Grouting anti-drag model test device and method for construction of ultra-large-diameter ultra-deep sinking well
By designing test devices and methods in the construction of ultra-large diameter ultra-deep caisson, the process of sinking and grouting and drag reduction of caisson are simulated, the problem of difficult to evaluate grouting effect is solved, and scientific evaluation and construction optimization of grouting and drag reduction technology are achieved. , improve construction efficiency and safety.
Patent Information
- Application Number
- CN202410906730.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2024-11-08
AI Technical Summary
The existing grouting resistance reduction technology faces the problem of unclear dynamic mechanical response of pipe sheet sinking and difficult to evaluate the grouting effect in the construction of ultra-large diameter and ultra-deep caissons. The lack of systematic model testing equipment and methods leads to the existence of engineering design and construction. Greater uncertainty and risks.
A test device for grouting and drag reduction model of ultra-large diameter ultra-deep caisson construction including test loading device, soil box, caisson pipe sheet, data acquisition system and control system was designed. By simulating the sinking and injection of caisson under actual engineering conditions, the caisson was submerged and absorbed under actual engineering conditions. The slurry drag reduction process monitors soil pressure, pore water pressure, displacement and strain in real time, and scientifically evaluates the grouting drag reduction effect.
Effectively reproduce different formation conditions, highly simulate the caisson sinking and grouting drag reduction process, provide scientific reference data, intuitively evaluate the grouting drag reduction effect, improve construction efficiency and safety, and reduce project risks.
Smart Images

Figure CN118913919A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of caisson construction, and in particular to a grouting drag reduction model test device and method for ultra-large diameter and ultra-deep caisson construction. Background Art
[0002] In modern infrastructure projects, the construction technology of ultra-large diameter and ultra-deep caissons has received increasing attention. Such projects usually involve deep foundation pit excavation, large underground structure construction, etc., and have extremely high requirements for construction technology. Traditional caisson construction methods often encounter problems such as high construction difficulty, high cost, long construction period, and high construction safety risks when faced with ultra-large diameters and ultra-deep depths. Especially during the sinking process of the caisson, due to the large resistance of the soil to the caisson, additional drag reduction measures, such as grouting drag reduction, are often required to ensure that the caisson can sink smoothly to the predetermined depth.
[0003] Grouting drag reduction technology is an effective method to reduce the sinking resistance of caissons. It changes the physical properties of the surrounding soil by injecting a specific slurry around the caisson, thereby reducing the lateral resistance of the soil to the caisson. However, due to the particularity of ultra-large diameter and ultra-deep caissons, the existing grouting drag reduction technology still faces many challenges during the construction process, including unclear dynamic mechanical response of the pipe segment sinking and difficulty in evaluating the grouting effect. The existing technology lacks a set of systematic model test devices and methods for predicting and verifying the grouting drag reduction effect before actual construction, which leads to greater uncertainty in the engineering design and construction process, increasing engineering risks and costs.
[0004] Therefore, developing a model test device and method for grouting drag reduction in ultra-large diameter and ultra-deep caisson construction is of great significance for optimizing construction plans, improving construction efficiency, reducing costs, and ensuring engineering safety. The present invention is proposed in this context, aiming to provide a test device and method that can simulate the grouting drag reduction process of caisson under actual engineering conditions, so as to scientifically evaluate the effect of grouting drag reduction technology and provide a reference for engineering design and construction. Summary of the invention
[0005] In view of the shortcomings of the prior art, the present invention provides a grouting drag reduction model test device and method for ultra-large diameter and ultra-deep caisson construction, which aims to simulate actual engineering conditions, scientifically evaluate the effect of grouting drag reduction technology, and provide a reference for engineering design and construction.
