Floor-free supporting equipment for fabricated structural floor slab and construction method of floor-free supporting equipment
Through the combined structure of supporting steel truss, lifting components and heating softening gaskets, the problem of high cost and experience dependence on experience in traditional temporary support devices is solved, and the construction of floor slabs without floor support is achieved, saving costs and improving construction efficiency and stability is achieved. sex.
Patent Information
- Application Number
- CN202411407754.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-10-10
AI Technical Summary
Traditional temporary support devices have problems in construction, such as high cost, low construction efficiency, and poor stability dependence on experience and aesthetics. The existing support-free structures rely too much on precast concrete overlapping beams, making them difficult to fine-tune and reuse.
Using a combined structure of supporting steel truss, lifting components and heating softening gaskets, the supporting parts are installed and adjusted by calculating the minimum bending strength, and the supporting parts are installed and adjusted by calculating the minimum bending strength. disassembly and reuse.
The construction of floor slabs without floor support is achieved, saving construction costs, improving construction efficiency and stability, and allowing fine adjustment of the height of prefabricated slabs.
Smart Images

Figure CN118911443A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction, and in particular to ground-free support equipment for assembled structural floors and a construction method. Background Art
[0002] In the prefabricated building structure system, the installation and construction of the floor slab usually requires temporary support to ensure stability and safety during the construction process. However, there are many problems with traditional temporary support devices. First of all, traditional support devices usually require a large amount of steel or wood, which not only increases the construction cost, but also the transportation and storage of materials are cumbersome. At the same time, the installation and removal of these support devices require a lot of manpower and time, which seriously affects the construction efficiency. During the construction process, since the support structure adopts the ground support method, the support structure needs to occupy a large space, which will interfere with the layout of the construction site and other construction processes. Moreover, the stability and reliability of traditional supports often depend on the experience and operation level of the construction personnel, and there is a certain degree of uncertainty. Therefore, there are now some methods of constructing floor slabs using support-free structures on the market.
[0003] For example, the Chinese patent with patent number ZL201920167703.1 discloses a support-free prefabricated frame structure system, which includes: precast concrete columns, precast concrete composite beams and precast prestressed concrete slabs. The precast concrete composite beams are overlapped in the grooves of the corbels on the precast concrete columns in the length direction, and the precast prestressed concrete slabs are overlapped on the ears of the precast concrete composite beams. Through the above structure, a support-free prefabricated concrete frame structure system that meets the existing structural standards is formed. This solution can eliminate the need for traditional support erection during construction and achieve the goal of rapid construction. This solution can well control the project management goals such as construction efficiency, quality, and progress of prefabricated buildings, and achieve better project development effects.
[0004] The above patent provides a support-free prefabricated frame structure system, which does eliminate the support system of traditional floor construction. However, the existing support-free prefabricated frame structure system is overly dependent on precast concrete composite beams, and it is necessary to set multiple precast concrete composite beams at a certain distance in the direction of precast slab laying. If too few precast concrete composite beams are set, the precast slabs will not have enough support. When pouring concrete on the precast slabs later, the precast slabs will not be able to bear the weight of the concrete and will break. At the same time, setting too many precast concrete composite beams in the building will affect the aesthetics of the building, and because the precast concrete composite beams cannot be disassembled and reused after the floor construction is completed, the construction cost is greatly increased. At the same time, the existing support-free structure is not convenient for fine-tuning the height of the precast slabs. Summary of the invention
[0005] The purpose of the present invention is to provide a ground-support-free equipment and construction method for a prefabricated structural floor, so that during the floor construction process, there is no need to support the floor by ground support. At the same time, the support-free structure can be disassembled and reused, is not limited by the building space, and does not require the prefabrication of a large number of precast concrete composite beams, thereby reducing construction costs.
[0006] In order to achieve the above-mentioned object, according to one aspect of the present invention, there is provided a ground-free support device for a prefabricated structural floor, comprising: Supporting steel trusses; Support members symmetrically arranged at both ends of the supporting steel truss, the support members are connected to the bottom of the supporting steel truss through fixing bolts; A lifting assembly is arranged between the supporting steel truss and the supporting member. A heating and softening gasket is provided on the upper edge of the lifting assembly and at the bottom of the supporting steel truss. The heating and softening gasket is heated and softened so that the supporting steel truss is separated from the prefabricated panel, thereby realizing the disassembly and reuse of the supporting member, the lifting assembly and the supporting steel truss.
