Combined positioning and mounting structure of heating ventilation air conditioner

By designing the combined positioning and installation structure of HVAC, and using components such as rollers, universal wheels and magnetic suction plates, the problem of large mechanical and manpower demand during the installation of HVAC is solved, and convenient and efficient installation operation and stability are achieved. reduces costs.

CN118912692APending Publication Date: 2024-11-08CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410995429.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

During the installation of existing HVAC, various machinery and multiple staff members are required to cooperate, resulting in cumbersome and complex installation and high cost.

Method used

A combined positioning and installation structure of HVAC is designed, including cement base piers, fixed steel plates, load-bearing steel plates, support blocks, bottom frame components, mobile components, body components and support components, through rollers, universal wheels, and magnetic suction plates and dampers to achieve convenient transportation and installation of the air conditioner body, reduce friction and improve installation stability.

Benefits of technology

The installation operation of the air conditioner body is simplified, the demand for manpower and mechanical equipment is reduced, the installation convenience and stability are improved, and the installation cost is saved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912692A_ABST
    Figure CN118912692A_ABST
Patent Text Reader

Abstract

The invention discloses a heating ventilation air conditioner combined type positioning installation structure, and relates to the technical field of heating ventilation air conditioner installation, the heating ventilation air conditioner combined type positioning installation structure comprises a plurality of cement base piers, and the tops of the cement base piers are fixedly connected with fixing steel plates. When the air conditioner body is transported and installed, after the air conditioner body is transported in place, the air conditioner body is installed, the air conditioner body is moved through a forklift to be unloaded, the air conditioner body can be directly pushed to be installed through the arrangement that universal wheels are located at the bottom for supporting, and after a bottom frame body is moved to the position above an installation block, the air conditioner body is unloaded. The position of the bottom frame body is locked and fixed through the first bolts to complete installation, when the connecting bases move on the outer sides of the supporting blocks, the effect of reducing friction force can be achieved through supporting of the rolling wheels, labor is saved when a worker pushes the air conditioner body to move in the installation operation process, and the convenience of the installation operation is improved; and meanwhile, overhead installation can be carried out without cooperation of hoisting equipment, and the installation cost is effectively saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of HVAC installation, and in particular to a combined positioning and installation structure for a HVAC. Background Art

[0002] HVAC is an important technical field in construction engineering. It covers the design, installation and maintenance of heating, ventilation and air conditioning systems. The design of HVAC systems must take into account factors such as the building's use requirements, comfort requirements, and energy-saving requirements to ensure good indoor air quality and appropriate temperature, and to be able to effectively regulate indoor environmental temperature, humidity and fresh air supply.

[0003] In the prior art, such as Chinese patent CN 214665146 U, there is a HVAC system installation device that is easy to maintain, which includes a chassis, a base plate, a buffer seat and a placement slot. The top of the chassis is installed with a base plate, and the top of the base plate is evenly welded with a buffer seat, and the inside of the buffer seat is fixed with a rubber shock-absorbing column. The utility model optimizes its own performance by installing a base plate, a chassis, a reserved insert and a reserved slot. The user can use the plug-in connection structure composed of the reserved insert and the reserved slot, and cooperate with the locking and fixing effect composed of the locking plate and the locking bolt to realize the assembly of the base plate and the chassis, that is, the main part of the installation structure and the pre-assembled chassis can be assembled, so that the device realizes the advantages of positioning assembly and improves the accuracy of the assembly position. Moreover, by using this assembly structure, the device realizes the advantages of combination, which is convenient for disassembly and maintenance of the installation structure.

[0004] Currently, when installing the outdoor unit of the HVAC, due to the large overall size and heavy weight of the HVAC, engineering machinery is needed during the installation process. After the HVAC is transported to the destination, a forklift is needed to complete the unloading, and then the HVAC needs to be hoisted to the top of the pier by a crane to complete the fixed installation. During the installation operation, various machines and multiple workers are needed to cooperate in the installation, which makes the installation process more cumbersome and complicated, and the installation cost is also high.

[0005] Therefore, we propose a combined HVAC positioning and installation structure to solve the above-mentioned problems. Summary of the invention

[0006] The purpose of the present invention is to provide a combined positioning and installation structure for HVAC to solve the problem raised in the above background technology that various machines and multiple workers are required to cooperate in the installation operation, which makes the installation process more cumbersome and complicated, and the installation cost is high.

