Protection device for steel strand in steel structure welding after lifting of super high-rise steel corridor

By using protective devices of protective covers, crawl components, wax components and shading components during the welding process after the steel corridor lift, the welding spark splash problem is solved, and the multiple protection and performance improvement of steel strands are achieved.

CN118911453APending Publication Date: 2024-11-08CCCC FOURTH HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410884002.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Sparks generated during welding after the steel corridor are lifted will splash onto the steel strand, causing local melting and affecting its performance.

Method used

A protective device consisting of a protective cover, a crawler assembly, a waxing assembly and a shading assembly is designed. The protective cover consists of a curved plate and a connecting assembly. The crawler assembly is moved through a cylinder and a servo motor, and the waxing assembly is passed through a wax solution and a sponge. Perform the application and the shielding assembly avoids spark splashing through the curved plate and the servo motor.

Benefits of technology

It realizes multiple protection of steel strands to prevent sparks from splashing, improves its cold resistance, heat resistance, chemical resistance and wear resistance, and improves the quality of waxing, completely eliminates the sparks on steel strands during welding. Influence.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911453A_ABST
    Figure CN118911453A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of steel strand protection, and particularly relates to a steel strand protection device for steel structure welding after lifting of a super high-rise steel corridor, which comprises a steel strand and a protective cover capable of covering the steel strand, the crawling assembly can enable the protective cover to move on the steel strand and is arranged on the protective cover; the waxing assembly can smear protective wax on the steel strand and is arranged on the protective cover; the shielding assembly can prevent sparks generated during welding from splashing on the steel strand, the shielding assembly is arranged on the protective cover, multiple protection can be conducted on the steel strand, and then the influence of the sparks generated during welding on the steel strand can be thoroughly eradicated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel strand protection, and in particular to a protection device for steel strands welded by steel structures after the lifting of a super-high-rise steel corridor. Background Art

[0002] The corridor is a kind of complex high-rise building structure system. It generally refers to two or several high-rise buildings connected by an overhead connector to meet the requirements of building shape and functional use. The connector is the corridor. Its span can be several meters long or tens of meters long. There are one or several corridors arranged along the vertical direction of the building. On the one hand, the corridor is set up for the requirements of building functions, which can facilitate the connection between the two towers. At the same time, the corridor has good lighting effects and a wide field of vision and can be used as a sightseeing corridor or a leisure cafe; on the other hand, due to the setting of the corridor, the appearance of the building can be more distinctive and a more harmonious architectural atmosphere can be created. In addition, there are fire corridors, which serve as safe passages. They have high fire protection requirements and must be made entirely of fireproof materials.

[0003] At present, after the steel corridor is lifted, the steel structure in the steel corridor is generally welded. Sparks are generated during the welding process, and the generated sparks may fly onto the steel strands. Since the generated sparks are still at a high temperature, over time, the steel strands may be partially melted, which in turn affects the performance of the steel strands. Therefore, a protective device for steel strands during welding of steel structures after the super-high-rise steel corridor is lifted is invented. Summary of the invention

[0004] In view of the above and / or existing problems in a protective device for steel strands welded in a super-high-rise steel corridor after lifting, the present invention is proposed.

[0005] Therefore, the purpose of the present invention is to provide a protective device for steel strands welded on the steel structure after the super-high-rise steel corridor is lifted, which can solve the above-mentioned existing problems.

[0006] To solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:

[0007] A protective device for steel strands during welding of a super high-rise steel corridor after lifting, comprising steel strands and:

[0008] A protective cover capable of covering the steel strands;

[0009] A crawling assembly capable of moving the protective cover on the steel strand, and the crawling assembly is arranged on the protective cover;

[0010] A waxing component capable of applying protective wax to the steel strand, and the waxing component is arranged on the protective cover;

[0011] The shielding component can prevent sparks generated during welding from splashing onto the steel strand, and the shielding component is arranged on the protective cover.

[0012] As a preferred solution of the protective device for steel strands welded on the steel structure after lifting of a super-high-rise steel corridor described in the present invention, the protective cover is composed of two groups of first arc plates, and the two groups of first arc plates are connected together by a first connecting component.

