Guide hole construction monitoring and early warning method and device for soft rock muddy stratum

By combining the distribution profile of the mine formation and the inclination angle of the shaft design, the drilling reverse water state is analyzed in real time, high-pressure water is injected and grouted into filling, the problem of safety risks of soft rock mud strata construction is solved, and construction efficiency and safety are improved sex.

CN118911664AActive Publication Date: 2024-11-08KUNMING UNIV OF SCI & TECH +1

Patent Information

Application Number
CN202411267708.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-11
Publication Date
2024-11-08
Estimated Expiration
2044-09-11

AI Technical Summary

Technical Problem

In mining engineering, the characteristics of soft rock mud strata lead to safety risks in the construction of guide holes. The existing technology relies on manual observation and empirical judgment, and lacks accurate identification and treatment methods, resulting in low construction efficiency and difficulty in ensuring safety.

Method used

By constructing a mine strata distribution profile, combining the relationship between the design inclination angle of the shaft and the distribution inclination angle of the soft rock mud texture, collect the drilling backwater status in real time, conduct mud-containing characteristics analysis and reverse water color collection, if it meets the predetermined characteristics, Then high-pressure water is injected to form a cavity and grouting is filled to ensure construction safety.

Benefits of technology

It effectively avoids hole blockage and pipe buried problems, reduces construction safety risks, improves construction efficiency, and provides a more stable working environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911664A_ABST
    Figure CN118911664A_ABST
Patent Text Reader

Abstract

The invention provides a guide hole construction monitoring and early warning method and device for a soft rock muddy stratum, and relates to the technical field of mineral engineering, and the method comprises the steps: constructing a mine stratum distribution profile map, and determining a guide hole construction position; guide hole construction is conducted, the water return state of a drill hole is collected in real time, and mud-containing characteristic analysis and water return color collection are conducted; if the mud-containing feature meets the preset muddy feature or the water return image meets the preset mudstone color, it is judged that construction is conducted to the soft rock muddy stratum, high-pressure water is injected into the guide hole, and a cavity is formed; and when the cavity meets the preset size constraint, grouting is conducted in the cavity, and after filling is conducted, the guide hole is continuously constructed till construction is finished. The technical problem that in the prior art, safety risks exist in guide hole construction due to the characteristics of the soft rock muddy stratum can be solved, high-pressure grouting pouring is conducted on the soft rock muddy stratum, the problems of hole blocking, pipe burying and the like are effectively avoided, the safety risks in the construction process are reduced, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of mining engineering technology, and in particular to a method and device for monitoring and early warning of pilot hole construction in soft rock mud formations. Background Art

[0002] In the field of mining engineering, especially in the construction of deep well ventilation, filling, drainage and chute systems, the construction of long-distance shafts is a key technical link. These shafts need to cross multiple strata in the mine, including the unavoidable soft mudstone strata. Due to its special physical and mechanical properties, such as high water content, low strength, and easy deformation, the soft mudstone strata face many challenges in the construction of pilot holes. The existing pilot hole construction mainly relies on manual observation and experience judgment to monitor the stability of soft mudstone strata, which has problems such as high subjectivity, poor real-time performance, and low warning accuracy. At present, when dealing with soft mudstone strata, there is often a lack of accurate identification of stratum characteristics and effective treatment measures. After determining that the construction has reached the soft mudstone stratum, it is usually impossible to provide effective stratum treatment methods, resulting in low construction efficiency and difficulty in ensuring safety.

[0003] In summary, the prior art has a technical problem that the pilot hole construction has safety risks due to the characteristics of the soft rock mudstone formation. Summary of the invention

[0004] The purpose of this application is to provide a monitoring and early warning method and device for pilot hole construction in soft rock mudstone formations, so as to solve the technical problem in the prior art that there are safety risks in pilot hole construction due to the characteristics of soft rock mudstone formations.

[0005] In view of the above problems, the present application provides a method and device for monitoring and early warning of pilot hole construction in soft rock mud formations.

[0006] In the first aspect, the present application provides a pilot hole construction monitoring and early warning method for soft rock mudstone formations, the pilot hole construction monitoring and early warning method for soft rock mudstone formations is implemented by a pilot hole construction monitoring and early warning device for soft rock mudstone formations, wherein the pilot hole construction monitoring and early warning method for soft rock mudstone formations comprises: constructing a mine stratum distribution profile according to mine stratum distribution information and known segmented plane stratum distribution, based on predetermined skylight layout requirements and the mine stratum distribution profile, combining the relationship between the chute design inclination and the soft rock mudstone stratum distribution inclination to determine the pilot hole construction position; according to the predetermined construction plan and the pilot hole construction monitoring and early warning device, the pilot hole construction monitoring and early warning method for soft rock mudstone formations is realized by a pilot hole construction monitoring and early warning device for soft rock mudstone formations, wherein the pilot hole construction monitoring and early warning method for soft rock mudstone formations comprises: constructing a mine stratum distribution profile according to mine stratum distribution information and known segmented plane stratum distribution, based on the predetermined skylight layout requirements and the mine stratum distribution profile, combining the relationship between the chute design inclination and the soft rock mudstone stratum distribution inclination to determine the pilot hole construction position; according to the predetermined construction plan and the pilot hole construction monitoring and early warning device, the pilot hole construction monitoring and early warning method for soft rock mudstone formations is realized by a pilot hole construction monitoring and early warning device for soft rock mudstone formations; A pilot hole is constructed at the working position, the water return status of the borehole during the pilot hole construction process is collected in real time, the mud-containing feature of the borehole water return status is analyzed and the water return color is collected to obtain the mud-containing feature and the water return image; if the mud-containing feature meets the predetermined mud feature or the water return image meets the predetermined mudstone color, it is determined that the current construction is to the soft rock mudstone formation, and high-pressure water is injected into the bottom position of the pilot hole, and the water pressure is increased until a cavity is formed near the drill bit; until the cavity meets the predetermined size constraint, grouting is injected into the cavity, and after the cavity is filled, the pilot hole is continuously constructed until the pilot hole construction is completed, wherein the predetermined size constraint is a cavity diameter of 1 meter.

