Limestone calcining device

By using the top coarse material and side fine material feeding method in the limestone calcining device, combined with the annular blanking pipe and the material pushing mechanism, the problem of fine material blockage on the preheating platform is solved, and sufficient preheating and fine material of the coarse material is achieved The effective use of calcium oxide improves the quality and production efficiency, and reduces energy consumption and production costs.

CN118912897APending Publication Date: 2024-11-08XIANGFEN XINGSHENG BUILDING MATERIALS CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202411176690.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

During the limestone calcination process, the gap between the coarse material particles and the fine material particles on the preheating platform is blocked by the fine material, resulting in poor penetration of hot air, affecting the uniform preheating and decomposition of the raw materials, leading to raw firing and overfiring, and affecting oxidation The quality of calcium.

Method used

A limestone calcining device was designed to separate and preheat the coarse material from the fine material through the feeding of the top coarse material and the side fine material feeding method. The annular blanking pipe and material pushing mechanism ensure that the hot air penetrates, and combines the expansion and contraction and fall. The material pipe and the adjustment mechanism adjust the thickness of the material layer to ensure that the hot air and the coarse material are in full contact, and the fine material slips into the rotary kiln in the second preheating zone for preheating.

Benefits of technology

It improves the preheating effect of crude materials and the quality of calcium oxide, reduces energy losses, improves resource utilization and production efficiency, and saves production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912897A_ABST
    Figure CN118912897A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of limestone calcination, and particularly discloses a limestone calcination device which comprises a rotary kiln and a preheater, a coarse material bin, a first preheating area, a second preheating area and a discharging chute are distributed in the preheater from top to bottom, and a coarse material inlet is formed in the top of the coarse material bin; the coarse material bin is communicated with the first preheating area through a plurality of blanking pipes, a preheating table used for receiving blanking materials is arranged in the second preheating area, the preheater is provided with a material pushing mechanism used for pushing the materials on the preheating table into the discharging chute, and a fine material inlet is formed in the side wall of the preheater in the second preheating area. And the fine material inlet is externally connected with a fine material feeding mechanism. By using the device, the preheating effect of coarse material particles and fine material particles is improved, the coarse material particles and the fine material particles can be decomposed more completely after entering the rotary kiln, the quality of calcium oxide is improved, in the whole production process, the energy loss is reduced, the utilization rate of raw materials and resources and the overall production efficiency are improved, and the production cost is greatly saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of limestone calcining, and particularly relates to a limestone calcining device. Background Art

[0002] When limestone is calcined, it is usually fed uniformly from the top of the preheater. The limestone raw materials are transported to the preheating platform of the preheating chamber through a drop pipe, and then the preheated raw materials are pushed out by a pushing mechanism, so that the raw materials enter the rotary kiln for calcination. However, during the preheating process, the limestone raw materials will accumulate on the preheating platform, and the gaps formed by the coarse particles will be blocked by the fine particles, resulting in the inability of hot air to penetrate the material layer, causing poor ventilation, which will not only lead to incomplete combustion of coal powder, but also the inability to evenly and fully preheat the raw materials, and the raw materials entering the rotary kiln cannot be evenly and fully decomposed, which will lead to the occurrence of raw burning, over-burning and other phenomena, which seriously affect the quality of calcium oxide. Summary of the invention

[0003] In order to overcome the deficiencies of the prior art and solve the problems existing in the prior art, the present invention provides a limestone calcining device.

[0004] The present invention is achieved through the following technical solutions.

[0005] A limestone calcining device provided by the present invention comprises a rotary kiln and a preheater, wherein a coarse material bin, a first preheating zone, a second preheating zone and a discharge chute connected to the feed port of the rotary kiln are arranged from top to bottom in the preheater, a coarse material inlet is arranged at the top of the coarse material bin, the coarse material bin is connected to the first preheating zone through a plurality of drop pipes, a preheating table for receiving dropped materials is arranged in the second preheating zone, a pushing mechanism for pushing materials on the preheating table into the discharge chute is arranged on the preheater, a fine material inlet is constructed on the side wall of the preheater in the second preheating zone, and the fine material inlet is externally connected to a fine material feeding mechanism.