[0006] A super-large diameter and super-deep caisson construction grouting drag reduction model test device, comprising a test loading device, a soil box, a caisson segment, a caisson segment control device, a data acquisition system, a grouting device and a control system. A soil box is arranged above the test loading device, and different types of fill can be filled in the soil box according to test requirements to simulate the soil conditions at the construction site; the caisson segment control device controls the caisson segment to sink inside the soil of the soil box, and the caisson segment is connected by a first ring segment and a plurality of ordinary segments through longitudinal steel bars, and a blade foot is arranged at the bottom of the first ring segment, and a plurality of grouting holes are evenly distributed on the side walls of the first ring segment and the ordinary segment; the data acquisition system comprises an earth pressure gauge, a pore water pressure gauge, and a The caisson segments are provided with earth pressure gauges at equal distances from the center of each ring of the caisson segments, pore water pressure gauges are arranged below the groundwater level on the outside of the caisson segments, multiple displacement gauges at equal distances from the center of each ring of the caisson segments are arranged around each ring of the caisson segments at different soil layer depths, and multiple displacement gauges are evenly distributed on one side of the caisson segments in the same soil layer with the segments as the axis, respectively monitoring the deformation of the soil around the caisson segments at equal distances in different directions and unequal distances in the same direction; multiple strain sensors are arranged in the caisson segments; a control system is connected to the test loading device and the grouting device, and the control system controls the loading rate and load size of the test loading device, the grouting speed and the grouting amount.
[0007] The caisson segment control device is provided with a plurality of traction devices, which include a sinking pull wire, a dynamometer, a sinking slide and a positioning knot. A positioning ring beam is provided on the top of the caisson segment, and the positioning ring beam is fixed on the soil surface. One end of the sinking pull wire is connected to the pull wire fixing ring at the bottom inner side of the first ring segment, and the other end is wound around the sinking pulley positioned above the ring beam and connected to the dynamometer. The other end of the dynamometer is connected to the positioning knot. The positioning knot is provided with a plurality of equally spaced knots, and the knot spacing is the sinking height of a single ring of the segment. The dynamometer measures the traction force during the sinking process of the segment.
[0008] The knot spacing is the same as the ring height of the caisson segment.
[0009] The blade foot thickness of the first ring segment is greater than the thickness of the caisson segment.
[0010] The test loading device includes a base, a telescopic column, a loading beam, a mobile clamp, and a jack. The telescopic columns are symmetrically arranged above the base, and loading beams are fixed on the top of the two telescopic columns. Two mobile clamps are slidably connected above the loading beams, and jacks are respectively arranged under the mobile clamps. One jack loads the caisson segment, and the other jack loads the soil in the soil box, thereby realizing the simulation of the formation pressure at an extremely large burial depth.
[0011] The power device of the grouting device is an air compressor.
[0012] The control system includes a control operation platform, a loading control button, a grouting control button and a storage cabinet. The top of the storage cabinet is provided with a control operation platform, the control operation platform is connected to the test loading device, the loading control button on the control operation platform controls the loading rate and load size of the test loading device, and the grouting control button on the control operation platform controls the grouting speed and grouting amount.
[0013] The soil box is made of a steel frame with a transparent tempered glass plate embedded in it, and a reinforcing cross beam is arranged on the outer side of the middle part of the transparent tempered glass plate.
[0014] The caisson pipe segment is prepared from water, gypsum and diatomaceous earth in a certain proportion, and the mass ratio of water: gypsum: diatomaceous earth is 1:1.33:0.1 to 1:1.6:0.15.
