Water mill drilling machine control method, device and equipment for subway shaft construction and readable storage medium

Through the automated controlled water grinding drilling system, combined with fuzzy control and adaptive control technology, the problems of low efficiency, high labor costs and construction hazards in subway shaft construction are solved, and efficient and safe construction is achieved to adapt to different environmental needs.

CN118911662APending Publication Date: 2024-11-08CHINA COMMUNICATIONS CONSTRUCTION +10
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411143531.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Traditional methods in subway shaft construction are inefficient, have high labor costs, high labor intensity, dangerous construction and high equipment costs. Large drilling rigs are inconvenient to move, making it difficult to adapt to different construction environments.

Method used

The water grinding drilling rig system adopts an automated control, combining fuzzy control and adaptive control technology, detects the rock position and hardness through sensors, and automatically adjusts the drilling speed and walking motor speed to achieve automatic rock search and automatic drilling, supporting local and remote control. It has anti-malfunction function and adapts to different construction environments.

Benefits of technology

It improves construction efficiency, reduces labor costs and equipment costs, enhances construction safety, realizes one-click operation of single holes and unattended one-click, adapts to different construction environments, and reduces equipment maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911662A_ABST
    Figure CN118911662A_ABST
Patent Text Reader

Abstract

The invention relates to a water mill drilling machine control method, device and equipment for subway shaft construction and a readable storage medium, and belongs to the field of engineering machinery. The automatic control technology is adopted, the sensor is used for sensing information such as the position and hardness of the rock, the rock is automatically searched, the drilling speed is controlled, automatic drilling without human intervention is achieved, the construction efficiency is greatly improved, and the safety is improved. The system further comprises a local / remote two-place automatic control mode, a wireless anti-interference coding technology is adopted for remote control, stable and accurate operation of the system is ensured, an anti-misoperation function is achieved in the remote and local operation switching process, and safe operation of equipment is ensured. According to the method, fuzzy control and self-adaptive control technologies are combined, a complete mechanical control model is established according to different rock stratum properties, and parameters such as speeds and torques of a walking motor and a drilling motor are dynamically adjusted, so that the system reaches an optimal operation mode, automatic operation is achieved, and control is conducted through the current of a rotating motor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of engineering machinery, and relates to a water-mill drilling rig control method, device, equipment and a readable storage medium for subway shaft construction. Background Art

[0002] During subway construction, shaft construction is an important link, mainly used for ventilation, drainage, personnel entry and exit, etc. Traditional shaft construction methods mainly rely on manual work, which is inefficient, high in labor costs, labor-intensive, and dangerous.

[0003] At present, the equipment used for shaft construction mainly includes the following:

[0004] Manual water-grinding drill: completely dependent on manual operation, low efficiency, high labor intensity and dangerous construction.

[0005] Small hydraulic drilling rig: requires manual operation, has low efficiency, and poses safety hazards during the construction process.

[0006] Large drilling rig: suitable for large shaft construction, with high equipment cost and inconvenient movement.

[0007] Defects of the prior art:

[0008] Low efficiency: Traditional methods mainly rely on manual operation, which is inefficient and difficult to meet the needs of rapid construction.

[0009] High labor cost: A large number of workers are required for construction, which results in high labor cost.

[0010] High labor intensity: Manual operation is required during the construction process, which is labor-intensive and easily causes fatigue to construction workers.

[0011] Construction hazards: There are safety hazards such as falling and collapse during the construction process.

[0012] High equipment cost: Large drilling rigs are expensive and difficult to use in small shaft construction.

[0013] Inconvenient to move: Large drilling rigs are inconvenient to move and difficult to adapt to different construction environments. Summary of the invention

[0014] In view of this, the purpose of the present invention is to provide a water-grinding drilling rig control method, device, equipment and readable storage medium for subway shaft construction, so as to realize automatic control, improve construction efficiency, reduce labor costs, improve safety, reduce equipment costs, and adapt to different construction environments.

[0015] In order to achieve the above object, the present invention provides the following technical solutions:

[0016] A water mill drilling rig control method for subway shaft construction, the method comprising the following steps:

[0017] S1: Automatically search for rocks and drill at the initial speed. When the initial drilling time is reached, the motor switches to the running speed and starts drilling.