[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a combined positioning and installation structure of a heating, ventilation and air conditioning system, comprising: a plurality of cement base piers, the tops of the plurality of cement base piers are fixedly connected with fixed steel plates, the tops of the plurality of fixed steel plates are fixedly connected with load-bearing steel plates, and the tops of the load-bearing steel plates are symmetrically fixedly connected with support blocks; a bottom frame assembly, the bottom frame assembly is fixedly connected to the top of the load-bearing steel plate, the bottom frame assembly comprises a bottom frame body, the bottom of the bottom frame body is symmetrically fixedly connected with a connecting seat, the inner surface of the connecting seat is equidistantly connected with a plurality of support rods, and the outer surfaces of the plurality of support rods are fixedly connected with rollers; a moving assembly, the number of the moving assemblies is set to two, the two moving assemblies are symmetrically fixedly connected to the outer surface of the bottom frame body, and the moving assembly comprises a side frame and a positioning frame; a body assembly, the body assembly is fixedly connected to the top of the bottom frame body, the body assembly comprises a bottom frame, and the top of the bottom frame is fixedly connected with an air-conditioning body; a support assembly, the number of the support assemblies is set to two, the two support assemblies are symmetrically fixedly connected to the top of the bottom frame body, and the support assembly comprises a magnetic suction plate and a first bracket.

[0008] Preferably, limiting grooves are provided on the outer surfaces of both sides of the support block, the inner surfaces of the limiting grooves are fixedly connected to the second slide rails, the inner surface of the connecting seat is symmetrically fixedly connected to the first slider, the first slider is located at the lower side of the roller, and the outer surface of the first slider is slidably connected to the inner surface of the second slide rail.

[0009] Preferably, a through hole is opened on the top of the bearing steel plate, penetrating the fixed steel plate and the cement foundation pier, a mounting block is symmetrically fixedly connected to the top of the bearing steel plate near the through hole, and a stabilizing rod is symmetrically fixedly connected to the bottom of the mounting block.

[0010] Preferably, the stabilizing rod passes through the load-bearing steel plate and extends to the lower side, a stabilizing plate is fixedly connected between the end faces of the two stabilizing rods, a plurality of inclined plates are fixedly connected at equal intervals to the bottom of the stabilizing plate, and the inclined plates are fixedly connected to the cement foundation pier.

[0011] Preferably, threaded holes are symmetrically opened on the top of the mounting block, and insertion holes are opened at the top corners of the bottom frame body. A first bolt is inserted into the inner surface of the insertion hole. The insertion hole matches the position of the threaded hole, and the outer surface of the first bolt is threadedly connected to the inner surface of the threaded hole.

[0012] Preferably, an insert block is fixedly connected to the outer surface of the side frame, a slot is provided on the outer surface of the positioning frame, the outer surface of the insert block is plug-connected with the inner surface of the slot, and positioning holes are symmetrically provided on the top of the insert block and the positioning frame.

[0013] Preferably, a second bolt is inserted into the inner surface of the positioning hole, a nut is threadedly connected to the outer surface of the second bolt, the nut is located at the lower side of the positioning frame, a plurality of support columns are equidistantly fixedly connected to the bottom of the positioning frame, a mounting plate is fixedly connected between the bottoms of the plurality of support columns, and a universal wheel is symmetrically fixedly connected to the bottom of the mounting plate.

[0014] Preferably, the outer surface of the base frame is symmetrically provided with side grooves, the inner surface of the side groove is symmetrically provided with inner grooves, a plurality of first dampers are evenly fixedly connected to the top of the side grooves, a first spring is sleeved on the outer surfaces of the plurality of first dampers, a stabilizing block is fixedly connected between the lower end surfaces of the plurality of first dampers, a second slider is symmetrically fixedly connected to the outer surface of the stabilizing block, a first slide rail is symmetrically fixedly connected to the inner surface of the inner groove, and the outer surface of the second slider is slidably connected to the inner surface of the first slide rail.