[0015] A grouting drag reduction model test method for ultra-large diameter and ultra-deep caisson construction includes the following steps:
[0016] Step 1: Test preparation: According to the actual engineering design, prefabricate caisson segments of corresponding sizes, and evenly compact the soil samples taken from the construction site and fill them in the soil box to simulate the ground conditions at the construction site. The moisture content and density of the soil are determined according to the actual working conditions at the engineering site;
[0017] Step 2: First, place the first ring segment with blade feet on the ground surface, set the positioning ring beam on the outside of the first ring segment and fix it on the soil surface, create a sinking space for the segment by artificial excavation and soil discharge, so that the caisson segment starts to sink under the action of its own weight, and calculate the weight of the soil inside the first ring segment according to the internal volume of a single ring of the first ring segment and the density of the soil sample when excavating the soil, and weigh the weight of the soil taken while excavating. If the weight of the soil taken reaches the weight of a single ring of soil, stop excavating, and loosen the positioning rope knot to make the first ring segment sink vertically. When it sinks to the height of the first ring segment, the rope knot will control the sinking to stop. If the soil density is high and it is difficult to sink, use the jack of the test loading device to make the first ring segment continue to sink, and the sinking is controlled by the self-weight of the first ring segment and the jack loading; and so on to control the sinking of all the caisson segments. After the first ring segment sinks, it is connected to the ordinary segment through the longitudinal steel bars, and sinks in turn, and finally overlapped to form an integral segment and completes the sinking;
[0018] Step 3: During the sinking process of the caisson segment, a grouting device is used to inject grout into the outer gap of the caisson segment through the grouting holes on the side wall of the caisson segment. The gap formed between the blade foot cutting the soil and the ordinary segment is filled with grouting material to form a drag reduction layer;
[0019] Step 4: The data acquisition system monitors the soil pressure, pore water pressure, soil layer displacement value, and segment strain value during the sinking process of the caisson segment in real time, and analyzes the drag reduction effect of grouting.
[0020] In step 4, when the soil pressure on the side wall of the caisson segment is significantly reduced, the pore water pressure remains stable, the soil layer displacement is small, and the segment strain is small, it means that the grouting drag reduction effect is good.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] 1) Effective reproduction of different stratum conditions: The test soil box of the present invention can simulate different soil layers (sand layer, clay layer, sand-clay composite stratum) and caisson construction processes under different moisture contents in different test groups according to test requirements.
[0023] 2) High degree of simulation of the caisson process: The test device of the present invention highly simulates the caisson sinking and grouting drag reduction process under actual engineering conditions through a test loading device and a caisson segment control device, providing scientific reference data for engineering design and construction.
[0024] 3) Intuitive evaluation of the drag reduction effect of grouting: The soil box of the present invention is embedded with transparent tempered glass, and the grouting process and effect can be observed through the transparent tempered glass plate. In addition, the caisson control device is connected to a spring dynamometer, and the effect of the grouting drag reduction technology can be intuitively evaluated by comparing the dynamometer reading with the deadweight of the segment, thereby optimizing the grouting scheme.
[0025] 4) Improve construction efficiency and safety: Through scientific test methods and data analysis, guide the application of grouting drag reduction technology in actual projects, improve construction efficiency and reduce construction risks; the test device and method of the present invention provide an effective evaluation and verification means for grouting drag reduction technology in the construction of ultra-large diameter and ultra-deep caissons, which helps to promote the development and application of caisson construction technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a schematic diagram of the model test system of the present invention;
[0027] Figure 2 It is a structural schematic diagram of the model test loading device of the present invention;
[0028] Figure 3 It is a structural schematic diagram of the soil box of the present invention;
[0029] Figure 4 It is a schematic diagram of the structure of the caisson segment control device of the present invention;
[0030] Figure 5 This is a schematic diagram of the first ring segment structure of the present invention;
[0031] Figure 6 This is a schematic diagram of a common segment structure of the present invention;
[0032] Figure 7 It is a position diagram of the soil pressure gauge, pore water pressure gauge, displacement gauge and strain sensor of the present invention;