[0013] As a preferred solution of the protective device for steel strands of the steel structure welding after the super high-rise steel corridor is lifted according to the present invention, the first connecting component includes:

[0014] A notch, wherein one end of the first arc-shaped plates is provided with a notch;

[0015] A convex block, one end of another group of the first arc-shaped plates is integrally provided with a convex block;

[0016] A first rotating shaft, wherein the first rotating shaft is rotatably connected in the notch via a bearing, and the protrusion is fixedly mounted on the first rotating shaft;

[0017] A first servo motor is fixedly mounted on the top of a group of first arc-shaped plates, and an output shaft of the first servo motor is fixedly connected to the first rotating shaft.

[0018] As a preferred solution of the protective device for steel strands of the steel structure welding after the super-high-rise steel corridor is lifted according to the present invention, the crawling assembly includes:

[0019] A first box body, the first box body being fixedly mounted on the top of the first arc-shaped plate;

[0020] A first cylinder, wherein the first cylinder is fixedly installed in the first box body;

[0021] A second arc-shaped plate, the first cylinder fixes the second arc-shaped plate via a piston rod;

[0022] A second box body, wherein the second arc-shaped plate is fixedly mounted with the second box body;

[0023] a second cylinder, the second cylinder being fixedly mounted in the second box body;

[0024] The first extrusion plate is fixedly mounted by the second cylinder via a piston rod.

[0025] As a preferred solution of the protective device for steel strands of the steel structure welding after the super high-rise steel corridor is lifted according to the present invention, the waxing component includes:

[0026] A cleaning component capable of cleaning the steel strand, and the cleaning component is arranged on the top end of the first arc-shaped plate;

[0027] A coating component is provided for coating the steel strands, and the coating component is arranged on the bottom end of the first arc-shaped plate.

[0028] As a preferred solution of the protective device for steel strands of the steel structure welding after the super high-rise steel corridor is lifted according to the present invention, the coating component includes:

[0029] A third box body, wherein the third box body is fixedly mounted on the bottom end of the first arc-shaped plate;

[0030] A third cylinder, the third cylinder being fixedly installed in the third box body;

[0031] A second extrusion plate, the third cylinder fixing the second extrusion plate via a piston rod;

[0032] A first storage tank for polyethylene wax solution is provided in its inner cavity, and the first storage tank is fixedly mounted on the side wall of the first arc-shaped plate;

[0033] a first water pump, wherein the first water pump is fixedly mounted on the top of the first storage tank;

[0034] A first liquid inlet pipe, wherein the first liquid inlet pipe is fixedly mounted on the liquid inlet end of the first water pump, and one end of the first liquid inlet pipe extends into the first storage tank;

[0035] A first liquid outlet pipe, wherein the first liquid outlet pipe is fixedly mounted on a liquid outlet end of the first water pump;

[0036] A first mounting hole, wherein the first mounting hole is opened on the top end of the second extrusion plate, and one end of the first liquid outlet pipe is fixedly mounted in the first mounting hole;

[0037] A first sponge is fixedly mounted on one side of the second squeezing plate.

[0038] As a preferred solution of the protective device for steel strands of the steel structure welding after the super-high-rise steel corridor is lifted according to the present invention, the coating component also includes:

[0039] A first fixing hole, wherein the first fixing hole is opened on the bottom end of the second extrusion plate;

[0040] A first hollow tube, wherein the first hollow tube is fixedly installed in the first fixing hole;

[0041] A first fan is fixedly installed in the first hollow tube.

