Multi-strand anchor cable mounting trolley and anchor cable mounting construction method
By designing a multi-strand anchor cable installation trolley, the cooperation of the main and auxiliary arms is used to achieve safe and efficient lifting of the anchor cable head and suspended delivery in the middle, solving the problems of many people and high friction resistance during the anchor cable installation process. , improve construction efficiency and safety.
Patent Information
- Application Number
- CN202411167677.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-11-08
AI Technical Summary
During the installation of anchor cables in underground chambers and high slopes, the anchor cables are long and heavy in weight. The traditional cable delivery method requires multiple construction personnel to lift and clamp, and the dragging of the tail of the anchor cables leads to high friction resistance, and construction efficiency Low.
Design a multi-strand anchor cable installation trolley, including the main arm and the auxiliary arm, with a cable conveying device on the main arm, the auxiliary arm is used to cooperate with the main arm, and the traction mechanism lifts the head of the anchor cable to the cable conveying device, and During the cable delivery process, the middle part of the anchor cable is lifted to a suspended state, reducing ground friction and achieving continuous delivery.
The number of construction personnel is reduced, the cable delivery resistance is reduced, the efficiency and safety of anchor cable installation is improved, and the continuity of the construction process is ensured.
Smart Images

Figure CN118911734A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of engineering machinery, and in particular to a multi-strand anchor cable installation trolley and an anchor cable installation construction method. Background Art
[0002] Underground chambers and high slopes of hydropower stations are usually equipped with multiple strands of prestressed anchor cables to enhance the stability of the surrounding rock. The traditional cable delivery method uses manual cooperation with hoists, winches or cranes to deliver cables, which has many disadvantages such as large number of construction workers, high labor intensity, low operating efficiency and poor safety. The use of mechanized construction is the fundamental way to solve this problem. For example, Chinese patent application number CN202223008885.9 is a cable delivery device for anchor cables, which discloses the use of two cable clamps, one in front and one in the back, to achieve continuous delivery of anchor cables and then install anchor cables.
[0003] However, the above-mentioned prior art is limited to the study of a single component such as the anchor cable installation device, and has not been analyzed and considered from the perspective of the entire equipment of the anchor cable installation. Therefore, there are at least the following technical problems: in the anchor cable installation occasions in underground chambers and high slopes, the length of the anchor cable usually ranges from ten meters to several dozen meters. The anchor cable itself is heavy, and during the installation of the anchor cable head, multiple construction workers are required to lift it and then complete the clamping and fixing of the anchor cable head; and, during the above-mentioned anchor cable transportation process, the tail of the anchor cable drags on the ground, which brings great friction resistance to the front end cable feeding action, resulting in slow cable feeding speed and low construction efficiency.
[0004] In view of this, it is necessary to propose a new technical solution to solve the above technical problems. Summary of the invention
[0005] In order to solve the problems existing in the prior art, the present invention provides a multi-strand anchor cable installation trolley and an anchor cable installation method, which can achieve the purpose of smoother cable feeding operation, reduce labor and improve construction efficiency.
[0006] To achieve the above-mentioned purpose, the first aspect of the present invention provides a multi-strand anchor cable installation trolley, which includes a chassis and a main arm and an auxiliary arm installed on the chassis; a working platform and a cable feeding device are installed at the end of the main arm, and the cable feeding device is used to continuously feed the anchor cable to the anchor hole; the auxiliary arm cooperates with the main arm, and a traction mechanism is installed at the end of the auxiliary arm, and the traction mechanism is used to lift the anchor cable to the cable feeding device; the traction mechanism is also used to lift the middle part of the anchor cable to a suspended state during the cable feeding process, and continuously deliver the anchor cable to the cable feeding device.
[0007] As a further improvement, the cable feeding device includes a slide, a propulsion beam, a fixed clamping mechanism, a sliding clamping mechanism and a cable feeding drive mechanism; the fixed clamping mechanism includes a fixed seat and a first clamping jaw, and the fixed seat is fixedly connected to the front end of the propulsion beam; the sliding clamping mechanism includes a movable seat and a second clamping jaw, and the movable seat can be slidably installed on the propulsion beam; the cable feeding drive mechanism is connected to the sliding clamping mechanism and is used to drive the sliding clamping mechanism to move back and forth.
[0008] As a further improvement, a guide tube is provided at the front end and / or rear end of the fixed clamping mechanism; a guide tube is provided at the front end and / or rear end of the sliding clamping mechanism; when the cable is fed, the anchor cable is passed through the guide tube.
[0009] As a further improvement, the guide tubes are all provided with bell mouths.
[0010] As a further improvement, the guide tube comprises an upper guide tube and a lower guide tube connected together by a hinge; after assembly, the upper guide tube and the lower guide tube are locked by a pin shaft.
[0011] As a further improvement, a first guide wheel group is provided between the fixed clamping mechanism and the sliding clamping mechanism, and a second guide wheel group is provided behind the sliding clamping mechanism;
[0012] The first guide wheel group and the second guide wheel group both include a wheel frame and two semi-guide wheels, and the two semi-guide wheels are arranged opposite to each other up and down; when the cable is sent, the anchor cable is passed between the upper and lower semi-guide wheels.