[0033] In the attached drawings: 1. Test loading device; 101. Base; 102. Telescopic column; 103. Loading beam; 104. Mobile fixture; 105. Jack; 2. Soil box; 201. Steel frame; 202. Transparent tempered glass plate; 203. Reinforcement beam; 3. Caisson segment; 301. First ring segment; 3011. Blade foot; 302. Ordinary segment; 303. Grouting hole; 4. Traction device; 401. Sinking wire; 402. Dynamometer; 403. Sinking pulley; 404. Positioning knot; 405. Wire fixing ring; 5. Control system; 501. Control operation platform; 502. Loading control button; 503. Storage cabinet; 504. Grouting control button; 6. Soil pressure gauge; 7. Pore water pressure gauge; 8. Displacement gauge; 9. Strain sensor; 10. Positioning ring beam. DETAILED DESCRIPTION
[0034] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0035] like Figure 1-7 As shown, a super-large diameter and super-deep caisson construction grouting drag reduction model test device includes a test loading device 1, a soil box 2, a caisson segment 3, a caisson segment control device, a data acquisition system, a grouting device and a control system 5. A soil box 2 is provided above the test loading device base 101. Different types of fill can be filled in the soil box 2 according to the test requirements to simulate the soil conditions of the construction site; the caisson segment control device 4 controls the caisson segment 3 to sink inside the soil of the soil box. The caisson segment 3 is connected by a first ring segment 301 and a plurality of ordinary segments 302 through longitudinal steel bars. A blade foot 3011 is provided at the bottom of the first ring segment 301. The thickness of the blade foot 3011 of the first ring segment 301 is greater than the thickness of the caisson segment. A plurality of grouting holes 303 are evenly distributed on the side walls of the first ring segment 301 and the ordinary segment 302; the data acquisition system includes an earth pressure gauge 6, a pore water Pressure gauge 7, displacement gauge 8 and strain sensor 9, earth pressure gauge 6 is arranged at equal distance from the center of each ring of the caisson segment 3 on the outside of the caisson segment 3, pore water pressure gauge 7 is arranged below the groundwater level on the outside of the caisson segment 3, multiple displacement gauges 8 with equal distance from the center are arranged around each ring of the caisson segment 3 at different soil layer depths, multiple displacement gauges 8 are evenly distributed on one side of the caisson segment of the same soil layer with the caisson segment as the axis, respectively monitoring the deformation of the soil around the caisson segment 3 with equal distances in different directions and unequal distances in the same direction; multiple strain sensors 9 are arranged in the caisson segment 3; when the caisson segment is prefabricated, the strain sensor 9 is buried in the caisson segment 3 to complete the deformation monitoring of the entire sinking process of the caisson segment 3, the control system 5 is connected to the test loading device 1 and the grouting device, and the control system 5 controls the loading rate and load size of the test loading device, the grouting speed and the grouting amount.
[0036] The caisson segment control device is provided with a plurality of traction devices 4, the traction device 4 comprises a sinking pull wire 401, a dynamometer 402, a sinking slide 403 and a positioning rope knot 404, a positioning ring beam 10 is provided on the top of the caisson segment 3, during the test, the positioning ring beam 10 is fixed on the surface of the soil layer, and serves as a sinking guide device for the caisson segment 3, one end of the sinking pull wire 401 is connected to a pull wire fixing ring 405 at the bottom inner side of the first ring segment 301, and the other end is wound around a sinking pulley 403 above the positioning ring beam 10 to connect to the dynamometer 402, and the sinking pulley 403 reduces the distance between the sinking pull wire 401 and the positioning ring beam 10 Friction force, the sinking pull line 401 is connected to the dynamometer 402 to measure the lateral friction resistance during the sinking process of the caisson segment 3, and the other end of the dynamometer 402 is connected to the positioning knot 404. The positioning knot 404 is provided with a plurality of equally spaced knots. The knot spacing is the sinking height of a single ring of the segment, and the knot spacing is the same as the ring height of the caisson segment 3, ensuring that the caisson segment 3 sinks vertically and evenly according to a predetermined trajectory. The dynamometer 402 measures the traction force of the caisson segment 3 during the sinking process; the test loading device 4 applies load to the prefabricated caisson segment through the jack 105, and controls its sinking process in the soil box through the sinking pull line 401 in the caisson control device.
[0037] The test loading device 1 includes a base 101, a telescopic column 102, a loading beam 103, a mobile clamp 104, and a jack 105. The telescopic columns 102 are symmetrically arranged above the base 101, and loading beams 103 are fixed on the top of the two telescopic columns 102. Two mobile clamps 104 are slidably connected above the loading beam 103, and jacks 105 are respectively arranged under the mobile clamps 104. One jack 105 loads the caisson segment 3, and the other jack 105 loads the soil in the soil box 2, thereby realizing the simulation of the formation pressure at a very large burial depth.
