Special tool for testing transformer bushing
By designing a special tooling for transformer bushing testing and adopting a temperature control system and ultra-high frequency sensors, the problem of transformer bushing testing being affected by the transformer itself was solved, and more accurate test results were achieved.
Patent Information
- Application Number
- CN202411313697.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-09-20
AI Technical Summary
Existing technologies lack specialized tooling to simulate the actual operating environment of transformer bushings in transformer oil, resulting in test results being affected by the transformer's structure, and partial discharge measurement values exceeding the standard.
A special tooling for testing transformer bushings was designed, including a closed oil tank, bushing mounting base, temperature sensor, heating element and temperature monitoring device. The temperature control system simulates the actual operating environment in transformer oil, and is equipped with an ultra-high frequency sensor and a transparent observation window for real-time monitoring and observation.
It improves the accuracy of transformer bushing testing, can realistically simulate actual operating conditions, monitor partial discharge in real time, assist in identifying abnormal bushings, and enhance the accuracy and reliability of testing.
Smart Images

Figure CN118914781A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of mechanical technology, and in particular to a special tool for testing transformer bushings. Background Art
[0002] According to DL / T596-2021 "Preventive Test Procedures for Power Equipment", the preventive test items for bushings include AC withstand voltage test and partial discharge measurement of 66kV and above capacitor bushings. Among them, the test voltage requirement for partial discharge measurement of transformer bushings is (U m The local discharge value of oil-paper capacitor bushing under the test voltage should be less than 10pC, and that of adhesive-paper capacitor bushing should be less than 250pC.
[0003] At present, GB / T4109-2008 "Insulating Bushings with AC Voltage Higher Than 1000V" also makes clear requirements for the power frequency withstand voltage test and partial discharge measurement of different bushings.
[0004] However, the prior art lacks a special tool to simulate the actual operating environment of the transformer bushing in transformer oil, which can easily lead to the test results of the transformer bushing being affected by the internal structure of the transformer body (such as structural defects such as transformer windings and core clamps), causing the measured value of the partial discharge to exceed the standard value. Therefore, there is an urgent need for a special tool for transformer bushing testing that can simulate the actual operating environment of the transformer bushing in transformer oil, thereby improving the test accuracy of the transformer bushing. Summary of the invention
[0005] The technical problem to be solved by the embodiments of the present invention is to provide a special tool for testing a transformer bushing, which can simulate the actual operating environment of the transformer bushing in transformer oil, thereby improving the testing accuracy of the transformer bushing.
[0006] In order to solve the above technical problems, the embodiment of the present invention provides a special tool for transformer bushing testing, including a closed oil tank, a bushing mounting seat, a temperature sensing probe, a heating component and a temperature monitoring device; wherein,
[0007] The closed oil tank comprises a top surface, a bottom surface and a side wall between the top surface and the bottom surface; the top surface is provided with an inlet for inserting the transformer bushing to be tested, an oil filling port for injecting transformer oil and a first through hole for installing the temperature sensing probe; the side wall is provided with a second through hole for installing the heating component and an oil outlet for discharging transformer oil on a side close to the bottom surface;
[0008] The bushing mounting seat is in the shape of a hollow column, one end of which is fixed to the entrance of the top surface of the closed oil tank, and the other end is formed with a flange for fixing the bushing of the transformer to be tested;
[0009] The temperature sensing probe is sealed and installed on the first through hole, one end of which extends into the closed oil tank and is immersed in the transformer oil, and the other end is located outside the closed oil tank and is connected to the temperature monitoring device through a wire;
[0010] The heating component is sealed and mounted on the second through hole, one end of which extends into the closed oil tank and is immersed in the transformer oil, and the other end is located outside the closed oil tank and is formed with a voltage terminal connected to an external power supply;
[0011] The temperature monitoring device is installed on the side wall of the closed oil tank;
[0012] Among them, after the transformer bushing to be tested is fixed on the flange of the bushing mounting seat and extended into the closed oil tank from the inlet, transformer oil is injected through the oil filling port so that the transformer oil immerses the heating component, the temperature sensing probe and the preset equalizing ring on the base of the transformer bushing to be tested, and the external power supply is connected to the heating component for continuous heating until the oil temperature monitored by the temperature monitoring device through the temperature sensing probe is equal to the preset oil temperature, so as to simulate the temperature required for the transformer bushing to be tested in the actual operating environment in the transformer oil.