[0013] As a further improvement, the wheel frame includes an upper wheel frame and a lower wheel frame connected together by a hinge; the two semi-guide wheels are respectively installed on the upper wheel frame and the lower wheel frame; after assembly, the upper wheel frame and the lower wheel frame are locked by a pin shaft.
[0014] As a further improvement, the first guide wheel group and the second guide wheel group each include two vertical semi-guide wheels, and the two vertical semi-guide wheels are arranged opposite to each other on the left and right; when the cable is sent, the anchor cable is passed between the four semi-guide wheels on the upper, lower, left and right sides.
[0015] As a further improvement, the first guide wheel group and the second guide wheel group are both provided with a sliding wheel seat, and the sliding wheel seat can be slidably connected to the propulsion beam back and forth; a synchronous linkage mechanism is provided between the first guide wheel group, the second guide wheel group and the sliding clamping mechanism.
[0016] As a further improvement, a third guide wheel set is fixedly provided at the rear end of the slide, and the third guide wheel set is inclined rearward and downward.
[0017] As a further improvement, the traction mechanism includes a lifting bracket, at least two fourth guide wheel groups are arranged below the lifting bracket, and a winch is arranged at one end of the lifting bracket; when sending the cable, the anchor cable is clamped and passed through the middle of the fourth guide wheel group, and the winch is used to pull the anchor cable.
[0018] As a further improvement, the hanging bracket is connected to the end of the auxiliary arm through a turntable.
[0019] As a further improvement, the chassis includes a wheeled chassis and a tracked chassis.
[0020] A second aspect of the present invention provides a method for installing an anchor cable using the multi-strand anchor cable installation trolley as described above, which comprises the following steps:
[0021] The jib winch lifts the anchor cable head and places it on the cable feeding device for clamping and fixing;
[0022] The jib will lift the middle part of the anchor cable, and the anchor cable between the lifting point and the clamping position of the main arm cable feeding device will hang down in a V shape. The jib will be lifted so that the bottom of the V-shaped anchor cable is off the ground.
[0023] The cable feeding device installs the anchor cable;
[0024] The winch on the jib lifts the anchor cable from the ground, and according to the speed of loading, the wire rope pulls the anchor cable to the cable feeding device.
[0025] As a further improvement, the step of installing the anchor cable includes:
[0026] The fixed clamping mechanism is released, and the sliding clamping mechanism is clamped to drive the anchor cable forward to complete one cable feeding; then the fixed clamping mechanism clamps the anchor cable, and the sliding clamping mechanism releases the anchor cable and retreats to the initial position to start the next cable feeding.
[0027] Compared with the prior art, the present invention brings the following technical effects:
[0028] The multi-strand anchor cable installation trolley of the present invention comprises a main arm and an auxiliary arm. The main arm is provided with a cable feeding device for continuously feeding the anchor cable into the anchor hole. The auxiliary arm is used to cooperate with the main arm. A traction mechanism is provided thereon for lifting the head of the anchor cable to the cable feeding device for clamping and fixing in the early stage of construction. Compared with manual operation, it is safer and more efficient. The traction mechanism is also used to lift the middle part of the anchor cable to a suspended state during the cable feeding process, and continuously feed the anchor cable to the cable feeding device. On the one hand, this arrangement can reduce the huge friction generated by the contact between the anchor cable and the ground, thereby reducing the cable feeding resistance and making the cable feeding action smoother. On the other hand, with the cooperation of the traction mechanism, the anchor cable is continuously delivered to the cable feeding device, thereby ensuring that the construction process is continuous and uninterrupted, further improving the efficiency of the anchor cable installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.
[0030] Figure 1 A three-dimensional diagram showing a multi-strand anchor cable installation trolley according to a preferred embodiment of the present invention;
[0031] Figure 2 Shows Figure 1 A partial stereogram of the installation trolley (mainly including the main arm);
[0032] Figure 3 Shows Figure 1 A three-dimensional view of the working platform in the middle;
[0033] Figure 4 Shows Figure 1 A three-dimensional diagram of the mid-cable feeding device;
[0034] Figure 5 Shows Figure 1 The structural diagram of the central cable feeding device from another perspective;
[0035] Figure 6 Shows Figure 1 A three-dimensional view of the first guide wheel assembly (open state);
[0036] Figure 7 Shows Figure 1 A three-dimensional view of the middle guide tube (open state);
[0037] Figure 8 Shows Figure 1 Structural diagram of the synchronous linkage mechanism (some structural parts are omitted);
[0038] Fig. 9 A perspective view of a cable feeding mechanical arm according to another preferred embodiment of the present invention is shown;
[0039] Fig.10 A schematic diagram showing the state of the present invention operating in a chamber;
[0040] Fig.11 Shows Figure 1 A three-dimensional view of the middle auxiliary arm;
[0041] Fig.12 Shows Fig.11 Partial structural diagram of the auxiliary arm.