[0038] For the construction conditions of deep foundation pit caisson with a diameter of more than 20 meters and a depth of more than 50 meters, it may be difficult to simulate the soil pressure of a large deeply buried stratum during the model test due to the small overall size of the soil box. When higher soil pressure conditions are required, a load can be applied to the surface to simulate the pressure of the stratum at a very large burial depth. Therefore, a jack is used to load the surface to simulate the pressure of the stratum at a very large burial depth.
[0039] The power device of the grouting device is an air compressor.
[0040] The control system 5 includes a control operation platform 501, a loading control button 502, a storage cabinet 503, and a grouting control button 504. The top of the storage cabinet 503 is provided with a control operation platform 501, and the control operation platform 501 is connected to the test loading device 1. The loading control button 502 on the control operation platform 501 controls the loading rate and load size of the test loading device, and the grouting control button 504 on the control operation platform 501 controls the grouting speed and grouting amount; the storage cabinet 503 is used to load test supplies such as collection and monitoring data lines, and at the same time, a small amount of operating supplies required for related tests, such as small soil shovels, soil pressure boxes and measuring lines, pore water pressure gauges, displacement meters and other equipment, can be stored for standby use.
[0041] The soil box 2 is made of a steel frame 201 with a transparent tempered glass plate 202 embedded therein, a reinforcing beam 203 is provided on the outer side of the middle of the transparent tempered glass plate 202, and transparent tempered glass plates 202 are embedded around it for easy observation. Reinforcing beams 203 are provided around it to ensure overall stability during loading.
[0042] The caisson pipe segment 3 is made of water, gypsum and diatomaceous earth in a certain proportion, and the mass ratio of water: gypsum: diatomaceous earth is 1:1.33:0.1~1:1.6:0.15; the main mechanical parameters considered in the selection of similar materials for pipe segment production are: uniaxial compressive strength and elastic modulus of pipe segment concrete, and equivalent tensile (compressive) stiffness of tensile (compressive) main reinforcement in reinforced concrete. According to the "Underground Railway Design Specifications" and referring to the values of the "Highway Tunnel Design Specifications", water, gypsum and diatomaceous earth are prepared into composite materials in a certain proportion to achieve similar simulation of concrete pipe segments prefabricated, processed and installed on the project site; the properties of gypsum are relatively close to those of concrete, and diatomaceous earth is a water-hardening material with strong water absorption and good workability. It can play a certain retarding role in gypsum slurry and is conducive to the escape of air in the slurry, which can reduce the strength and water separation of gypsum. Gypsum diatomaceous earth is a similar material commonly found in China. Its properties are similar to those of pure gypsum, but its physical and mechanical properties are closer to concrete than pure gypsum, making it more suitable for this test.
[0043] To simulate the longitudinal seam joint of the caisson segment 3, a groove of a certain depth should be opened at the location where the longitudinal joint is set in the caisson segment to weaken the bending stiffness of this location. The groove depth is set based on the principle of being equivalent to the bending capacity of the prototype joint.
[0044] Simulation of the annular joint of caisson segment 3: In actual engineering, the displacement of the segment at the annular joint is very small, so in the test, the radial shear stiffness and tangential shear stiffness of the segment joint can be taken as infinite, which is safer, that is, it is assumed that there is no displacement at the longitudinal joint of each ring segment.
