Refrigerant filling and discharging device for refrigeration equipment
By designing a refrigerant charging and discharging device for refrigeration equipment and utilizing a combination of a recycling filter tank and a conveying tank, the efficient filtration, purification, and recycling of refrigerant are achieved. This solves the problem of refrigerant contamination during use and improves the operating efficiency and resource utilization of refrigeration equipment.
Patent Information
- Application Number
- CN202411399194.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-10-09
AI Technical Summary
During the operation of existing refrigeration machines, the refrigerant will undergo an oxidation reaction with metals and water over time to produce sludge and impurities. This results in the refrigerant containing impurities, making it impossible to directly recycle and reuse it. It needs to be treated before it can be used.
A refrigerant charging and discharging device for refrigeration equipment was designed, including a recycling filter tank and a conveying tank. The device achieves the filtration, purification and recycling of refrigerant through a pump and a diversion valve, compresses and transports the refrigerant through a compression chamber, and controls the transmission of refrigerant by combining a pressurizing component and a diversion valve.
It achieves efficient refrigerant recovery and purification, improves refrigerant recycling rate, saves resources, and improves the operating efficiency of refrigeration equipment.
Smart Images

Figure CN118912760A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of refrigerant charging, and in particular to a refrigerant charging and discharging device for refrigeration equipment. Background Art
[0002] A refrigerator is a machine that transfers the heat of a cooled object with a lower temperature to the ambient medium to obtain cooling capacity. The heat transferred from the lower temperature object is usually called cooling capacity. The working fluid that participates in the thermodynamic process changes (energy conversion and heat transfer) in the refrigerator is called refrigerant. The refrigeration temperature range is usually above 120K, and below 120K belongs to the deep low temperature technology range. Refrigerator is widely used in industrial and agricultural production and daily life. Refrigerant recovery and filling machines can recycle the refrigerant in the refrigerator into the equipment, and after purification, it can meet the standards for reuse. The refrigerant in the refrigerator also has a certain use cycle. When the two substances do not meet the use standards, they need to be maintained and replaced.
[0003] Existing refrigerators are often filled with refrigerant through filling equipment. As the refrigerant is used for a long time, it undergoes oxidation reaction with metals and water in the system to generate sludge and impurities. When some parts in the refrigerator are damaged, a large amount of impurities will also be generated, so that the discharged refrigerant contains impurities and needs to be processed before it can be reused. In order to address the deficiencies of the prior art, we propose a refrigerant filling and discharging device for refrigeration equipment. Summary of the invention
[0004] The main purpose of the present invention is to provide a refrigerant charging and discharging device for refrigeration equipment, which can effectively solve the problems in the background technology.
[0005] To achieve the above object, the technical solution adopted by the present invention is: A refrigerant filling and discharging device for refrigeration equipment comprises a device box, an outer surface of one side of the device box is provided with a feed trough, and an outer surface of the other side of the device box is provided with a heat dissipation port, a bottom warehouse body is provided on the outer surface of the lower end of the device box, a No. 1 support plate is provided on the outer surface of the upper end of the bottom warehouse body, a recovery filter barrel is provided on the outer surface of the upper end of the No. 1 support plate, and the recovery filter barrel is located inside the device box, a suction pump is provided on the outer surface of the upper end of the recovery filter barrel, and a No. 1 pressure gauge is provided on the outer surface of the suction pump, a mounting sleeve is provided on the outer surface of the lower end of the suction pump, and a fixed pipe body is provided on the outer surface of the lower end of the mounting sleeve, and the fixed pipe body extends into the recovery filter barrel, a filter pipe is provided on the outer surface of the lower end of the recovery filter barrel, a filter screen is provided inside the filter pipe, a mounting bracket is provided on the outer wall of the filter screen, the mounting bracket is attached to the inner wall of the filter pipe, and the upper surface of the filter screen A leak-proof plug is provided on the surface, and the leak-proof plug is connected to the fixed pipe body. A No. 2 support plate is provided on the outer surface of the upper end of the bottom warehouse body, and a compression warehouse is provided on the outer surface of the upper end of the No. 2 support plate. A feeding pipe is provided on the outer surface of the compression warehouse, and the feeding pipe is connected with the feeding trough. A delivery barrel is provided on the outer surface of the upper end of the compression warehouse, and a No. 2 pressure gauge is provided on the outer surface of the delivery barrel. A barrel cover is provided on the outer surface of the barrel cover, and a diverter pipe is provided on the outer surface of the suction pump. A diverter valve is provided between the two groups of diverter pipes, and an adjusting pile is provided on the outer surface of the lower end of the diverter valve. An adjusting shaft is provided on the outer surface of the lower end of the adjusting pile, and a knob is provided on the outer surface of the adjusting shaft. A connecting rod is provided on the outer surface of the upper end of the adjusting shaft, and the connecting rod is connected to the inside of the adjusting pile. A ball valve body is provided on the outer surface of the upper end of the connecting rod, and the ball valve body is placed inside the diverter valve.