[0007] In the second aspect, the present application also provides a guide hole construction monitoring and early warning device for soft rock mudstone formations, which is used to execute the guide hole construction monitoring and early warning method for soft rock mudstone formations as described in the first aspect, wherein the guide hole construction monitoring and early warning device for soft rock mudstone formations includes: a construction position determination module, the construction position determination module is used to construct a mine stratum distribution profile according to mine stratum distribution information and known segmented plane stratum distribution, and determine the guide hole construction position based on the predetermined skylight layout requirements and the mine stratum distribution profile, combined with the relationship between the chute design inclination angle and the soft rock mudstone stratum distribution inclination angle; a construction process monitoring module, the construction process monitoring module is used to guide according to the predetermined construction plan and the guide hole construction position In the process of borehole construction, the water return status of the borehole during the pilot hole construction is collected in real time, the mud characteristics of the borehole water return status are analyzed and the water return color is collected to obtain the mud characteristics and water return image; a soft rock mudstone formation determination module, the soft rock mudstone formation determination module is used to determine that the current construction is to the soft rock mudstone formation if the mud characteristics meet the predetermined mud characteristics or the water return image meets the predetermined mudstone color, and inject high-pressure water into the bottom position of the pilot hole, and increase the water pressure until a cavity is formed near the drill bit; a grouting control module, the grouting control module is used to grout the cavity until the cavity meets the predetermined size constraint, and after the cavity is filled, the pilot hole is continuously constructed until the pilot hole construction is completed, wherein the predetermined size constraint is a cavity diameter of 1 meter.

[0008] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0009] A mine stratum distribution profile is constructed according to the mine stratum distribution information and the known segmented plane stratum distribution. Based on the predetermined shaft layout requirements and the mine stratum distribution profile, the pilot hole construction position is determined in combination with the relationship between the designed inclination angle of the chute and the distribution inclination angle of the soft rock mudstone stratum. The pilot hole construction is carried out according to the predetermined construction plan and the pilot hole construction position, the borehole backflow state during the pilot hole construction process is collected in real time, the mud-containing feature analysis and backflow color collection are performed on the borehole backflow state, and the mud-containing feature and backflow image are obtained. If the mud-containing feature meets the predetermined mud feature or the backflow image meets the predetermined mudstone color, it is determined that the current construction is to the soft rock mudstone stratum, and high-pressure water is injected into the bottom position of the pilot hole, and the water pressure is increased until a cavity is formed near the drill bit. Grouting is injected into the cavity until the cavity meets the predetermined size constraint. After the cavity is filled, the pilot hole is continuously constructed until the pilot hole construction is completed, wherein the predetermined size constraint is that the cavity diameter is 1 meter. In other words, by carrying out high-pressure grouting on soft rock mudstone formations, problems such as hole blockage and pipe burial can be effectively avoided, the safety risks in the construction process are reduced, and construction efficiency is improved.

[0010] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented according to the contents of the specification, and in order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are specifically cited below. It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easy to understand through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.

[0012] Figure 1 A schematic diagram of the process of the pilot hole construction monitoring and early warning method for soft rock mud formations in this application;

[0013] Figure 2 This is a schematic diagram of the structure of the pilot hole construction monitoring and early warning device used in the soft rock mud formation in this application.

[0014] Explanation of the reference numerals: construction position determination module 11 , construction process monitoring module 12 , soft rock mud formation determination module 13 , grouting control module 14 . DETAILED DESCRIPTION

[0015] This application solves the technical problem in the prior art that there are safety risks in pilot hole construction due to the characteristics of soft rock mudstone formations by providing a pilot hole construction monitoring and early warning method and device for soft rock mudstone formations. By performing high-pressure grouting on soft rock mudstone formations, problems such as hole blockage and buried pipes can be effectively avoided, reducing safety risks during construction and improving construction efficiency.

[0016] Below, the technical solutions in the present application will be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments of the present application. It should be understood that the present application is not limited to the example embodiments described herein. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application. It should also be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, rather than all of them.