[0045] A grouting drag reduction model test method for ultra-large diameter and ultra-deep caisson construction includes the following steps:
[0046] Step 1: Test preparation: According to the actual engineering design, prefabricate caisson segments 3 of corresponding sizes, and evenly compact the soil samples taken from the construction site and fill them in the soil box 2 to simulate the soil quality at the construction site. The moisture content and density of the soil are determined according to the actual working conditions at the engineering site;
[0047] Step 2: First, place the first ring segment 301 with the blade foot 3011 on the stratum surface, and set the positioning ring beam 10 on the outside of the first ring segment 301 and fix it on the stratum surface. Use manual shovel to dig soil or a small spiral excavator to simulate the excavation process, so that the first ring segment 301 begins to sink under the action of its own weight. During the excavation process, the weight of the soil inside the single ring is calculated according to the internal volume of the first ring segment 301 and the density of the soil sample. The weight of the soil taken is weighed while digging. If the weight of the soil taken reaches the weight of the first ring soil, stop digging, loosen the positioning knot 404 to make the first ring segment 301 sink vertically. When it sinks to the height of the first ring segment 301, the knot buckle will control the sinking to stop. If the soil layer The high density makes it difficult to sink, that is, the soil layer has a large friction with the side wall of the first ring segment 301. If the first ring segment 301 is blocked from sinking, the jack 105 of the test loading device 1 can be used to make the first ring segment 301 continue to sink, and the sinking is comprehensively controlled by the deadweight of the first ring segment 301 and the loading of the jack 105; and the whole caisson segment 3 is controlled to sink in the same way. After the first ring segment 301 sinks, it is connected to the common segment 302 through the longitudinal steel bars, and sinks in turn, and finally overlaps as an integral segment to complete the whole sinking work. During the sinking process, the correct plane position and verticality are maintained to prevent the sinking direction from being deflected and difficult to adjust when continuing to sink. When the design elevation is reached, soil extraction is stopped and the segment sinks to the design elevation;
[0048] When a higher earth pressure condition is required, a load may be applied to the soil surface to simulate the ground pressure at a very large burial depth, so a jack 105 is used to simulate the ground pressure at a very large burial depth;
[0049] Step 3: During the sinking process of the caisson segment 3, a grouting device is used to inject grout into the outer space of the caisson segment 3 through the grouting holes 303 on the side walls of the caisson segment 3. The control system controls the grouting speed and grouting amount of the grouting device. The gap formed between the blade foot 3011 and the ordinary segment 302 after cutting the soil is filled with grouting material to form a drag reduction layer.
[0050] Step 4: The data acquisition system monitors the soil pressure, pore water pressure, soil layer displacement, and segment strain during the sinking process of the caisson segment 3 in real time, and analyzes the grouting drag reduction effect; when the soil pressure fluctuation on the side wall of the caisson segment is small, the pore water pressure remains stable, the soil layer displacement is small, and the segment strain is small, it means that the grouting drag reduction effect is good.
[0051] The displacement meter monitoring the surface settlement is a comprehensive indicator for evaluating the quality of the entire caisson construction process. Small vertical displacement of the soil layer indicates that the settlement process is good, the drag reduction effect is good, the pipe segment is stable, and the disturbance to the formation is small.
[0052] Through the above steps, the test device and method of the present invention can be effectively used to simulate and evaluate the grouting drag reduction technology in the construction of ultra-large diameter and ultra-deep caissons, thereby improving construction efficiency and reducing construction risks.
[0053] The comprehensive analysis of the drag reduction effect of grouting can be carried out according to the following methods:
[0054] 1. Correlation analysis
[0055] 1) Multivariate regression analysis: Analyze the relationship between earth pressure, pore water pressure and segment strain using statistical methods;
[0056] 2) Cause and effect: Through data analysis, determine the direct impact of different grouting parameters on soil pressure, pore water pressure and segment strain.
[0057] 2. Numerical simulation
[0058] 1) Model calibration: Establish a numerical model and calibrate the model parameters according to experimental data to improve the accuracy of simulation results;
[0059] 2) Simulation analysis: Run the calculation model to analyze the drag reduction effect under different grouting conditions.
[0060] Evaluation and optimization of grouting drag reduction effect:
[0061] 1. Drag reduction effect evaluation
[0062] 1) Comprehensive evaluation: The drag reduction effect of grouting is evaluated by combining experimental data and numerical simulation results.