[0007] Further, the lifting assembly is configured as a lifting adjuster, and the lifting adjuster comprises a plug-in rod; The heating and softening gasket is arranged on the plug-in rod, and a hexagonal joint is arranged on the side of the bottom of the plug-in rod.
[0008] Further, the lifting and lowering adjuster includes an adjusting screw; A thread groove is arranged at the bottom end of the plug-in rod, and the thread groove is connected to the adjusting screw rod.
[0009] Furthermore, a bottom rod is provided at the bottom of the adjusting screw, and a plug connector is provided at the bottom end of the bottom rod.
[0010] Furthermore, the lifting component is a lifting screw, the top end of the lifting screw is set as a supporting surface, the bottom end is provided with a driving joint, and the heating and softening gasket is sleeved on the lifting screw.
[0011] Furthermore, the support member is L-shaped, a nut is provided on its upper surface, and a threaded hole penetrating the support member is provided in the middle of the nut.
[0012] Furthermore, the two ends of the support member are connected by an oblique support rod to increase the strength of the support member.
[0013] Furthermore, a plurality of through holes are provided at one end of the support member that is in contact with the assembled structural component, and the through holes match the bolt sleeves pre-embedded in the assembled structural component.
[0014] Furthermore, a socket is provided on the top of the support member.
[0015] Furthermore, the heat-softening gasket is made of hydrocarbon or vinyl thermoplastic containing polar genes.
[0016] Furthermore, the heating and softening gasket contains an electric heating metal sheet or an electric heating metal wire.
[0017] Furthermore, a plurality of triangular support plates are evenly arranged on the inner side of the supporting steel truss.
[0018] According to a second aspect of the present invention, a method for constructing a prefabricated structural floor slab without ground support is provided, which is implemented by using the prefabricated structural floor slab without ground support equipment, and includes the following steps: S100, calculating the minimum bending strength required for the supporting steel truss, and processing a supporting steel truss with a bending strength greater than the minimum bending strength based on the minimum bending strength; S200, during the prefabrication process of the assembled structural components in the factory, the embedded bolt sleeves are positioned and laid out in advance, and the assembled structural components are prefabricated; at the same time, a batch of prefabricated panels required for use are prefabricated in the factory; S300, transporting the processed assembled structural components, supporting steel trusses and prefabricated panels to the location designated by the construction workers, and performing protective treatment on the assembled structural components and supporting steel trusses; S400, a plurality of through holes are provided at one end of the support member that is in contact with the assembled structural member, and the through holes are aligned with the embedded bolt sleeves, and then a plurality of fixing bolts are sequentially passed through the through holes of the support member and screwed into the embedded sleeves; S500, connect the lifting assembly vertically upward to the support frame, slowly rotate the lifting assembly, adjust the lifting assembly to a predetermined height, and then place a heated and softened gasket; S600, lifting the supporting steel truss by using a lifting device, and aligning the two ends of the supporting steel truss with the lifting assembly, so that the two ends of the supporting steel truss are installed on the lifting assembly; S700, using a lifting device to lift the precast panel and install it on the upper surface of the assembled structural member and the supporting steel truss, then tying the steel mesh on the precast panel and pouring concrete; S800. After the concrete is poured and solidified, the heat-softened gasket is first heated to soften it, so that the supporting steel truss is moved down, and then the lifting assembly is disassembled. After the lifting assembly is disassembled, the supporting steel truss is disassembled, and finally the supporting member is disassembled, and the disassembled components are classified and stored.
[0019] Furthermore, the minimum bending strength of the supporting steel truss calculated in step S100 is: The cross-section of the supporting steel truss is a rectangular structure. The width of the supporting steel truss is b, the height is h, and the length is determined according to the span of the floor slab; the calculation formula for the bending strength of the load-bearing beam is: , Where: M is the bending moment and W is the bending coefficient.
[0020] Furthermore, the bending resistance coefficient W is: , Where: b is the width of the supporting steel truss, h is the height of the supporting steel truss.
[0021] Furthermore, in the process of fixing the support member by fixing bolts in step S400, the support member needs to be fixed at a specified height on the surface of the assembled structural member. After the support member is fixed, check whether the support member shakes and whether the fixing bolts are tightened.