[0006] As a further improvement of the above scheme, there are 12 to 14 drop tubes, which are distributed in a ring shape, and a pushing mechanism is provided for each drop tube; the preheating table is constructed in a ring shape, and a circular drop opening is constructed in the middle of the preheating table.

[0007] As a further improvement of the above solution, the ring width of the preheating table is not less than 1.5m, and a slope is constructed on one side of the preheating table close to the circular discharge port, and the angle between the slope and the horizontal plane is 20°.

[0008] As a further improvement of the above solution, the lower end of the blanking pipe extends into the first preheating zone, and the distance between the lower end of the blanking pipe and the upper surface of the preheating table is 1m to 2.8m.

[0009] As a further improvement of the above scheme, the fine material feeding mechanism includes a first screw conveyor and a second screw conveyor, the discharge port of the first screw conveyor is connected to the feed port of the second screw conveyor, the discharge port of the second screw conveyor is connected to the fine material inlet, and the feed port of the first screw conveyor is externally connected to a feeding mechanism.

[0010] As a further improvement of the above solution, a high temperature resistant layer is provided on the inner wall of the fine material inlet, and the discharge port of the second screw conveyor is connected to the fine material inlet through an extension port, and the extension port is made of heat-resistant steel.

[0011] As a further improvement of the above scheme, the length of the extension port is 30 to 50 cm; the blade thickness of the first screw conveyor is not less than 10 mm; the second screw conveyor is a shaftless screw conveyor, and the blade thickness of the second screw conveyor is not less than 15 mm.

[0012] As a further improvement of the above scheme, the feeding mechanism includes a fine material feeding hopper, a weighing and conveying belt is arranged below the fine material feeding hopper, a hoist is arranged at the tail end of the weighing and conveying belt, and the discharge port of the hoist is connected from top to bottom to the feed port of the first screw conveyor.

[0013] As a further improvement of the above scheme, an interlayer is arranged between the coarse material bin and the first preheating zone, the drop pipe is a telescopic tube, and the drop pipe includes an outer upper tube, the outer upper tube is located in the interlayer, and is fixed to the bottom of the coarse material bin, and is connected with the drop port at the bottom of the coarse material bin, the outer upper tube is slidably connected with an inner lower tube, and the lower port of the inner lower tube extends into the first preheating zone, and an adjustment mechanism for adjusting the distance between the lower port of the inner lower tube and the upper surface of the preheating table is arranged in the interlayer, and the adjustment range of the distance is 1m to 2.8m.

[0014] As a further improvement of the above solution, the adjustment mechanism is an electric hoist installed at the bottom of the coarse material bin, the electric hoist has a hook, and a hanging ring is provided on the outer wall of the inner lower tube corresponding to the hook, and the hanging ring is located in the interlayer.

[0015] The beneficial effects achieved by the present invention are:

[0016] Compared with the prior art, the limestone calcining device provided by the present invention modifies the feeding mode into top coarse material feeding and side fine material feeding according to the different particle sizes of the limestone, separates the coarse material particles from the fine material particles, and preheats the two separately, so that the gaps between the coarse material particles will not be blocked by the fine material particles, so that the hot air can completely penetrate the coarse material layer, so that it has a larger preheating area that can directly contact with the hot air, improves the preheating effect of the coarse material particles, and enables them to be more completely decomposed after entering the rotary kiln, thereby improving the quality of calcium oxide; at the same time, compared with the prior art, due to the technology proposed by the present invention, The problem cannot be solved. Most manufacturers choose to directly remove the fine particles, increase the preheating temperature or directly use coarse particles as raw materials. In the present invention, the fine particles are fully and completely utilized. Due to their small particle size and increased preheating area, better preheating effect can be achieved in the process of sliding from the second preheating zone to the rotary kiln, so that they can be more completely decomposed after entering the rotary kiln, thereby improving the quality of calcium oxide. In summary, the limestone calcining device provided by the present invention reduces energy loss, improves the utilization rate of raw materials and resources and the overall production efficiency, and greatly saves production costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a structural schematic diagram of the preheater in the present invention;