[0042] As a preferred solution of the protective device for steel strands of the steel structure welding after the super high-rise steel corridor is lifted according to the present invention, the cleaning component includes:

[0043] A fourth box body, the fourth box body is fixedly mounted on the top end of the first arc-shaped plate;

[0044] A fourth cylinder, wherein the fourth cylinder is fixedly installed in the fourth box body;

[0045] A third extrusion plate, the fourth cylinder fixing the third extrusion plate via a piston rod;

[0046] A second water storage tank is provided in its inner cavity, and the second water storage tank is fixedly mounted on the side wall of the first arc-shaped plate;

[0047] a second water pump, the second water pump being fixedly mounted on the top of the second storage tank;

[0048] A second liquid inlet pipe, wherein the second liquid inlet pipe is fixedly mounted on the liquid inlet end of the second water pump, and one end of the second liquid inlet pipe extends into the second storage tank;

[0049] A second liquid outlet pipe, wherein the second liquid outlet pipe is fixedly mounted on a liquid outlet end of the second water pump;

[0050] A second mounting hole, wherein the second mounting hole is formed on the top of the third extrusion plate, and one end of the second liquid outlet pipe is fixedly mounted in the second mounting hole;

[0051] A second sponge is fixedly mounted on one side of the third extrusion plate.

[0052] As a preferred solution of the protective device for steel strands of the steel structure welding after the super-high-rise steel corridor is lifted according to the present invention, the cleaning component also includes:

[0053] a second fixing hole, wherein the second fixing hole is opened on the bottom end of the third extrusion plate;

[0054] A second hollow tube, wherein the second hollow tube is fixedly installed in the second fixing hole;

[0055] a second fan, wherein the second fan is fixedly installed in the second hollow tube;

[0056] The electric heating wire is fixedly installed in the second hollow tube.

[0057] As a preferred solution of the protective device for steel strands of the steel structure welding after the super-high-rise steel corridor is lifted according to the present invention, the shielding component includes:

[0058] A plurality of third curved plates, wherein the plurality of third curved plates are connected together by a second connecting assembly, and the plurality of third curved plates can be arranged in a circle;

[0059] A support plate, a support plate fixedly mounted on the bottom of a group of the third curved plates;

[0060] The connection component comprises:

[0061] Side plates, both ends of one side of the third curved plate are fixedly mounted with side plates;

[0062] A movable plate, the movable plate is fixedly mounted on the other side of the third curved plate;

[0063] A second rotating shaft, the second rotating shaft is rotatably connected between the two sets of side plates through a bearing, and a movable plate is fixedly mounted on the second rotating shaft;

[0064] A second servo motor is fixedly mounted on a set of side plates, and an output shaft of the second servo motor is fixedly connected to the second rotating shaft.

[0065] Compared with existing technologies:

[0066] By providing a protective cover capable of covering the steel strands, the first layer of protection for the steel strands can be achieved; by providing a crawling component capable of moving the protective cover on the steel strands, and by providing a waxing component capable of applying protective wax to the steel strands, the second layer of protection for the steel strands can be achieved; by providing a shielding component capable of preventing sparks generated during welding from splashing on the steel strands, the third layer of protection for the steel strands can be achieved. Based on this, the steel strands can be provided with multiple protections, thereby completely preventing the sparks generated during welding from affecting the steel strands. In addition, the waxing component can form a layer of polyethylene wax on the surface of the steel strands to improve the cold resistance, heat resistance, chemical resistance and wear resistance of the steel strand surface. In addition, the waxing component can also achieve the cleaning of the steel strands first and then the waxing operation, thereby improving the waxing quality of the steel strands. BRIEF DESCRIPTION OF THE DRAWINGS

[0067] Figure 1 It is a front view schematic diagram of the structure of the present invention;

[0068] Figure 2 For the present invention Figure 1 A schematic diagram of the structure enlargement in the middle;

[0069] Figure 3 For the present invention Figure 1 A magnified schematic diagram of the structure at B in the middle;

[0070] Figure 4 For the present invention Figure 1A magnified schematic diagram of the structure at C in the middle;

[0071] Figure 5 For the present invention Figure 1 A magnified schematic diagram of the structure at D in the middle;

[0072] Figure 6 It is a top view schematic diagram of the protective cover of the present invention;

[0073] Figure 7 It is a top view schematic diagram of the waxing assembly of the present invention;

[0074] Figure 8 It is a top view schematic diagram of the crawling assembly of the present invention;

[0075] Fig. 9 It is a top view schematic diagram of the shielding assembly of the present invention.