[0022] Furthermore, after the supporting steel truss is installed in step S600, the overall levelness is checked by a level ruler. If it is skewed, the lifting assembly is adjusted to ensure that the overall levelness of the steel truss meets the requirements.
[0023] Furthermore, in step S600, when both ends of the supporting steel truss are sleeved on the lifting assembly, it is necessary to ensure that the top of the lifting assembly is lower than the top of the supporting steel truss, so as to ensure that the supporting steel truss moves downward after the heated and softened gasket is heated and softened.
[0024] Furthermore, after the prefabricated panels are hoisted in step S700, the height of the prefabricated panels is adjusted using a lifting assembly so that the upper surfaces of the plurality of prefabricated panels are in the same plane.
[0025] Furthermore, each component disassembled in step S800 should be subjected to rust prevention treatment before storage to avoid a large amount of rust after long-term storage.
[0026] Compared with the prior art, the present invention has the following beneficial effects: 1. The present invention embeds a plurality of bolt sleeves on the assembled structural member, and after the assembled structural member is installed, the support member is installed at the bolt sleeve embedded in the wall. The support member is arranged in a row on the assembled structural member, and a lifting assembly is installed on the support member. The top of the lifting assembly is connected to a supporting steel truss, and the two ends of the supporting steel truss are respectively erected on the mutually aligned support members on the two assembled structural members; the height of the supporting steel truss can be adjusted by the lifting assembly, thereby achieving the purpose of adjusting the prefabricated plate above the supporting steel truss. At the same time, the support member, the lifting assembly and the supporting steel truss can be disassembled and reused, thereby achieving the purpose of saving construction costs.
[0027] 2. The lifting assembly of the present invention is provided with a heating and softening gasket, which is convenient for heating and softening the heating and softening gasket when disassembling the supporting steel truss, so that the supporting steel truss is separated from the prefabricated plate, which is convenient for disassembly and reuse of the supporting steel truss.
[0028] 3. The supporting steel truss of the present invention adopts high-strength steel and can meet the load-bearing requirements during floor construction through reasonable structural design and calculation. There is no need to set up traditional temporary supports, thus saving construction costs and time.
[0029] 4. The present invention can effectively improve the local bearing capacity and overall stability of the device through accurate calculation and reasonable arrangement of support members, thereby ensuring the safety and reliability of the construction process. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the structure of the coordination of various components of the ground-free support equipment of the present invention; Figure 2 It is a structural schematic diagram of the supporting steel truss of the present invention, in conjunction with the lifting screw rod and the supporting member; Figure 3 It is a schematic diagram of the structure of the supporting steel truss of the present invention, which is partially enlarged with the lifting screw rod and the supporting member; Figure 4 is a schematic structural diagram of a support member according to Embodiment 1 of the present invention; Figure 5 It is a structural schematic diagram of the lifting screw rod of the present invention; Figure 6 is a schematic structural diagram of a support member according to Embodiment 2 of the present invention; Figure 7 It is a structural schematic diagram of the lifting regulator of the present invention; Figure 8 It is a flow chart of the construction method of the present invention.
[0031] In the figure: 1. assembled structural member; 11. embedded steel; 2. fixing bolt; 21. bolt sleeve; 3. support; 31. nut; 32. diagonal brace; 33. through hole; 34. socket; 4. lifting screw; 41. heating softening gasket; 42. driving joint; 5. supporting steel truss; 51. triangular supporting plate; 6. prefabricated plate; 7. lifting adjuster; 71. plug-in rod; 711. hexagonal joint; 712. threaded groove; 72. adjusting screw; 721. bottom rod; 722. plug-in joint. DETAILED DESCRIPTION
[0032] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0033] The following is a further description with reference to the accompanying drawings and specific embodiments: Example 1
[0034] like Figure 1 and Figure 5 As shown, a ground-free support equipment for assembled structural floor slabs includes assembled structural members 1 and prefabricated panels 6, and also includes support members 3. The assembled structural members 1 are provided with multiple blocks, and the assembled structural members 1 are used to assemble the walls of the building. A row of support members 3 are aligned on the tops of the two opposite assembled structural members 1, and the support members 3 are fixed on the concrete wall by fixing bolts 2. The support members 3 are used to support and support other components to facilitate the support and use of the floor slab. A lifting assembly is installed on the support members 3, and the lifting assembly is vertically arranged upward. Support steel trusses 5 are arranged above the mutually aligned support members 3 on the two assembled structural members 1, and the lifting assembly is used to install the support steel trusses 5 to ensure the stability of the support steel trusses 5. The two ends of the support steel trusses 5 are respectively connected to the top of the lifting assembly on the support members 3, and the support steel trusses 5 and the lifting assembly are detachably connected; the support steel trusses 5 are used to support the prefabricated panels 6 to ensure the stability of the prefabricated panels 6. A heating and softening gasket 41 is provided at the bottom of the supporting steel truss 5 along the upper edge of the lifting assembly; the heating methods mainly include resistance wire heating, electromagnetic induction heating, etc. The heating and softening gasket 41 is convenient for heating the heating and softening gasket 41 when disassembling the supporting steel truss 5, so as to soften the heating and softening gasket 41, thereby facilitating the disassembly and assembly of the supporting steel truss 5. The prefabricated panel 6 is arranged on two adjacent assembled structural members 1, and the bottom end of the prefabricated panel 6 is attached to the supporting steel truss 5. This structure facilitates the stability of the prefabricated panel 6.