[0017] For example, please refer to the attached Figure 1 The present application provides a pilot hole construction monitoring and early warning method for soft rock mudstone formations, wherein the pilot hole construction monitoring and early warning method for soft rock mudstone formations is executed by a pilot hole construction monitoring and early warning device for soft rock mudstone formations, and the pilot hole construction monitoring and early warning method for soft rock mudstone formations specifically includes the following steps:

[0018] Step 1: Construct a mine stratigraphic distribution profile according to the mine stratigraphic distribution information and the known segmented plane stratigraphic distribution. Determine the pilot hole construction position based on the predetermined shaft layout requirements and the mine stratigraphic distribution profile, combined with the relationship between the chute design inclination and the soft rock mudstone stratum distribution inclination.

[0019] Specifically, the mine stratigraphic distribution information is obtained from the mining engineering drilling catalog, including borehole number, borehole location, borehole start and end depth, borehole diameter, stratigraphic description, sampling conditions, groundwater level and other related information. Mine engineering drilling catalog refers to the process of recording and summarizing drilling activities carried out in mining engineering. The stratigraphic distribution is analyzed and interpreted in detail, and the stratigraphic distribution of each segmented plane is further clarified in production drilling. Before the chute design, the various segmented plane stratigraphic maps involved in the chute project are composited to form a stratigraphic distribution profile of the area involved in the chute project. The stratigraphic distribution profile is a graphical tool drawn based on geological survey and drilling data to show the distribution and change patterns of the strata. Usually, the spatial depth is used as the horizontal axis and the stratigraphic type or stratum is used as the vertical axis. The spatial characteristics of the geological strata are presented by drawing distribution curves of different geological units, profile diagrams, and measured wellbore sections. According to the predetermined shaft layout requirements and the constructed mine stratum distribution profile, combined with the relationship between the shaft design inclination and the soft rock mudstone stratum distribution inclination, the construction location of the pilot hole is determined. The shaft layout requirements refer to the requirements for the location and number of shafts (ventilation shafts or transportation shafts) in mining. The shaft design inclination refers to the design angle of the shaft (inclined channel for ore transportation). The distribution inclination of the soft rock mudstone stratum refers to the inclination angle of this type of stratum in space. By comprehensively analyzing the spatial distribution and design requirements of the stratum, the construction location of the pilot hole can be determined more accurately, improving the safety and efficiency of the construction.

[0020] Step 2: Carry out pilot hole construction according to the predetermined construction plan and the pilot hole construction position, collect the drilling water return status during the pilot hole construction process in real time, analyze the mud characteristics of the drilling water return status and collect the water return color, and obtain the mud characteristics and water return image.

[0021] Specifically, the pilot hole construction operation is carried out at the previously determined pilot hole construction position according to the predetermined construction plan. The predetermined construction plan usually includes specific construction steps, the technology and equipment used, safety measures, etc. During the construction process, the borehole water return situation is monitored in real time, and the water return state data, including flow, color, mud content, pH value, temperature, etc., are recorded. The borehole water return state refers to the state of water discharged from the borehole during the drilling process and the substances it carries, which reflects the nature of the formation and the response of the formation during the construction process. The borehole water return state is filtered to obtain solid substances. The water return state and the filtered solid substances are imaged respectively to obtain an initial water return image and an initial solid image. The initial image is image preprocessed to reduce image noise and obtain a clearer water return image and solid image. A feature extraction model is trained using the sample water return solid image and the sample fine sand debris material features and the sample granular clay material features. The solid image is input into the feature extraction model, and a convolution operation is performed to determine the mud content feature. The water return image is color recognized using image processing technology to collect water return color information. Analyze the water backflow color and compare it with the known formation color standard to assist in judging the formation properties. Integrate the mud characteristics and water backflow color data for comprehensive analysis to judge the current construction formation and form a comprehensive analysis result. Collect the drilling water backflow status during the pilot hole construction in real time, analyze the mud characteristics and collect the water backflow color, take timely measures to deal with potential risks, and ensure construction safety and efficiency.

[0022] Step 3: If the mud-containing feature meets the predetermined mud feature or the water reflection image meets the predetermined mudstone color, it is determined that the current construction is in the soft rock mud formation, and high-pressure water is injected into the bottom of the pilot hole to increase the water pressure until a cavity is formed near the drill bit.

[0023] Specifically, if the mud content meets the predetermined mud quality characteristics, that is, when the mud content in the borehole return water increases and the content of granular clay material exceeds 50%, it is judged that the current construction is in the soft rock mud layer. If the mud content does not meet the predetermined mud quality characteristics, the return water image is judged. If the borehole return water is purple or gray-green, which is the color of the unique mudstone in the mine, it is judged that the current construction is in the soft rock mud layer. When the raise boring machine guide hole is constructed to the soft rock mud layer, there will be a great risk of continuing the construction at this time, and measures need to be taken immediately to slow down the progress of the guide rail construction. Prepare a high-pressure water pump and related water supply equipment to ensure that sufficient high-pressure water flow can be provided. Determine the bottom position of the guide hole so that the high-pressure water can be accurately injected. Start the high-pressure water pump to inject water and gradually increase the water pressure. As the water pressure increases, water enters the bottom position of the guide hole through the raise boring machine drill rod until a cavity is formed near the drill bit. During the whole process, the stability of the borehole wall is monitored in real time to ensure that the borehole wall will not collapse due to excessive water pressure. According to the monitoring results, the water pressure is adjusted when necessary to maintain the stability of the borehole wall. The formation of cavities by high-pressure water helps to enhance the stability of the formation and reduce the risk of formation collapse.

