TBM construction surrounding rock tunnability evaluation method based on tunneling specific energy
Through the method based on excavation specific energy, combined with the uniaxial compressive strength and abrasive index of the rock mass, the problem of poor adaptability of the existing TBM construction surrounding rock evaluation model is solved, and a rapid and accurate surrounding rock excavability assessment is achieved. TBM Engineering provides scientific decision-making basis.
Patent Information
- Application Number
- CN202410949275.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-16
- Publication Date
- 2024-11-08
AI Technical Summary
The existing TBM construction surrounding rock excavability evaluation model ignores factors such as rock joint fractures, and the conventional type has poor adaptability, making it difficult to meet the actual needs of TBM projects.
Using a method based on excavation specific energy, a relationship model of uniaxial compressive strength and abrasive index of rock mass is established offline, and a TBM rock-machine perception database is constructed online, and the TBM excavation specific energy is calculated, and surrounding rock grades are divided and excavated. Sexual assessment.
It realizes rapid and accurate evaluation of surrounding rock excavability, provides scientific basis for decision-making of surrounding rock excavation and support plans, and improves the reliability and efficiency of construction.
Smart Images

Figure CN118917066A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of TBM tunnel construction, and in particular relates to a method for evaluating the excavability of surrounding rock during TBM construction based on excavation specific energy. Background Art
[0002] With the continuous planning and advancement of infrastructure construction in the fields of hydropower, transportation, energy, etc. in my country, a large number of major tunnel projects are developing in the direction of long distance, ultra-deep burial and large diameter. Tunnel boring machine (TBM) is widely used in tunnel construction due to its advantages such as fast excavation rate, high ecological environmental protection and construction safety. However, due to the poor adaptability of TBM to geological conditions, any slight change in rock mass conditions may affect the excavation efficiency of TBM. If the excavation parameters adopted during excavation do not match the geological conditions, it is very easy to cause TBM jamming or even face collapse.
[0003] The current conventional TBM construction surrounding rock excavability assessment model is mainly based on the mechanical parameters of the rock, not the rock mass parameters, and ignores the effects of joints and fissures in the rock mass. During the TBM excavation process, the face rock mass directly interacts with the cutterhead, and its excavation parameters actually reflect the rock mass parameters of the rock mass. In addition, the conventional model has never paid attention to the wear resistance of the rock, and the conventional TBM construction surrounding rock excavability model lacks reliability.
[0004] In addition, the surrounding rock classification method in the current tunnel specification is mainly proposed with reference to the drilling and blasting method, which cannot adapt well to the TBM excavation method and the surrounding rock damage state. Simply copying the old surrounding rock classification standard is difficult to meet the actual needs of TBM projects. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a method for evaluating the excavability of surrounding rock in TBM construction based on excavation specific energy in response to the deficiencies in the above-mentioned prior art. The method adopts rock mass parameters to perform index-excavation specific energy classification, and has the advantages of convenient calculation, rapid evaluation, and reliable results. The method can quickly and accurately evaluate the excavability of the rock mass under excavation based on the TBM excavation morphological parameters, and provide a decision-making basis for engineering personnel to formulate more scientific and systematic surrounding rock excavation and optimized support plans, which is convenient for promotion and use.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for evaluating the excavability of surrounding rock in TBM construction based on excavation specific energy, characterized in that the method comprises the following steps:
[0007] Step 1: Offline establishment of rock mass uniaxial compressive strength σ cm and TBM excavation specific energy SE TBM The first relationship model of rock abrasiveness index CAI and TBM excavation specific energy SE are established offline.TBM The second relational model of
[0008] Step 2: Build the TBM rock-machine perception database of the project under construction online;
[0009] Step 3: Calculate TBM excavation specific energy SE based on the TBM rock-machine sensing database of the ongoing project TBM , and then use the first relationship model to calculate the uniaxial compressive strength of the rock mass σ cm , the rock abrasiveness index CAI is calculated using the second relationship model;
[0010] Step 4: Take the uniaxial compressive strength of rock mass σ cm , rock abrasiveness index CAI and TBM excavation specific energy SE TBM As the evaluation index, the surrounding rock grade classification and excavability assessment of TBM construction are carried out.