[0042] Description of main component symbols:
[0043] Chassis-1; Support leg-101;
[0044] Main arm-2; first swivel seat-201; first telescopic arm-202; first small arm-203; first pitch cylinder-204; four-link structure-205;
[0045] Working platform-300; Main platform-301; Extension platform-302;
[0046] Rope feeding device 400; carriage 401; propulsion beam 402; fixed clamping mechanism 403; sliding clamping mechanism 404; fixed seat 406; first clamping jaw 407; movable seat 408; second clamping jaw 409; propulsion cylinder 410; guide tube 411; first guide wheel group 412; second guide wheel group 413; wheel frame 414; semi-guide wheel 415; sliding wheel seat 416; first movable pulley 417; second movable pulley 418; first steel wire rope 419; second steel wire rope 420; third guide wheel group 421; mounting seat 431; hydraulic motor 432;
[0047] Auxiliary arm-5; second rotating seat-501; second telescopic arm-502; second small arm-503; rotating disk-506;
[0048] Traction mechanism-600; hoisting bracket-601; fourth guide wheel set-602; winch-603; wire rope-604;
[0049] Anchor cable - 90. DETAILED DESCRIPTION
[0050] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0051] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other. The embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions.
[0052] Example
[0053] See also Figure 1The present embodiment discloses a multi-strand anchor cable installation trolley, which includes a chassis 1 and a main arm 2 and an auxiliary arm 5 installed on the chassis 1; a working platform 300 and a cable feeding device 400 are installed at the end of the main arm 2, the working platform 300 is for personnel to stand, and the cable feeding device 400 is used to continuously feed the anchor cable to the anchor hole; the auxiliary arm 5 cooperates with the main arm 2, and a traction mechanism 600 is installed at the end of the auxiliary arm 5, and the traction mechanism 600 is used to lift the head of the anchor cable 90 to the cable feeding device 400 at the initial stage of cable feeding, so that the cable feeding device 400 can clamp and fix the anchor cable 90; the traction mechanism 600 is also used to lift the middle part of the anchor cable 90 to a suspended state during the cable feeding process, and continuously deliver the anchor cable 90 to the cable feeding device 400, thereby ensuring that the cable feeding action is continuous and uninterrupted.
[0054] The present invention is designed from the perspective of the entire trolley, and the main arm 2 is equipped with an auxiliary arm 5. The auxiliary arm 5 can provide auxiliary functions both in the initial stage and during the cable feeding process, thereby achieving the purpose of smoother cable feeding operations, reducing labor and improving construction efficiency.
[0055] See also Figure 4-7 In this embodiment, the cable feeding device 400 includes a slide 401, a propulsion beam 402, a fixed clamping mechanism 403, a sliding clamping mechanism 404 and a cable feeding driving mechanism.
[0056] Specifically, the push beam 402 is composed of two parallel strip plates, and a guide rail structure is arranged outside the strip plates. The cross section of the guide rail is triangular, and the push beam 402 is fixed on the slide 401 as a whole. Of course, the push beam 402 and the slide 401 can also be made into an integral structure.
[0057] The fixed clamping mechanism 403 includes a fixed seat 406 and a first clamping jaw 407. The fixed seat 406 is fixedly connected to the front end of the propulsion beam 402. The first clamping jaw 407 includes two oppositely arranged and openable clamping blocks. The opposite surfaces of the two clamping blocks are arranged in a shape that matches the cross section of the anchor cable 90, so that the anchor cable 90 can be kept in a consistent state when clamped.
[0058] The sliding clamping mechanism 404 includes a movable seat 408 and a second clamping claw 409. The movable seat 408 can be slidably mounted on the propulsion beam 402. Specifically, the bottom of the movable seat 408 is provided with a slide groove that matches the guide rail structure of the propulsion beam 402. The slide groove is engaged with the guide rail, and the movable seat 408 is then mounted on the propulsion beam 402. The cable feeding drive mechanism is fixed on the propulsion beam 402 and connected to the sliding clamping mechanism 404. The cable feeding drive mechanism is used to drive the sliding clamping mechanism 404 to move back and forth. There are many technologies that can be used as a cable feeding drive mechanism. For example, the simplest one uses a propulsion oil cylinder 410 as a drive. The cylinder body of the oil cylinder is connected to the propulsion beam 402, and the movable rod of the oil cylinder is connected to the sliding clamping mechanism 404, so that the sliding clamping mechanism 404 can be driven back and forth.
[0059] The structure of the second clamping jaw 409 is the same as that of the first clamping jaw 407, and also includes two clamping blocks that are arranged opposite to each other and can be opened and closed. The opposite surfaces of the two clamping blocks are arranged to have a shape that matches the cross-section of the anchor cable 90, so that they can maintain a fit when clamping the anchor cable 90.
[0060] The working principle of the cable feeding device 400 is as follows: the first clamping jaw 407 of the fixed clamping mechanism 403 releases the anchor cable 90, the second clamping jaw 409 of the sliding clamping mechanism clamps the anchor cable 90, and the cable feeding drive mechanism is started, thereby driving the sliding clamping mechanism 404 to slide forward, and during this process, the second clamping jaw 409 drives the anchor cable 90 to be transported forward for a distance; thereafter, the first clamping jaw 407 of the fixed clamping mechanism 403 clamps the anchor cable 90, the second clamping jaw 409 of the sliding clamping mechanism 404 releases the anchor cable 90, and the cable feeding drive mechanism acts in reverse, driving the sliding clamping mechanism 404 to retreat backward to the initial position; repeat the above actions to complete the transportation of the entire anchor cable 90.