[0013] Among them, it also includes: UHF sensor;
[0014] Wherein, a third through hole for installing the UHF sensor is also provided on the side wall of the closed oil tank;
[0015] The UHF sensor is mounted on the third through hole, one end of which extends into the closed oil tank and is immersed in the transformer oil, and the other end is located outside the closed oil tank and is formed with a signal terminal connected to an external partial discharge signal detection device; wherein the partial signal detection device is used to detect the partial discharge signal existing on the transformer bushing to be tested.
[0016] Among them, it also includes: a transparent observation window;
[0017] Wherein, a fourth through hole for installing the transparent observation window is also provided on the side wall of the closed oil tank;
[0018] The transparent observation window is sealed and mounted on the fourth through hole.
[0019] Among them, it also includes: a grounding column;
[0020] One end of the grounding column is installed on the side wall of the closed oil tank, and the other end is grounded.
[0021] Among them, it also includes: lifting rings;
[0022] There are four lifting rings, which are respectively fixed on the four corners of the top surface of the closed oil tank.
[0023] Wherein, the sleeve mounting seat cover is arranged at the entrance of the top surface of the closed oil tank and is fixed by welding.
[0024] The transformer bushing to be tested is a 110kV transformer bushing or a 220kV transformer bushing; a first mounting hole for installing the 110kV transformer bushing and a second mounting hole for installing the 220kV transformer bushing are formed on the flange of the bushing mounting seat.
[0025] Wherein, the oil filling port and the oil outlet of the closed oil tank are both provided with manual valves.
[0026] There are two heating components, both of which are heating tubes.
[0027] There are four transparent observation windows, all of which are made of glass; there are four fourth through holes;
[0028] The four transparent observation windows are sealedly connected with the four fourth through holes through sealing rings and are located in the middle of the closed oil tank; two of the four transparent observation windows are located on one side wall, and the other two are located on the other side wall.
[0029] Implementing the embodiments of the present invention has the following beneficial effects:
[0030] 1. The present invention adopts a temperature sensing probe, a heating component and a temperature monitoring device to form a matched temperature control system, performs real-time temperature control on the transformer oil in the closed oil tank, and can simulate various actual operating conditions of the transformer bushing to be tested in the transformer oil, thereby having good authenticity and improving the test accuracy of the transformer bushing;
[0031] 2. The present invention uses a UHF sensor to monitor the partial discharge situation during the test of the transformer bushing in real time, and uses a transparent observation window to observe the transformer oil in the closed oil tank and the equalizing ring of the transformer bushing immersed in the transformer oil in real time, which can assist in the judgment and analysis of abnormal bushings in the test, thereby further improving the test accuracy of the transformer bushing. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, without paying creative labor, other drawings obtained based on these drawings still belong to the scope of the present invention.
[0033] Figure 1 It is a left-side stereoscopic structural schematic diagram of a special tool for testing a transformer bushing provided in an embodiment of the present invention and the assembly of the transformer bushing to be tested;
[0034] Figure 2 A right-side stereoscopic structural schematic diagram of a special tool for testing a transformer bushing provided in an embodiment of the present invention and the transformer bushing to be tested when assembled;
[0035] Figure 3 A top plan view of a special tool for testing a transformer bushing provided in an embodiment of the present invention and the transformer bushing to be tested when assembled;
[0036] Figure 4 for Figures 1 to 3 Installation structure diagram of medium and ultra high frequency sensor;
[0037] Figure 5 for Figures 1 to 3 Three-dimensional structural diagram of the transformer bushing to be tested. DETAILED DESCRIPTION
[0038] In order to make the objectives, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings.