[0015] Preferably, the magnetic plate is attached to the outer surface of the air conditioner body, a support plate is fixedly connected to the outer surface of the magnetic plate, second dampers are fixedly connected at the corners of the outer surface of the support plate, a second spring is sleeved on the outer surfaces of multiple second dampers, a clamping plate is fixedly connected between the end faces of multiple second dampers, and a second ear plate is symmetrically fixedly connected to the outer surface of the clamping plate.

[0016] Preferably, the inner surface of the first bracket is rotatably connected to the first support shaft, the outer surface of the first support shaft is fixedly connected to a support arm, the inner surface of the support arm passes through and is fixedly connected to the second support shaft, the outer surface of the second support shaft is rotatably connected to the second bracket, the outer surface of the second bracket is fixedly connected to a fixing plate, the outer surface of the fixing plate is symmetrically fixedly connected to a first ear plate, and the positions of the first ear plate and the second ear plate match.

[0017] Compared with the prior art, the present invention has the following beneficial effects:

[0018] 1. When transporting and installing the air conditioner body, after transporting it to the destination, install the air conditioner body. Use a forklift to move the air conditioner body for unloading. With the universal wheel at the bottom support, the air conditioner body can be directly pushed for installation. After the bottom frame body is moved above the mounting block, use the first bolt to lock the bottom frame body position to complete the installation. When the connecting seat moves on the outside of the support block, the support of the roller can reduce friction, making it easier for the staff to push the air conditioner body to move during the installation operation, thereby improving the convenience of the installation operation. At the same time, there is no need for hoisting equipment to cooperate with overhead installation, effectively saving installation costs.

[0019] 2. The setting of the mounting block can make the fixed position of the mounting block more stable. At the same time, the coordinated setting of the stabilizing rod and the mounting block can provide a reinforcing support for the mounting block. After the air conditioner body and the mounting block are fixedly installed, the stability of the installation of the air conditioner body can be improved. The coordinated setting of the stabilizing rod, the stabilizing plate and the inclined plate can further reinforce the fixed position of the mounting block, thereby further improving the stability of the installation position of the air conditioner body.

[0020] 3. After the air conditioner body and the bearing steel plate are installed, the magnetic plate is adsorbed on the outer side of the air conditioner body, and the support plate is set to provide reinforcement support for both sides of the air conditioner body. After rotating the support arm to move the fixing plate to the position of the fitting clamping plate, the fixing plate and the clamping plate are installed and fixed. After the fixation is completed, the support plates on both sides provide support for both sides of the air conditioner body. The coordinated use of the second damper and the second spring can play a role in buffering and shock absorption, so that the support plate position can absorb and buffer the external vibration of the air conditioner body, thereby improving the stability of the installation position of the air conditioner body. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 A three-dimensional diagram of a combined positioning and installation structure of a heating, ventilation and air conditioning system according to the present invention;

[0022] Figure 2 A bottom view of a combined positioning and mounting structure for heating, ventilation and air conditioning according to the present invention;

[0023] Figure 3 A schematic diagram of a bearing steel plate structure of a combined positioning and mounting structure for a heating, ventilation and air conditioning system according to the present invention;

[0024] Figure 4 A schematic diagram of a support block structure of a combined positioning and mounting structure for a heating, ventilation and air conditioning system according to the present invention;

[0025] Figure 5 It is a schematic structural diagram of a bottom frame assembly of a combined positioning and mounting structure for a heating, ventilation and air conditioning system according to the present invention;

[0026] Figure 6 This is a schematic diagram of the structure of a moving component of a combined positioning and installation structure for a heating, ventilation and air conditioning system according to the present invention;

[0027] Figure 7 It is a schematic diagram of the structure of a body component of a combined positioning and mounting structure of a heating, ventilation and air conditioning system according to the present invention;

[0028] Figure 8 It is a schematic diagram of a stabilizing block structure of a combined positioning and mounting structure for a heating, ventilation and air conditioning system according to the present invention;

[0029] Fig. 9 This is a schematic diagram of the support component structure of a combined positioning and mounting structure for a heating, ventilation and air conditioning system according to the present invention.