[0018] Figure 2 It is a schematic diagram of the structure of the preheater and the rotary kiln in the present invention;

[0019] Figure 3 It is a structural schematic diagram of the preheating station in the present invention;

[0020] Figure 4 It is a structural schematic diagram of the regulating mechanism in the present invention;

[0021] Figure 5 The present invention Figure 1 A magnified view of middle;

[0022] Figure 6 The present invention Figure 4 Enlarged view of B.

[0023] In the figure: coarse material bin 1, coarse material inlet 101, first preheating zone 2, second preheating zone 3, rotary kiln 4, discharge chute 5, drop pipe 6, outer upper pipe 601, inner lower pipe 602, lifting ring 603, preheating table 7, circular discharge port 701, slope 702, pushing mechanism 8, fine material inlet 9, high temperature resistant layer 901, first screw conveyor 10, second screw conveyor 11, extension port 1101, fine material feeding hopper 12, weighing and transporting belt 13, elevator 14, interlayer 15, adjustment mechanism 16, electric hoist 1601, hook 1602. DETAILED DESCRIPTION

[0024] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.

[0025] like Figures 1 to 6 As shown, a limestone calcining device provided by the present invention includes a rotary kiln 4 and a preheater, wherein a coarse material bin 1, a first preheating zone 2, a second preheating zone 3 and a discharge chute 5 connected to the feed port of the rotary kiln 4 at the bottom are arranged in the preheater from top to bottom, the side wall of the second preheating zone 3 has a certain slope, and smoothly transitions with the discharge chute 5, so as to facilitate the entry of fine materials into the rotary kiln, a coarse material inlet 101 is arranged on the top of the coarse material bin 1, the coarse material bin 1 and the first preheating zone 2 are connected by a plurality of drop pipes 6, a preheating table 7 for receiving dropped materials is arranged in the second preheating zone 3, and a pushing mechanism 8 for pushing the material on the preheating table 7 into the discharge chute 5 is arranged on the preheater, and the pushing mechanism is a prior art and will not be described in detail herein; a fine material inlet 9 is constructed on the side wall of the preheater of the second preheating zone 3, and the fine material inlet 9 is externally connected to a fine material feeding mechanism.

[0026] Specifically, coarse material is input from the top of the preheater, and the coarse material is preheated in the first preheating zone 2 and the second preheating zone 3 in turn before entering the calcination process for calcination. Fine material is input from the side of the preheater, and is preheated in the second preheating zone 3 before entering the calcination process for calcination. In addition, the side wall of the second preheating zone 3 of the preheater is a chute structure with a certain slope to facilitate the material to slide down into the rotary kiln 4.

[0027] Specifically, there is a crushing and screening process before the preheating process and the calcining process. In this embodiment, the coarse material is a limestone raw material with a minimum particle size of not less than 1 cm, and the fine material is a limestone raw material with a maximum particle size of not more than 1 cm. Specifically, in this implementation, the coarse material is a limestone raw material of 1 to 4 cm.

[0028] Furthermore, the high-temperature gas generated by the calcination process in the preheater is introduced into the second preheating zone 3 and the first preheating zone 2 through the high-temperature induced draft fan from the rotary kiln to preheat the raw materials. The preheating temperature of the second preheating zone 3 is 950-1100°C, and the preheating pressure is -80--200Pa. The preheating temperature of the first preheating zone 2 is 850-1050°C, and the preheating pressure is -1500Pa--2500Pa. The preheating effect of the coarse particle material preheated in the first preheating zone 2 can reach 30%, that is, 30% of the coarse particles from the outside to the inside are decomposed into calcium oxide. The preheating effect of the fine particle material preheated in the second preheating zone 3 can reach 50%, that is, 50% of the fine particle material from the outside to the inside is decomposed into calcium oxide, and then enters the rotary kiln 4.