[0039] like Figures 1 to 5 As shown in the figure, a special tool for testing transformer bushings is proposed in an embodiment of the present invention, comprising a closed oil tank 1 made of metal, a bushing mounting seat 2 made of metal, a temperature sensing probe 3, a heating component 4 and a temperature monitoring device 5; wherein,
[0040] The closed oil tank 1 includes a top surface 11, a bottom surface 12, and a side wall 13 located between the top surface 11 and the bottom surface 12; the top surface 1 is provided with an inlet (not shown) for the transformer bushing T to be tested to extend into, an oil filling port 14 for injecting transformer oil (not shown), and a first through hole (not shown) for installing a temperature sensor; the side wall 13 is provided with a second through hole (not shown) for installing a heating component 4 and an oil outlet 15 for discharging transformer oil on a side close to the bottom surface 12; it should be noted that manual valves are provided on the oil filling port 14 and the oil outlet 15 to control the injection and discharge of transformer oil;
[0041] The bushing mounting seat 2 is in the shape of a hollow column, one end of which is fixedly mounted at the entrance of the top surface 11 of the closed oil tank 1, and the other end is formed with a flange 21 for fixing the bushing T of the transformer to be tested; at this time, the bushing mounting seat 2 is covered at the entrance of the top surface 11 of the closed oil tank 1 and fixed by welding, so that the bushing mounting seat 2 is fixed to the closed oil tank 1 and is also connected to the entrance of the top surface 11; considering that the common transformer bushing T to be tested is a 110kV transformer bushing or a 220kV transformer bushing, the flange 21 of the bushing mounting seat 2 needs to be matched with transformer bushings of different specifications, and a first mounting hole 211 for installing the 110kV transformer bushing and a second mounting hole 212 for installing the 220kV transformer bushing are formed thereon;
[0042] The temperature sensing probe 3 is sealed and installed on the first through hole through a sealing ring, one end of which extends into the closed oil tank 1 and is immersed in the transformer oil, and the other end is located outside the closed oil tank 1 and connected to the temperature monitoring device 5 through a wire (not shown);
[0043] The heating component 4 (such as a heating tube or a heating wire) is sealed and installed on the second through hole through a sealing ring, one end of which extends into the closed oil tank 1 and is immersed in the transformer oil, and the other end is located outside the closed oil tank 1 and is formed with a voltage terminal 41 connected to an external power supply (not shown, such as an AC power supply); in one example, there are two heating components 4 and both are heating tubes;
[0044] The temperature monitoring device 5 (such as an electronic thermometer) is mounted on the side wall 13 of the closed oil tank 1 by means of screws or the like;
[0045] Among them, after the transformer bushing T to be tested is fixed on the flange 21 of the bushing mounting seat 2 and extended into the closed oil tank 1 from the entrance, transformer oil is injected through the oil filling port 14 so that the transformer oil immerses the heating component 4, the temperature sensing probe 3 and the preset equalizing ring T1 on the base of the transformer bushing T to be tested, and the external power supply is connected to the heating component 4 for continuous heating until the oil temperature monitored by the temperature monitoring device 5 through the temperature sensing probe 3 is equal to the preset oil temperature, so as to simulate the temperature required for the transformer bushing T to be tested in the actual operating environment in the transformer oil.
[0046] It should be noted that transformer oil has insulation and heat dissipation properties, and the capacity filled in the closed oil tank 1 should simultaneously meet the detection requirements of the temperature sensor 3, the immersion of the transformer bushing T to be tested, and the heating requirements of the heating component 4. In addition, the preset oil temperature can be flexibly adjusted according to the temperature required by the transformer bushing T to be tested of different specifications in various actual operating conditions in the transformer oil, and the actual operating conditions are the required conditions for the transformer bushing withstand voltage test, partial discharge test or other tests.