[0006] Preferably, an installation groove is provided inside the bottom warehouse body, and a No. 1 connecting pipe port and a No. 2 connecting pipe port are respectively provided inside the installation groove, a drawing valve is provided at the lower end of the recovery filter material barrel, and a discharge valve is provided at the lower end of the delivery barrel, and the drawing valve and the discharge valve are both placed inside the bottom warehouse body, and a hose is provided on the outer surface of the drawing valve, and a hose is also provided on the outer surface of the discharge valve, wherein the hose installed on the drawing valve side is connected to the No. 1 connecting pipe port, and the hose connected on the discharge valve side is connected to the No. 2 connecting pipe port, a refrigeration equipment silo is provided at the front end of the device box body, and the No. 1 connecting pipe port and the No. 2 connecting pipe port are both connected to the refrigeration equipment silo, a connecting port is provided on the outer surface of the upper end of the refrigeration equipment silo, a silo door is provided on the outer surface of the front end of the refrigeration equipment silo, and heat dissipation grooves are respectively provided on the outer surfaces of both sides of the refrigeration equipment silo.
[0007] Preferably, a support frame is provided on the side of the device box, and a No. 1 pressure pipe is provided on the outer surface of the upper end of the support frame. The No. 1 pressure pipe is connected to the interior of the bottom warehouse and is connected to the extraction valve. A No. 2 pressure pipe is provided on the outer surface of the upper end of the No. 1 pressure pipe, and a control component is provided on the outer surface of the No. 2 pressure pipe. A connecting pipe is provided at the tail end of the No. 1 pressure pipe, and the connecting pipe is connected to the No. 2 pressure pipe.
[0008] Preferably, a material storage barrel is provided on the side of the device box body, a drainage faucet is provided on the outer surface of the front end of the material storage barrel, a discharge valve is provided on the outer surface of the upper end of the drainage faucet, a connecting pipe mouth is provided on the outer surface of the upper end of the material storage barrel, a material delivery pipeline is provided on the top of the connecting pipe mouth, a control valve is provided on the outer surface of the material delivery pipeline, the end of the material delivery pipeline is connected to the feed trough, an exhaust pipe mouth is provided on the top of the material storage barrel, a liquid level gauge is provided on the side of the material storage barrel, two groups of connecting flanges are provided on the outer surface of the liquid level gauge, and the two groups of connecting flanges are connected to the outer surface of the material storage barrel.
[0009] Preferably, four groups of warning light groups are provided on the outer surface of the device box body, two groups of circuit interfaces are provided at the lower ends of the four groups of warning light groups, an operation panel is provided on the outer surface of the device box body, a front box cover is provided on the outer surface of the front end of the device box body, and buckles are provided on the outer surfaces of both sides of the front box cover.
[0010] Preferably, a No. 1 pallet is provided between the recovery filter material barrel and the bottom warehouse body, and the recovery filter material barrel and the bottom warehouse body are detachably connected through the No. 1 pallet. A support rod is provided between the feed barrel and the No. 2 pallet, and the feed barrel and the No. 2 pallet are detachably connected through the support rod.
[0011] Preferably, a fixed tube body is arranged between the filter material tube and the mounting sleeve, and the filter material tube and the mounting sleeve are detachably connected through the fixed tube body; a mounting sleeve is arranged between the fixed tube body and the material pump, and the fixed tube body and the material pump are detachably connected through the mounting sleeve; a mounting bracket is arranged between the filter screen and the filter material tube, and the filter screen and the filter material tube are detachably connected through the mounting bracket.