[0035] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, a pre-embedded steel section 11 is embedded in the top end of the assembled structural member 1, and the pre-embedded steel section 11 is used to be connected to the adjacent assembled structural member 1 or precast concrete beam; bolt sleeves 21 are pre-embedded at the positions where the support members 3 are installed on the sides of the assembled structural member 1, and the bolt sleeves 21 are used to be threadedly connected to the fixing bolts 2.
[0036] like Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, the support member 3 is L-shaped, and the upper surface of the support member 3 is arranged horizontally. This structure is convenient for the support member 3 to stably support the supporting steel truss 5 horizontally. A nut 31 is provided on the upper surface of the support member 3, and a threaded hole penetrating the support member 3 is provided in the middle of the nut 31. This structure is convenient for the support member 3 to be threadedly connected with the lifting screw 4. The two ends of the support member 3 are connected by a diagonal brace 32 to increase the strength of the support member 3. The end of the support member 3 that fits the assembled structural member 1 is provided with a plurality of through holes 33, and the through holes 33 are aligned with the bolt sleeves 21 embedded on the assembled structural member 1. This structure is convenient for the fixing bolts 2 to pass through the support member 3 and be connected with the bolt sleeves 21, so as to achieve the purpose of installing the support member 3 by the fixing bolts 2. The lifting assembly is set as the lifting screw 4, and the top of the lifting screw 4 is set as the supporting surface, which is convenient for the supporting surface to be against the inner side of the supporting steel truss 5, so as to facilitate the stability of the supporting steel truss 5. A driving joint 42 is provided at the bottom of the lifting screw 4, and the driving joint 42 is used to rotate the driving screw. The supporting surfaces at the top of each lifting screw 4 are on the same plane, which can ensure that the upper surface of the supporting steel truss 5 is on the same plane, thereby facilitating stable support of the prefabricated board 6. The heating and softening gasket 41 is sleeved on the lifting screw 4, and the heating and softening gasket 41 is used to heat and soften the heating and softening gasket 41 when disassembling the supporting steel truss 5, so as to facilitate the disassembly and assembly of the supporting steel truss 5.
[0037] like Figure 5 As shown, the heating and softening gasket 41 is a hydrocarbon or vinyl thermoplastic containing polar genes. The heating and softening gasket 41 contains an electric heating metal sheet or an electric heating metal wire. The metal sheet or the metal wire is connected to an external power cord to achieve heating and softening. All the heating and softening gaskets 41 can be connected in series as a whole to quickly soften the gaskets at different positions of the floor slab.
[0038] like Figure 3 As shown, a plurality of triangular support plates 51 are evenly arranged inside the supporting steel truss 5, and the triangular support plates 51 are used to support the inside of the supporting steel truss 5 to ensure that the strength of the supporting steel truss 5 is high enough. Both ends of the supporting steel truss 5 are sleeved on the top of the lifting screw 4, and the bottom of the supporting steel truss 5 is attached to the upper surface of the heating and softening gasket 41. This structure can ensure that the supporting steel truss 5 is sufficiently stable.