[0018] S2: If the current drilling rotation current is normal, drilling will continue; if the current drilling rotation current is greater than the set value, the travel motor will stop, and when the rotation motor current returns to normal, the motor will continue drilling;

[0019] S3: When the travel switch is touched, the drilling rig is completed, the travel motor reverses and returns, and when the set time is reached, the main motor stops and the travel motor rises to zero position and stops automatically.

[0020] Furthermore, the principle of automatic rock search is:

[0021] Each drilling module includes a main motor responsible for the rotation of the drill bit and a feed motor responsible for the drilling and retraction of the drill bit.

[0022] First, start the main motor to drive the drill bit to idle at high speed, and then the cutter motor drives the drill bit to approach the rock at a lower speed. When the drill bit encounters the rock, the load of the main motor will increase rapidly, that is, the current of the main motor will increase rapidly from the idling current. When the increase value reaches 10% of the idling current, it is considered that the drill bit touches the rock.

[0023] Furthermore, the drilling rig system has local / remote automatic control modes.

[0024] Furthermore, the remote control adopts wireless anti-interference coding technology, and has an anti-misoperation function during the switching process between remote and local operations to ensure the safe operation of the equipment;

[0025] When the system is in manual mode, the equipment operates independently according to the system setting mode;

[0026] When the system is in automatic mode, a single-hole unattended one-key operation function is realized, the system automatically drills and automatically finds the zero point of the equipment.

[0027] Furthermore, in the drilling process, fuzzy control and adaptive control technology are combined to establish a mechanical control model according to the properties of different rock formations, and the speed and torque parameters of the travel motor and the drilling motor are dynamically adjusted to enable the system to achieve the optimal operating mode.

[0028] A water mill drilling rig control device for subway shaft construction, comprising:

[0029] A controller, used for receiving control signals and controlling the drilling rig actuator;

[0030] Travel motor, used to drive the drill forward and backward;

[0031] Drilling motor, used to drive the drill bit to rotate;

[0032] Sensors to detect information about rock position and hardness;

[0033] Communication module for local / remote control.

[0034] Further, the controller adopts a programmable logic controller;

[0035] The communication module adopts wireless anti-interference coding technology.

[0036] A water mill drilling rig equipment for subway shaft construction, comprising:

[0037] The drilling rig body, including the traveling mechanism, drilling mechanism and control system;

[0038] Drill bits, used to break up rock;

[0039] Sensors are used to detect information about the position and hardness of the rock.

[0040] Further, the control system includes a local control unit and a remote control unit;

[0041] The control system combines fuzzy control with adaptive control technology.

[0042] A readable storage medium stores a water-mill drilling rig control method for subway shaft construction, the control method comprising the steps described.

[0043] The beneficial effects of the present invention are:

[0044] (1) Improve construction efficiency

[0045] The sensors can sense the rock positions and automatically search for rocks, thus avoiding the tedious operation of manual rock search and improving construction efficiency.

[0046] Automatically adjust the drilling speed according to the rock hardness to avoid damage to the drill bit or low efficiency due to excessive speed, thereby improving construction efficiency.

[0047] It realizes the unattended one-key operation function of a single hole, without the need for manual monitoring throughout the process. One person can control multiple drilling rigs to operate simultaneously, greatly improving construction efficiency.

[0048] (2) Reduce labor costs

[0049] Realize automated operation, eliminate the need for tedious manual operations, reduce labor demand and lower labor costs.

[0050] Remote control can be achieved without the need for personnel to go deep into the construction area, reducing labor costs and construction risks.

[0051] (3) Improved safety

[0052] Realize automated operation and avoid the safety risks brought by manual operation.

[0053] It can realize remote monitoring, timely discover and deal with potential safety hazards, and improve construction safety.

[0054] The system has an anti-misoperation function during the switching process between remote and local operation to ensure the safe operation of the equipment.

[0055] (4) Reduce equipment costs

[0056] The equipment is small in size and light in weight, which reduces manufacturing and transportation costs.

[0057] Modular design makes maintenance and replacement easy and reduces maintenance costs.

[0058] (5) Adapt to different construction environments

[0059] You can choose the appropriate control mode according to the construction environment to adapt to different construction needs.