[0012] Preferably, a diverter valve is arranged between the two groups of diverter tubes, and the two groups of diverter tubes are detachably connected through the diverter valve. An adjusting pile is arranged between the adjusting shaft and the diverter valve, and the adjusting shaft and the diverter valve are detachably connected through the adjusting pile. A connecting rod is arranged between the adjusting shaft and the ball valve body, and the adjusting shaft and the ball valve body are detachably connected through the connecting rod.
[0013] Preferably, a connecting groove is provided between the No. 1 pressurizing pipe and the drawing valve, and the No. 1 pressurizing pipe and the drawing valve are detachably connected via the connecting groove; a hose is provided between the drawing valve and the No. 1 connecting pipe port, and the drawing valve and the No. 1 connecting pipe port are detachably connected via the hose; a hose is provided between the discharge valve and the No. 2 connecting pipe port, and the discharge valve and the No. 2 connecting pipe port are detachably connected via the hose; a material delivery pipe is provided between the No. 1 connecting pipe port and the refrigeration equipment silo, and the No. 1 connecting pipe port and the refrigeration equipment silo are detachably connected via the material delivery pipe.
[0014] Preferably, a connecting flange is provided between the storage barrel and the liquid level gauge, and the storage barrel and the liquid level gauge are detachably connected via the connecting flange; a connecting pipe mouth is provided between the storage barrel and the material delivery pipeline, and the storage barrel and the material delivery pipeline are detachably connected via the connecting pipe mouth; a feed trough is provided between the material delivery pipeline and the device box, and the material delivery pipeline and the device box are detachably connected via the feed trough; a feed pipe is provided between the material delivery pipeline and the compression bin, and the material delivery pipeline and the compression bin are detachably connected via the feed pipe.
[0015] Beneficial Effects Compared with the prior art, the present invention has the following beneficial effects: 1. In the present invention, the feed barrel and the recovery filter barrel are provided to realize the function of refrigerant recovery and filling of the refrigerator. The two groups of through pipe openings are used to connect the refrigeration equipment silo. The connecting pipe openings are connected with the extraction valve and the discharge valve to respectively play the role of filling the refrigerant and recovering the refrigerant. The recovered refrigerant is sent to the inside of the recovery filter barrel. After filtering and purification, the usable refrigerant is re-delivered to the feed barrel to recycle the refrigerant, saving resources.
[0016] 2. In the present invention, a diverter valve is provided to control the transmission of refrigerant between the recovery filter barrel and the delivery barrel. The extraction pump can extract the refrigerant recovered in the recovery filter barrel. During the extraction process, the refrigerant is filtered by the filter tube. The filtered refrigerant is transmitted through the diverter tube, and the diverter valve refills the purified refrigerant into the delivery barrel, so that the refrigerant recovery process of the device is smoother and the operation efficiency of the device is improved.
[0017] 3. In the present invention, the refrigerant in the feed barrel is compressed by the compression bin, and then transported to the refrigeration equipment silo by using the discharge valve and the No. 2 connecting pipe port. In addition to being recovered by using the recovery filter barrel, the refrigerant in the feed barrel can also be directly injected into it through the storage barrel. The storage barrel is connected to the feed trough through the feed pipeline, and the compression bin can be fed by connecting the feed pipeline with the feed pipe. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the connection structure between the material storage barrel and the device box of the present invention; Figure 3 It is a schematic diagram of the structure of the filter material recovery barrel of the present invention; Figure 4 It is a schematic diagram of the filter material tube structure of the present invention; Figure 5 It is a schematic diagram of the filter structure of the present invention; Figure 6 It is a schematic diagram of the structure of the material storage barrel of the present invention; Figure 7 It is a schematic diagram of the refrigeration equipment silo structure of the present invention; Figure 8 It is a schematic diagram of the connection structure between the filter material recovery barrel and the material delivery barrel of the present invention; Fig. 9 It is a schematic diagram of the structure of the pressurized pipe of the present invention; Fig.10 It is a schematic diagram of the structure of the diverter valve of the present invention; Fig.11 It is a schematic diagram of the ball valve body structure of the present invention.