[0039] Example 2
[0040] like Figure 1 , Figure 5 and Figure 6As shown, a ground-free support equipment for assembled structural floor slabs includes assembled structural members 1 and prefabricated panels 6, and also includes support members 3. The assembled structural members 1 are provided with multiple blocks, and the assembled structural members 1 are used to assemble the walls of the building. A row of support members 3 are aligned on the tops of the two opposite assembled structural members 1, and the support members 3 are fixed on the concrete wall by fixing bolts 2. The support members 3 are used to support and support other components to facilitate the support and use of the floor slab. A lifting assembly is installed on the support members 3, and the lifting assembly is vertically arranged upward. Support steel trusses 5 are arranged above the mutually aligned support members 3 on the two assembled structural members 1, and the lifting assembly is used to install the support steel trusses 5 to ensure the stability of the support steel trusses 5. The two ends of the support steel trusses 5 are respectively connected to the top of the lifting assembly on the support members 3, and the support steel trusses 5 and the lifting assembly are detachably connected; the support steel trusses 5 are used to support the prefabricated panels 6 to ensure the stability of the prefabricated panels 6. A heating and softening gasket 41 is provided at the bottom of the supporting steel truss 5 along the upper edge of the lifting assembly; the heating methods mainly include resistance wire heating, electromagnetic induction heating, etc. The heating and softening gasket 41 is convenient for heating the heating and softening gasket 41 when disassembling the supporting steel truss 5, so as to soften the heating and softening gasket 41, thereby facilitating the disassembly and assembly of the supporting steel truss 5. The prefabricated panel 6 is arranged on two adjacent assembled structural members 1, and the bottom end of the prefabricated panel 6 is attached to the supporting steel truss 5. This structure facilitates the stability of the prefabricated panel 6.
[0041] like Figure 1 , Figure 2 and Figure 3 As shown, a pre-embedded steel section 11 is embedded in the top end of the assembled structural member 1, and the pre-embedded steel section 11 is used to be connected to the adjacent assembled structural member 1 or precast concrete beam; bolt sleeves 21 are pre-embedded at the positions where the support members 3 are installed on the sides of the assembled structural member 1, and the bolt sleeves 21 are used to be threadedly connected to the fixing bolts 2.
[0042] like Figure 2 , Figure 3 and Figure 7As shown, the support member 3 is L-shaped, and one end of the support member 3 that fits the assembled structural member 1 is provided with a plurality of through holes 33; this structure is convenient for installing the support member 3 on the assembled structural member 1. The two ends of the support member 3 are connected by a diagonal brace 32; this structure ensures that the support member 3 is sufficiently stable. A plug hole 34 is provided on the top of the support member 3, and the plug hole 34 is convenient for installing the lifting component. The lifting component is set as a lifting regulator 7, and the lifting regulator 7 is convenient for adjusting the height of the supporting steel truss 5. The lifting regulator 7 includes a plug rod 71 and an adjusting screw 72, and the plug rod is used to insert into the inner side of the supporting steel truss 5. The adjusting screw 72 is convenient for adjusting the height of the plug rod 71. A heating and softening gasket 41 is provided on the plug rod 71, and the heating and softening gasket 41 is used for heating and softening by means of resistance wire heating, electromagnetic induction heating, etc., and a hexagonal joint 711 is provided on the bottom side of the plug rod 71, and the hexagonal joint 711 is convenient for rotating the adjusting screw 72. A thread groove 712 is provided at the bottom end of the plug rod 71, and the thread groove 712 is connected to the adjusting screw 72, so that the height of the plug rod 71 can be adjusted by rotating the adjusting screw 72. A bottom rod 721 is provided at the bottom of the adjusting screw 72, and a plug connector 722 is provided at the bottom end of the bottom rod 721. The plug connector 722 is plugged into the inner side of the socket 34. This structure facilitates the connection between the adjusting screw 72 and the supporting steel truss 5.
[0043] like Figure 7 As shown, the heating and softening gasket 41 is a hydrocarbon-based, vinyl-based thermoplastic containing polar genes. The heating and softening gasket 41 contains a metal sheet, and the metal sheet is connected to an external power cord to achieve heating and softening. All the heating and softening gaskets 41 can be connected in series as a whole to quickly soften the gaskets at different positions of the floor.
[0044] like Figure 2 and Figure 3 As shown, a plurality of triangular support plates 51 are evenly arranged inside the supporting steel truss 5, and the triangular support plates 51 are used to support the inside of the supporting steel truss 5 to ensure that the strength of the supporting steel truss 5 is high enough. Both ends of the supporting steel truss 5 are sleeved on the top of the lifting regulator 7, and the bottom of the supporting steel truss 5 is attached to the upper surface of the heating and softening gasket 41. This structure can ensure that the supporting steel truss 5 is sufficiently stable.
