method is as follows: S1. The inclined steel pipe 1 is hoisted and installed on the support frame of the construction building by a tower crane. The inclined steel pipe 1 is in an inclined state, and residual debris is checked and cleaned.

[0038] S2. Pour concrete into the inclined steel pipe 1 from top to bottom through the opening above the inclined steel pipe 1, and then use a vibrator to vibrate the concrete inside and on the surface of the steel pipe and outside the inclined steel pipe 1 to make the concrete dense, and add concrete to the space below the vibration limit of the steel pipe concrete.

[0039] Comparative Example 3 The inclined steel pipe 1 is cast by high-position dropping without vibration casting method. The construction method is as follows: S1. The inclined steel pipe 1 is hoisted and installed on the support frame of the construction building by a tower crane. The inclined steel pipe 1 is in an inclined state, and residual debris is checked and cleaned.

[0040] S2. Pour concrete into the inclined steel pipe 1 from top to bottom through the opening above the inclined steel pipe 1 until the steel pipe is filled.

[0041] Experimental method: The inclined steel tube 1 is cast using the vibration-free self-compacting construction method of the inclined steel tube 1 concrete column of the present invention and the traditional jacking casting method, vibration casting method and high-position drop casting method without vibration, and the casting time is recorded respectively. The overall density of the steel tube concrete column cast by different methods and the local density at the annular rib 4 are detected by an ultrasonic detector, so as to detect the influence of different casting methods on the quality of the concrete column. When the ultrasonic detector is used to detect the overall density of the concrete column, the probes of the detector are respectively placed at the upper and lower ends of the inclined steel tube 1 concrete column to check the amplitude of the ultrasonic wave from the lower end to the upper end, so as to determine whether the concrete column has defects; when the annular rib 4 is detected, the two probes of the ultrasonic detector are respectively placed on both sides of the steel pipe at the annular rib 4, so as to detect the change in the amplitude of the concrete when the ultrasonic wave passes through the annular rib 4, so as to detect the density of the concrete at the annular rib 4.

[0042] After testing, the experimental results of the concrete columns of the embodiment and the comparative example are shown in Table 1; Example Comparative Example 1 Comparative Example 2 Comparative Example 3 Casting completion time 10min40s 13min32s 14min20s 7min12s Overall density Stable amplitude and good compactness The local amplitude changes significantly and some defects exist Stable amplitude and good compactness The amplitude is unstable, the changes are large, and the overall density is poor Annular rib density Stable amplitude and good compactness The amplitude is unstable and varies greatly, and there may be cavity defects. The local amplitude is abnormal and there are some defects The amplitude is unstable, the variation is large, there are large cavity defects, and the density is poor Table 1 As shown in Table 1, the overall compactness of the inclined steel tube 1 concrete column and the compactness at the annular ribs 4 of the embodiment of the present invention are good, and the casting speed is fast and the efficiency is high; the jacking casting method of comparative example 1 has a large defect at the annular ribs 4, the local compactness is poor, and the casting speed is slow and the efficiency is low; the vibration casting method of comparative example 2 requires a long time of vibration operation after casting, and its compactness is good, but it consumes a lot of time and the casting efficiency is low; although the high-position dropping and non-vibration casting method of comparative example 3 has a fast casting speed, the cast steel tube concrete column has poor overall compactness and local compactness; It is concluded that the vibration-free self-compacting construction method of the inclined steel tube 1 concrete column of the present invention has the advantages of fast casting, high efficiency and good compactness.

[0043] Example 2 S1. The inclined steel pipe 1 is hoisted and installed on the support frame of the construction building by a tower crane. The inclined steel pipe 1 is in an inclined state, and residual debris is checked and cleaned.

[0044] S2. Lift the casting conduit 2 and insert it into the inclined steel pipe 1 from the upper end of the inclined steel pipe 1. During lifting and installation, the casting conduit 2 and the inclined steel pipe 1 have the same inclination angle, which facilitates the installation of the casting conduit 2 into the inclined steel pipe 1. Install the two guide mechanisms 9 on the upper end of the inclined steel pipe 1 by bolts, and support rollers 92 to support and clamp the side wall of the casting conduit 2.