[0019] In the figure: 1. Device box; 2. Heat dissipation port; 3. Front box cover; 4. Buckle; 5. Bottom bin; 6. Warning light group; 7. Circuit interface; 8. Operation panel; 9. Feed pipeline; 10. Control valve; 11. Storage barrel; 12. Exhaust pipe port; 13. Connecting pipe port; 14. Base; 15. Drain faucet; 16. Discharge valve; 17. Connecting flange; 18. Refrigeration equipment silo; 19. Heat dissipation slot; 20. Bin door; 21. Connecting port; 22. Support frame; 23. Control assembly; 24. No. 1 pressurized pipe; 25. No. 2 pressurized pipe; 26. Connecting pipe; 27. Liquid level meter; 28. Feed trough; 29. Installation slot ;30. No. 1 connecting pipe port;31. No. 2 connecting pipe port;32. Recover filter material barrel;33. No. 1 support plate;34. Extraction pump;35. No. 1 pressure gauge;36. Feed barrel;37. Extraction valve;38. Filter material pipe;39. Fixed pipe body;40. Mounting sleeve;41. Leakage plug;42. Filter screen;43. Mounting frame;44. Diverter valve;45. Adjusting pile;46. Barrel cover;47. No. 2 pressure gauge;48. Compression chamber;49. Feed pipe;50. No. 2 support plate;51. Discharge valve;52. Hose;53. Adjusting shaft;54. Knob;55. Connecting rod;56. Ball valve body;57. Diverter pipe. DETAILED DESCRIPTION
[0020] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0021] like Figure 2 As shown, a refrigerant charging and discharging device for refrigeration equipment, Figure 2 The figure is an internal structure diagram of the device box 1 of the device and a specific structure diagram of the storage barrel 11. In the figure, the storage barrel 11 is connected to the device box 1 through a material delivery pipeline 9. The lower end of the device box 1 is a bottom warehouse 5. The installation groove 29 inside the bottom warehouse 5 is provided with a first connection pipe port 30 and a second connection pipe port 31. The device box 1 uses the second connection pipe port 31 to charge the refrigeration equipment, and the first connection pipe port 30 is used to recover the residual refrigerant inside the refrigeration equipment. A feed barrel 36 and a recovery filter barrel 32 are provided. The feed barrel 36 is used to store refrigerant and coolant. A compression chamber 48 is provided at its lower end for compressing the refrigerant in the feed barrel 36 so as to charge the refrigerant. The recovery filter barrel 32 is used for storing the refrigerant recovered by the storage device. After being cleaned and purified by the filter assembly, the refrigerant is reintroduced into the feed barrel 36 to realize the recycling of part of the refrigerant. In addition to being recycled by the recovery filter barrel 32, the refrigerant in the feed barrel 36 can also be recycled by the storage barrel 11. It is directly injected, and the feed pipe 9 is connected to the feed trough 28 outside the device box 1. By connecting the feed pipe 49 installed on the outer surface of the compression bin 48 with the feed pipe 9, the refrigerant raw material in the storage barrel 11 can be transported to the compression bin 48 to carry out the feeding process. The outer wall of the lower bin 48 is installed with a liquid level meter 27. The liquid level display function of the liquid level meter 27 can monitor the amount of raw materials inside the storage barrel 11 to reasonably control the delivery of the refrigerant. The connecting pipe 13 and the feed pipe 9 are detachable structures. If it is not needed, To fill the material storage barrel 11, the connection between the material delivery pipe 9 and the connecting pipe mouth 13 can be removed. At this time, the material storage barrel 11 can be refilled with raw materials through the connecting pipe mouth 13, and the connecting pipe mouth 13 can be sealed immediately. Due to the closed structure of the material storage barrel 11, the raw materials can be stored in the material storage barrel 11 for a period of time, which is convenient for subsequent use. If the raw materials in the material storage barrel 11 are not used for a long time, the raw materials stored in the material storage barrel 11 can also be discharged and recycled through the drain tap 15, thereby avoiding waste of resources and saving time for raw material recycling.