[0061] Specifically, in this embodiment, a guide tube 411 is provided at the rear end of the fixed clamping mechanism 403, and guide tubes 411 are provided at the front and rear ends of the sliding clamping mechanism 404, respectively. When the cable is sent, the anchor cable 90 is inserted into these guide tubes 411, and the guide tubes 411 can limit the position of the anchor cable 90 to always be consistent with the direction of the cable sending, thereby making the cable sending action smoother. Of course, in some other embodiments, the number and position of the guide tubes 411 can also be flexibly adjusted according to the situation, for example, a guide tube 411 is also provided at the front end of the fixed clamping mechanism 403, and a guide tube 411 can be provided at one end of the sliding clamping mechanism 404.
[0062] Preferably, the guide tubes 411 are all provided with bell-mouths. The reason for providing the bell-mouths is that a support frame is provided at intervals of length for the multiple anchor cables 90, and the support frame protrudes from the outer surface of the anchor cables 90. When entering the guide tube 411, the support frame will be stuck at the tube mouth, causing obstruction to the feeding cable, and the setting of the bell-mouth can play a guiding role, so that the support frame can smoothly pass through the tube mouth into the guide tube 411.
[0063] Specifically, in this embodiment, each guide tube 411 includes an upper guide tube and a lower guide tube connected together by a hinge; after assembly, the upper guide tube and the lower guide tube are locked by a pin shaft to form a complete guide tube 411. This setting is to facilitate the clamping and fixing of the anchor cable 90: if the guide tube 411 is a complete integrated structure, when clamping the anchor cable 90, the anchor cable 90 needs to be passed through the guide tube 411; and if the guide tube 411 is set as a structure with two halves hinged and openable, before clamping the anchor cable 90, the upper guide tube can be opened first, and after the anchor cable 90 is installed, the upper guide tube can be closed and then locked, thereby completing the clamping and fixing of the anchor cable 90 - this operation is much simpler and more convenient than threading the anchor cable 90.
[0064] As a further improvement, a first guide wheel group 412 is provided between the fixed clamping mechanism 403 and the sliding clamping mechanism 404, and a second guide wheel group 413 is provided behind the sliding clamping mechanism 404; the first guide wheel group 412 and the second guide wheel group 413 have the same structure, but the installation positions are different. The structure is described below by taking the first guide wheel group 412 as an example. The first guide wheel group 412 includes a wheel frame 414 and two semi-guide wheels 415. The two semi-guide wheels 415 are arranged opposite to each other up and down, and the two are arranged in parallel. The middle position is for the anchor cable 90 to pass through. Specifically in this embodiment, the wheel frame 414 includes an upper wheel frame and a lower wheel frame connected together by a hinge. The two semi-guide wheels 415 are respectively installed on the upper wheel frame and the lower wheel frame. After assembly, the upper wheel frame and the lower wheel frame are locked by a pin shaft to form a complete wheel frame 414. When feeding the cable, the anchor cable 90 is passed (or passed) between the upper and lower semi-guide wheels 415. The purpose of setting the wheel frame 414 to be hinged with two parts is also to facilitate the clamping and fixing of the anchor cable 90: that is, before clamping, the upper wheel frame is opened, the anchor cable 90 is placed in, and then the upper wheel frame is closed and locked. Otherwise, the anchor cable 90 needs to be clamped by passing through the wheel frame 414, which increases the difficulty of operation.
[0065] When the anchor cable 90 moves on the carriage 401, it will bend and sag due to its own weight, thereby generating friction resistance between the carriage 401 and the carriage 401, which is not conducive to the cable feeding. The guide wheel set is fixedly arranged at the corresponding position of the carriage 401, which can support the anchor cable 90 and prevent it from sagging, and can also guide the sliding, so that the cable feeding process is smoother.
[0066] Furthermore, the first guide wheel group 412 and the second guide wheel group 413 each include two vertical semi-guide wheels 415, which are arranged opposite to each other on the left and right and are located on one side of the wheel frame 414; when sending the cable, the anchor cable 90 is passed through the four semi-guide wheels 415 on the upper, lower, left and right sides, thereby guiding and sliding the anchor cable 90 from multiple directions, further ensuring the smoothness of the cable sending process.
[0067] In this embodiment, the first guide wheel group 412 and the second guide wheel group 413 are both provided with a sliding wheel seat 416, and the sliding wheel seat 416 can be connected to the propulsion beam 402 by sliding back and forth. The sliding connection relationship between the sliding wheel seat 416 and the propulsion beam 402 can refer to the movable seat 408 of the sliding clamping mechanism 404. In addition, a synchronous linkage component is provided between the first guide wheel group 412, the second guide wheel group 413 and the sliding clamping mechanism 404. Therefore, in the process of the sliding clamping mechanism 404 driving the anchor cable 90 to be transported forward, the first guide wheel group 412 and the second guide wheel group 413 respectively support and guide the anchor cable 90 from the front and rear of the sliding clamping mechanism 404, which can further ensure the smoothness of the cable feeding process.