[0060] The equipment is small in size and light in weight and can adapt to narrow construction spaces.

[0061] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0062] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:

[0063] Figure 1 It is a schematic diagram of the device of the present invention;

[0064] Figure 2 It is a schematic diagram of the process of the present invention;

[0065] Figure 3 The figure is a flow chart of the method of the present invention.

[0066] Figure numerals: 1: drilling rig No. 1, 2: drilling rig No. 2, 3: drilling rig No. 3, 4: drilling rig No. 4. DETAILED DESCRIPTION

[0067] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.

[0068] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0069] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0070] See also Figure 1 to Figure 3 , a control method, device, equipment and readable storage medium for a water mill drilling rig for subway shaft construction. The water mill drilling rig for subway shaft construction includes a No. 1 drilling rig 1, a No. 2 drilling rig 2, a No. 3 drilling rig 3 and a No. 4 drilling rig 4.

[0071] Example 1: Construction in narrow spaces

[0072] Equipment parameters:

[0073] Drill diameter: 150mm

[0074] Travel motor power: 500W

[0075] Drilling motor power: 7.5kW

[0076] Travel speed: 5mm / s

[0077] Drilling speed: 10mm / s

[0078] Rotation current setting value: 60A

[0079] Travel switch position: 1000mm

[0080] Control Flow:

[0081] Equipment startup: The operator starts the equipment through a handheld controller for remote control.

[0082] Automatic rock search: The controller controls the travel motor to move forward slowly at a speed of 5mm / s, and the main motor idles. When the sensor detects that the drill bit touches the rock, the travel motor stops.

[0083] Automatic drilling: The controller automatically adjusts the drilling speed and travel speed according to the hardness of the rock and starts drilling. For example, for rocks with higher hardness, the drilling speed is set to 5mm / s and the travel speed is set to 2mm / s; for rocks with lower hardness, the drilling speed is set to 10mm / s and the travel speed is set to 5mm / s.

[0084] Current monitoring: The sensor monitors the current of the rotating motor in real time. When the current exceeds 60A, the travel motor stops to prevent damage to the drill bit. When the current returns to normal, the travel motor continues to run.

[0085] Stroke monitoring: The sensor monitors the drill stroke in real time. When the drill reaches a depth of 500mm, the travel motor reverses and the drill is withdrawn.

[0086] Equipment stop: When the drill bit is completely withdrawn, the main motor stops, the travel motor rises to zero position, and the equipment stops automatically.

[0087] Example 2: Construction in hard rock layer

[0088] Equipment parameters:

[0089] Drill diameter: 200mm

[0090] Travel motor power: 10kW

[0091] Drilling motor power: 15kW

[0092] Travel speed: 10mm / s

[0093] Drilling speed: 15mm / s

[0094] Rotation current setting value: 80A

[0095] Travel switch position: 1000mm

[0096] Control Flow:

[0097] Equipment startup: The operator starts the equipment through the operation interface and selects the automatic control mode.

[0098] Automatic rock search: The controller controls the travel motor to move slowly at a speed of 10mm / s, and the main motor idles. When the sensor detects that the drill bit touches the rock, the travel motor stops.

[0099] Automatic drilling: The controller automatically adjusts the drilling speed and travel speed according to the hardness of the rock and starts drilling. For example, for rocks with higher hardness, the drilling speed is set to 10mm / s and the travel speed is set to 5mm / s; for rocks with lower hardness, the drilling speed is set to 15mm / s and the travel speed is set to 10mm / s.

[0100] Current monitoring: The sensor monitors the current of the rotating motor in real time. When the current exceeds 80A, the travel motor stops to prevent damage to the drill bit. When the current returns to normal, the travel motor continues to run.

[0101] Stroke monitoring: The sensor monitors the drill stroke in real time. When the drill reaches a depth of 1000mm, the travel motor reverses and the drill is withdrawn.

[0102] Equipment stop: When the drill bit is completely withdrawn, the main motor stops, the travel motor rises to zero position, and the equipment stops automatically.