[0029] Furthermore, in the present embodiment, 12 to 14 drop tubes 6 are provided, the drop tubes 6 are distributed in a ring shape, and a push mechanism 8 is provided corresponding to each drop tube 6 .

[0030] Furthermore, the preheating table 7 is constructed in a ring shape, and a circular discharge port 701 is constructed in the middle of the preheating table 7 . The pushing mechanism 8 pushes the falling material into the circular discharge port 701 and drops it to the discharge chute 5 .

[0031] Furthermore, the ring width of the preheating table 7 is not less than 1.5 m.

[0032] Furthermore, a slope 702 is constructed on one side of the preheating table 7 close to the circular discharge port 701. The angle between the slope 702 and the horizontal plane is 20 degrees, which facilitates the coarse material to slide into the rotary kiln and prevents the pusher head of the pusher mechanism 8 from extending excessively.

[0033] Furthermore, the lower end of the blanking pipe 6 extends into the first preheating zone 2, and the distance between the lower end of the blanking pipe 6 and the upper surface of the preheating table 7 is 1m to 2.8m.

[0034] Specifically, the fine material feeding mechanism includes a first screw conveyor 10 and a second screw conveyor 11. The discharge port of the first screw conveyor 10 is connected to the feed port of the second screw conveyor 11, and the discharge port of the second screw conveyor 11 is connected to the fine material inlet 9. The feed port of the first screw conveyor 10 is externally connected to a feeding mechanism.

[0035] Specifically, the first screw conveyor 10 is located above the second screw conveyor 11 , the discharge port of the first screw conveyor 10 is downwardly connected to the feed port of the second screw conveyor 11 , and the discharge port of the second screw conveyor 11 is connected to the fine material inlet 9 .

[0036] Furthermore, a high temperature resistant layer 901 is provided on the inner wall of the fine material inlet 9, and the high temperature resistant layer 901 is made of refractory bricks to prevent the discharge port of the second screw conveyor 11 from being deformed due to high temperature.

[0037] Furthermore, the discharge port of the second screw conveyor 11 is connected to the fine material inlet 9 via an extension port 1101 , and the extension port 1101 is made of heat-resistant steel to prevent the extension port 1101 from being deformed.

[0038] Furthermore, the length of the extension port 1101 is 30 to 50 cm, and the extension port 1101 can be integrated with the discharge port of the second screw conveyor 11. While avoiding damage to the second screw conveyor 11 caused by high temperature, the material is squeezed forward and accumulated in the extension port 1101 to form a seal, which plays a good role in locking the wind and preventing hot air from leaking out and causing problems in the production system.

[0039] Furthermore, the blade thickness of the first screw conveyor 10 is not less than 10 mm. The limestone raw material particles are hard in texture, so the blades are prevented from being deformed or stuck.

[0040] Furthermore, to prevent the shaft end of the second screw conveyor 11 from being deformed due to high temperature, the second screw conveyor 11 is a shaftless screw conveyor, and the blade thickness of the second screw conveyor 11 is not less than 15 mm. The limestone raw material particles are hard, so deformation or jamming of the blades is avoided.

[0041] Specifically, the feeding mechanism includes a fine material feeding hopper 12, a weighing and conveying belt 13 is arranged below the fine material feeding hopper 12, a hoist 14 is arranged at the tail end of the weighing and conveying belt 13, and the discharge port of the hoist 14 is connected to the feed port of the first screw conveyor 10 from top to bottom.

[0042] Furthermore, in order to ensure production efficiency and production benefits, in the prior art, the rotary kiln has strict requirements on the particle size of raw material particles, and usually directly calcines limestone raw material particles with a particle size of 2cm to 4cm. However, the maximum recovery rate of raw material particles with a particle size of 2cm to 4cm does not exceed 60% during the crushing process, which is a great waste for rotary kiln calcination mines. The remaining particles below 2cm cannot be reasonably utilized. Therefore, the price of limestone raw materials with a particle size of 2cm to 4cm will be much higher than that of 1cm to 2cm, which increases the production cost. The present invention solves the problem of calcining particles below 1cm by feeding fine materials from the side, and makes further improvements to limestone raw material particles with a particle size of 2 to 4cm.