[0068] See also Figure 8 Specifically, the synchronous linkage assembly includes a first movable pulley 417, a second movable pulley 418, a first steel wire rope 419, a second steel wire rope 420 and the above-mentioned propulsion cylinder 410. The first movable pulley 417 is fixedly mounted on the first guide wheel group 412. The first steel wire rope 419 passes around the first movable pulley 417, and its two ends are respectively connected to the propulsion beam 402 and the sliding clamping mechanism 404; the second movable pulley 418 is fixedly mounted on the second guide wheel group 413, the second steel wire rope 420 passes around the second movable pulley 418, and its two ends are respectively connected to the propulsion beam 402 and the sliding clamping mechanism 404; the cylinder body of the propulsion cylinder 410 is fixed on the propulsion beam 402, and the movable rod of the propulsion cylinder 410 is connected to the first guide wheel group 412. The propulsion beam 402, the first steel wire rope 419, the sliding clamping mechanism 404, and the second steel wire rope 420 form a ring with a fixed circumference.
[0069] The action principle and process of the synchronous linkage component are as follows:
[0070] The propulsion cylinder 410 extends forward, driving the first guide wheel group 412 to move forward, and due to the action of the first steel wire rope 419, the sliding clamping mechanism 404 is driven to move forward; at the same time, since the circumference of the ring formed by the propulsion beam 402, the first steel wire rope 419, the sliding clamping mechanism 404, and the second steel wire rope 420 remains unchanged, the sliding clamping mechanism 404 will actually drive the second guide wheel group 413 to move forward, and the speed of the second guide wheel group 413 moving forward is the same as the speed of the first guide wheel group 412, while the speed of the sliding clamping mechanism 404 moving forward is twice that of the first guide wheel group 412. When the sliding clamping mechanism 404 moves to abut against the first guide wheel group 412, the propulsion cylinder 410 stops moving forward. At this time, the cable feeding device 400 completes the action of conveying a section of the anchor cable 90 forward.
[0071] After that, the propulsion oil cylinder 410 contracts backwards, driving the first guide wheel group 412 to retreat backwards, and due to the action of the first steel wire rope 419, the sliding clamping mechanism 404 is driven to retreat backwards; at the same time, since the circumference of the ring formed by the propulsion beam 402, the first steel wire rope 419, the sliding clamping mechanism 404, and the second steel wire rope 420 remains unchanged, the sliding clamping mechanism 404 will actually drive the second guide wheel group 413 to retreat backwards, and the speed of the second guide wheel group 413 retreating backwards is the same as that of the first guide wheel group 412, while the speed of the sliding clamping mechanism 404 retreating backwards is twice that of the first guide wheel group 412. When the sliding clamping mechanism 404 moves to abut against the second guide wheel group 413, the propulsion oil cylinder 410 stops contracting backwards. At this time, the cable feeding device 400 completes the reset action.
[0072] With the help of the synchronous linkage mechanism, the forward and backward speeds of the sliding clamping mechanism 404 can be twice that of the thrust cylinder 410, thereby significantly increasing the speed of cable feeding and improving construction efficiency.
[0073] In this embodiment, a third guide wheel set 421 is fixedly provided at the rear end of the slide 401, and the third guide wheel set 421 is arranged to be tilted backward and downward. The third guide wheel set 421 is located at the bent portion of the anchor cable 90, and the third guide wheel set 421 is arranged to be tilted backward and downward in order to adapt to and ease the bending degree of the anchor cable 90, and to prevent the huge resistance caused by the sudden bending of the anchor cable 90 at this place, thereby further ensuring the smoothness of the cable feeding process.
[0074] See also Fig.10 , Fig.11 Specifically, in this embodiment, the traction guide device 600 includes a lifting bracket 601, and three fourth guide wheel groups 602 are arranged below the lifting bracket 601, and the three fourth guide wheel groups 602 are evenly distributed below the lifting bracket 601. A winch 603 is arranged at one end of the lifting bracket 601. The structure of the fourth guide wheel group 602 is similar to the structure of the guide wheel group mentioned above, and the fourth guide wheel group 602 includes a wheel frame and two semi-guide wheels (not shown in the figure), and the two semi-guide wheels are both arranged at the bottom of the wheel frame; when the cable is sent, the anchor cable 90 passes over the two semi-guide wheels. Preferably, the fourth guide wheel group 602 is also provided with an openable and closable structure to facilitate the clamping of the anchor cable 90. The fourth guide wheel group 602 also includes two vertical semi-guide wheels, and the two vertical semi-guide wheels are arranged opposite to each other on the left and right. When the cable is sent, the anchor cable 90 is clamped and inserted in the middle of the fourth guide wheel group 602, and the wire rope 604 of the winch 603 is connected to the tail of the anchor cable 90. After the winch 603 is started, the anchor cable 90 is pulled and continuously sent in the direction of the cable sending device 400.
[0075] The working principle and function of the traction mechanism 600 are as follows:
[0076] 1. Assist in clamping and fixing the anchor cable 90 head
[0077] The main arm 2 is controlled to descend to a position close to the ground, the winch 603 of the auxiliary arm 5 lowers the wire rope 604, and hangs the head of the anchor cable 90. The winch 603 starts to lift the head of the anchor cable 90, and then the auxiliary arm 5 is controlled to move close to the main arm 2, and the head of the anchor cable 90 is lifted and sent to the cable feeding device 400. The head of the anchor cable 90 is clamped and fixed at the cable feeding device 400 in the manner described above.