[0045] Example 3
[0046] like Figure 8 As shown, a construction method for a prefabricated structural floor without ground support, the specific steps of the construction method are as follows: S100, calculating the minimum bending strength required for the supporting steel truss 5, and then processing the supporting steel truss 5 with a bending strength greater than the minimum bending strength based on the minimum bending strength, to ensure that the bending strength of the supporting steel truss 5 meets the use requirements; the method of calculating the minimum bending strength of the supporting steel truss 5 is as follows: the cross-section of the supporting steel truss 5 is a rectangular structure, assuming that the width of the supporting steel truss 5 is b, the height is h, and the length is determined according to the span of the floor; the bending strength calculation formula of the load-bearing beam is: ; Where M is the bending moment and W is the bending coefficient; the calculation formula of the bending coefficient W is: , where b is the width of the supporting steel truss 5 , and h is the height of the supporting steel truss 5 .
[0047] S200, during the prefabrication process of the assembled structural component 1 in the factory, the embedded bolt sleeve 21 is positioned and laid out in advance to ensure the accuracy of the embedded position; then the assembled structural component 1 is prefabricated; at the same time, a batch of prefabricated panels 6 that need to be used are prefabricated in the factory.
[0048] S300, transporting the processed assembled structural components 1, supporting steel trusses 5 and prefabricated panels 6 to the location designated by the construction workers, and performing protective treatment on the assembled structural components 1 and supporting steel trusses 5.
[0049] S400, a plurality of through holes 33 are set on one end of the support member 3 that is in contact with the assembled structural member 1, and the through holes 33 are aligned with the embedded bolt sleeves 21, and then a plurality of fixing bolts 2 are sequentially passed through the through holes 33 of the support member 3 and screwed into the embedded sleeves to achieve the purpose of fixing the support member 3; in the process of fixing the support member 3 by the fixing bolts 2, the support member 3 needs to be fixed at a specified height on the surface of the assembled structural member 1. After the support member 3 is fixed, check whether the support member 3 is shaking and whether the fixing bolts 2 are tightened.
[0050] S500, connect the lifting assembly vertically upward to the support frame thread, slowly rotate the lifting assembly, adjust the lifting assembly to a predetermined height, and then place the heated and softened gasket 41.
[0051] S600, lift the supporting steel truss 5 by the lifting equipment, and align the two ends of the supporting steel truss 5 with the lifting assembly, so that the two ends of the supporting steel truss 5 are installed on the lifting assembly; after the supporting steel truss 5 is installed, check the overall levelness by the level ruler, if it is skewed, adjust the lifting assembly to ensure that the overall levelness of the steel truss meets the requirements. When the two ends of the supporting steel truss 5 are sleeved on the lifting assembly, ensure that the top of the lifting assembly is lower than the top of the supporting steel truss 5, so as to ensure that the supporting steel truss 5 moves down after the heated and softened gasket 41 is heated and softened.
[0052] S700, use the lifting equipment to lift the prefabricated panels 6 and install them on the upper surface of the assembled structural member 1 and the supporting steel truss 5, then tie the steel mesh on the prefabricated panels 6 and pour concrete. After the prefabricated panels 6 are lifted, the height of the prefabricated panels 6 is adjusted by the lifting assembly so that the upper surfaces of the multiple prefabricated panels 6 are in the same plane.
[0053] S800, after the concrete is poured and solidified, the heat-softened gasket 41 is first heated to soften the heat-softened gasket 41, so that the supporting steel truss 5 moves downward, and then the lifting assembly is disassembled. After the lifting assembly is disassembled, the supporting steel truss 5 can be disassembled, and finally the support member 3 is disassembled, and the disassembled components are classified and stored for later use. Before storing the disassembled components, they should be treated with anti-rust to avoid a large amount of rust after long-term storage, thereby affecting the overall strength of each component.