[0030] In the figure:

[0031] 1. Cement foundation pier; 2. Fixed steel plate; 3. Load-bearing steel plate; 4. Support block; 5. Bottom frame assembly; 501. Bottom frame body; 502. Plug hole; 503. First bolt; 504. Connecting seat; 505. Support rod; 506. Roller; 507. First slider; 6. Moving assembly; 601. Side frame; 602. Plug block; 603. Positioning hole; 604. Positioning frame; 605. Slot; 606. Second bolt; 607. Nut; 608. Support column; 609. Mounting plate; 610. Universal wheel; 7. Body assembly; 701. Bottom frame; 702. Air conditioner body; 703. Side groove; 704. Inner groove; 705 , the first damper; 706, the first spring; 707, the stabilizing block; 708, the second slider; 709, the first slide rail; 8, the supporting assembly; 801, the magnetic plate; 802, the supporting plate; 803, the first bracket; 804, the first supporting shaft; 805, the second supporting shaft; 806, the second bracket; 807, the fixing plate; 808, the first ear plate; 809, the second damper; 810, the second spring; 811, the clamping plate; 812, the second ear plate; 813, the supporting arm; 9, the limiting groove; 10, the second slide rail; 11, the through hole; 12, the mounting block; 13, the stabilizing rod; 14, the stabilizing plate; 15, the inclined plate; 16, the threaded hole. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] See also Figure 1-Figure 9The present invention provides a technical solution: a combined positioning and installation structure of a heating, ventilation and air conditioning system, comprising: a plurality of cement base piers 1, the tops of the plurality of cement base piers 1 are all fixedly connected with fixed steel plates 2, the tops of the plurality of fixed steel plates 2 are fixedly connected with load-bearing steel plates 3, the tops of the load-bearing steel plates 3 are symmetrically fixedly connected with support blocks 4; a bottom frame assembly 5, the bottom frame assembly 5 is fixedly connected to the tops of the load-bearing steel plates 3, the bottom frame assembly 5 comprises a bottom frame body 501, the bottom of the bottom frame body 501 is symmetrically fixedly connected with a connecting seat 504, the inner surface of the connecting seat 504 is equidistantly connected to a plurality of support rods 505, the outer surfaces of the plurality of support rods 505 They are all fixedly connected with rollers 506; a moving component 6, the number of the moving components 6 is set to two, the two moving components 6 are symmetrically fixedly connected to the outer surface of the bottom frame body 501, and the moving component 6 includes a side frame 601 and a positioning frame 604; a body component 7, the body component 7 is fixedly connected to the top of the bottom frame body 501, the body component 7 includes a base frame 701, and the top of the base frame 701 is fixedly connected with an air-conditioning body 702; a supporting component 8, the number of the supporting components 8 is set to two, the two supporting components 8 are symmetrically fixedly connected to the top of the bottom frame body 501, and the supporting component 8 includes a magnetic suction plate 801 and a first bracket 803.

[0034] like Figure 3-Figure 5 As shown, the outer surfaces of both sides of the support block 4 are provided with limiting grooves 9, the inner surfaces of the limiting grooves 9 are fixedly connected with the second slide rails 10, the inner surface of the connecting seat 504 is symmetrically fixedly connected with the first slider 507, the first slider 507 is located at the lower side of the roller 506, the outer surface of the first slider 507 is slidably connected with the inner surface of the second slide rail 10, when the air conditioner body 702 is transported and installed, the base frame 701 and the bottom frame body 501 provide support for the air conditioner body 702, the base frame 701, the bottom frame body 501 and the air conditioner body 702 form a complete whole for transportation, and after being transported to the place, the air conditioner body 702 is installed. After the air conditioner body 702 is pushed toward the bearing steel plate 3, the connecting seat 504 moves to the outer position of the support block 4, and the first slider 507 engages and slides with the second slide rail 10, which supports and limits the movement trajectory of the connecting seat 504, thereby preventing the bottom frame body 501 from tilting as a whole and causing the air conditioner body 702 to fall and be damaged. When the connecting seat 504 moves on the outer side of the support block 4, the support of the roller 506 can reduce the friction, making it easier for the staff to push the air conditioner body 702 to move during the installation operation, thereby improving the convenience of the installation operation.