[0024] Step 4: until the cavity meets the predetermined size constraint, grouting is injected into the cavity, and after the cavity is filled, the guide hole is continuously constructed until the guide hole construction is completed, wherein the predetermined size constraint is that the cavity diameter is 1 meter.

[0025] Specifically, when the cavity reaches the predetermined size and shape, the water supply is stopped. It is usually recommended that the cavity diameter should not be less than 1m. High-pressure grouting (concrete enters the cavity at the bottom of the pilot hole through the drill rod of the raise drilling rig) is used to fill the cavity formed in the soft rock mud layer to achieve the reconstruction of the pilot hole construction environment and avoid the process of mud or debris in the drilling backwater being deposited in the borehole. As the mud or debris in the drilling backwater is continuously discharged from the bottom of the borehole, it gradually forms a blockage in the borehole, affecting the smooth progress of the drilling. The larger the cavity formed by the high-pressure water-washed mud, the better the stability of the pouring body after high-pressure grouting, which is more conducive to the pilot hole construction. After the cavity is filled, the pilot hole construction continues, but the stability of the hole wall needs to be continuously monitored. According to the monitoring results, the construction parameters such as drilling speed and water pressure are adjusted when necessary. When the pilot hole construction reaches the designed depth and position, the construction is completed. By forming and processing cavities and grouting treatment, the safety of construction in soft rock mud layers is significantly improved, providing a more stable working environment for subsequent construction and improving construction efficiency.

[0026] Furthermore, step 2 of this application includes:

[0027] The borehole water reflection state is filtered to obtain water reflection solid matter, and the borehole water reflection state and the water reflection solid matter are respectively imaged by an image sensor array to obtain an initial water reflection image and an initial solid-state image; the initial water reflection image and the initial solid-state image are denoised according to an image preprocessing scheme to obtain a water reflection image and a solid-state image; the solid-state image is input into a feature extraction model for convolution, and the mud-containing feature is determined based on feature convolution result analysis.

[0028] Furthermore, the present application also includes the following steps:

[0029] A sample training data set is obtained, wherein the sample training data includes a sample water-reflected solid image and sample fine sand-like debris material characteristics and sample granular clay material characteristics; the sample training data set is divided into a training set and a validation set according to a preset ratio, and the training set and the validation set are used to perform supervised training and validation training on a convolutional neural network to obtain a feature extraction model that meets a predetermined convergence condition.

[0030] Specifically, the water return state of the borehole is filtered to separate the solid matter. An image sensor array is set up to collect images of the water return state and the solid matter. The image sensor array includes multiple sensors that can collect images from different angles or resolutions to provide comprehensive data. The water return state before filtering and the solid matter obtained by filtering are imaged to obtain an initial water return image and an initial solid-state image. According to a predetermined image preprocessing scheme, the initial water return image and the initial solid-state image are denoised to remove noise in the image due to various reasons (such as sensor noise, illumination changes, etc.) to improve the visual effect and analyzability of the image. Mean filtering, median filtering, Gaussian filtering, etc. are used to reduce image noise, and histogram equalization is used to improve the contrast of the image to make the image clearer. After denoising, clearer water return images and solid-state images are obtained.

[0031] Collect and organize sample training data sets, including a series of sample water-reflecting solid images, and the corresponding fine sand-like debris material features and granular clay material features. Perform data preprocessing on these data sets, and randomly divide the processed data sets into training sets and validation sets according to the preset ratio to ensure the randomness and uniformity of data distribution. The training set is used for model training, and the validation set is used to evaluate the performance of the model and adjust the model parameters. The preset ratio is determined according to the specific application scenario and the size of the data set. Common division ratios are 70% training set and 30% validation set. Design a CNN architecture suitable for image recognition, including convolutional layers, pooling layers, and fully connected layers. Select a suitable loss function, such as the cross entropy loss function, to calculate the difference between the predicted value and the true value. Use the training set to supervise the CNN training, including forward propagation, loss calculation, back propagation, etc. Perform forward propagation through CNN to obtain the output result, calculate the loss between the output result and the true label, perform back propagation according to the loss, and update the network weights. Use the data in the validation set to verify the trained model, and use indicators such as accuracy, recall, and F1 score to evaluate the performance of the model to prevent overfitting or underfitting. The model parameters or training strategies are continuously adjusted according to the verification results until the model meets the predetermined convergence conditions, such as the loss on the verification set no longer decreases or the accuracy reaches a predetermined threshold.

[0032] The solid image is input into the feature extraction model, and the model performs convolution operation to extract the features of the image. The convolution operation is the core of the convolutional neural network, which extracts local features on the image by sliding the convolution kernel. Based on the results of the convolution operation, the extracted features are analyzed, and the mud-containing characteristics such as particle size, shape, and distribution are determined using classification, regression, or other machine learning tasks. The borehole water return status is collected in real time and image analysis is performed to detect abnormal changes in the formation in a timely manner. Through image processing and convolutional neural networks, solid substances in the borehole water return are identified and classified to improve the accuracy of identifying the formation lithology.