[0011] The above-mentioned method for evaluating the excavability of surrounding rock in TBM construction based on excavation specific energy is characterized in that: in step 1, the uniaxial compressive strength of the rock mass σ cm and TBM excavation specific energy SE TBM The first relational model is Among them, the determination coefficient of the first relationship model is R 2 =0.861;
[0012] Rock abrasiveness index CAI and TBM specific energy SE TBM The second relational model is Among them, the determination coefficient of the second relationship model is R 2 =0.770.
[0013] The above-mentioned method for evaluating the excavability of surrounding rock in TBM construction based on excavation specific energy is characterized in that: the uniaxial compressive strength of the rock mass σ cm and TBM excavation specific energy SE TBM The first relationship model of rock abrasiveness index CAI and TBM excavation specific energy SE TBM The determination process of the second relationship model is as follows:
[0014] Step 101: Obtain original data of TBM excavation projects with different tunnel diameters, TBM design parameters and geological data. The original data of TBM excavation projects include the total thrust of the cutterhead Th and the penetration per revolution of the cutterhead P. rev , TBM design parameters include shield friction f, cutter head diameter D t, the distance between adjacent cutters S, the installation area radius D1 of the cutter head center cutter, the number of cutter heads N1, the installation area radius D2 of the cutter head front cutter, the number of cutter heads N2, the installation area radius D3 of the cutter head gauge cutter, the number of cutter head gauge cutters N3 and the cutter diameter d; geological data including the uniaxial compressive strength σ of the rock mass cm and rock abrasiveness index CAI;
[0015] Step 102: According to the formula Calculate the cutter correction factor k, where N is the total number of cutters and N = N1 + N2 + N3;
[0016] Step 103: According to the formula Calculation of TBM Specific Energy SE TBM ;
[0017] Step 104: Use mathematical regression method to establish the uniaxial compressive strength σ of rock mass cm and TBM excavation specific energy SE TBM The first relational model Among them, the determination coefficient of the first relationship model is R 2 =0.861; Rock abrasiveness index CAI and TBM excavation specific energy SE TBM The second relational model is Among them, the determination coefficient of the second relationship model is R 2 =0.770.
[0018] The above-mentioned method for evaluating the excavability of surrounding rock in TBM construction based on excavation specific energy is characterized in that: in step 2, the determination process of online constructing the TBM rock-machine perception database of the construction project is as follows:
[0019] Step 201: Collect TBM excavation raw data and TBM design parameters online. The TBM excavation raw data includes the total thrust of the cutterhead Th and the penetration per revolution of the cutterhead P. rev ; TBM design parameters include shield friction f, cutter head diameter D t , the distance S between adjacent hobs, the installation area radius D1 of the center hob of the cutter disc, the number of hobs N1 at the center of the cutter disc, the installation area radius D2 of the front hob of the cutter disc, the number of hobs N2 at the front of the cutter disc, the installation area radius D3 of the gauge hob of the cutter disc, the number of gauge hobs N3 of the cutter disc and the hob diameter d;
[0020] Step 202: using the isolation forest algorithm to clean the abnormal values of the TBM excavation raw data;
[0021] Step 203: For the missing values of the original TBM excavation data, the two closest data points and the missing value are regarded as the smallest data unit and linear interpolation is performed;
[0022] Step 204: Online construction of the TBM rock-machine perception database.
