Electromechanical installation system for engineering equipment installation

The three-dimensional model is generated through cloud databases and back-end platforms and the rational allocation of technicians and equipment is solved, and the problem of large amount of information and uneven distribution in the installation of large-scale engineering equipment is improved, and the installation efficiency is reduced.

CN118917797AInactive Publication Date: 2024-11-08GUANGDONG KAICHEN SMART TECH CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202410983098.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the installation of large or super-large engineering equipment, due to the diverse projects, large amount of information, uneven allocation of technicians and uneven allocation of lifting equipment, the construction process leads to omissions and rework, which affects the installation efficiency.

Method used

The cloud database and back-end platform are adopted to generate a three-dimensional installation model through collection, storage, computing and distribution units, and reasonably allocate it according to the information of technicians and equipment, marking easy-to-miss points to reduce construction omissions.

Benefits of technology

It improves the efficiency of the installation of engineering electromechanical equipment, ensures that technicians use appropriate equipment for installation in suitable projects, reduces omissions, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917797A_ABST
    Figure CN118917797A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of electromechanical construction, in particular to an electromechanical installation system for engineering equipment installation, which comprises a cloud database, a back-end platform and a personnel terminal, and is characterized in that the cloud database is used for classified storage of a large amount of data and can be called and collected through a network; the stored data comprises technical standard specifications and construction technician information, and the electromechanical installation system can generate a three-dimensional model after the engineering equipment is installed according to various types of information through the cloud database, the back-end platform, the personnel terminal and other structures; the construction technicians and the hoisting equipment are reasonably distributed in different projects according to various information, and the three-dimensional models of the corresponding project areas are distributed, so that the construction technicians can use the proper hoisting equipment to install the engineering equipment in projects conforming to the technical field of the construction technicians; and error-prone point marking of the three-dimensional model can also reduce installation careless mistakes of construction technicians, so that the installation efficiency of the engineering electromechanical equipment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electromechanical construction, and in particular to an electromechanical installation system for installing engineering equipment. Background Art

[0002] Engineering equipment refers to the equipment required for capital construction, expansion and enterprise technological transformation. The installation of electromechanical equipment in construction projects generally includes multiple project areas such as electrical, fire protection, lighting, communications, and HVAC.

[0003] Traditional electromechanical installation methods often use two-dimensional drawings as the basis for technical solution briefings, and construction workers need to carry a large number of drawings for on-site installation. When equipment installation is required for large or super-large projects, due to the large number of projects and the huge amount of information, the electromechanical equipment to be installed is complex and diverse, the poor allocation of technical personnel, the uneven allocation of lifting equipment, and the rework caused by negligence during the actual installation process will all affect the installation efficiency. Therefore, based on the above problems, an electromechanical installation system for engineering equipment installation is proposed. Summary of the invention

[0004] The purpose of the present invention is to provide an electromechanical installation system for engineering equipment installation to solve the problem that when equipment needs to be installed for large or super-large projects, there are many projects, a huge amount of information, the electromechanical equipment to be installed is complex and diverse, the allocation of technical personnel is poor, the allocation of lifting equipment is uneven, and rework caused by negligence during the actual installation process will affect the installation efficiency.

[0005] To achieve the above object, the present invention provides the following technical solutions:

[0006] An electromechanical installation system for engineering equipment installation, including a cloud database, a back-end platform and a personnel terminal. The cloud database is used for classified storage of a large amount of data, which can be called and collected through the network; the stored data includes technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information and hoisting equipment information;

[0007] The back-end platform is used for processing data information and allocating resources; it includes an acquisition unit, a storage unit, a computing unit, a 3D modeling unit, a distribution unit, and an information sending unit;

[0008] A collection unit is used to collect technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information and lifting equipment information in the cloud database, and transmit the above information to the storage unit for storage;

[0009] A storage unit for storing technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information, and hoisting equipment information, so that the computing unit and the distribution unit can call the required data in real time;

[0010] The computing unit calls the technical standards and specifications, engineering equipment information and construction site information in the storage unit, and cooperates with the three-dimensional modeling unit to form a three-dimensional installation model of the equipment after installation; calls the technical standards and specifications and equipment installation error-prone information in the storage unit to mark the installation error-prone points of the equipment in the three-dimensional installation model, and obtains the marked three-dimensional model;

[0011] The allocation unit calls the construction technician information and the lifting equipment information in the storage unit, and reasonably groups the construction technicians into different installation projects according to the past resumes and work experience of the construction technicians in the construction technician information, and reasonably allocates each lifting equipment into different groups according to the types and quantities of the lifting equipment in the lifting equipment information, and can divide the annotated three-dimensional model into regions of different projects, and allocate the divided three-dimensional models to corresponding groups of different projects, and obtain the allocated information through the above operations;

[0012] An information sending unit, used to distribute the allocated information to the terminals of each construction technician;

[0013] The personnel terminal refers to a handheld electronic device such as a mobile phone, which is used to receive the allocated information sent by the information sending unit.