[0033] Further, step three of this application includes:

[0034] The predetermined mud feature is that the content of granular clay material exceeds 50%, and the predetermined mudstone color is set based on the mudstone state of the mine; if the mud-containing feature meets the predetermined mud feature, it is determined that the current construction is in a soft rock mudstone formation; if the mud-containing feature does not meet the predetermined mud feature, a similarity comparison is performed on the water reflection image and the predetermined mudstone color. If the comparison similarity meets a predetermined similarity threshold, it indicates that the water reflection image meets the predetermined mudstone color, and it is determined that the current construction is in a soft rock mudstone formation.

[0035] Furthermore, the present application also includes the following steps:

[0036] If the mud-containing feature meets the predetermined fine sand feature and the water reflection image does not meet the predetermined mudstone color, it is determined that the current construction reaches other hard rock formations, and the pilot hole construction is continued, wherein the predetermined fine sand feature is that the content of fine sand-like debris exceeds 50%.

[0037] Specifically, in order to determine whether the construction has reached the soft rock mud formation, a clear mud content standard is set. When the content of granular clay in the borehole return water exceeds 50%, it is judged that the current construction has reached the soft rock mud formation. Observe the return water color of the borehole return water. When the borehole return water is the color of the mine mudstone, it is judged that the current construction has reached the soft rock mud formation. The mudstone color is generally purple or gray-green (each mine can be judged according to the color of the special soft rock mud formation of the mine). Compare the mud-containing characteristics with the predetermined mud characteristics. When the mud content in the borehole return water increases and the content of granular clay exceeds 50%, it is judged that the current construction has reached the soft rock mud formation. If the mud-containing characteristics do not meet the standard, the return water image is further compared. The return water image is similarly compared with the predetermined mudstone color, and the similarity between the return water image and the predetermined mudstone color is calculated. Select a suitable similarity comparison operator, determine the accuracy of each comparison operator, configure the weight, and construct a similarity comparison strategy based on this. According to the similarity comparison strategy, the water reflection image and the predetermined mudstone color are compared and the comparison similarity is output.

[0038] Based on experience and experimental data, the similarity threshold is determined to provide a clear judgment standard and reduce the uncertainty of subjective judgment. If the comparison similarity meets the predetermined similarity threshold, the water reflection image is judged to meet the predetermined mudstone color, and then it is judged that the current construction is in the soft rock mud layer. In actual situations, only one of the mud-containing characteristics and the water reflection color needs to meet the predetermined mud characteristics or the predetermined mudstone color to determine that the construction is in the soft rock mud layer.

[0039] If the mud content meets the predetermined fine sand characteristics, that is, the content of fine sand-like debris in the borehole return water exceeds 50%, and the particle size of the fine sand-like debris is 0.06 mm-2 mm. And the return water image does not meet the predetermined mudstone color, it is judged that the current construction is to other hard rock formations, and the guide rail construction continues. By setting clear mud content standards and color standards, the nature of the formation, such as hard rock formations or soft rock mud formations, can be quickly and accurately identified, which helps the construction team make more reasonable construction decisions, and the monitored mud content or return water color information can be fed back to the construction team in real time, so that the construction plan and construction parameters can be quickly adjusted to ensure the smooth progress of the construction process.

[0040] Furthermore, the present application also includes the following steps:

[0041] A predetermined similarity comparison operator is configured, wherein the predetermined similarity comparison operator includes at least Euclidean distance, Manhattan distance and Bhattacharyya distance; taking the predetermined mudstone color and the predetermined similarity comparison operator as constraints, a sample comparison data set is retrieved and obtained, and a plurality of comparison accuracies are determined based on the analysis of the sample comparison data set; based on the coefficient of variation method, weights are configured according to the plurality of comparison accuracies, the predetermined similarity comparison operator is assigned a value, and a similarity comparison strategy is constructed; a similarity comparison is performed on the water reflection image and the predetermined mudstone color according to the similarity comparison strategy, and a comparison similarity is output.

[0042] Specifically, a suitable similarity comparison operator, including but not limited to Euclidean distance, Manhattan distance and Bhattacharyya distance, is selected as a predetermined similarity comparison operator to calculate the similarity between the image color and the predetermined mudstone color. A sample comparison data set related to the predetermined mudstone color is collected using database retrieval and data screening techniques to ensure that the selected data set meets the constraints of the predetermined mudstone color. The similarity between each sample water-reflecting image and the predetermined mudstone color is calculated using the selected similarity comparison operator. The comparison results are analyzed to determine the comparison accuracy of each operator. The coefficient of variation method is used to quantify the relative importance of each comparison operator. The coefficient of variation method is a statistical method used to evaluate the discreteness of data and to configure weights according to the comparison accuracy. According to the results of the coefficient of variation method, weight optimization and parameter adjustment techniques are used to assign corresponding weights to each comparison operator. Based on the weight configuration results, an effective similarity comparison strategy is constructed to evaluate the similarity between the water-reflecting image and the predetermined mudstone color and improve the accuracy of formation identification. The similarity between the water-reflecting image and the predetermined mudstone color is evaluated using the similarity comparison strategy, and the water-reflecting image and the predetermined mudstone color are actually compared similarly, and the comparison similarity is output. By selecting appropriate comparison operators, analyzing the comparison accuracy, configuring weights, and constructing similarity comparison strategies, the similarity between the reflected water image and the predetermined mudstone color can be accurately evaluated.