[0054] In summary, compared with the prior art, the present invention of the present application embeds a plurality of bolt sleeves 21 on the prefabricated structural member 1, and after the prefabricated structural member 1 is installed, the support member 3 is installed at the prefabricated bolt sleeves 21 on the wall. The support member 3 is arranged in a row on the prefabricated structural member 1, and a lifting assembly is installed on the support member 3. The top of the lifting assembly is connected to a supporting steel truss 5, and the two ends of the supporting steel truss 5 are respectively mounted on the support members 3 aligned with each other on two prefabricated structural members 1; the height of the supporting steel truss 5 can be adjusted by the lifting assembly, thereby achieving the purpose of adjusting the prefabricated plate 6 above the supporting steel truss 5. At the same time, the supporting member 3, the lifting assembly and the supporting steel truss 5 can be disassembled and reused, thereby achieving the purpose of saving construction costs.
[0055] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A ground-free support device for assembled structural floors, characterized in that: include: Supporting steel trusses (5); Support members (3) symmetrically arranged at both ends of the supporting steel truss (5), the support members (3) being connected to the bottom of the supporting steel truss (5) via fixing bolts (2); A lifting assembly is provided between the supporting steel truss (5) and the supporting member (3); a heating and softening gasket (41) is provided on the upper edge of the lifting assembly at the bottom of the supporting steel truss (5); the supporting steel truss (5) and the prefabricated plate (6) are separated by heating and softening the heating and softening gasket (41), thereby achieving disassembly and reuse of the supporting member (3), the lifting assembly and the supporting steel truss (5).
2. The ground-free support equipment for prefabricated structural floor according to claim 1, characterized in that: The lifting component is configured as a lifting regulator (7), and the lifting regulator (7) comprises a plug-in rod (71); The heating and softening gasket (41) is arranged on the plug-in rod (71), and a hexagonal joint (711) is provided on the bottom side of the plug-in rod (71).
3. The ground-free support equipment for assembled structural floor according to claim 2, characterized in that: The lifting and lowering adjuster (7) comprises an adjusting screw (72); A thread groove (712) is provided at the bottom end of the plug-in rod (71), and the thread groove (712) is connected to the adjusting screw rod (72).
4. The ground-free support equipment for assembled structural floor according to claim 3, characterized in that: A bottom rod (721) is provided at the bottom of the adjusting screw rod (72), and a plug connector (722) is provided at the bottom end of the bottom rod (721).
5. The ground-free support equipment for assembled structural floor according to claim 1, characterized in that: The lifting component is a lifting screw (4), the top end of the lifting screw (4) is provided as a support surface, the bottom end is provided with a driving joint (42), and the heating and softening gasket (41) is sleeved on the lifting screw (4).
6. A ground-free support device for a prefabricated structural floor according to any one of claims 1 to 5, characterized in that: The support member (3) is L-shaped, and a nut (31) is provided on its upper surface. A threaded hole penetrating the support member (3) is provided in the middle of the nut (31).
7. The ground-free support equipment for prefabricated structural floor according to claim 6, characterized in that: The two ends of the support member (3) are connected via an oblique support rod (32) to increase the strength of the support member (3).
8. The ground-free support equipment for assembled structural floor according to claim 7, characterized in that: One end of the support member (3) that abuts against the assembled structural component (1) is provided with a plurality of through holes (33), and the through holes (33) match the bolt sleeves (21) pre-buried in the assembled structural component (1).
9. The ground-free support equipment for assembled structural floor according to claim 8, characterized in that: The top of the support member (3) is provided with an insertion hole (34).
10. The ground-free support equipment for assembled structural floor according to claim 9, characterized in that: The heat-softening gasket (41) is made of hydrocarbon or vinyl thermoplastic containing polar genes.
11. The ground-free support equipment for assembled structural floor according to claim 10, characterized in that: The heating and softening gasket (41) contains an electric heating metal sheet or an electric heating metal wire.
12. A ground-free support device for a prefabricated structural floor according to any one of claims 1 to 4, characterized in that: A plurality of triangular support plates are evenly arranged on the inner side of the supporting steel truss.