[0035] like Figure 3As shown, a through hole 11 is opened on the top of the bearing steel plate 3, passing through the fixed steel plate 2 and the cement foundation pier 1, and a mounting block 12 is symmetrically fixedly connected to the top of the bearing steel plate 3 near the through hole 11, and a stabilizing rod 13 is symmetrically fixedly connected to the bottom of the mounting block 12. Through the setting of the mounting block 12, it can be fixedly connected to the cement foundation pier 1 by using expansion bolts, so that the fixed position of the mounting block 12 is relatively stable. At the same time, the coordinated setting of the stabilizing rod 13 and the mounting block 12 can play a role of reinforcing support for the mounting block 12. After the air-conditioning body 702 and the mounting block 12 are fixedly installed, the installation stability of the air-conditioning body 702 can be improved.

[0036] like Figure 3 As shown, the stabilizing rod 13 passes through the bearing steel plate 3 and extends to the lower side, a stabilizing plate 14 is fixedly connected between the end faces of the two stabilizing rods 13, and a plurality of inclined plates 15 are fixedly connected at equal intervals at the bottom of the stabilizing plate 14, and the inclined plates 15 are fixedly connected to the cement base pier 1. Through the coordinated arrangement of the stabilizing rod 13, the stabilizing plate 14 and the inclined plates 15, the fixed position of the mounting block 12 can be further reinforced, thereby further improving the stability of the installation position of the air conditioner body 702.

[0037] like Figure 3 and Figure 5 As shown, threaded holes 16 are symmetrically provided on the top of the mounting block 12, and sockets 502 are provided at the top corners of the bottom frame body 501. A first bolt 503 is inserted into the inner surface of the socket 502. The socket 502 matches the position of the threaded hole 16, and the outer surface of the first bolt 503 is threadedly connected with the inner surface of the threaded hole 16. After the air-conditioning body 702 is pushed to the upper position of the mounting block 12, the first bolt 503 is inserted from the position of the socket 502. After the first bolt 503 is inserted into the socket 502, it will be inside the threaded hole 16. At this time, tighten the first bolt 503 to lock and fix the bottom frame body 501 and the mounting block 12, thereby completing the fixed installation operation of the air-conditioning body 702.

[0038] like Figure 6 As shown, an insert block 602 is fixedly connected to the outer surface of the side frame 601, a slot 605 is provided on the outer surface of the positioning frame 604, the outer surface of the insert block 602 is plugged into the inner surface of the slot 605, and positioning holes 603 are symmetrically provided on the top of the insert block 602 and the positioning frame 604. After the air-conditioning body 702 is transported to the location and unloaded, the support column 608 is set to provide support for the mounting plate 609, so that the universal wheel 610 is in contact with the ground to provide support for the bottom frame body 501. With the universal wheel 610 at the bottom support, the air-conditioning body 702 can be directly pushed for installation.

[0039] like Figure 6As shown, a second bolt 606 is inserted into the inner surface of the positioning hole 603, and a nut 607 is threadedly connected to the outer surface of the second bolt 606, and the nut 607 is located at the lower side of the positioning frame 604. A plurality of support columns 608 are fixedly connected to the bottom of the positioning frame 604 at equal intervals, and a mounting plate 609 is fixedly connected between the bottoms of the plurality of support columns 608, and a universal wheel 610 is symmetrically fixedly connected to the bottom of the mounting plate 609. After completing the installation operation of the air conditioner body 702, the second bolt 606 can be taken out by loosening the nut 607. At this time, the positioning frame 604 is separated from the insert block 602. After the positioning frame 604 is removed, the universal wheel 610 can be disassembled and reused.

[0040] like Figure 7 and Figure 8 As shown, the outer surface of the bottom frame 701 is symmetrically provided with side grooves 703, the inner surface of the side groove 703 is symmetrically provided with inner grooves 704, a plurality of first dampers 705 are evenly fixedly connected to the top of the inner side groove 703, the outer surfaces of the plurality of first dampers 705 are sleeved with first springs 706, a stabilizing block 707 is fixedly connected between the lower end surfaces of the plurality of first dampers 705, the outer surface of the stabilizing block 707 is symmetrically fixedly connected with a second slider 708, the inner surface of the inner groove 704 is symmetrically fixedly connected with a first slide rail 709, the outer surface of the second slider 708 is aligned with the inner surface of the first slide rail 709 Sliding connection, when the air conditioner body 702 is unloaded, the air conditioner body 702 is moved by a forklift for unloading. After the forklift is running and the fork plate is inserted into the side groove 703, the air conditioner body 702 is lifted and unloaded to the ground for installation operation. After the fork plate is inserted into the side groove 703, the fork plate is clamped in the side groove 703 by the setting of the stabilizing block 707. The first damper 705 and the first spring 706 are coordinated to provide support for the stabilizing block 707, so that the stabilizing block 707 provides a stable clamping for the fork plate, so that the unloading and moving process of the air conditioner body 702 is relatively stable.