[0014] Preferably, the technical standard specification refers to the electromechanical installation standard, the construction technician information refers to the technician's work experience, profession, education and physical condition in different projects, and the engineering equipment information refers to the equipment's classification, three-dimensional dimensions, weight parameters and fragility.

[0015] Preferably, the equipment installation error-prone information refers to the location summary of error-prone points by technical personnel in the project field where the equipment is located, the construction site information refers to the area, topography, and height difference data of the construction site, and the lifting equipment information refers to the type, quantity, rated lifting capacity, maximum amplitude, and maximum lifting height of the lifting equipment.

[0016] Compared with the prior art, the present invention has the following beneficial effects:

[0017] In the present invention, by setting up a cloud database, a back-end platform and a personnel terminal, and structures such as a collection unit, a storage unit, a computing unit, a three-dimensional modeling unit, a distribution unit and an information sending unit of the back-end platform, the electromechanical installation system can generate a three-dimensional model of the engineering equipment after installation according to various types of information, and reasonably allocate construction technicians and lifting equipment to different projects according to various types of information, and distribute the three-dimensional models of the corresponding project areas, so that construction technicians can use appropriate lifting equipment to install engineering equipment in projects that meet their own technical fields, and the marking of easy-to-error points in the three-dimensional model can also reduce the installation errors of construction technicians, thereby speeding up the installation efficiency of engineering electromechanical equipment, and solving the problem that when it is necessary to install equipment for large or super-large projects, due to the large number of projects and the huge amount of information, the electromechanical equipment to be installed is complex and diverse, the poor allocation of technicians, the uneven allocation of lifting equipment and the rework caused by omissions due to negligence during the actual installation process will all affect the installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a system schematic diagram of the present invention;

[0019] Figure 2 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION

[0020] See also Figure 1-2 , the present invention provides a technical solution:

[0021] An electromechanical installation system for engineering equipment installation, including a cloud database, a back-end platform and a personnel terminal. The cloud database is used for classified storage of a large amount of data, which can be called and collected through the network; the stored data includes technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information and hoisting equipment information;

[0022] The back-end platform is used for processing data information and allocating resources; it includes an acquisition unit, a storage unit, a computing unit, a 3D modeling unit, a distribution unit, and an information sending unit;

[0023] The collection unit is used to collect technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information and lifting equipment information in the cloud database, and transmit the above information to the storage unit for storage;

[0024] The storage unit is used to store technical standards and specifications, construction technician information, engineering equipment information, equipment installation error information, construction site information and lifting equipment information, so that the calculation unit and the distribution unit can call the required data in real time;

[0025] The computing unit calls the technical standards and specifications, engineering equipment information and construction site information in the storage unit, and cooperates with the three-dimensional modeling unit to produce a three-dimensional installation model of the equipment after installation; calls the technical standards and specifications and equipment installation error-prone information in the storage unit to mark the installation error-prone points of the equipment in the three-dimensional installation model, and obtains the marked three-dimensional model;

[0026] The allocation unit calls the construction technician information and the lifting equipment information in the storage unit, and reasonably groups the construction technicians into different installation projects according to the past resumes and work experience of the construction technicians in the construction technician information, and reasonably allocates each lifting equipment into different groups according to the types and quantities of the lifting equipment in the lifting equipment information, and can divide the annotated three-dimensional model into regions of different projects, and allocate the divided three-dimensional models to corresponding groups of different projects, and obtain the allocated information through the above operations;

[0027] An information sending unit, used to distribute the allocated information to the terminals of each construction technician;

[0028] The personnel terminal refers to a handheld electronic device such as a mobile phone, which is used to receive the allocated information sent by the information sending unit.

[0029] Technical standards and specifications refer to the standards for electromechanical installation, construction technician information refers to the technician's work experience, profession, education and physical condition in different projects, and engineering equipment information refers to the equipment's classification, three-dimensional dimensions, weight parameters and fragility. This description explains the specific contents of technical standards and specifications, construction technician information and engineering equipment information; equipment installation error-prone information refers to the location summary of error-prone points by technicians in the project field where the equipment is located, construction site information refers to the area, terrain and height difference data of the construction site, and lifting equipment information refers to the type, quantity, rated lifting capacity, maximum amplitude and maximum lifting height of the lifting equipment. This description explains the origin of equipment installation error-prone information and the contents of construction site information and lifting equipment information.