[0022] like Figure 1 and Figure 8As shown, a refrigerant filling and discharging device for refrigeration equipment, the bottom of the recovery filter barrel 32 and the feed barrel 36 are respectively provided with a suction valve 37 and a discharge valve 51, and the two sets of connecting pipe ports are respectively connected to the suction valve 37 and the discharge valve 51 through a hose 52, and the No. 1 connecting pipe port 30 and the No. 2 connecting pipe port 31 are connected to the refrigeration equipment silo 18 through a conveying pipeline, so that the device box body 1 can control the filling and recovery of the refrigerant. When the refrigerant is recovered, the refrigerant remaining in the refrigeration equipment silo 18 can be extracted through the suction valve 37. A pressurizing component is provided on the outside of the device box body 1, and the suction valve 37 inside the bottom silo 5 is connected through a No. 1 pressurizing pipe 24 to improve the suction effect of the suction valve 37, so that the recovery effect is more thorough, and the refrigerant is pumped to the recovery filter barrel 3 through the suction valve 37. 2 is temporarily stored inside, and the feeding barrel 36 sends the new refrigerant stored inside into the compression bin 48 for compression. The compressed refrigerant is discharged through the discharge valve 51, and the No. 2 connecting pipe port 31 is used to realize the filling of the raw materials of the refrigeration equipment silo 18. When the feeding barrel 36 is in the process of feeding operation, the extraction pump 34 on the top of the recovery filter barrel 32 can extract the refrigerant recovered in the recovery filter barrel 32 and filter it at the same time. The filtered refrigerant is transmitted through the shunt pipe 57, passes through the shunt valve 44, and the rotating adjustment shaft 53 can drive the ball valve body 56 in the shunt valve 44 to rotate, so as to realize the opening and closing of the valve. The shunt valve 44 refills the purified refrigerant into the feeding barrel 36 to realize the recycling of the refrigerant, save resources, and improve the operation efficiency of the device.
[0023] like Figure 3-Figure 5 As shown, a refrigerant charging and discharging device for refrigeration equipment, Figure 3 It is a specific structural diagram of the device recovery filter material barrel 32, wherein Figure 4 and Figure 5This is a structural diagram of the internal filtering component of the recovery filter barrel 32. The recovered refrigerant extracted by the extraction valve 37 is transported to the recovery filter barrel 32 for storage. When it is needed, the bottom of the extraction pump 34 is connected to a filter pipe 38. The extraction pump 34 can control the filter pipe 38 to suck the refrigerant in the recovery filter barrel 32. During the extraction process, the filter pipe 38 is used to filter the refrigerant. A filter screen 42 is provided inside the filter pipe 38, wherein a mounting frame 43 is installed on the outside of the filter screen 42. The filter screen 42 can be supported and fixed by the mounting frame 43. At the same time, the mounting frame 43 can be used to install the filter screen 42 on the inner wall of the filter pipe 38. The extracted refrigerant passes through the filter pipe 38 and is fully filtered by the internal filter screen 42 before it can be put into recycling. The filter screen 42 needs to be replaced and cleaned after long-term use. The suction pump 34 and the recovery filter material barrel 32 are detachable structures. The suction pump 34 can be installed on the top of the recovery filter material barrel 32 through the installation sleeve 40, and the filter material pipe 38 at the bottom of the suction pump 34 is connected and fixed to the installation sleeve 40 through the fixed tube body 39. The connection between the suction pump 34 and the diversion pipe 57 is disassembled, and the suction pump 34 and the filter material pipe 38 can be removed by disassembling the installation sleeve 40. The fixed tube body 39 and the filter material pipe 38 can also be disassembled. When the fixed tube body 39 is removed, the anti-leakage plug 41 is pulled out, and the filter screen 42 inside the filter material pipe 38 can be taken out together with the mounting frame 43, so that the filter screen 42 can be cleaned and replaced, making the use of the device more convenient.