[0041] like Fig. 9 As shown, the magnetic plate 801 is attached to the outer surface of the air-conditioning body 702, and the outer surface of the magnetic plate 801 is fixedly connected to the support plate 802, and the second dampers 809 are fixedly connected at the corners of the outer surface of the support plate 802, and the outer surfaces of multiple second dampers 809 are sleeved with second springs 810, and the end surfaces of multiple second dampers 809 are fixedly connected with a clamping plate 811, and the outer surface of the clamping plate 811 is symmetrically fixedly connected with a second ear plate 812. After the air-conditioning body 702 and the bearing steel plate 3 are installed, the magnetic plate 801 is adsorbed on the outer side of the air-conditioning body 702, and the support plate 802 is set to provide reinforcement support for both sides of the air-conditioning body 702.

[0042] like Fig. 9As shown, the inner surface of the first bracket 803 is rotatably connected to the first support shaft 804, the outer surface of the first support shaft 804 is fixedly connected to the support arm 813, the inner surface of the support arm 813 penetrates and is fixedly connected to the second support shaft 805, the outer surface of the second support shaft 805 is rotatably connected to the second bracket 806, the outer surface of the second bracket 806 is fixedly connected to the fixing plate 807, the outer surface of the fixing plate 807 is symmetrically fixedly connected to the first ear plate 808, the first ear plate 808 is matched with the second ear plate 812, and the support arm 813 can be connected to the second support shaft 804 and the second support shaft 805. By freely rotating and rotating the support arm 813 to move the fixed plate 807 to the position of fitting the clamping plate 811, the fixed plate 807 and the clamping plate 811 are installed and fixed through the cooperation of the first ear plate 808 and the second ear plate 812. After the fixation is completed, the support plates 802 on both sides provide support for the two sides of the air-conditioning body 702. The cooperation of the second damper 809 and the second spring 810 can play a role in buffering and shock absorption, so that the position of the support plate 802 can absorb and buffer the external vibration of the air-conditioning body 702, thereby improving the stability of the installation position of the air-conditioning body 702.