[0078] 2. Auxiliary cable feeding process
[0079] The main arm 2 is controlled to move to a predetermined position so that the cable feeding device 400 is aligned with a certain anchor hole. The auxiliary arm 5 is lowered to a position close to the ground. With the assistance of manual labor, the middle part of the anchor cable 90 is clamped to the traction mechanism 600 of the auxiliary arm 5. At this time, the wire rope 604 of the winch 603 is connected to the tail of the anchor cable 90. The auxiliary arm 5 is controlled to rise and the middle part of the anchor cable 90 is lifted. The anchor cable 90 between the lifting point and the clamping position of the cable feeding device 400 of the main arm 2 will hang down in a V shape. The auxiliary arm 5 is lifted so that the bottom of the V-shaped anchor cable 90 is off the ground, which can reduce the friction between the anchor cable 90 and the ground, thereby facilitating the cable feeding device to feed the cable.
[0080] See also Figure 1 Specifically, in this embodiment, the chassis 1 adopts a wheeled chassis, which has stronger maneuverability and enables the trolley to be flexibly transferred at the construction site. Of course, in some other embodiments, the chassis 1 may also adopt a crawler chassis. As for which chassis 1 is specifically adopted, it can be determined according to the environment and conditions of the construction site.
[0081] In order to maintain the stability of the chassis 1, support legs 101 are further provided at the front and rear of the chassis 1. Specifically, two vertical support legs 101 are provided at the front of the chassis 1, located on both sides of the front; two inclined support legs 101 are provided at the rear of the chassis 1, located on both sides of the rear. Moreover, the two inclined support legs 101 are triangular in structure after being spread out, which has better stability. At the same time, the structural arrangement of the two inclined support legs 101 can also reduce space occupation. It is worth mentioning that the structure of the support leg 101 structure itself is an existing well-known technology, such as having telescopic function, folding function, etc., which will not be described in detail here.
[0082] See also Figure 1 , Figure 2Specifically, in this embodiment, the main arm 2 also includes a first swivel seat 201, a first telescopic arm 202 and a first small arm 203. The first swivel seat 201 can be horizontally rotatably mounted on the chassis 1, and has a triangular seat body that is inclined toward one side. The first telescopic arm 202 has multiple telescopic sections, such as a four-section structure in this embodiment. One end of the first telescopic arm 202 is hinged to the top of the first swivel seat 201, and a first pitch cylinder 204 is provided between the first telescopic arm 202 and the first swivel seat 201, so that the pitch angle of the first telescopic arm 202 can be adjusted. The front end of the first small arm 203 is used to connect the working platform 300, and a leveling mechanism is provided between the rear end of the first small arm 203 and the front end of the first telescopic arm 202. Specifically, in one of the embodiments, the leveling mechanism adopts a four-link structure 205. The four-link structure 205 adopts the existing technology, and the technology disclosed in Chinese Patent Application No. 202110896656.6 can be referred to. In addition, the first small arm 203 is connected to the front end of the four-bar structure 205 so as to swing around a vertical axis. Therefore, the working platform 300 connected to the first small arm 203 can swing horizontally to a certain extent, thereby fine-tuning the position of the working platform 300.
[0083] See also Figure 8 In another embodiment, the first arm 203 may also have a simpler leveling mechanism. For example, the rear end of the first arm 203 is hinged to the front end of the first telescopic arm 202, and a leveling cylinder (not shown) is arranged between the two. The leveling cylinder can drive the first arm 203 to do up and down pitching movements, thereby adjusting the first arm 203 to always be in a horizontal state. In this case, the working platform 300 can be horizontally rotatably connected to the front end of the first arm 203. The present invention does not specifically limit the arm structure of the main arm 2, as long as it can drive the working platform 300 and the cable feeding device 400 to move freely in the construction space.
[0084] Please refer to Figure 1 , Figure 2 ,and Figure 3 Specifically, in this embodiment, the cable feeding device 400 is connected to one side of the working platform 300. Specifically, the cable feeding device 400 also includes a mounting seat 431 and a hydraulic motor 432. The mounting seat 431 is fixedly connected to one side of the working platform 300. The hydraulic motor 432 is horizontally connected between the mounting seat 431 and the slide 401. Therefore, under the action of the hydraulic motor 432, the slide 401 and the entire cable feeding device 400 can rotate around the horizontal axis, so that the cable feeding device 400 can perform anchoring operations on anchor holes at different positions on the side walls and top arches of the chamber (such as Fig. 9 shown).
[0085] See also Figure 3Specifically in the embodiment, the working platform 300 includes a main platform 301 and an expansion platform 302. Two expansion platforms 302 are provided, which are arranged on both lateral sides of the main platform 301 to extend the activity space of the main platform 301 so as to facilitate construction workers to have a larger construction space.