[0045] S3. The tower crane unloads the concrete into the lower hopper 8 at the upper end of the pouring conduit 2 through the bucket. The concrete is poured directly into the bottom of the inclined steel pipe 1 through the pouring conduit 2. The pouring conduit 2 is lifted upward along the inclined direction of the inclined steel pipe 1 by the crane. The concrete is automatically poured from bottom to top. The pouring conduit 2 moves upward along the supporting roller 92 of the guide mechanism 9, so that the pouring is more stable and uniform, and the concrete is more compact. When pouring to the position of the weeping hole 6 at the top of the inclined steel pipe 1, the floating slurry overflows from the surface of the concrete to form a concrete construction joint. The remaining section of concrete at the top of the inclined steel pipe 1 is constructed together with the concrete of the lower section of the steel pipe column so as to form a connection with the lower section of the steel pipe column.

[0046] The pouring conduit 2 is pulled upward at a speed of 5 mm / s during pouring.

[0047] Example 3 According to the casting method of Example 2, the pulling speed of the casting conduit 2 is 8 mm / s.

[0048] Example 4 According to the casting method of Example 2, the pulling speed of the casting conduit 2 is 10 mm / s.

[0049] Example 5 According to the casting method of Example 2, the pulling speed of the casting conduit 2 is 13 mm / s.

[0050] Example 6 According to the casting method of Example 2, the pulling speed of the casting conduit 2 is 15 mm / s.

[0051] Example 7 According to the casting method of Example 2, the pulling speed of the casting conduit 2 is 18 mm / s.

[0052] Example 8 According to the casting method of Example 2, the pulling speed of the casting conduit 2 is 20 mm / s.

[0053] The density of the steel tube concrete columns cast in different embodiments was tested by using an ultrasonic detector. The density of the concrete was determined by the change in the amplitude of the ultrasonic wave propagating in the concrete column. The results are shown in Table 2. Overall density of concrete column Density at annular rib Example 2 Stable amplitude and good compactness Stable amplitude and good compactness Example 3 Stable amplitude and good compactness Stable amplitude and good compactness Example 4 Stable amplitude and good compactness Stable amplitude and good compactness Example 5 Stable amplitude and good compactness Stable amplitude and good compactness Example 6 Stable amplitude and good compactness Stable amplitude and good compactness Example 7 The amplitude changes locally and there are certain defects The amplitude is unstable and there are defects Example 8 The amplitude changes locally and there are certain defects The amplitude is unstable and there are defects Table 2 As shown in Table 2, when the pulling speed of the casting conduit 2 is higher than 15 mm / s, the faster pulling speed will lead to insufficient filling of the annular rib 4, affecting the compactness of the concrete. Therefore, when the pulling speed is lower than 15 mm / s, the compactness of the concrete column of the inclined steel pipe 1 is better. In order to improve the casting efficiency, the pulling speed should not be too low.

[0054] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail through the above preferred embodiments, those skilled in the art should understand that various changes can be made in form and details without departing from the scope defined by the claims of the present invention.

Claims

1. A rotating frame inclined steel tube concrete column construction device, characterized in that: The rotating frame inclined steel pipe (1) concrete column construction device comprises an inclined steel pipe (1) and a pouring conduit (2) installed in the inclined steel pipe (1); the inner wall of the inclined steel pipe (1) is evenly provided with vertical ribs (3) and transverse annular ribs (4), the annular ribs (4) are provided with circular overflow holes (5), and the inner wall of the steel pipe above the annular ribs (4) and the upper side wall of the inclined steel pipe (1) are provided with weeping holes (6); the inclined steel pipe (1) is obliquely installed on a support frame of a construction building by means of a corbel (7) using bolts; the pouring conduit (2) is obliquely inserted in the inclined steel pipe (1), and the upper end of the pouring conduit (2) is provided with an open lower hopper (8) for convenient pouring of concrete, and the upper end of the lower hopper (8) is arranged horizontally.

2. A rotating frame inclined steel tube concrete column construction device according to claim 1, characterized in that: The vertical ribs (3) are provided in four pieces, and the annular ribs (4) are provided in two pieces, which are respectively provided at the positions of the corbels (7) provided on the outer wall of the steel pipe, and each of the annular ribs (4) is provided with three layers of annular ribs (4) parallel to each other.