[0043] Further improvement, in the prior art, the length of the drop tube 6 is selected according to the actual production demand, and the length is fixed. The present invention has made a more in-depth study on the above problem, and the drop tube 6 is changed to a telescopic tube structure. The principle is that the material has a material layer thickness on the preheating table, and the material layer thickness depends on the distance between the lower end of the drop tube 6 and the upper surface of the preheating table 7. In this embodiment, for raw material particles with a particle size of 2cm to 4cm, a tube-to-table distance of 2.8m is adopted. Under this distance, the raw material particles with a particle size of 2cm to 4cm can maintain a sufficient gap between each other, so that the hot air can penetrate smoothly and achieve the expected preheating effect, but the 2.8m tube The spacing between the platforms cannot be applied to 1cm~2cm. Since the particle size of raw materials with a particle size of 1cm~2cm is smaller, the material layer height is too high, which will cause the hot air to be unable to penetrate the material layer, resulting in poor ventilation, and then incomplete combustion of coal powder. The raw materials cannot be fully preheated, and the insufficiently preheated raw materials cannot be evenly and fully decomposed after entering the rotary kiln 4, resulting in raw burning and overburning, affecting the quality of calcium oxide. Therefore, by changing the drop pipe 6 to a telescopic tube structure, the lower end of the drop pipe 6 can be lowered, and then after adjusting the material layer, in this embodiment, for the calcination of 1cm~2cm raw material particles, the lower end of the drop pipe is lowered to 1m above the upper surface of the preheating platform 6.

[0044] Specifically, the material dropping pipe 6 is a telescopic pipe, and the thickness of the material layer on the preheating table 7 is adjusted by adjusting the distance between the lower end of the material dropping pipe 6 and the preheating table 7 .

[0045] Specifically, an interlayer 15 is provided between the coarse material bin 1 and the first preheating zone 2, and the drop pipe 6 includes an outer upper tube 601, which is located in the interlayer 15 and fixed to the bottom of the coarse material bin 1 and communicated with the drop port at the bottom of the coarse material bin 1, and the outer upper tube 601 is slidably connected with the inner lower tube 602, and the lower end of the inner lower tube 602 extends into the first preheating zone 2, and an adjusting mechanism 16 for adjusting the distance between the lower end of the inner lower tube 602 and the upper surface of the preheating table 7 is provided in the interlayer 15, and the adjustment range of the distance is 1m to 2.8m.

[0046] Specifically, compared to the telescopic tube structure in which the inner tube is on the top and the outer tube is on the bottom, in this embodiment, the outer upper tube 601 and the inner lower tube 602 can also play a good sealing role to prevent hot air from leaking out.

[0047] Specifically, the adjustment mechanism 16 is an electric hoist 1601 installed at the bottom of the coarse material bin 1. The electric hoist 1601 has a hook 1602. A hanging ring 603 is provided on the outer wall of the inner lower tube 602 corresponding to the hook 1602. The hanging ring is located in the interlayer 15. The electric hoist 1601 is a chain electric hoist or a wire rope electric hoist.

[0048] Specifically, the use of electric hoist 1601 is the preferred solution, which is more convenient, faster, and saves manpower. According to the actual production scale, there can be other implementation solutions. For example, a beam or pulley is set at the bottom of the coarse material bin 1, and the lifting ring 603 is directly pulled by a pull rope by manpower, and then the pulling end of the pull rope is fixed to achieve the effect of adjusting the height of the lower port of the inner lower tube 602.