[0024] like Figure 1-Figure 11As shown, a refrigerant filling and discharging device for refrigeration equipment, the device can be used to fill the refrigerator with refrigerant and discharge the residual refrigerant in the refrigerator. When in use, the No. 1 connecting pipe port 30 and the No. 2 connecting pipe port 31 inside the bottom warehouse body 5 are connected to the refrigeration equipment silo 18, so that the refrigerator is filled with raw materials and discharged through the control of the device box body 1. A feed barrel 36 and a recovery filter barrel 32 are respectively arranged inside the device box body 1. The feed barrel 36 is used to store refrigerant and coolant. A compression bin 48 is arranged at its lower end for compressing the refrigerant in the feed barrel 36 so that the refrigerant can be charged. The raw material inside the feed barrel 36 is filled with the storage barrel 11, and the feed pipeline 9 is connected to the outside of the device box body 1. The feed trough 28 on the side is connected, and the refrigerant raw material in the storage barrel 11 can be transported to the compression bin 48 by docking the feed pipe 49 installed on the outer surface of the compression bin 48 with the feed pipe 9 to carry out the feeding process. The outer wall of the lower bin 48 is installed with a liquid level meter 27. The liquid level display function of the liquid level meter 27 can monitor the amount of raw materials inside the storage barrel 11. The connecting pipe 13 and the feed pipe 9 are detachable structures. If the storage barrel 11 is not needed to be charged, the connection between the feed pipe 9 and the connecting pipe 13 can be removed. At this time, the raw material can be refilled into the storage barrel 11 through the connecting pipe 13. At the same time, the device has the function of recovering the residual refrigerant in the refrigerator. The refrigeration equipment can be connected to the No. 1 connecting pipe 30 connected to the extraction valve 37. The refrigerant remaining in the silo 18 is extracted, and a pressurizing component is arranged on the outside of the device box 1, and a suction valve 37 inside the bottom silo 5 is connected through a No. 1 pressurizing pipe 24 to improve the suction effect of the suction valve 37, so as to make the recovery effect more thorough. The refrigerant is pumped into the recovery filter barrel 32 through the suction valve 37 for temporary storage, and the feed barrel 36 sends the new refrigerant stored inside into the compression bin 48 for compression. The compressed refrigerant is discharged through the discharge valve 51, and the No. 2 connecting pipe port 31 is used to realize the filling of raw materials in the refrigeration equipment silo 18. When the feed barrel 36 is in the process of feeding operation, the suction pump 34 on the top of the recovery filter barrel 32 can extract the refrigerant recovered in the recovery filter barrel 32 and filter it at the same time, and the filtration is completed. The refrigerant is transmitted through the shunt pipe 57 and passes through the shunt valve 44. The staff can open the front box cover 3 and rotate the adjusting shaft 53 to drive the ball valve body 56 in the shunt valve 44 to rotate, so as to realize the opening and closing of the valve. The shunt valve 44 refills the purified refrigerant into the feed barrel 36 to realize the recycling of the refrigerant. The filter screen 42 inside the filter tube 38 needs to be replaced and cleaned after long-term use. The extraction pump 34 can be installed on the top of the recovery filter barrel 32 through the installation sleeve 40, and the filter tube 38 at the bottom of the extraction pump 34 is connected and fixed to the installation sleeve 40 through the fixed tube body 39. The extraction pump 34 and the filter tube 38 can be removed by disassembling the installation sleeve 40, and the fixed tube body 39 is removed at the same time, and the anti-leakage plug 41 is pulled out.The filter screen 42 inside the filter material pipe 38 can be taken out together with the mounting frame 43, so as to clean and replace the filter screen 42. The refrigerant filling can be completed by using the recovery filter material barrel 32 and the feed barrel 36 in the device box 1. The refrigerant discharged from the refrigeration equipment silo 18 can be cleaned and reused by using the recovery component.
[0025] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A refrigerant charging and discharging device for refrigeration equipment, comprising a device housing (1), characterized in that: A feed trough (28) is provided on the outer surface of one side of the device case (1), a heat dissipation port (2) is provided on the outer surface of the other side of the device case (1), a bottom bin (5) is provided on the outer surface of the lower end of the device case (1), a No. 1 support plate (33) is provided on the outer surface of the upper end of the bottom bin (5), a recovery filter material barrel (32) is provided on the outer surface of the upper end of the No. 1 support plate (33), the recovery filter material barrel (32) is located inside the device case (1), a material extraction pump (34) is provided on the outer surface of the upper end of the recovery filter material barrel (32), a No. 1 pressure gauge (35) is provided on the outer surface of the material extraction pump (34), and the recovery filter material barrel (32) is provided on the outer surface of the recovery filter material barrel (32). The outer surface of the lower end of the material pump (34) is provided with a mounting sleeve (40), the outer surface of the lower end of the mounting sleeve (40) is provided with a fixed tube body (39), the fixed tube body (39) extends into the interior of the recovery filter material barrel (32), the outer surface of the lower end of the recovery filter material barrel (32) is provided with a filter material pipe (38), the interior of the filter material pipe (38) is provided with a filter screen (42), the outer wall of the filter screen (42) is provided with a mounting frame (43), the mounting frame (43) is attached to the inner wall of the filter material pipe (38), the upper end of the filter screen (42) is provided with a leak-proof plug (41), the leak-proof plug (41) is connected to the fixed tube body ( The bottom bin body (5) is connected to the feed trough (28), the upper outer surface of the bottom bin body (5) is provided with a No. 2 support plate (50), the upper outer surface of the No. 2 support plate (50) is provided with a compression bin (48), the outer surface of the compression bin (48) is provided with a feed pipe (49), the feed pipe (49) is connected to the feed trough (28), the upper outer surface of the compression bin (48) is provided with a feed barrel (36), the outer surface of the feed barrel (36) is provided with a No. 2 pressure gauge (47), the upper outer surface of the fixed pipe body (39) is provided with a barrel cover (46), the outer surface of the barrel cover (46) is provided with a shunt pipe (57), the extraction pump (34) A diverter tube (57) is also provided on the outer surface, a diverter valve (44) is provided between the two groups of diverter tubes (57), an adjustment pile (45) is provided on the outer surface of the lower end of the diverter valve (44), an adjustment shaft (53) is provided on the outer surface of the lower end of the adjustment pile (45), a knob (54) is provided on the outer surface of the adjustment shaft (53), a connecting rod (55) is provided on the outer surface of the upper end of the adjustment shaft (53), the connecting rod (55) is connected to the inside of the adjustment pile (45), a ball valve body (56) is provided on the outer surface of the upper end of the connecting rod (55), and the ball valve body (56) is placed inside the diverter valve (44).