[0047] Therefore, a temperature sensing probe 3, a heating component 4 and a temperature monitoring device 5 are used to form a coordinated temperature control system to perform real-time temperature control on the transformer oil in the closed oil tank 1, which can simulate various actual operating conditions of the transformer bushing T to be tested in the transformer oil, thereby improving the authenticity and the test accuracy of the transformer bushing.
[0048] It is understandable that after the test of the transformer bushing T is completed, the transformer oil in the closed oil tank 1 can be discharged through the oil filling port 15 .
[0049] In the embodiment of the present invention, in order to monitor the partial discharge situation of the transformer bushing T to be tested in real time, the special tooling also includes: a UHF sensor 6; wherein, a third through hole (not shown) for installing the UHF sensor 6 is also provided on the side wall 13 of the closed oil tank 1; the UHF sensor 6 is installed on the third through hole, one end of which extends into the closed oil tank 1 and is immersed in the transformer oil, and the other end is located outside the closed oil tank 1 and is formed with a signal terminal 61 connected to an external partial discharge signal detection device (not shown); at this time, the local signal detection device is used to detect the partial discharge signal existing on the transformer bushing T to be tested.
[0050] In the embodiment of the present invention, in order to ensure electrical safety, the special tooling needs to be designed for overall grounding, so the special tooling also includes: a grounding column 7 made of metal; one end of the grounding column 7 is installed on the side wall of the closed oil tank 1 by welding, and the other end is grounded. In addition, in order to facilitate lifting and moving, the special tooling also includes: a metal lifting ring 8; there are four lifting rings 8, which are respectively fixed to the four corners of the top surface 11 of the closed oil tank 1 by welding.
[0051] In the embodiment of the present invention, in order to be able to observe the condition of the transformer oil in the closed oil tank 1 and the condition of the equalizing ring T1 of the transformer bushing T to be tested immersed in the transformer oil in real time, auxiliary judgment and analysis of the abnormal bushing during the test can be performed. Therefore, the special tooling also includes: a transparent observation window 9; wherein, a fourth through hole (not shown) for installing the transparent observation window 9 is also provided on the side wall 13 of the closed oil tank 1; the transparent observation window 9 is sealed and installed on the fourth through hole. In one example, there are four transparent observation windows 9 and they are all made of glass; there are four fourth through holes; wherein, the four transparent observation windows 9 are all sealed and connected with the four fourth through holes through sealing rings (such as annular sealing rings with notches on the inner ring), and are all located in the middle of the closed oil tank 1 for easy observation; two of the four transparent observation windows are located on one side wall, and the other two are located on the other side wall.
[0052] Implementing the embodiments of the present invention has the following beneficial effects:
[0053] 1. The present invention adopts a temperature sensing probe, a heating component and a temperature monitoring device to form a matched temperature control system, performs real-time temperature control on the transformer oil in the closed oil tank, and can simulate various actual operating conditions of the transformer bushing to be tested in the transformer oil, thereby having good authenticity and improving the test accuracy of the transformer bushing;
[0054] 2. The present invention uses a UHF sensor to monitor the partial discharge situation during the test of the transformer bushing in real time, and uses a transparent observation window to observe the transformer oil in the closed oil tank and the equalizing ring of the transformer bushing immersed in the transformer oil in real time, which can assist in the judgment and analysis of abnormal bushings in the test, thereby further improving the test accuracy of the transformer bushing.
[0055] The above disclosure is only the preferred embodiment of the present invention, which certainly cannot be used to limit the scope of the present invention. Therefore, equivalent changes made according to the claims of the present invention are still within the scope of the present invention.