[0076] In the figure: a first arc plate 10, a notch 11, a protrusion 12, a first rotating shaft 13, a first servo motor 14, a first cylinder 20, a second arc plate 21, a second cylinder 22, a first extrusion plate 23, a third cylinder 30, a second extrusion plate 31, a first storage box 33, a first water pump 34, a first liquid inlet pipe 35, a first liquid outlet pipe 36, a first mounting hole 37, a first sponge 38, a first fixing hole 39, a first hollow tube 391, a first fan 392, a fourth cylinder 40, a third extrusion plate 41, a second storage box 43, a second water pump 44, a second liquid inlet pipe 45, a second liquid outlet pipe 46, a second mounting hole 47, a second sponge 48, a second fixing hole 49, a second hollow tube 491, a second fan 492, an electric heating wire 493, a third arc plate 50, a support plate 51, a side plate 52, a movable plate 53, a second rotating shaft 54, a second servo motor 55, and a strand 60. DETAILED DESCRIPTION

[0077] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0078] The present invention provides a protective device for steel strands welded on the steel structure after the super high-rise steel corridor is lifted. Figure 1-Figure 9 , including steel strand 60;

[0079] Also included: a protective cover capable of covering the steel strand 60;

[0080] The protective cover is composed of two groups of first arc-shaped plates 10, and the two groups of first arc-shaped plates 10 are connected together by a first connecting component;

[0081] The first connecting assembly includes: a notch 11, a protrusion 12, a first rotating shaft 13, and a first servo motor 14;

[0082] A notch 11 is formed at one end of one group of first curved plates 10, and a protrusion 12 is integrated at one end of another group of first curved plates 10. A first rotating shaft 13 is rotatably connected in the notch 11 through a bearing, and the protrusion 12 is fixedly mounted on the first rotating shaft 13. A first servo motor 14 is fixedly mounted on the top of one group of first curved plates 10, and an output shaft of the first servo motor 14 is fixedly connected to the first rotating shaft 13.

[0083] It also includes: a crawling assembly capable of moving the protective cover on the steel strand 60, and the crawling assembly is arranged on the protective cover;

[0084] The crawling assembly includes: a first box body, a first cylinder 20, a second arc plate 21, a second cylinder 22, and a first extrusion plate 23;

[0085] The first box body is fixedly installed on the top of the first curved plate 10, the first cylinder 20 is fixedly installed in the first box body, the second curved plate 21 is fixedly installed by the first cylinder 20 through a piston rod, the second box body is fixedly installed in the second curved plate 21, the second cylinder 22 is fixedly installed in the second box body, and the first extrusion plate 23 is fixedly installed by the second cylinder 22 through a piston rod.

[0086] It also includes: a waxing component capable of applying protective wax to the steel strand 60, and the waxing component is arranged on the protective cover;

[0087] The waxing assembly includes: a cleaning assembly capable of cleaning the steel strand 60, and the cleaning assembly is arranged on the top end of the first curved plate 10; and a coating assembly capable of coating the steel strand 60, and the coating assembly is arranged on the bottom end of the first curved plate 10;

[0088] The coating assembly includes: a third box body, a third cylinder 30, a second extrusion plate 31, a first storage box 33 with a polyethylene wax solution in its inner cavity, a first water pump 34, a first liquid inlet pipe 35, a first liquid outlet pipe 36, a first mounting hole 37, a first sponge 38, a first fixing hole 39, a first hollow tube 391, and a first fan 392;