3. A rotating frame inclined steel tube concrete column construction device according to claim 1 or 2, characterized in that: The inner hole diameter of the annular rib plate (4) is 400 mm.

4. A rotating frame inclined steel tube concrete column construction device according to claim 1 or 2, characterized in that: The upper end of the inclined steel pipe (1) is bolted with a guide mechanism (9) supported on the outer wall of the casting conduit (2) for guiding the movement of the casting conduit (2); the guide mechanism (9) is provided with an arc plate (91), and support rollers (92) are evenly installed on the inner wall of the arc plate (91); the support rollers (92) are supported on the side wall of the casting conduit (2); two guide mechanisms (9) are provided, and the support rollers (92) of the two guide mechanisms (9) are respectively supported on both sides of the casting conduit (2).

5. A vibration-free self-compacting construction method using a rotating frame inclined steel tube concrete column construction device as described in claim 4, characterized in that it comprises the following steps; S1. The inclined steel pipe (1) is installed on the support frame of the construction building by lifting it with a tower crane, the inclined steel pipe (1) is in an inclined state, and residual debris is checked and cleaned; S2, after lifting the pouring conduit (2), insert it into the inclined steel pipe (1) from the upper end of the inclined steel pipe (1). During the lifting and installation, the pouring conduit (2) and the inclined steel pipe (1) have the same inclination angle, which facilitates the installation of the pouring conduit (2) into the inclined steel pipe (1). The two guide mechanisms (9) are installed on the upper end of the inclined steel pipe (1) by bolts, and the support rollers (92) are supported and clamped on the side wall of the pouring conduit (2); S3, the tower crane unloads the concrete into the lower hopper (8) at the upper end of the pouring conduit (2) through the bucket, and the concrete is directly poured into the bottom of the inclined steel pipe (1) through the pouring conduit (2). The pouring conduit (2) is lifted upward along the inclined direction of the inclined steel pipe (1) by the crane, and the concrete is automatically poured from bottom to top. The pouring conduit (2) moves upward along the supporting roller (92) of the guide mechanism (9), so that the pouring is more stable and uniform, and the concrete is more compact. When pouring to the position of the weeping hole (6) at the top of the inclined steel pipe (1), the floating slurry overflows from the surface of the concrete to form a concrete construction joint, and the remaining section of the concrete at the top of the inclined steel pipe (1) is constructed together with the concrete of the lower section of the steel pipe column, so as to form a connection with the lower section of the steel pipe column; S4, hoisting and connecting the next section of inclined steel pipe (1), and pouring concrete through the pouring guide tube (2) until the construction of the entire steel tube concrete column is completed.

6. The vibration-free self-compacting method according to claim 5, characterized in that: The pouring conduit (2) is pulled upward at a speed of 5 mm / s-20 mm / s during pouring.

7. The vibration-free self-compacting method according to claim 6, characterized in that: When the pouring conduit (2) is lifted upward, when the lower end of the pouring conduit (2) passes through each layer of annular ribs (4), the pouring conduit (2) stays for 30 seconds to 60 seconds, so that the space below each layer of annular ribs (4) is filled with concrete, thereby preventing the pouring conduit (2) from being lifted too quickly and the space below the annular ribs (4) not being filled yet, and the overflow hole (5) being blocked by concrete, resulting in the air below the annular ribs (4) being unable to be discharged and the formation of a cavity.

8. The vibration-free self-compacting method according to claim 6 or 7, characterized in that: The pouring conduit (2) is pulled upward at a speed of 8 mm / s-15 mm / s during pouring.

Citation Information

Patent Citations

  • Concrete casting and tamping method of steel tube concrete structure column

    CN101845889A

  • Concrete-filled steel tube column and casting method thereof

    CN102535746A

  • Construction process of freeze-thaw-resistant, anti-seepage and anti-crack concrete

    CN117569595A

  • Concrete placement method

    JP2013213348A

  • Construction member 3D printing spray head with vibrating rod

    US20170274404A1