2. The refrigerant charging and discharging device for refrigeration equipment according to claim 1, characterized in that: The bottom bin body (5) is provided with a mounting groove (29) inside, and a No. 1 connecting pipe port (30) and a No. 2 connecting pipe port (31) are respectively provided inside the mounting groove (29). A material extraction valve (37) is provided at the lower end of the recovery filter material barrel (32), and a material discharge valve (51) is provided at the lower end of the delivery barrel (36). Both the material extraction valve (37) and the material discharge valve (51) are arranged inside the bottom bin body (5). A hose (52) is provided on the outer surface of the material extraction valve (37), and a hose (52) is also provided on the outer surface of the material discharge valve (51). The hose installed on the side of the material extraction valve (37) is (52) is connected to the No. 1 connecting pipe port (30), and the hose (52) connected to the discharge valve (51) side is connected to the No. 2 connecting pipe port (31). A refrigeration equipment silo (18) is arranged at the front end of the device housing (1), and the No. 1 connecting pipe port (30) and the No. 2 connecting pipe port (31) are both connected to the refrigeration equipment silo (18). A connecting port (21) is arranged on the upper outer surface of the refrigeration equipment silo (18), and a silo door (20) is arranged on the front outer surface of the refrigeration equipment silo (18). Heat dissipation grooves (19) are respectively arranged on the outer surfaces of both sides of the refrigeration equipment silo (18).
3. The refrigerant charging and discharging device for refrigeration equipment according to claim 2, characterized in that: A support frame (22) is arranged on the side of the device box (1), and a No. 1 pressure pipe (24) is arranged on the outer surface of the upper end of the support frame (22), and the No. 1 pressure pipe (24) is connected to the interior of the bottom bin (5) and is connected to the extraction valve (37). A No. 2 pressure pipe (25) is arranged on the outer surface of the upper end of the No. 1 pressure pipe (24), and a control component (23) is arranged on the outer surface of the No. 2 pressure pipe (25). A connecting pipe (26) is arranged at the tail end of the No. 1 pressure pipe (24), and the connecting pipe (26) is connected to the No. 2 pressure pipe (25).
4. The refrigerant charging and discharging device for refrigeration equipment according to claim 1, characterized in that: A material storage barrel (11) is arranged on the side of the device housing (1), a liquid discharge tap (15) is arranged on the front outer surface of the material storage barrel (11), a discharge valve (16) is arranged on the upper outer surface of the liquid discharge tap (15), a connecting pipe opening (13) is arranged on the upper outer surface of the material storage barrel (11), a material delivery pipeline (9) is arranged at the top of the connecting pipe opening (13), a control valve (10) is arranged on the outer surface of the material delivery pipeline (9), the end of the material delivery pipeline (9) is connected to a feed trough (28), an exhaust pipe opening (12) is arranged on the top of the material storage barrel (11), a liquid level gauge (27) is arranged on the side of the material storage barrel (11), and two groups of connecting flanges (17) are arranged on the outer surface of the liquid level gauge (27), and the two groups of connecting flanges (17) are connected to the outer surface of the material storage barrel (11).