[0043] Furthermore, the present application also includes the following steps:

[0044] After determining that the current construction has reached the soft rock mud formation, the progress of the pilot hole construction is slowed down, and a high-pressure water pump is used to allow high-pressure water to enter the bottom of the pilot hole through the drill rod of the raise drilling rig until a cavity is formed near the drill bit.

[0045] Specifically, if the current construction stratum is judged to be a soft rock mudstone stratum, continued construction of the pilot hole will result in great risks of blockage (the gap between the borehole wall and the drill rod will be blocked by mud due to low water pressure and poor mud drainage), buried rods, and even abandoned holes. At this time, it is necessary to immediately take corresponding construction adjustment measures to slow down the progress of the pilot hole construction, such as controlling the drilling speed. Make sure that the high-pressure water pump equipment is in good condition and that all pipes and connectors are leak-free. Connect the high-pressure water pump to the drill rod of the raise drilling rig to ensure a firm connection and no leakage. Start the high-pressure water pump and perform water injection construction so that high-pressure water enters the bottom of the pilot hole through the drill rod of the raise drilling rig. Increase the speed and pressure of the high-pressure water flow to ensure that the gap between the borehole wall and the drill rod is unobstructed and that the conditions for reverse water and mud drainage are met until a cavity is formed near the drill bit. By slowing down the construction progress and using a high-pressure water pump to form a cavity, the safety of construction in soft rock mudstone strata is significantly improved.

[0046] In summary, the pilot hole construction monitoring and early warning method for soft rock mud formation provided by this application has the following technical effects:

[0047] A mine stratum distribution profile is constructed according to the mine stratum distribution information and the known segmented plane stratum distribution. Based on the predetermined shaft layout requirements and the mine stratum distribution profile, the pilot hole construction position is determined in combination with the relationship between the designed inclination angle of the chute and the distribution inclination angle of the soft rock mudstone stratum. The pilot hole construction is carried out according to the predetermined construction plan and the pilot hole construction position, the borehole backflow state during the pilot hole construction process is collected in real time, the mud-containing feature analysis and backflow color collection are performed on the borehole backflow state, and the mud-containing feature and backflow image are obtained. If the mud-containing feature meets the predetermined mud feature or the backflow image meets the predetermined mudstone color, it is determined that the current construction is to the soft rock mudstone stratum, and high-pressure water is injected into the bottom position of the pilot hole, and the water pressure is increased until a cavity is formed near the drill bit. Grouting is injected into the cavity until the cavity meets the predetermined size constraint. After the cavity is filled, the pilot hole is continuously constructed until the pilot hole construction is completed, wherein the predetermined size constraint is that the cavity diameter is 1 meter. In other words, by carrying out high-pressure grouting on soft rock mudstone formations, problems such as hole blockage and pipe burial can be effectively avoided, the safety risks in the construction process are reduced, and construction efficiency is improved.

[0048] Embodiment 2, based on the same inventive concept as the pilot hole construction monitoring and early warning method for soft rock mud formation in the previous embodiment, the present application also provides a pilot hole construction monitoring and early warning device for soft rock mud formation, please refer to the attached Figure 2 The pilot hole construction monitoring and early warning device for soft rock mud formation comprises:

[0049] The construction position determination module 11 is used to construct a mine stratum distribution profile according to the mine stratum distribution information and the known segmented plane stratum distribution, and determine the guide hole construction position based on the predetermined shaft layout requirements and the mine stratum distribution profile, combined with the relationship between the chute design inclination and the soft rock mudstone stratum distribution inclination.

[0050] The construction process monitoring module 12 is used to perform pilot hole construction according to a predetermined construction plan and the pilot hole construction position, collect the drilling water return status during the pilot hole construction process in real time, perform mud feature analysis and water return color collection on the drilling water return status, and obtain mud features and water return images.

[0051] The soft rock mudstone formation determination module 13 is used to determine that the current construction is to the soft rock mudstone formation if the mud-containing characteristics meet the predetermined mud characteristics or the water reflection image meets the predetermined mudstone color, and inject high-pressure water into the bottom position of the guide hole to increase the water pressure until a cavity is formed near the drill bit.

[0052] The grouting control module 14 is used to inject grout into the cavity until the cavity meets a predetermined size constraint, and after the cavity is filled, continue to construct the guide hole until the guide hole construction is completed, wherein the predetermined size constraint is that the cavity diameter is 1 meter.