[0103] Example 3: Collaborative construction with multiple drilling rigs

[0104] Equipment parameters:

[0105] Drill diameter: 200mm

[0106] Travel motor power: 10kW

[0107] Drilling motor power: 15kW

[0108] Travel speed: 10mm / s

[0109] Drilling speed: 15mm / s

[0110] Rotation current setting value: 80A

[0111] Travel switch position: 1000mm

[0112] Control Flow:

[0113] Equipment start-up: The operator starts all drilling rigs through a centralized control unit.

[0114] Automatic rock search: Each drilling rig independently searches for rocks and performs drilling operations.

[0115] Data sharing: Each drilling rig uploads the detected data to the centralized control unit, which performs global scheduling based on the data.

[0116] Collaborative operation: The centralized control unit adjusts the operating parameters of each drilling rig based on global data to achieve collaborative operation. For example, for areas with higher hardness, the centralized control unit can reduce the drilling speed and travel speed in that area to prevent damage to the drill bit; for areas with lower hardness, the centralized control unit can increase the drilling speed and travel speed in that area to improve construction efficiency.

[0117] Equipment stop: After all drilling rigs complete the drilling operation, the centralized control unit controls all drilling rigs to stop.

[0118] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.

Claims

1. A water mill drilling rig control method for subway shaft construction, characterized in that: The method comprises the following steps: S1: Automatically search for rocks and drill at the initial speed. When the initial drilling time is reached, the motor switches to the running speed and starts drilling. S2: If the current drilling rotation current is normal, drilling will continue; if the current drilling rotation current is greater than the set value, the travel motor will stop, and when the rotation motor current returns to normal, the motor will continue drilling; S3: When the travel switch is touched, the drilling rig is completed, the travel motor reverses and returns, and when the set time is reached, the main motor stops and the travel motor rises to zero position and stops automatically.

2. The water mill drilling rig control method for subway shaft construction according to claim 1 is characterized in that: The principle of automatic rock search is: Each drilling module includes a main motor responsible for the rotation of the drill bit and a feed motor responsible for the drilling and retraction of the drill bit. First, start the main motor to drive the drill bit to idle at high speed, and then the cutter motor drives the drill bit to approach the rock at a lower speed. When the drill bit encounters the rock, the load of the main motor will increase rapidly, that is, the current of the main motor will increase rapidly from the idling current. When the increase value reaches 10% of the idling current, it is considered that the drill bit touches the rock.

3. The water mill drilling rig control method for subway shaft construction according to claim 1 is characterized in that: The drilling rig system has local / remote automatic control modes.

4. The water mill drilling rig control method for subway shaft construction according to claim 1 is characterized in that: The remote control adopts wireless anti-interference coding technology, and has an anti-misoperation function during the switching process between remote and local operations to ensure the safe operation of the equipment; When the system is in manual mode, the equipment operates independently according to the system setting mode; When the system is in automatic mode, a single-hole unattended one-key operation function is realized, the system automatically drills and automatically finds the zero point of the equipment.

5. The water mill drilling rig control method for subway shaft construction according to claim 3 is characterized in that: In the drilling process, fuzzy control and adaptive control technology are combined, a mechanical control model is established according to different rock formation properties, and the speed and torque parameters of the travel motor and the drilling motor are dynamically adjusted to enable the system to reach the optimal operating mode.

6. A water mill drilling rig control device for subway shaft construction, characterized in that: include: A controller, used for receiving control signals and controlling the drilling rig actuator; Travel motor, used to drive the drill forward and backward; Drilling motor, used to drive the drill bit to rotate; Sensors to detect information about rock position and hardness; Communication module for local / remote control.

7. A water mill drilling rig control device for subway shaft construction according to claim 6, characterized in that: The controller adopts a programmable logic controller; The communication module adopts wireless anti-interference coding technology.

8. A water mill drilling rig for subway shaft construction, characterized in that: include: The drilling rig body, including the traveling mechanism, drilling mechanism and control system; Drill bits, used to break up rock; Sensors are used to detect information about the position and hardness of the rock.

9. The water-mill drilling rig for subway shaft construction according to claim 8, characterized in that: The control system includes a local control unit and a remote control unit; The control system combines fuzzy control with adaptive control technology.

10. A readable storage medium, characterized in that: A control method of a water-mill drilling rig for subway shaft construction is stored, and the control method comprises the steps described in claims 1 to 5.