[0043] The use method and working principle of the device are as follows: when transporting and installing the air conditioner body 702, the base frame 701 and the bottom frame body 501 provide support for the air conditioner body 702. The base frame 701, the bottom frame body 501 and the air conditioner body 702 form a complete whole for transportation. After being transported to the destination, the air conditioner body 702 is installed, and the air conditioner body 702 is moved by a forklift to be unloaded. After the forklift is operated to insert the fork plate into the side groove 703, the air conditioner body 702 is lifted and unloaded to the ground for installation. After the fork plate is inserted into the side groove 703, the fork plate is clamped in the side groove 703 by the setting of the stabilizing block 707, and the first damper 705 and the first spring 706 are cooperated to provide support for the stabilizing block 707, so that the stabilizing block 707 is stabilized. The block 707 provides a stable clamp for the fork plate, so that the unloading and moving process of the air-conditioning body 702 is relatively stable. After the air-conditioning body 702 is transported to the place and unloaded, the support column 608 is set to provide support for the mounting plate 609, so that the universal wheel 610 is close to the ground to provide support for the bottom frame body 501. With the setting of the universal wheel 610 at the bottom support, the air-conditioning body 702 can be directly pushed for installation operation. After the air-conditioning body 702 is pushed toward the direction of the bearing steel plate 3, the connecting seat 504 is moved to the outer position of the supporting block 4, and the first sliding block 507 will engage and slide with the second sliding rail 10, which plays a role of supporting and limiting the moving trajectory of the connecting seat 504, so as to prevent the bottom frame body 501 from tilting as a whole and causing the air-conditioning body 702 to fall and be damaged. When the connecting seat 504 moves on the outside of the supporting block 4, the support of the roller 506 can reduce the friction force, making it easier for the staff to push the air conditioner body 702 to move during the installation operation, thereby improving the convenience of the installation operation. At the same time, there is no need to cooperate with the lifting equipment for overhead installation, which effectively saves the installation cost. The setting of the mounting block 12 can make the fixed position of the mounting block 12 more stable. At the same time, the coordination setting of the stabilizing rod 13 and the mounting block 12 can serve as a reinforcing support for the mounting block 12. After the air conditioner body 702 and the mounting block 12 are fixedly installed, the stability of the installation of the air conditioner body 702 can be improved. The coordination setting of the stabilizing rod 13, the stabilizing plate 14 and the inclined plate 15 can be used to stabilize the mounting block 12. The fixed position of the mounting block 12 plays a further reinforcing role, thereby further improving the stability of the installation position of the air-conditioning body 702. After the air-conditioning body 702 is pushed to the upper position of the mounting block 12, the first bolt 503 is inserted from the position of the insertion hole 502. After the first bolt 503 is inserted into the insertion hole 502, it will be inside the threaded hole 16. At this time, the first bolt 503 is tightened to lock and fix the bottom frame body 501 and the mounting block 12, completing the fixed installation operation of the air-conditioning body 702. After completing the installation operation of the air-conditioning body 702, the second bolt 606 can be taken out by loosening the nut 607. At this time, the positioning frame 604 is separated from the insertion block 602. After the positioning frame 604 is removed, the universal wheel 610 can be disassembled and reused.After the air conditioner body 702 and the bearing steel plate 3 are installed, the magnetic plate 801 is adsorbed on the outer side of the air conditioner body 702, and the support plate 802 is set to provide reinforcement support for both sides of the air conditioner body 702. After the support arm 813 is rotated to move the fixing plate 807 to the position of the fitting clamping plate 811, the fixing plate 807 and the clamping plate 811 are installed and fixed. After the fixing is completed, the support plates 802 on both sides provide support for both sides of the air conditioner body 702. The second damper 809 and the second spring 810 are used in combination to play a role in buffering and shock absorption, so that the support plate 802 position can absorb and buffer the external vibration of the air conditioner body 702, thereby improving the stability of the installation position of the air conditioner body 702.

[0044] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A combined positioning and installation structure for HVAC, characterized in that: include: A plurality of cement-based piers (1), each of the plurality of cement-based piers (1) being fixedly connected to a fixed steel plate (2) at its top, a bearing steel plate (3) being fixedly connected between the tops of the plurality of fixing steel plates (2), and a support block (4) being symmetrically fixedly connected to the top of the bearing steel plate (3); A bottom frame assembly (5), the bottom frame assembly (5) is fixedly connected to the top of the bearing steel plate (3), the bottom frame assembly (5) comprises a bottom frame body (501), a connecting seat (504) is symmetrically fixedly connected to the bottom of the bottom frame body (501), a plurality of support rods (505) are equidistantly rotatably connected to the inner surface of the connecting seat (504), and a plurality of support rods (505) are fixedly connected to the outer surfaces of the plurality of support rods (505); A movable assembly (6), wherein the number of the movable assembly (6) is set to two, and the two movable assemblies (6) are symmetrically fixedly connected to the outer surface of the bottom frame body (501), and the movable assembly (6) comprises a side frame (601) and a positioning frame (604); A machine body component (7), the machine body component (7) being fixedly connected to the top of the bottom frame body (501), the machine body component (7) comprising a bottom frame (701), the top of the bottom frame (701) being fixedly connected to an air conditioner body (702); A support assembly (8), wherein the number of the support assemblies (8) is set to two, and the two support assemblies (8) are symmetrically fixedly connected to the top of the bottom frame body (501), and the support assembly (8) comprises a magnetic attraction plate (801) and a first bracket (803).

2. The HVAC combined positioning and installation structure according to claim 1, characterized in that: The outer surfaces of both sides of the support block (4) are provided with limiting grooves (9), the inner surfaces of the limiting grooves (9) are fixedly connected to the second slide rails (10), the inner surface of the connecting seat (504) is symmetrically fixedly connected to the first sliding block (507), the first sliding block (507) is located at the lower side of the roller (506), and the outer surface of the first sliding block (507) is slidably connected to the inner surface of the second slide rail (10).