[0086] See also Figure 1 , Fig.10 In this embodiment, the auxiliary arm 5 further includes a second swivel seat 501, a second telescopic arm 502 and a second small arm 503. The second swivel seat 501 can be horizontally rotatably mounted on the chassis 1. The second swivel seat 501 is adjacent to the first swivel seat 201 and has a triangular seat body that is inclined toward one side. The second telescopic arm 502 has multiple telescopic sections, such as a four-section structure in this embodiment. One end of the second telescopic arm 502 is hinged to the top of the second swivel seat 501, and a second pitch cylinder is provided between the second telescopic arm 502 and the second swivel seat 501, so that the pitch angle of the second telescopic arm 502 can be adjusted. The front end of the second small arm 503 is used to connect the traction mechanism 600, and a leveling mechanism is provided between the rear end of the second small arm 503 and the front end of the second telescopic arm 502. Specifically in this embodiment, the leveling mechanism adopts a relatively simple structure, that is, a leveling cylinder is provided between the second small arm 503 and the second telescopic arm 502, and the front end of the second small arm 503 is kept horizontal by means of the leveling cylinder. The present invention does not specifically limit the arm frame mechanism of the auxiliary arm 5, as long as it can drive the traction mechanism 600 to move freely in the construction space.
[0087] Specifically, the traction mechanism 600 is connected to the bottom of the second small arm 503 through a turntable 506. Therefore, the traction mechanism 600 as a whole can rotate under the drive of the turntable 506, and then the relative position relationship between the traction mechanism 600 and the cable feeding device 400 can be adjusted. When the relative position relationship between the two is adjusted to the lifting bracket 601 is aligned with the slide 401, the cable feeding resistance is the smallest and the cable feeding action is the smoothest.
[0088] This embodiment also discloses a method for installing an anchor cable 90 using the above-mentioned multi-strand anchor cable installation trolley, which comprises the following steps:
[0089] S1. The winch 603 of the auxiliary arm 5 lifts the head of the anchor cable 90 and lifts it to the cable feeding device of the main arm 2 for clamping and fixing.
[0090] That is, the steel wire rope 604 is connected to the head of the anchor cable 90, and then the auxiliary arm 5 is controlled to move to a position close to the main arm 2, the head of the anchor cable 90 is lifted and sent to the vicinity of the cable feeding device, and then the head of the anchor cable 90 is clamped and fixed.
[0091] S2, the auxiliary arm 5 lifts the middle part of the anchor cable 90, and the anchor cable 90 between the lifting point and the clamping position of the cable feeding device 400 of the main arm 2 will hang down in a V shape, and the auxiliary arm 5 is lifted so that the bottom of the V-shaped anchor cable 90 is off the ground.
[0092] In this step, the auxiliary arm 5 lifts the middle part of the anchor cable 90, which means that the middle part of the anchor cable 90 is clamped to the guide wheel group of the lifting bracket 601; the lifting point roughly refers to the center of gravity of the section of the anchor cable 90 clamped to the lifting bracket 601.
[0093] S3. The cable feeding device of the main arm 2 installs the anchor cable 90.
[0094] That is, the cable feeding and installation steps are implemented in a step-by-step manner through the two anchor cable clamping mechanisms mentioned above: the fixed clamping mechanism 403 is loosened, and the sliding clamping mechanism 404 is clamped to drive the anchor cable 90 to move forward a preset distance to complete one cable feeding; then the fixed clamping mechanism 403 clamps the anchor cable 90, and the sliding clamping mechanism 404 loosens the anchor cable 90 and retreats to the initial position to start the next cable feeding.
[0095] S4. The winch 603 on the auxiliary arm 5 lifts the anchor cable 90 from the ground. According to the speed of the cable installation, the steel wire rope 604 pulls the anchor cable 90 to deliver the cable to the cable feeding device 400.
[0096] Every time the cable feeding device of the main arm 2 is transported forward a certain distance, the winch 603 of the auxiliary arm 5 pulls a section of the anchor cable 90 upward, thereby ensuring that the entire cable feeding action is continuous and uninterrupted.
[0097] As a further improvement, in order to make the cable feeding action smoother, the overall posture of the traction mechanism 600 is also adjusted, specifically, the angle of the turntable 506 is controlled so that the lifting bracket 601 is kept aligned with the slide 401.
[0098] In summary, the present invention brings the following technical effects:
[0099] The multi-strand anchor cable installation trolley of the present invention comprises a main arm 2 and an auxiliary arm 5. The main arm 2 is provided with a cable delivery device 400 for continuously delivering the anchor cable 90 into the anchor hole. The auxiliary arm 5 is used to cooperate with the main arm 2 and is provided with a traction mechanism 600 for lifting the head of the anchor cable 90 to the cable delivery device 400 for clamping and fixing in the early stage of construction, which is safer and more efficient than manual operation. The traction mechanism 600 is also used to lift the middle part of the anchor cable 90 to a suspended state during the cable delivery process, and continuously deliver the anchor cable 90 to the cable delivery device 400. On the one hand, this setting can reduce the huge friction generated by the contact between the anchor cable 90 and the ground, thereby reducing the cable delivery resistance and making the cable delivery action smoother. On the other hand, with the cooperation of the traction mechanism 600, the anchor cable 90 is continuously delivered to the cable delivery device 400, thereby ensuring that the construction process is continuous and uninterrupted, and further improving the installation efficiency of the anchor cable 90. By adjusting the relative position relationship between the hoisting bracket 601 and the slide 401, the smoothness of the cable delivery action can be further improved.
[0100] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom still fall within the scope of protection of the present invention.