Claims

1. A limestone calcining device, comprising a rotary kiln (4) and a preheater, characterized in that: The preheater is provided with a coarse material bin (1), a first preheating zone (2), a second preheating zone (3) and a discharge chute (5) connected to the feed port of a rotary kiln (4) from top to bottom. The top of the coarse material bin (1) is provided with a coarse material inlet (101). The coarse material bin (1) is connected to the first preheating zone (2) via a plurality of drop pipes (6). The second preheating zone (3) is provided with a preheating table (7) for receiving dropped materials. The preheater is provided with a pushing mechanism (8) for pushing the materials on the preheating table (7) into the discharge chute (5). The side wall of the preheater in the second preheating zone (3) is provided with a fine material inlet (9), and the fine material inlet (9) is externally connected to a fine material feeding mechanism.

2. A limestone calcining device according to claim 1, characterized in that: The number of the drop tubes (6) is 12 to 14, the drop tubes (6) are distributed in a ring shape, and a push mechanism (8) is provided corresponding to each drop tube (6); The preheating table (7) is constructed in a ring shape, and a circular discharge opening (701) is constructed in the middle of the preheating table (7).

3. A limestone calcining device according to claim 2, characterized in that: The ring width of the preheating table (7) is not less than 1.5 m, and a slope (702) is constructed on one side of the preheating table (7) close to the circular discharge port (701), and the angle between the slope (702) and the horizontal plane is 20°.

4. A limestone calcining device according to claim 2, characterized in that: The lower end of the blanking pipe (6) extends into the first preheating zone (2), and the distance between the lower end of the blanking pipe (6) and the upper surface of the preheating table (7) is 1m to 2.8m.

5. A limestone calcining device according to claim 1, characterized in that: The fine material feeding mechanism comprises a first screw conveyor (10) and a second screw conveyor (11); the discharge port of the first screw conveyor (10) is connected to the feed port of the second screw conveyor (11); the discharge port of the second screw conveyor (11) is connected to the fine material inlet (9); and the feed port of the first screw conveyor (10) is externally connected to a feeding mechanism.

6. A limestone calcining device according to claim 5, characterized in that: A high temperature resistant layer (901) is provided on the inner wall of the fine material inlet (9), and the discharge port of the second screw conveyor (11) is connected to the fine material inlet (9) via an extension port (1101), and the extension port (1101) is made of heat resistant steel.

7. A limestone calcining device according to claim 6, characterized in that: The length of the extension opening (1101) is 30 to 50 cm; The blade thickness of the first screw conveyor (10) is not less than 10 mm; The second screw conveyor (11) is a shaftless screw conveyor, and the blade thickness of the second screw conveyor (11) is not less than 15 mm.

8. A limestone calcining device according to claim 5, characterized in that: The feeding mechanism comprises a fine material feeding hopper (12), a weighing and conveying belt (13) is arranged below the fine material feeding hopper (12), a hoist (14) is arranged at the tail end of the weighing and conveying belt (13), and the discharge port of the hoist (14) is connected from top to bottom to the feed port of the first screw conveyor (10).

9. A limestone calcining device according to claim 8, characterized in that: An interlayer (15) is provided between the coarse material bin (1) and the first preheating zone (2); the drop tube (6) is a telescopic tube; the drop tube (6) comprises an outer upper tube (601); the outer upper tube (601) is located in the interlayer (15) and is fixed to the bottom of the coarse material bin (1) and is communicated with a drop opening at the bottom of the coarse material bin (1); the outer upper tube (601) is slidably connected to an inner lower tube (602); the lower end of the inner lower tube (602) extends into the first preheating zone (2); an adjusting mechanism (16) is provided in the interlayer (15) for adjusting the distance between the lower end of the inner lower tube (602) and the upper surface of the preheating table (7); the adjustment range of the distance is 1 m to 2.8 m.

10. A limestone calcining device according to claim 9, characterized in that: The adjustment mechanism (16) is an electric hoist (1601) installed at the bottom of the coarse material bin (1), and the electric hoist (1601) has a hook (1602). A hanging ring (603) is provided on the outer wall of the inner lower tube (602) corresponding to the hook (1602), and the hanging ring is located in the interlayer (15).

Citation Information

Cited By

  • Limestone calcining process

    CN118930078A

  • A limestone calcination process

    CN118930078B

  • Rotary kiln mixed material calcining method for calcining limestone with high pulverization rate

    CN121377570A