[0023] The above TBM construction surrounding rock excavability evaluation method based on tunneling specific energy is characterized in that: in step four, taking the uniaxial compressive strength σ of the rock mass cm , the rock abrasiveness index CAI, and the TBM tunneling specific energy SE TBM as evaluation indicators, the process of classifying the TBM construction surrounding rock grade and evaluating the excavability is as follows:
[0024] When the TBM tunneling specific energy SE TBM > 30 MJ / m 3 , the uniaxial compressive strength σ of the rock mass cm > 185 MPa, and the rock abrasiveness coefficient CAI > 6, the TBM is in a high specific energy tunneling state, the surrounding rock is extremely hard, the category is grade I, and the excavability is extremely poor;
[0025] When the TBM tunneling specific energy is 20 MJ / m 3 < SE TBM ≤ 30 MJ / m 3 , the uniaxial compressive strength of the rock mass 90 MPa < σ cm ≤ 185 MPa, and the rock abrasiveness coefficient 4 < CAI ≤ 6, the TBM is in a relatively high specific energy tunneling state, the surrounding rock is relatively hard, the category is grade II, and the excavability is good;
[0026] When the TBM tunneling specific energy is 10 MJ / m 3 < SE TBM ≤ 20 MJ / m 3 , the uniaxial compressive strength of the rock mass 30 MPa < σ cm ≤ 90 MPa, and the rock abrasiveness coefficient 2 < CAI ≤ 4, the TBM is in a medium specific energy tunneling state, the surrounding rock is good, the category is grade III, and the excavability is good;
[0027] When the TBM tunneling specific energy SE TBM ≤ 10 MJ / m 3 , the uniaxial compressive strength of the rock mass σ cm ≤ 30 MPa, and the rock abrasiveness coefficient CAI ≤ 2, the TBM is in a low specific energy tunneling state, the surrounding rock is broken, the category is grade IV, and the excavability is extremely poor.
[0028] The beneficial effect of the present invention is that by using rock mass parameters, index-tunneling specific energy grading is carried out, the calculation is convenient, the evaluation is rapid, the result is reliable, and it can quickly and accurately evaluate the excavability of the excavated rock mass based on the TBM tunneling form parameters, providing a decision-making basis for engineers to formulate a more scientific and systematic surrounding rock excavation and optimized support plan, and facilitating popularization and use.
[0029] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 The present invention is a flow chart of the method for evaluating the excavability of surrounding rock during TBM construction based on excavation specific energy.
[0031] Figure 2 The uniaxial compressive strength of the rock mass excavated by the TBM of the present invention is cm and TBM excavation specific energy SE TBM Fitting relationship diagram.
[0032] Figure 3 The rock abrasiveness coefficient CAI of the TBM in the rock mass excavation and the TBM excavation specific energy SE TBM Fitting relationship diagram.
[0033] Figure 4 This is a schematic diagram of the classification principle of the surrounding rock excavability assessment of TBM construction based on excavation specific energy in the present invention. DETAILED DESCRIPTION
[0034] like Figures 1 to 4 As shown, a method for evaluating the excavability of surrounding rock during TBM construction based on excavation specific energy of the present invention comprises the following steps:
[0035] Step 1: Offline establishment of rock mass uniaxial compressive strength σ cm and TBM excavation specific energy SE TBM The first relationship model of rock abrasiveness index CAI and TBM excavation specific energy SE are established offline. TBM The second relational model of
[0036] Step 2: Build the TBM rock-machine perception database of the project under construction online;
[0037] Step 3: Calculate TBM excavation specific energy SE based on the TBM rock-machine sensing database of the ongoing project TBM , and then use the first relationship model to calculate the uniaxial compressive strength of the rock mass σ cm , the rock abrasiveness index CAI is calculated using the second relationship model;
[0038] Step 4: Take the uniaxial compressive strength of rock mass σ cm , rock abrasiveness index CAI and TBM excavation specific energy SE TBM As the evaluation index, the surrounding rock grade classification and excavability assessment of TBM construction are carried out.
[0039] In this embodiment, in step 1, the uniaxial compressive strength of the rock mass σ cm and TBM excavation specific energy SE TBM The first relational model is Among them, the determination coefficient of the first relationship model is R 2 =0.861;
[0040] Rock abrasiveness index CAI and TBM specific energy SE TBM The second relational model is Among them, the determination coefficient of the second relationship model is R 2 =0.770.