[0089] The third box body is fixedly mounted on the bottom end of the first curved plate 10, the third cylinder 30 is fixedly mounted in the third box body, the third cylinder 30 is fixedly mounted on the second extrusion plate 31 through a piston rod, the first storage box 33 is fixedly mounted on the side wall of the first curved plate 10, the first water pump 34 is fixedly mounted on the top of the first storage box 33, the first liquid inlet pipe 35 is fixedly mounted on the liquid inlet end of the first water pump 34, and one end of the first liquid inlet pipe 35 extends into the first storage box 33, the first liquid outlet pipe 36 is fixedly mounted on the liquid outlet end of the first water pump 34, and the first installation The hole 37 is opened on the top of the second extrusion plate 31, and one end of the first liquid outlet pipe 36 is fixedly installed in the first installation hole 37, the first sponge 38 is fixedly installed on one side of the second extrusion plate 31, the first fixing hole 39 is opened on the bottom end of the second extrusion plate 31, the first hollow tube 391 is fixedly installed in the first fixing hole 39, and the first fan 392 is fixedly installed in the first hollow tube 391, wherein a heating structure (including but not limited to an electric heating tube) can be provided in the first storage box 33 as needed to avoid solidification of the polyethylene wax solution.

[0090] The cleaning assembly includes: a fourth cylinder 40, a third extrusion plate 41, a second storage box 43 with water in its inner cavity, a second water pump 44, a second liquid inlet pipe 45, a second liquid outlet pipe 46, a second mounting hole 47, a second sponge 48, a second fixing hole 49, a second hollow tube 491, a second fan 492, and an electric heating wire 493;

[0091] The fourth box body is fixedly mounted on the top of the first arc-shaped plate 10, the fourth cylinder 40 is fixedly mounted in the fourth box body, and the fourth cylinder 40 is fixedly mounted on the third extrusion plate 41 via a piston rod;

[0092] The second storage box 43 is fixedly mounted on the side wall of the first arc-shaped plate 10, the second water pump 44 is fixedly mounted on the top of the second storage box 43, the second liquid inlet pipe 45 is fixedly mounted on the liquid inlet end of the second water pump 44, and one end of the second liquid inlet pipe 45 extends into the second storage box 43, the second liquid outlet pipe 46 is fixedly mounted on the liquid outlet end of the second water pump 44, the second mounting hole 47 is opened on the top of the third extrusion plate 41, and one end of the second liquid outlet pipe 46 is fixedly mounted in the second mounting hole 47, the second sponge 48 is fixedly mounted on one side of the third extrusion plate 41, the second fixing hole 49 is opened on the bottom end of the third extrusion plate 41, the second hollow tube 491 is fixedly mounted in the second fixing hole 49, the second fan 492 is fixedly mounted in the second hollow tube 491, and the electric heating wire 493 is fixedly mounted in the second hollow tube 491.

[0093] It also includes: a shielding component capable of preventing sparks generated during welding from splashing on the steel strand 60, and the shielding component is arranged on the protective cover;

[0094] The shielding assembly includes: a plurality of third arc-shaped plates 50 and a support plate 51;

[0095] A plurality of third curved plates 50 are connected together by a second connecting assembly, and the plurality of third curved plates 50 can be arranged in a circle, a support plate 51 is fixedly installed at the bottom of a group of third curved plates 50, and a group of third curved plates 50 is fixedly installed on the first curved plate 10.

[0096] The connecting assembly includes: a side plate 52, a movable plate 53, a second rotating shaft 54, and a second servo motor 55;

[0097] Side plates 52 are fixedly installed at both ends of one side of the third curved plate 50, and a movable plate 53 is fixedly installed on the other side of the third curved plate 50. The second rotating shaft 54 ​​is rotatably connected between the two groups of side plates 52 through a bearing, and the movable plate 53 is fixedly installed on the second rotating shaft 54. The second servo motor 55 is fixedly installed on one group of side plates 52, and the output shaft of the second servo motor 55 is fixedly connected to the second rotating shaft 54.

[0098] When welding is required after the steel corridor is lifted, the following steps are performed:

[0099] Step 1: placing the steel strand 60 between the two sets of first curved plates 10, and then rotating the first rotating shaft 13 by the first servo motor 14 so that the two sets of first curved plates 10 are arranged in a circle;

[0100] Step 2: The first extrusion plate 23 is used to extrude the steel strand 60 through the second cylinder 22 at the bottom, and then the second curved plate 21 is raised through the first cylinder 20 at the top. After the second curved plate 21 is in a suitable position, the first extrusion plate 23 is used to extrude the steel strand 60 through the second cylinder 22 at the top. After that, the first extrusion plate 23 at the bottom is separated from the steel strand 60, and the first cylinder 20 at the top drives the first curved plate 10 to rise, so that the first curved plate 10 can move along the steel strand 60.