13. A method for constructing a prefabricated structural floor slab without ground support, which is implemented by using the prefabricated structural floor slab without ground support equipment as claimed in claims 1 to 12, characterized in that: The steps include: S100, calculating the minimum bending strength required for the supporting steel truss, and processing a supporting steel truss (5) with a bending strength greater than the minimum bending strength based on the minimum bending strength; S200, during the prefabrication process of the assembled structural component (1), the embedded bolt sleeve (21) is positioned and laid out in advance, and the assembled structural component (1) is prefabricated; at the same time, a batch of prefabricated panels (6) to be used are prefabricated in the factory; S300, transporting the processed assembled structural components (1), supporting steel trusses (5) and prefabricated panels (6) to a location designated by the construction worker, and performing protective treatment on the assembled structural components (1) and supporting steel trusses (5); S400, a plurality of through holes (33) are provided at one end of the support member (3) that is in contact with the assembled structural component (1), and the through holes (33) are aligned with the embedded bolt sleeves (21), and then a plurality of fixing bolts (2) are sequentially passed through the through holes (33) of the support member (3) and screwed into the embedded sleeves, thereby achieving the purpose of fixing the support member (3); S500, connect the lifting assembly vertically upward to the support frame, slowly rotate the lifting assembly, adjust the lifting assembly to a predetermined height, and then place the heated and softened gasket (41); S600, lifting the supporting steel truss (5) by means of a lifting device, and aligning the two ends of the supporting steel truss (5) with the lifting assembly, so that the two ends of the supporting steel truss (5) are mounted on the lifting assembly; S700, using a lifting device to lift the prefabricated panel (6) and install it on the upper surface of the assembled structural member (1) and the supporting steel truss (5), then tying a steel mesh on the prefabricated panel (6), and pouring concrete; S800, after the concrete is poured and solidified, the heat-softening gasket (41) is first heated to soften the heat-softening gasket (41), thereby allowing the supporting steel truss (5) to move downward, and then the lifting assembly is disassembled. After the lifting assembly is disassembled, the supporting steel truss (5) is disassembled, and finally the supporting member (3) is disassembled, and the disassembled components are classified and stored.
14. A method for constructing a prefabricated structural floor slab without ground support according to claim 13, characterized in that: The method of calculating the minimum bending strength of the supporting steel truss (5) in step S100 is as follows: The cross section of the supporting steel truss (5) is a rectangular structure. The width of the supporting steel truss (5) is b, the height is h, and the length is determined according to the span of the floor slab. The calculation formula for the bending strength of the load-bearing beam is: , Where: M is the bending moment and W is the bending coefficient.
15. A method for constructing a prefabricated structural floor slab without ground support according to claim 14, characterized in that: The bending resistance coefficient W is: , Wherein: b is the width of the supporting steel truss (5), and h is the height of the supporting steel truss (5).
16. A method for constructing a prefabricated structural floor slab without ground support according to any one of claims 13 to 15, characterized in that: In the process of fixing the support member (3) by the fixing bolts (2) in step S400, the support member (3) needs to be fixed at a specified height on the surface of the assembled structural component (1). After the support member (3) is fixed, it is checked whether the support member (3) is shaking and whether the fixing bolts (2) are tightened.
17. A method for constructing a prefabricated structural floor slab without ground support according to any one of claims 13 to 15, characterized in that: After the supporting steel truss (5) is installed in step S600, the overall levelness is checked with a level ruler. If there is any skewness, the lifting assembly is adjusted to ensure that the overall levelness of the steel truss meets the requirements.
18. A method for constructing a prefabricated structural floor slab without ground support according to claim 17, characterized in that: In step S600, when both ends of the supporting steel truss (5) are sleeved on the lifting assembly, it is ensured that the top of the lifting assembly is lower than the top of the supporting steel truss (5), so as to ensure that the supporting steel truss (5) moves downward after the heated and softened gasket (41) is heated and softened.
19. A method for constructing a prefabricated structural floor slab without ground support according to any one of claims 13 to 15, characterized in that: After the prefabricated panels (6) are hoisted in step S700, the height of the prefabricated panels (6) is adjusted using a lifting assembly so that the upper surfaces of the plurality of prefabricated panels (6) are on the same plane.
20. A method for constructing a prefabricated structural floor slab without ground support according to any one of claims 13 to 15, characterized in that: In the step S800, each component after disassembly must be subjected to rust prevention treatment before storage to avoid a large amount of rust after long-term storage.
Citation Information
Patent Citations
Steel structure supporting beam column for building construction and mounting method of steel structure supporting beam column
CN111519938A
Concrete frame assembly type light steel combined truss bearing steel wire net frame mortar-perlite-polyphenyl composite enclosure wall and manufacturing method
CN116044053A
Support-free truss laminated slab and construction method
CN116892265A
Formwork for cast-in-place concrete connecting beams
CN202627506U
Unit floor construction method
JP2009299311A