[0041] In this embodiment, the uniaxial compressive strength of the rock mass σ cm and TBM excavation specific energy SE TBM The first relationship model of rock abrasiveness index CAI and TBM excavation specific energy SE TBM The determination process of the second relationship model is as follows:
[0042] Step 101: Obtain original data of TBM excavation projects with different tunnel diameters, TBM design parameters and geological data. The original data of TBM excavation projects include the total thrust of the cutterhead Th and the penetration per revolution of the cutterhead P. rev , TBM design parameters include shield friction f, cutter head diameter D t , the distance between adjacent cutters S, the installation area radius D1 of the cutter head center cutter, the number of cutter heads N1, the installation area radius D2 of the cutter head front cutter, the number of cutter heads N2, the installation area radius D3 of the cutter head gauge cutter, the number of cutter head gauge cutters N3 and the cutter diameter d; geological data including the uniaxial compressive strength σ of the rock mass cm and rock abrasiveness index CAI;
[0043] Step 102: According to the formula Calculate the cutter correction factor k, where N is the total number of cutters and N = N1 + N2 + N3;
[0044] Step 103: According to the formula Calculation of TBM Specific Energy SE TBM ;
[0045] Step 104: Use mathematical regression method to establish the uniaxial compressive strength σ of rock mass cm and TBM excavation specific energy SE TBM The first relational model Among them, the determination coefficient of the first relationship model is R 2 =0.861; Rock abrasiveness index CAI and TBM excavation specific energy SE TBM The second relational model is Among them, the determination coefficient of the second relationship model is R 2 =0.770.
[0046] In this embodiment, in step two, the determination process of online constructing the rock-machine perception database for the under-construction project TBM is as follows:
[0047] Step 201: Online collect the original TBM tunneling data and the TBM design parameters. The original TBM tunneling data includes the total cutterhead thrust Th and the penetration per revolution of the cutterhead P rev ; The TBM design parameters include the shield friction f, the cutterhead diameter D t , the adjacent hob spacing S, the installation area radius D1 of the center hob on the cutterhead, the number of center hobs N1 on the cutterhead, the installation area radius D2 of the face hobs on the cutterhead, the number of face hobs N2 on the cutterhead, the installation area radius D3 of the gauge hobs on the cutterhead, the number of gauge hobs N3 on the cutterhead, and the hob diameter d;
[0048] Step 202: Use the Isolation Forest algorithm to clean the outliers in the original TBM tunneling data;
[0049] Step 203: For the missing values in the original TBM tunneling data, regard the two closest data points before and after the missing value as the smallest data unit and perform linear interpolation;
[0050] Step 204: Online construct the TBM rock-machine perception database.
[0051] In this embodiment, in step four, taking the uniaxial compressive strength σ of the rock mass cm , the rock abrasiveness index CAI, and the TBM tunneling specific energy SE TBM as evaluation indicators, the process of classifying the surrounding rock grade and evaluating the excavability of TBM construction is as follows:
[0052] When the TBM tunneling specific energy SE TBM > 30 MJ / m 3 , the uniaxial compressive strength σ of the rock mass cm > 185 MPa, and the rock abrasiveness coefficient CAI > 6, the TBM is in a high specific energy tunneling state, the surrounding rock is extremely hard, the category is grade I, and the excavability is extremely poor;
[0053] When the TBM tunneling specific energy 20 MJ / m 3 < SE TBM ≤ 30 MJ / m 3 , the uniaxial compressive strength of the rock mass 90 MPa < σ cm ≤ 185 MPa, and the rock abrasiveness coefficient 4 < CAI ≤ 6, the TBM is in a relatively high specific energy tunneling state, the surrounding rock is relatively hard, the category is grade II, and the excavability is good;
[0054] When the TBM tunneling specific energy 10 MJ / m 3 < SE TBM ≤ 20 MJ / m 3 , the uniaxial compressive strength of the rock mass 30 MPa < σcm When ≤ 90 MPa and the rock abrasion coefficient 2 < CAI ≤ 4, the TBM is in the medium specific energy tunneling state, the surrounding rock is good, the category is grade III, and the excavability is good;
[0055] When the specific energy SE of TBM tunneling TBM ≤ 10 MJ / m 3 and the uniaxial compressive strength σ of the rock mass cm ≤ 30 MPa and the rock abrasion coefficient CAI ≤ 2, the TBM is in the low specific energy tunneling state, the surrounding rock is broken, the category is grade IV, and the excavability is extremely poor.