[0063] 2) Sensitivity analysis: Analyze the influence of different grouting parameters (such as grouting volume, material type, grouting pressure, etc.) on the drag reduction effect.
[0064] 2. Optimization suggestions
[0065] 1) Grouting parameter optimization: Based on the analysis results, optimization suggestions such as grouting volume, grouting material selection, and grouting pressure control are put forward.
[0066] 2) Construction suggestions: Provide specific operational suggestions in actual construction to achieve the best drag reduction effect.
[0067] 2. Comprehensive evaluation
[0068] 1) Combine the experimental and simulation results to comprehensively evaluate the drag reduction effect of grouting.
[0069] 2) Propose optimized grouting scheme and construction suggestions.
[0070] 3) Through systematic experimental design, data collection, data analysis and numerical simulation, the effect of grouting on segment drag reduction can be comprehensively evaluated, and optimization suggestions can be put forward to improve project quality and construction efficiency.
[0071] The present invention simulates the soil working conditions at the construction site through a soil box; simulates the sinking process of the segments at the construction site through a caisson segment control device and a test loading device; an earth pressure gauge, a pore water pressure gauge, a displacement gauge and a strain sensor are arranged on the outside of the caisson segment to analyze the soil pressure distribution, the caisson segment stress and the pore water pressure during the caisson construction process, thereby simulating the construction process of an ultra-large diameter and ultra-deep caisson; and through a simulation experiment of the grouting drag reduction technology, the optimal grouting parameters are found to ensure the safety and efficiency of the caisson construction.
Claims
1. A grouting drag reduction model test device for ultra-large diameter and ultra-deep caisson construction, It is characterized in that It includes a test loading device, a soil box, a caisson segment, a caisson segment control device, a data acquisition system, a grouting device and a control system. A soil box is provided above the test loading device. Different types of fill can be filled in the soil box according to test requirements to simulate the soil conditions at the construction site. The caisson segment control device controls the caisson segment to sink inside the soil of the soil box. The caisson segment is connected by a first ring segment and multiple ordinary segments through longitudinal steel bars. The bottom of the first ring segment is provided with a blade foot. Multiple grouting holes are evenly distributed on the side walls of the first ring segment and the ordinary segment. The data acquisition system includes an earth pressure gauge, a pore water pressure gauge, a displacement gauge and a strain sensor Earth pressure gauges are arranged at equal distances from the center of each ring of the caisson segments on the outside of the caisson segments, pore water pressure gauges are arranged below the groundwater level on the outside of the caisson segments, multiple displacement gauges with equal distances from the center of each ring of the caisson segments are arranged at different soil layer depths, and multiple displacement gauges are evenly distributed on one side of the caisson segments in the same soil layer with the segments as the axis, respectively monitoring the deformation of the soil around the caisson segments with equal distances in different directions and unequal distances in the same direction; multiple strain sensors are arranged in the caisson segments; a control system is connected to a test loading device and a grouting device, and the control system controls the loading rate and load size of the test loading device, the grouting speed and the grouting amount.
2. According to claim 1, a super-large diameter and super-deep caisson construction grouting drag reduction model test device, It is characterized in that The caisson segment control device is provided with a plurality of traction devices, which include a sinking pull wire, a dynamometer, a sinking slide and a positioning knot. A positioning ring beam is provided on the top of the caisson segment, and the positioning ring beam is fixed on the soil surface. One end of the sinking pull wire is connected to the pull wire fixing ring at the bottom inner side of the first ring segment, and the other end is wound around the sinking pulley positioned above the ring beam and connected to the dynamometer. The other end of the dynamometer is connected to the positioning knot. The positioning knot is provided with a plurality of equally spaced knots, and the knot spacing is the sinking height of a single ring of the segment. The dynamometer measures the traction force during the sinking process of the segment.
3. A super-large diameter and super-deep caisson construction grouting drag reduction model test device according to claim 2, It is characterized in that The knot spacing is the same as the ring height of the caisson segment.