3. The HVAC combined positioning and installation structure according to claim 1, characterized in that: A through hole (11) is provided at the top of the bearing steel plate (3) and passes through the fixed steel plate (2) and the cement foundation pier (1); a mounting block (12) is symmetrically fixedly connected to the top of the bearing steel plate (3) near the through hole (11); and a stabilizing rod (13) is symmetrically fixedly connected to the bottom of the mounting block (12).

4. The HVAC combined positioning and installation structure according to claim 3, characterized in that: The stabilizing rod (13) penetrates the bearing steel plate (3) and extends to the lower side; a stabilizing plate (14) is fixedly connected between the end faces of the two stabilizing rods (13); a plurality of inclined plates (15) are fixedly connected to the bottom of the stabilizing plate (14) at equal intervals; and the inclined plates (15) are fixedly connected to the cement-based pier (1).

5. The HVAC combined positioning and installation structure according to claim 3, characterized in that: The top of the mounting block (12) is symmetrically provided with threaded holes (16); the top corners of the bottom frame body (501) are provided with insertion holes (502); the inner surfaces of the insertion holes (502) are provided with first bolts (503); the positions of the insertion holes (502) and the threaded holes (16) are matched; the outer surface of the first bolts (503) are threadedly connected with the inner surface of the threaded holes (16).

6. The HVAC combined positioning and installation structure according to claim 1, characterized in that: The outer surface of the side frame (601) is fixedly connected with an insert block (602), the outer surface of the positioning frame (604) is provided with a slot (605), the outer surface of the insert block (602) is plugged into the inner surface of the slot (605), and the tops of the insert block (602) and the positioning frame (604) are symmetrically provided with positioning holes (603).

7. The HVAC combined positioning and installation structure according to claim 6, characterized in that: A second bolt (606) is inserted into the inner surface of the positioning hole (603), and a nut (607) is threadedly connected to the outer surface of the second bolt (606). The nut (607) is located at the lower side of the positioning frame (604). A plurality of support columns (608) are fixedly connected at equal intervals to the bottom of the positioning frame (604), and a mounting plate (609) is fixedly connected between the bottoms of the plurality of support columns (608). A universal wheel (610) is symmetrically fixedly connected to the bottom of the mounting plate (609).

8. The HVAC combined positioning and installation structure according to claim 1, characterized in that: The outer surface of the base frame (701) is symmetrically provided with side grooves (703), the inner surface of the side groove (703) is symmetrically provided with inner grooves (704), a plurality of first dampers (705) are evenly fixedly connected to the top of the inner side groove (703), the outer surfaces of the plurality of first dampers (705) are sleeved with first springs (706), a stabilizing block (707) is fixedly connected between the lower end surfaces of the plurality of first dampers (705), the outer surface of the stabilizing block (707) is symmetrically fixedly connected with a second sliding block (708), the inner surface of the inner groove (704) is symmetrically fixedly connected with a first slide rail (709), and the outer surface of the second sliding block (708) is slidably connected to the inner surface of the first slide rail (709).

9. The HVAC combined positioning and installation structure according to claim 1, characterized in that: The magnetic attraction plate (801) is attached to the outer surface of the air conditioner body (702), the outer surface of the magnetic attraction plate (801) is fixedly connected to a support plate (802), the outer corners of the outer surface of the support plate (802) are fixedly connected to second dampers (809), the outer surfaces of multiple second dampers (809) are sleeved with second springs (810), the end surfaces of multiple second dampers (809) are fixedly connected with a clamping plate (811), and the outer surface of the clamping plate (811) is symmetrically fixedly connected with a second ear plate (812).

10. The HVAC combined positioning and installation structure according to claim 9, characterized in that: The inner surface of the first bracket (803) is rotatably connected to the first support shaft (804), the outer surface of the first support shaft (804) is fixedly connected to the support arm (813), the inner surface of the support arm (813) is penetrated and fixedly connected to the second support shaft (805), the outer surface of the second support shaft (805) is rotatably connected to the second bracket (806), the outer surface of the second bracket (806) is fixedly connected to the fixing plate (807), the outer surface of the fixing plate (807) is symmetrically fixedly connected to the first ear plate (808), and the first ear plate (808) and the second ear plate (812) are positioned in coordination with each other.