Claims
1. A special tool for transformer bushing testing, It is characterized in that It includes a closed oil tank, a casing mounting seat, a temperature sensor, a heating component and a temperature monitoring device; wherein, The closed oil tank comprises a top surface, a bottom surface and a side wall between the top surface and the bottom surface; the top surface is provided with an inlet for inserting the transformer bushing to be tested, an oil filling port for injecting transformer oil and a first through hole for installing the temperature sensing probe; the side wall is provided with a second through hole for installing the heating component and an oil outlet for discharging transformer oil on a side close to the bottom surface; The bushing mounting seat is in the shape of a hollow column, one end of which is fixed to the entrance of the top surface of the closed oil tank, and the other end is formed with a flange for fixing the bushing of the transformer to be tested; The temperature sensing probe is sealed and installed on the first through hole, one end of which extends into the closed oil tank and is immersed in the transformer oil, and the other end is located outside the closed oil tank and is connected to the temperature monitoring device through a wire; The heating component is sealed and mounted on the second through hole, one end of which extends into the closed oil tank and is immersed in the transformer oil, and the other end is located outside the closed oil tank and is formed with a voltage terminal connected to an external power supply; The temperature monitoring device is installed on the side wall of the closed oil tank; Among them, after the transformer bushing to be tested is fixed on the flange of the bushing mounting seat and extended into the closed oil tank from the inlet, transformer oil is injected through the oil filling port so that the transformer oil immerses the heating component, the temperature sensing probe and the preset equalizing ring on the base of the transformer bushing to be tested, and the external power supply is connected to the heating component for continuous heating until the oil temperature monitored by the temperature monitoring device through the temperature sensing probe is equal to the preset oil temperature, so as to simulate the temperature required for the transformer bushing to be tested in the actual operating environment in the transformer oil.
2. The special tooling for transformer bushing testing as claimed in claim 1, It is characterized in that Also includes: UHF sensor; Wherein, a third through hole for installing the UHF sensor is also provided on the side wall of the closed oil tank; The UHF sensor is mounted on the third through hole, one end of which extends into the closed oil tank and is immersed in the transformer oil, and the other end is located outside the closed oil tank and is formed with a signal terminal connected to an external partial discharge signal detection device; wherein the partial signal detection device is used to detect the partial discharge signal existing on the transformer bushing to be tested.
3. The special tooling for transformer bushing testing as claimed in claim 2, It is characterized in that Also includes: Transparent viewing window; Wherein, a fourth through hole for installing the transparent observation window is also provided on the side wall of the closed oil tank; The transparent observation window is sealed and mounted on the fourth through hole.
4. The special tool for transformer bushing testing as claimed in claim 3, It is characterized in that Also includes: Grounding posts; One end of the grounding column is installed on the side wall of the closed oil tank, and the other end is grounded.
5. The special tool for transformer bushing testing as claimed in claim 4, It is characterized in that Also includes: Rings; There are four lifting rings, which are respectively fixed on the four corners of the top surface of the closed oil tank.
6. The special tool for transformer bushing testing as claimed in claim 5, It is characterized in that The sleeve mounting seat cover is arranged at the inlet of the top surface of the closed oil tank and is fixed by welding.
7. The special tool for transformer bushing testing as claimed in claim 6, It is characterized in that The transformer bushing to be tested is a 110kV transformer bushing or a 220kV transformer bushing; a first mounting hole for installing the 110kV transformer bushing and a second mounting hole for installing the 220kV transformer bushing are formed on the flange of the bushing mounting seat.
8. The special tool for transformer bushing testing as claimed in claim 7, It is characterized in that Manual valves are provided on the oil filling port and the oil outlet of the closed oil tank.
9. The special tool for transformer bushing testing as claimed in claim 8, It is characterized in that The heating components are two and both are heating tubes.
10. The special tool for transformer bushing testing according to claim 9, It is characterized in that There are four transparent observation windows, all made of glass; there are four fourth through holes; The four transparent observation windows are sealedly connected with the four fourth through holes through sealing rings and are located in the middle of the closed oil tank; two of the four transparent observation windows are located on one side wall, and the other two are located on the other side wall.
Citation Information
Patent Citations
Performance detecting device for optical fiber type oil temperature sensor for transformer
CN105334008A
High-voltage bushing capacitor core body insulation performance testing device
CN106093725A
Transformer bushing temperature rise test device
CN115389981A
Test apparatus for simulating partial discharge phenomenon of transformer
WO2023236473A1