[0053] Furthermore, the construction process monitoring module 12 in the pilot hole construction monitoring and early warning device for soft rock mud formation is also used for:

[0054] The borehole water reflection state is filtered to obtain water reflection solid matter, and the borehole water reflection state and the water reflection solid matter are respectively imaged by an image sensor array to obtain an initial water reflection image and an initial solid-state image; the initial water reflection image and the initial solid-state image are denoised according to an image preprocessing scheme to obtain a water reflection image and a solid-state image; the solid-state image is input into a feature extraction model for convolution, and the mud-containing feature is determined based on feature convolution result analysis.

[0055] Furthermore, the pilot hole construction monitoring and early warning device for soft rock mud formations also includes a feature extraction model building module for:

[0056] A sample training data set is obtained, wherein the sample training data includes a sample water-reflected solid image and sample fine sand-like debris material characteristics and sample granular clay material characteristics; the sample training data set is divided into a training set and a validation set according to a preset ratio, and the training set and the validation set are used to perform supervised training and validation training on a convolutional neural network to obtain a feature extraction model that meets a predetermined convergence condition.

[0057] Furthermore, the soft rock mudstone formation determination module 13 in the pilot hole construction monitoring and early warning device for soft rock mudstone formation is also used for:

[0058] The predetermined mud feature is that the content of granular clay material exceeds 50%, and the predetermined mudstone color is set based on the mudstone state of the mine; if the mud-containing feature meets the predetermined mud feature, it is determined that the current construction is in a soft rock mudstone formation; if the mud-containing feature does not meet the predetermined mud feature, a similarity comparison is performed on the water reflection image and the predetermined mudstone color. If the comparison similarity meets a predetermined similarity threshold, it indicates that the water reflection image meets the predetermined mudstone color, and it is determined that the current construction is in a soft rock mudstone formation.

[0059] Furthermore, the soft rock mudstone formation determination module 13 in the pilot hole construction monitoring and early warning device for soft rock mudstone formation is also used for:

[0060] A predetermined similarity comparison operator is configured, wherein the predetermined similarity comparison operator includes at least Euclidean distance, Manhattan distance and Bhattacharyya distance; taking the predetermined mudstone color and the predetermined similarity comparison operator as constraints, a sample comparison data set is retrieved and obtained, and a plurality of comparison accuracies are determined based on the analysis of the sample comparison data set; based on the coefficient of variation method, weights are configured according to the plurality of comparison accuracies, the predetermined similarity comparison operator is assigned a value, and a similarity comparison strategy is constructed; a similarity comparison is performed on the water reflection image and the predetermined mudstone color according to the similarity comparison strategy, and a comparison similarity is output.

[0061] Furthermore, the soft rock mudstone formation determination module 13 in the pilot hole construction monitoring and early warning device for soft rock mudstone formation is also used for:

[0062] If the mud-containing feature meets the predetermined fine sand feature and the water reflection image does not meet the predetermined mudstone color, it is determined that the current construction reaches other hard rock formations, and the pilot hole construction is continued, wherein the predetermined fine sand feature is that the content of fine sand-like debris exceeds 50%.

[0063] Furthermore, the soft rock mudstone formation determination module 13 in the pilot hole construction monitoring and early warning device for soft rock mudstone formation is also used for:

[0064] After determining that the current construction has reached the soft rock mud formation, the progress of the pilot hole construction is slowed down, and a high-pressure water pump is used to allow high-pressure water to enter the bottom of the pilot hole through the drill rod of the raise drilling rig until a cavity is formed near the drill bit.

[0065] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. Figure 1The guide hole construction monitoring and early warning method and specific examples for soft rock mud formations in Example 1 are also applicable to the guide hole construction monitoring and early warning device for soft rock mud formations in this embodiment. Through the above detailed description of the guide hole construction monitoring and early warning method for soft rock mud formations, those skilled in the art can clearly know the guide hole construction monitoring and early warning device for soft rock mud formations in this embodiment, so for the sake of brevity of the specification, it will not be described in detail here. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.

[0066] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

[0067] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application belong to the scope of the present application and its equivalent technology, the present application is also intended to include these modifications and variations.

Claims

1. A method for monitoring and early warning of pilot hole construction in soft rock mud formations, characterized in that: include: Constructing a mine stratum distribution profile according to the mine stratum distribution information and the known segmented plane stratum distribution, and determining the pilot hole construction position based on the predetermined shaft layout requirements and the mine stratum distribution profile, combined with the relationship between the chute design inclination and the soft rock mudstone stratum distribution inclination; Conduct pilot hole construction according to a predetermined construction plan and the pilot hole construction position, collect the drilling water return status during the pilot hole construction process in real time, analyze the mud content characteristics and collect the water return color of the drilling water return status, and obtain the mud content characteristics and water return image; If the mud-containing feature meets the predetermined mud feature or the water reflection image meets the predetermined mudstone color, it is determined that the current construction is in a soft rock mud formation, and high-pressure water is injected into the bottom of the pilot hole to increase the water pressure until a cavity is formed near the drill bit; Until the cavity meets the predetermined size constraint, grouting is injected into the cavity. After the cavity is filled, the guide hole is continuously constructed until the guide hole construction is completed, wherein the predetermined size constraint is that the cavity diameter is 1 meter.