[0101] Step 3: When the first curved plate 10 moves along the steel strand 60, the first sponge 38 is brought into contact with the steel strand 60 through the fourth air cylinder 40, and then the water in the second storage box 43 is soaked in the second sponge 48 through the second water pump 44, so that the steel strand 60 can be wiped, and then the hot air is blown toward the steel strand 60 through the second fan 492 and the electric heating wire 493, so that the steel strand 60 can be dried;

[0102] Step 4: The first sponge 38 is brought into contact with the wiped steel strand 60 through the third cylinder 30, and then the polyethylene wax solution in the first storage tank 33 is soaked in the first sponge 38 through the first water pump 34, so that the steel strand 60 can be coated, and then the steel strand 60 is air-dried by the first fan 392, so that polyethylene wax can be formed on the surface of the steel strand 60;

[0103] Step 5: firstly, the first curved plate 10 is placed in a suitable position, and then, a plurality of third curved plates 50 are unfolded by the second servo motor 55 to block the sparks generated during welding and prevent the sparks from splashing on the steel strands 60 .

[0104] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced by equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A protective device for steel strands during welding of a super high-rise steel corridor after lifting, comprising steel strands (60), characterized in that: Also includes: A protective cover capable of covering the steel strand (60); A crawling assembly capable of enabling the protective cover to move on the steel strand (60), wherein the crawling assembly is arranged on the protective cover; A waxing component capable of applying protective wax to the steel strand (60), wherein the waxing component is arranged on the protective cover; The shielding component can prevent sparks generated during welding from splashing onto the steel strand (60), and the shielding component is arranged on the protective cover.

2. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 1 is characterized in that: The protective cover is composed of two groups of first arc-shaped plates (10), and the two groups of first arc-shaped plates (10) are connected together via a first connecting component.

3. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 2 is characterized in that: The first connection component comprises: A notch (11), wherein one end of a set of the first arc-shaped plates (10) is provided with a notch (11); A convex block (12), one end of another group of the first arc-shaped plates (10) being integrally provided with a convex block (12); A first rotating shaft (13), wherein the first rotating shaft (13) is rotatably connected in the notch (11) via a bearing, and the protrusion (12) is fixedly mounted on the first rotating shaft (13); A first servo motor (14), wherein the first servo motor (14) is fixedly mounted on the top of a group of first arc-shaped plates (10), and an output shaft of the first servo motor (14) is fixedly connected to the first rotating shaft (13).

4. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 2 is characterized in that: The crawling component includes: A first box body, the first box body being fixedly mounted on the top of the first curved plate (10); A first cylinder (20), the first cylinder (20) being fixedly mounted in the first box body; A second arc-shaped plate (21), the first cylinder (20) fixing the second arc-shaped plate (21) via a piston rod; A second box body, in which the second arc-shaped plate (21) is fixedly mounted; A second cylinder (22), the second cylinder (22) being fixedly mounted in the second box body; A first extrusion plate (23), the second cylinder (22) is fixedly mounted with the first extrusion plate (23) via a piston rod.

5. The protective device for steel strands after steel structure welding of a super high-rise steel corridor after lifting according to claim 2 is characterized in that: The waxing assembly comprises: A cleaning component capable of cleaning the steel strand (60), wherein the cleaning component is arranged on the top end of the first arc-shaped plate (10); A coating component is provided which can coat the steel strand (60), and the coating component is arranged on the bottom end of the first arc-shaped plate (10).

6. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 5 is characterized in that: The smearing assembly comprises: A third box body, the third box body being fixedly mounted on the bottom end of the first arc-shaped plate (10); A third cylinder (30), wherein the third cylinder (30) is fixedly installed in the third box body; A second extrusion plate (31), wherein the third cylinder (30) is used to fix the second extrusion plate (31) via a piston rod; A first storage box (33) for polyethylene wax solution is provided in its inner cavity, and the first storage box (33) is fixedly mounted on the side wall of the first curved plate (10); a first water pump (34), the first water pump (34) being fixedly mounted on the top of the first storage tank (33); A first liquid inlet pipe (35), wherein the first liquid inlet pipe (35) is fixedly mounted on the liquid inlet end of the first water pump (34), and one end of the first liquid inlet pipe (35) extends into the first storage box (33); A first liquid outlet pipe (36), the first liquid outlet pipe (36) being fixedly mounted on a liquid outlet end of the first water pump (34); A first mounting hole (37), wherein the first mounting hole (37) is opened on the top end of the second extrusion plate (31), and one end of the first liquid outlet pipe (36) is fixedly mounted in the first mounting hole (37); A first sponge (38), wherein the first sponge (38) is fixedly mounted on one side of the second squeezing plate (31).

7. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 6 is characterized in that: The smearing assembly also includes: A first fixing hole (39), wherein the first fixing hole (39) is opened on the bottom end of the second extrusion plate (31); A first hollow tube (391), wherein the first hollow tube (391) is fixedly installed in the first fixing hole (39); A first fan (392), wherein the first fan (392) is fixedly installed in the first hollow tube (391).

8. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 5 is characterized in that: The cleaning component comprises: a fourth box body, the fourth box body being fixedly mounted on the top end of the first arc-shaped plate (10); A fourth cylinder (40), wherein the fourth cylinder (40) is fixedly installed in the fourth box body; A third extrusion plate (41), the fourth cylinder (40) fixing the third extrusion plate (41) via a piston rod; A second water storage tank (43) is provided in its inner cavity, and the second water storage tank (43) is fixedly mounted on the side wall of the first arc-shaped plate (10); a second water pump (44), the second water pump (44) being fixedly mounted on the top of the second storage tank (43); A second liquid inlet pipe (45), the second liquid inlet pipe (45) is fixedly mounted on the liquid inlet end of the second water pump (44), and one end of the second liquid inlet pipe (45) extends into the second storage tank (43); A second liquid outlet pipe (46), the second liquid outlet pipe (46) is fixedly mounted on the liquid outlet end of the second water pump (44); A second mounting hole (47), wherein the second mounting hole (47) is formed on the top end of the third extrusion plate (41), and one end of the second liquid outlet pipe (46) is fixedly mounted in the second mounting hole (47); A second sponge (48), wherein the second sponge (48) is fixedly mounted on one side of the third squeezing plate (41).

9. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 8 is characterized in that: The cleaning assembly also includes: A second fixing hole (49), wherein the second fixing hole (49) is formed on the bottom end of the third extrusion plate (41); A second hollow tube (491), wherein the second hollow tube (491) is fixedly installed in the second fixing hole (49); a second fan (492), the second fan (492) being fixedly installed in the second hollow tube (491); An electric heating wire (493), wherein the electric heating wire (493) is fixedly installed in the second hollow tube (491).

10. The protective device for steel strands of steel structure welding after lifting of super high-rise steel corridor according to claim 2 is characterized in that: The shielding component comprises: A plurality of third curved plates (50), wherein the plurality of third curved plates (50) are connected together via a second connecting assembly, and the plurality of third curved plates (50) can be arranged in a circle; A support plate (51), a support plate (51) is fixedly mounted on the bottom of a group of the third curved plates (50); The connection component comprises: A side plate (52), the side plates (52) being fixedly mounted on both ends of one side of the third arc-shaped plate (50); A movable plate (53), the movable plate (53) being fixedly mounted on the other side of the third arc-shaped plate (50); A second rotating shaft (54), the second rotating shaft (54) is rotatably connected between the two sets of side plates (52) via a bearing, and a movable plate (53) is fixedly mounted on the second rotating shaft (54); A second servo motor (55), wherein the second servo motor (55) is fixedly mounted on a set of side plates (52), and an output shaft of the second servo motor (55) is fixedly connected to the second rotating shaft (54).