4. A super-large diameter and super-deep caisson construction grouting drag reduction model test device according to claim 1, It is characterized in that The blade foot thickness of the first ring segment is greater than the thickness of the caisson segment.
5. A drag reduction model test device for grouting in ultra-large diameter and ultra-deep caisson construction according to claim 1, It is characterized in that The test loading device includes a base, a telescopic column, a loading beam, a mobile clamp, and a jack. The telescopic columns are symmetrically arranged above the base, and loading beams are fixed on the top of the two telescopic columns. Two mobile clamps are slidably connected above the loading beams, and jacks are respectively arranged under the mobile clamps. One jack is used to load the caisson segment, and the other jack is used to load the soil in the soil box.
6. A super-large diameter and super-deep caisson construction grouting drag reduction model test device according to claim 1, It is characterized in that The control system includes a control operation platform, a loading control button, a grouting control button and a storage cabinet. The top of the storage cabinet is provided with a control operation platform, the control operation platform is connected to the test loading device, the loading control button on the control operation platform controls the loading rate and load size of the test loading device, and the grouting control button on the control operation platform controls the grouting speed and grouting amount.
7. A grouting drag reduction model test device for ultra-large diameter and ultra-deep caisson construction according to claim 1, It is characterized in that The soil box is made of a steel frame with a transparent tempered glass plate embedded in it, and a reinforcing cross beam is arranged on the outer side of the middle part of the transparent tempered glass plate.
8. A grouting drag reduction model test device for ultra-large diameter and ultra-deep caisson construction according to claim 1, It is characterized in that The caisson pipe segment is prepared from water, gypsum and diatomaceous earth in a certain proportion, and the mass ratio of water: gypsum: diatomaceous earth is 1:1.33:0.1 to 1:1.6:0.
15.
9. A grouting drag reduction model test method for ultra-large diameter ultra-deep caisson construction, using the device described in claim 1, It is characterized in that The following steps are involved: Step 1: Test preparation: According to the actual engineering design, prefabricate caisson segments of corresponding sizes, and evenly compact the soil samples taken from the construction site and fill them in the soil box to simulate the ground conditions at the construction site. The moisture content and density of the soil are determined according to the actual working conditions at the engineering site; Step 2: First, place the first ring segment with blade feet on the ground surface, set the positioning ring beam on the outside of the first ring segment and fix it on the soil surface, create a sinking space for the segment by artificial excavation and soil discharge, so that the caisson segment starts to sink under the action of its own weight, and calculate the weight of the soil inside the first ring segment according to the internal volume of a single ring of the first ring segment and the density of the soil sample when excavating the soil, and weigh the weight of the soil taken while excavating. If the weight of the soil taken reaches the weight of a single ring of soil, stop excavating, and loosen the positioning rope knot to make the first ring segment sink vertically. When it sinks to the height of the first ring segment, the rope knot will control the sinking to stop. If the soil density is high and it is difficult to sink, use the jack of the test loading device to make the first ring segment continue to sink, and the sinking is controlled by the self-weight of the first ring segment and the jack loading; and so on to control the sinking of all the caisson segments. After the first ring segment sinks, it is connected to the ordinary segment through the longitudinal steel bars, and sinks in turn, and finally overlapped to form an integral segment and completes the sinking; Step 3: During the sinking process of the caisson segment, a grouting device is used to inject grout into the outer gap of the caisson segment through the grouting holes on the side wall of the caisson segment. The gap formed between the blade foot cutting the soil and the ordinary segment is filled with grouting material to form a drag reduction layer; Step 4: The data acquisition system monitors the soil pressure, pore water pressure, soil layer displacement value, and segment strain value during the sinking process of the caisson segment in real time, and analyzes the drag reduction effect of grouting.
Citation Information
Cited By
System and method for testing bearing characteristics of vertical shaft duct pieces under mechanical open caisson milling and excavation disturbance
CN120869760A
Device and method for measuring resistance reduction effect of slurry on side wall of fabricated open caisson
CN121783700A