Claims
1. A multi-strand anchor cable installation trolley, characterized in that: It includes a chassis and a main arm and an auxiliary arm installed on the chassis; a working platform and a cable feeding device are installed at the end of the main arm, and the cable feeding device is used to continuously feed the anchor cable to the anchor hole; the auxiliary arm cooperates with the main arm, and a traction mechanism is installed at the end of the auxiliary arm, and the traction mechanism is used to lift the anchor cable to the cable feeding device; the traction mechanism is also used to lift the middle part of the anchor cable to a suspended state during the cable feeding process, and continuously deliver the anchor cable to the cable feeding device.
2. The multi-strand anchor cable installation trolley according to claim 1, characterized in that: The cable feeding device includes a slide, a propulsion beam, a fixed clamping mechanism, a sliding clamping mechanism and a cable feeding drive mechanism; the fixed clamping mechanism includes a fixed seat and a first clamping jaw, and the fixed seat is fixedly connected to the front end of the propulsion beam; the sliding clamping mechanism includes a movable seat and a second clamping jaw, and the movable seat can be slidably installed on the propulsion beam; the cable feeding drive mechanism is connected to the sliding clamping mechanism and is used to drive the sliding clamping mechanism to move back and forth.
3. The multi-strand anchor cable installation trolley according to claim 2, characterized in that: A guide tube is provided at the front end and / or rear end of the fixed clamping mechanism; a guide tube is provided at the front end and / or rear end of the sliding clamping mechanism; when the cable is fed, the anchor cable is passed through the guide tube.
4. The multi-strand anchor cable installation trolley according to claim 3, characterized in that: The guide pipes are all provided with bell mouths.
5. The multi-strand anchor cable installation trolley according to claim 3, characterized in that: The guide tube comprises an upper guide tube and a lower guide tube connected together by a hinge; after assembly, the upper guide tube and the lower guide tube are locked by a pin shaft.
6. The multi-strand anchor cable installation trolley according to any one of claims 2 to 5, characterized in that: A first guide wheel group is provided between the fixed clamping mechanism and the sliding clamping mechanism, and a second guide wheel group is provided behind the sliding clamping mechanism; The first guide wheel group and the second guide wheel group both include a wheel frame and two semi-guide wheels, and the two semi-guide wheels are arranged opposite to each other up and down; when the cable is sent, the anchor cable is passed between the upper and lower semi-guide wheels.
7. The multi-strand anchor cable installation trolley according to claim 6, characterized in that: The wheel frame comprises an upper wheel frame and a lower wheel frame connected together by a hinge; the two semi-guide wheels are respectively mounted on the upper wheel frame and the lower wheel frame; after assembly, the upper wheel frame and the lower wheel frame are locked by a pin shaft.
8. The multi-strand anchor cable installation trolley according to claim 6, characterized in that: The first guide wheel group and the second guide wheel group each include two vertical semi-guide wheels, and the two vertical semi-guide wheels are arranged opposite to each other on the left and right. When the cable is sent, the anchor cable is passed between the four semi-guide wheels on the upper, lower, left and right sides.
9. The multi-strand anchor cable installation trolley according to claim 6, characterized in that: The first guide wheel group and the second guide wheel group are both provided with a sliding wheel seat, and the sliding wheel seat can be slidably connected to the propulsion beam back and forth; A synchronous linkage mechanism is arranged among the first guide wheel group, the second guide wheel group and the sliding clamping mechanism.
10. The multi-strand anchor cable installation trolley according to claim 6, characterized in that: A third guide wheel set is fixedly provided at the rear end of the slide, and the third guide wheel set is tilted rearward and downward.
11. The multi-strand anchor cable installation trolley according to claim 1, characterized in that: The traction mechanism includes a lifting bracket, at least two fourth guide wheel groups are arranged below the lifting bracket, and a winch is arranged at one end of the lifting bracket; when feeding the cable, the anchor cable is clamped and passed through the middle of the fourth guide wheel group, and the winch is used to pull the anchor cable.
12. The multi-strand anchor cable installation trolley according to claim 11, characterized in that: The hanging bracket is connected to the end of the auxiliary arm through a rotating disk.
13. The multi-strand anchor cable installation trolley according to claim 1, characterized in that: The chassis includes a wheeled chassis and a tracked chassis.
14. A method for installing anchor cables using the multi-strand anchor cable installation trolley as described in any one of claims 1 to 13, characterized in that: The steps include: The jib winch lifts the anchor cable head and places it on the cable feeding device for clamping and fixing; The jib will lift the middle part of the anchor cable, and the anchor cable between the lifting point and the clamping position of the main arm cable feeding device will hang down in a V shape. The jib will be lifted so that the bottom of the V-shaped anchor cable is off the ground. The cable feeding device installs the anchor cable; The winch on the jib lifts the anchor cable from the ground, and according to the speed of loading, the wire rope pulls the anchor cable to the cable feeding device.
15. The method according to claim 14, characterized in that The steps of installing the anchor cable include: The fixed clamping mechanism is released, and the sliding clamping mechanism is clamped to drive the anchor cable forward to complete one cable feeding; then the fixed clamping mechanism clamps the anchor cable, and the sliding clamping mechanism releases the anchor cable and retreats to the initial position to start the next cable feeding.