2. The method for monitoring and early warning of pilot hole construction in soft rock mud formation according to claim 1, characterized in that: Obtain mud features and water reflection images, including: Filtering the borehole water return state to obtain water return solid matter, and collecting images of the borehole water return state and the water return solid matter through an image sensor array to obtain an initial water return image and an initial solid image; De-noising the initial water-reflecting image and the initial solid-state image according to an image preprocessing scheme to obtain a water-reflecting image and a solid-state image; The solid image is input into a feature extraction model for convolution, and the mud-containing features are determined based on feature convolution result analysis.

3. The method for monitoring and early warning of pilot hole construction in soft rock mud formation according to claim 2 is characterized in that: Build a feature extraction model, including: Acquire a sample training data set, wherein the sample training data includes a sample water-reflecting solid image and sample fine sand-like debris material features and sample granular clay material features; The sample training data set is divided into a training set and a validation set according to a preset ratio, and the convolutional neural network is supervised and validated using the training set and the validation set to obtain a feature extraction model that meets a predetermined convergence condition.

4. The method for monitoring and early warning of pilot hole construction in soft rock mud formation according to claim 1, characterized in that: Determine whether the current construction is in soft rock mud formation, including: The predetermined mudstone characteristic is that the content of granular clay material exceeds 50%, and the predetermined mudstone color is set based on the state of the mudstone in the mine; If the mud-containing characteristics meet the predetermined mud characteristics, it is determined that the current construction is in a soft rock mud formation; If the mud-containing feature does not meet the predetermined mud feature, a similarity comparison is performed on the water reflection image and the predetermined mudstone color. If the comparison similarity meets a predetermined similarity threshold, indicating that the water reflection image meets the predetermined mudstone color, it is determined that the current construction is in a soft rock mudstone formation.

5. The method for monitoring and early warning of pilot hole construction in soft rock mud formation according to claim 4, characterized in that: Performing a similarity comparison between the water reflection image and the predetermined mudstone color includes: Configuring a predetermined similarity comparison operator, wherein the predetermined similarity comparison operator at least includes Euclidean distance, Manhattan distance and Bhattacharyya distance; Retrieving and acquiring a sample comparison data set based on the predetermined mudstone color and the predetermined similarity comparison operator as constraints, and determining a plurality of comparison accuracies based on analysis of the sample comparison data set; Based on the coefficient of variation method, weights are configured according to the multiple comparison accuracies, values ​​are assigned to the predetermined similarity comparison operators, and a similarity comparison strategy is constructed; A similarity comparison is performed on the water reflection image and the predetermined mudstone color according to the similarity comparison strategy, and a comparison similarity is output.

6. The method for monitoring and early warning of pilot hole construction in soft rock mud formation according to claim 1, characterized in that: If the mud-containing feature meets the predetermined fine sand feature and the water reflection image does not meet the predetermined mudstone color, it is determined that the current construction reaches other hard rock formations, and the pilot hole construction is continued, wherein the predetermined fine sand feature is that the content of fine sand-like debris exceeds 50%.

7. The method for monitoring and early warning of pilot hole construction in soft rock mud formation according to claim 1, characterized in that: Increase water pressure until a cavity forms near the drill bit, including: After determining that the current construction has reached the soft rock mud formation, the progress of the pilot hole construction is slowed down, and a high-pressure water pump is used to allow high-pressure water to enter the bottom of the pilot hole through the drill rod of the raise drilling rig until a cavity is formed near the drill bit.

8. A monitoring and early warning device for pilot hole construction in soft rock mud formations, characterized in that: Steps for implementing the method for monitoring and early warning of pilot hole construction for soft rock mud formations as claimed in any one of claims 1 to 7, wherein the device for monitoring and early warning of pilot hole construction for soft rock mud formations comprises: A construction position determination module, the construction position determination module is used to construct a mine stratum distribution profile according to the mine stratum distribution information and the known segmented plane stratum distribution, and determine the pilot hole construction position based on the predetermined skylight layout requirements and the mine stratum distribution profile, combined with the relationship between the chute design inclination and the soft rock mud stratum distribution inclination; A construction process monitoring module, the construction process monitoring module is used to perform pilot hole construction according to a predetermined construction plan and the pilot hole construction position, collect the drilling water return status during the pilot hole construction process in real time, perform mud feature analysis and water return color collection on the drilling water return status, and obtain mud feature and water return image; A soft rock mudstone formation determination module, wherein the soft rock mudstone formation determination module is used to determine that the current construction is in a soft rock mudstone formation if the mud-containing feature meets the predetermined mudstone feature or the water reflection image meets the predetermined mudstone color, and inject high-pressure water into the bottom of the pilot hole to increase the water pressure until a cavity is formed near the drill bit; A grouting control module is used to inject grout into the cavity until the cavity meets a predetermined size constraint, and after the cavity is filled, continue to construct the guide hole until the guide hole construction is completed, wherein the predetermined size constraint is that the cavity diameter is 1 meter.

Citation Information

Patent Citations

  • Novel metro engineering geological exploration method based on drilling and micro detection combination

    CN110031893A

  • Device for stabilizing the course of the tunnelling element

    US3677354A

Cited By

  • Method for building draw shaft

    CN119801546A