[0030] Workflow: The operation of the electromechanical installation system is as follows: Step 1: First, the data information in the cloud database is collected through the network through the acquisition unit. The collected information includes technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information and lifting equipment information; Step 2: The data information is transmitted to the storage unit for storage; Step 3: The operation unit calls the technical standards and specifications, construction site information, and engineering equipment information in the storage unit, and uses the three-dimensional modeling unit to generate a three-dimensional installation model after the equipment is installed; Step 4: The operation unit then calls the technical standards and specifications, and equipment installation error-prone information in the storage unit, and marks the error-prone points of the equipment in the three-dimensional installation model to obtain the marked three-dimensional model; Step 5: After receiving the marked three-dimensional model, the allocation unit calls the construction technician information and lifting equipment information in the storage unit, and reasonably groups each construction technician into different installation projects according to the past resume and work experience of the construction technician. Secondly, according to The installation requirements of different projects will reasonably allocate each lifting equipment to different groups, and finally divide the marked three-dimensional model into areas of different projects, and allocate the divided three-dimensional model to the corresponding groups of different projects, and obtain the allocated information through the above operations; step six, distribute the allocated information to the terminals of each construction technician through the information sending unit; step seven, each construction technician groups each installation project and allocates lifting equipment according to the allocated information, and then installs the engineering equipment on-site through the allocated three-dimensional model, so that the electromechanical installation system can generate a three-dimensional model of the engineering equipment after installation according to various types of information, and reasonably allocate construction technicians and lifting equipment to different projects according to various types of information, and distribute the three-dimensional model of the corresponding project area, so that construction technicians can use appropriate lifting equipment to install engineering equipment in projects that meet their own technical fields, and the marking of easy-to-error points in the three-dimensional model can also reduce the installation omissions of construction technicians, thereby speeding up the installation efficiency of engineering electromechanical equipment.

[0031] This article uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. The above are only preferred implementation methods of the present invention. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principles of the present invention, they can make several improvements, modifications or changes, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the inventive concept and technical solution to other occasions without improvement, should be regarded as the protection scope of the present invention.

Claims

1. An electromechanical installation system for engineering equipment installation, characterized in that: It includes cloud database, back-end platform and personnel terminal. Cloud database is used for classified storage of large amounts of data, which can be called and collected through the network; the stored data includes technical standards and specifications, construction technicians information, engineering equipment information, equipment installation error-prone information, construction site information and hoisting equipment information; Backend platform, used for data information processing and resource allocation; It includes a collection unit, a storage unit, a calculation unit, a three-dimensional modeling unit, a distribution unit and an information sending unit; A collection unit is used to collect technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information and lifting equipment information in the cloud database, and transmit the above information to the storage unit for storage; A storage unit for storing technical standards and specifications, construction technician information, engineering equipment information, equipment installation error-prone information, construction site information, and hoisting equipment information, so that the computing unit and the distribution unit can call the required data in real time; The computing unit calls the technical standards and specifications, engineering equipment information and construction site information in the storage unit, and cooperates with the three-dimensional modeling unit to form a three-dimensional installation model of the equipment after installation; calls the technical standards and specifications and equipment installation error-prone information in the storage unit to mark the installation error-prone points of the equipment in the three-dimensional installation model, and obtains the marked three-dimensional model; The allocation unit calls the construction technician information and the lifting equipment information in the storage unit, and reasonably groups the construction technicians into different installation projects according to the past resumes and work experience of the construction technicians in the construction technician information, and reasonably allocates each lifting equipment into different groups according to the types and quantities of the lifting equipment in the lifting equipment information, and can divide the annotated three-dimensional model into regions of different projects, and allocate the divided three-dimensional models to corresponding groups of different projects, and obtain the allocated information through the above operations; An information sending unit, used to distribute the allocated information to the terminals of each construction technician; The personnel terminal refers to a handheld electronic device such as a mobile phone, which is used to receive the allocated information sent by the information sending unit.

2. The electromechanical installation system for engineering equipment installation according to claim 1, characterized in that: The technical standards and specifications refer to the mechanical and electrical installation standards, the construction technician information refers to the technician's work experience, profession, education and physical condition in different projects, and the engineering equipment information refers to the equipment's classification, three-dimensional dimensions, weight parameters and fragility.

3. The electromechanical installation system for engineering equipment installation according to claim 1, characterized in that: The equipment installation error-prone information refers to the location summary of error-prone points by technical personnel in the project field where the equipment is located; the construction site information refers to the area, terrain, and height difference data of the construction site; and the lifting equipment information refers to the type, quantity, rated lifting capacity, maximum amplitude, and maximum lifting height of the lifting equipment.

Citation Information

Patent Citations

  • A project management system based on three-dimensional visualization

    CN109447479A

  • Construction site role management and control method based on BIM

    CN109492875A

  • Interaction method of construction management system and GIM model

    CN110598346A

  • Intelligent engineering management system and method based on GIS

    CN115660567A

  • Building mechanical and electrical installation engineering construction method based on BIM

    CN117634774A