[0056] The classification of the surrounding rock grade and the evaluation of the excavability obtained by using the model of the present invention are as Figure 4 shown, and are divided into four grades in total. ① The surrounding rock is extremely hard, the category is grade I, and the excavability is extremely poor; ② The surrounding rock is relatively hard, the category is grade II, and the excavability is good; ③ The surrounding rock is good, the category is grade III, and the excavability is good; ④ The surrounding rock is broken, the category is grade IV, and the excavability is extremely poor.
[0057] When the present invention is used, rock mass parameters are adopted to carry out index - specific energy grading of tunneling. It is convenient to calculate, the evaluation is rapid, and the result is reliable. It can quickly and accurately evaluate the excavability of the rock mass being tunneled based on the TBM tunneling form parameters, providing a decision - making basis for engineering personnel to formulate a more scientific and systematic surrounding rock excavation and optimized support plan.
[0058] The above - mentioned is only a preferred embodiment of the present invention, and does not impose any limitation on the present invention. Any simple modification, change, and equivalent structural change made to the above - mentioned embodiments according to the technical essence of the present invention still fall within the protection scope of the technical solution of the present invention.
Claims
1. A method for evaluating the excavability of surrounding rock in TBM construction based on excavation specific energy, characterized in that: The method comprises the following steps: Step 1: Offline establishment of rock mass uniaxial compressive strength σ cm and TBM excavation specific energy SE TBM The first relationship model of rock abrasiveness index CAI and TBM excavation specific energy SE are established offline. TBM The second relational model of Step 2: Build the TBM rock-machine perception database of the project under construction online; Step 3: Calculate TBM excavation specific energy SE based on the TBM rock-machine sensing database of the ongoing project TBM , and then use the first relationship model to calculate the uniaxial compressive strength of the rock mass σ cm , the rock abrasiveness index CAI is calculated using the second relationship model; Step 4: Take the uniaxial compressive strength of rock mass σ cm , rock abrasiveness index CAI and TBM excavation specific energy SE TBM As the evaluation index, the surrounding rock grade classification and excavability assessment of TBM construction are carried out.
2. A method for evaluating the excavability of surrounding rock during TBM construction based on excavation specific energy according to claim 1, characterized in that: In step 1, the uniaxial compressive strength of the rock mass σ cm and TBM excavation specific energy SE TBM The first relational model is Among them, the determination coefficient of the first relationship model is R 2 =0.861; Rock abrasiveness index CAI and TBM specific energy SE TBM The second relational model is Among them, the determination coefficient of the second relationship model is R 2 =0.
770.