5. The refrigerant charging and discharging device for refrigeration equipment according to claim 1, characterized in that: The outer surface of the device box (1) is provided with four groups of warning light groups (6), and two groups of circuit interfaces (7) are provided at the lower ends of the four groups of warning light groups (6). The outer surface of the device box (1) is provided with an operation panel (8), and the outer surface of the front end of the device box (1) is provided with a front box cover (3), and buckles (4) are provided on the outer surfaces of both sides of the front box cover (3).
6. The refrigerant charging and discharging device for refrigeration equipment according to claim 1, characterized in that: A first support plate (33) is provided between the filter material recovery barrel (32) and the bottom bin body (5), and the filter material recovery barrel (32) and the bottom bin body (5) are detachably connected via the first support plate (33). A support rod is provided between the feed barrel (36) and the second support plate (50), and the feed barrel (36) and the second support plate (50) are detachably connected via the support rod.
7. The refrigerant charging and discharging device for refrigeration equipment according to claim 1, characterized in that: A fixed tube body (39) is provided between the filter material tube (38) and the mounting sleeve (40), and the filter material tube (38) and the mounting sleeve (40) are detachably connected via the fixed tube body (39); a mounting sleeve (40) is provided between the fixed tube body (39) and the material extraction pump (34), and the fixed tube body (39) and the material extraction pump (34) are detachably connected via the mounting sleeve (40); a mounting frame (43) is provided between the filter screen (42) and the filter material tube (38), and the filter screen (42) and the filter material tube (38) are detachably connected via the mounting frame (43).
8. The refrigerant charging and discharging device for refrigeration equipment according to claim 1, characterized in that: A diverter valve (44) is provided between the two groups of diverter pipes (57), and the two groups of diverter pipes (57) are detachably connected via the diverter valve (44); an adjustment pile (45) is provided between the adjustment shaft (53) and the diverter valve (44), and the adjustment shaft (53) and the diverter valve (44) are detachably connected via the adjustment pile (45); a connecting rod (55) is provided between the adjustment shaft (53) and the ball valve body (56), and the adjustment shaft (53) and the ball valve body (56) are detachably connected via the connecting rod (55).
9. The refrigerant charging and discharging device for refrigeration equipment according to claim 3, characterized in that: A connecting groove is provided between the No. 1 pressurizing pipe (24) and the extraction valve (37), and the No. 1 pressurizing pipe (24) and the extraction valve (37) are detachably connected via the connecting groove. A hose (52) is provided between the extraction valve (37) and the No. 1 connecting pipe port (30), and the extraction valve (37) and the No. 1 connecting pipe port (30) are detachably connected via the hose (52). A hose (52) is provided between the discharge valve (51) and the No. 2 connecting pipe port (31), and the discharge valve (51) and the No. 2 connecting pipe port (31) are detachably connected via the hose (52). A material delivery pipe is provided between the No. 1 connecting pipe port (30) and the refrigeration equipment silo (18), and the No. 1 connecting pipe port (30) and the refrigeration equipment silo (18) are detachably connected via the material delivery pipe.
10. The refrigerant charging and discharging device for refrigeration equipment according to claim 4, characterized in that: A connecting flange (17) is provided between the material storage barrel (11) and the liquid level gauge (27), and the material storage barrel (11) and the liquid level gauge (27) are detachably connected via the connecting flange (17); a connecting pipe opening (13) is provided between the material storage barrel (11) and the material delivery pipeline (9), and the material storage barrel (11) and the material delivery pipeline (9) are detachably connected via the connecting pipe opening (13); a feeding trough (28) is provided between the material delivery pipeline (9) and the device housing (1), and the material delivery pipeline (9) and the device housing (1) are detachably connected via the feeding trough (28); a feeding pipe (49) is provided between the material delivery pipeline (9) and the compression bin (48), and the material delivery pipeline (9) and the compression bin (48) are detachably connected via the feeding pipe (49).
Citation Information
Patent Citations
Refrigerant recycling, purifying and regenerating all-in-one machine
CN108469138A
Purifying instrument for refrigerant
CN113237255A
Refrigerant charge device and refrigerant charge system having the same
US20210003332A1
Bypass manifold valve for charging repairing and / or testing refrigerant systems
US5172557A
Refrigerant recovery system and apparatus
US6260372B1
Cited By
Refrigerant charging and discharging device for refrigeration equipment
CN121557641A
A refrigerant charging and discharging device for refrigeration equipment
CN121557641B