3. A method for evaluating the excavability of surrounding rock during TBM construction based on excavation specific energy according to claim 2, characterized in that: Uniaxial compressive strength of rock massσ cm and TBM excavation specific energy SE TBM The first relationship model of rock abrasiveness index CAI and TBM excavation specific energy SE TBM The determination process of the second relationship model is as follows: Step 101: Obtain original data of TBM excavation projects with different tunnel diameters, TBM design parameters and geological data. The original data of TBM excavation projects include the total thrust of the cutterhead Th and the penetration per revolution of the cutterhead P. rev , TBM design parameters include shield friction f, cutter head diameter D t , the distance between adjacent cutters S, the installation area radius D1 of the cutter head center cutter, the number of cutter heads N1, the installation area radius D2 of the cutter head front cutter, the number of cutter heads N2, the installation area radius D3 of the cutter head gauge cutter, the number of cutter head gauge cutters N3 and the cutter diameter d; geological data including the uniaxial compressive strength σ of the rock mass cm and rock abrasiveness index CAI; Step 102: According to the formula Calculate the cutter correction factor k, where N is the total number of cutters and N = N1 + N2 + N3; Step 103: According to the formula Calculation of TBM Specific Energy SE TBM ; Step 104: Use mathematical regression method to establish the uniaxial compressive strength σ of rock mass cm and TBM excavation specific energy SE TBM The first relational model Among them, the determination coefficient of the first relationship model is R 2 =0.861; Rock abrasiveness index CAI and TBM excavation specific energy SE TBM The second relational model is Among them, the determination coefficient of the second relationship model is R 2 =0.
770.
4. A method for evaluating the excavability of surrounding rock during TBM construction based on excavation specific energy according to claim 3, characterized in that: In step 2, the process of determining the online construction of the TBM rock-machine perception database for the project under construction is as follows: Step 201: Collect TBM excavation raw data and TBM design parameters online. The TBM excavation raw data includes the total thrust of the cutter head Th and the penetration per revolution of the cutter head P. rev ; TBM design parameters include shield friction f, cutter head diameter D t , the distance S between adjacent hobs, the installation area radius D1 of the center hob of the cutter disc, the number of hobs N1 at the center of the cutter disc, the installation area radius D2 of the front hob of the cutter disc, the number of hobs N2 at the front of the cutter disc, the installation area radius D3 of the gauge hob of the cutter disc, the number of gauge hobs N3 of the cutter disc and the hob diameter d; Step 202: using the isolation forest algorithm to clean the abnormal values of the TBM excavation raw data; Step 203: For the missing values of the original TBM excavation data, the two closest data points and the missing value are regarded as the smallest data unit and linear interpolation is performed; Step 204: construct a TBM rock-machine perception database online.
5. A method for evaluating the excavability of surrounding rock during TBM construction based on excavation specific energy according to claim 4, characterized in that: In step 4, the uniaxial compressive strength of rock mass σ cm , rock abrasiveness index CAI and TBM excavation specific energy SE TBM For the evaluation index, the process of surrounding rock classification and excavability assessment for TBM construction is as follows: When TBM excavation specific energy SE TBM >30MJ / m 3 , uniaxial compressive strength of rock mass σ cm When the rock abrasiveness coefficient CAI>185MPa and the rock abrasiveness coefficient CAI>6, the TBM is in a high specific energy excavation state, the surrounding rock is extremely hard, the category is Class I, and the excavability is extremely poor; When the specific energy of TBM tunneling is 20 MJ / m 3 <SE TBM ≤ 30 MJ / m 3 、uniaxial compressive strength of rock mass 90 MPa < σ cm ≤ 185 MPa, rock abrasion coefficient 4 < CAI ≤ 6, the TBM is in a state of tunneling with relatively high specific energy, the surrounding rock is relatively hard, the category is grade II, and the drivability is good; When the specific energy of TBM tunneling is 10 MJ / m 3 <SE TBM ≤20 MJ / m 3 、the uniaxial compressive strength of rock mass is 30 MPa < σ cm ≤90 MPa, and the rock abrasion coefficient is 2 < CAI ≤ 4, the TBM is in the state of medium specific energy tunneling, the surrounding rock is good, the category is grade III, and the drivability is good; When TBM excavation specific energy SE TBM ≤10MJ / m 3 , uniaxial compressive strength of rock mass σ cm When the pressure is ≤30MPa and the rock abrasiveness coefficient CAI≤2, the TBM is in a low specific energy excavation state, the surrounding rock is broken, the category is Grade IV, and the excavability is extremely poor.
Citation Information
Cited By
Method and system for evaluating rock breaking effect of hob
CN120876561A