Full-process control method, system and equipment for property evaluation and medium
Through the full-process control method and system, the management and control problems of cooperation among professionals in property valuation are solved, efficient generation and accuracy of property valuation reports are achieved, and the work efficiency and quality of the evaluation agency are improved.
Patent Information
- Application Number
- CN202410919628.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-08
AI Technical Summary
In the process of property valuation, how to achieve full-process control of professionals from multiple parties and improve the efficiency and accuracy of valuation reports.
A full-process control method and system was designed to obtain property valuation requests, generate and assign survey tasks, set survey periods, and generate and return valuation reports within the period, supporting the reuse of emergency tasks and historical survey information to ensure multiple parties. Efficient integration of collaboration.
The full process control of property valuation has been achieved, the efficiency and accuracy of valuation reports have been improved, the standardized and standardized operations within the evaluation agency have been ensured, and the work efficiency and quality have been improved.
Smart Images

Figure CN118917903A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of real estate evaluation, and in particular to a full-process control method, system, equipment and medium for property evaluation. Background Art
[0002] Property refers to various types of houses that have been built and put into use, as well as their supporting equipment, facilities and venues. Property includes various business formats, such as: office buildings, commercial buildings, residential communities, villas, industrial parks, hotels, factories and warehouses, etc. Among them, property valuation is the most representative of common real estate valuation. Property valuation is not a necessary step in property transactions. It is only required in the following specific circumstances: 1. The buyer and seller consider it necessary; 2. Apply for property insurance; 3. Apply for mortgage loans; 4. Transaction disputes, etc.
[0003] Property valuation refers to the activity of professional real estate appraisers, asset appraisers or land appraisers, etc., estimating and determining the value of the valuation object at the time of valuation based on a comprehensive analysis of the factors affecting the value of the valuation object, according to the specific valuation purpose, following the recognized valuation principles, following the rigorous valuation procedures, and using scientific valuation methods. Since property valuation involves the participation and collaboration of multiple professionals, how to achieve full process control of the multiple professionals involved in property valuation has become an urgent problem to be solved. Summary of the invention
[0004] The embodiments of the present invention provide a full-process control method, system, device and medium for property valuation, so as to solve the problem of achieving full-process control over multiple professionals involved in property valuation.
[0005] A full process control method for property valuation, comprising: Obtain the property valuation request sent by the requesting end, which includes the information of the property to be appraised, the information of the requester and the purpose of the appraisal, and send the property valuation request to the configuring end; In response to the valuation process returned by the configuration end after configuration based on the requester information and the valuation purpose, in combination with the property information to be valued, a valuation task and a valuation period are generated, wherein the valuation task includes an inspection task, and the valuation period includes an inspection period; Issue the survey task to the target survey terminal, and start the task countdown for the survey task according to the survey time limit; If the target survey end returns the survey result based on the survey task within the survey time limit, the survey result is sent to the valuation end, so that the valuation end returns the valuation report based on the valuation process and the survey result.
[0006] A full-process control system for property valuation includes: a full-process control system end, and a request end, a configuration end, a target survey end, and a valuation end respectively connected to the full-process control system end through a network, wherein the full-process control system end includes: The valuation request acquisition module is used to acquire the property valuation request sent by the request end, the property valuation request includes the information of the property to be valued, the information of the requester and the valuation purpose, and send the property valuation request to the configuration end; An investigation task generation module, for generating an investigation task and an investigation period in response to the valuation process returned by the configuration end after configuration based on the requester information and the valuation purpose, and combining the information of the property to be assessed, wherein the valuation task includes the investigation task and the valuation period includes the investigation period; The survey task issuing module is used to issue the survey task to the target survey terminal and start the task countdown for the survey task according to the survey time limit; The survey result sending module is used to send the survey result to the valuation end if the target survey end returns the survey result based on the survey task within the survey time limit, so that the valuation end returns the valuation report based on the valuation process and the survey result.
[0007] In some embodiments, the full-process control system for property valuation is also used to: push the remaining survey volume of each survey end, and to obtain the target survey end returned by the configuration end based on all the remaining survey volumes.
[0008] In some embodiments, the full-process control system for property valuation is also used to: if the target survey end fails to return the survey results based on the survey task within the survey time limit, then extract the survey progress of the target survey end; based on the survey progress, determine whether to assign the survey task to other survey ends; if the survey task is assigned to other survey ends, then repeat the step of counting down the survey task starting from the survey time limit.
[0009] In some embodiments, the survey result sending module is further used for: the valuation end generates a process report based on the valuation process and the survey result, and generates and returns a valuation report from the process report through a valuation report template corresponding to the valuation purpose.
[0010] In some embodiments, the full-process control system for property valuation is also used to: send the valuation report to the audit end, so that the audit end audits the valuation report and returns the audit version of the report.
[0011] In some embodiments, the survey task issuing module is further used to: if the task urgency is an urgent task, issue the survey task to the target survey terminal and the auxiliary survey terminal.
[0012] In some embodiments, the full-process control system for property valuation is also used to: obtain historical survey information of the property information to be valued; if there is historical survey information of the property information to be valued, and the historical survey information is within the valid survey period, then extract the historical survey information as the survey result, and directly execute the step of sending the survey result to the valuation end, so that the valuation end returns a valuation report based on the valuation process and the survey result.
[0013] An electronic device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the full-process control method for property valuation is implemented.
[0014] A computer-readable medium stores a computer program, which, when executed by a processor, implements the above-mentioned full-process control method for property valuation.
[0015] The above-mentioned full-process control method, system, equipment and medium for property valuation generate valuation tasks and valuation deadlines through the valuation process returned by the configuration end based on the requester information and the valuation purpose, combined with the property information to be valued. The valuation task includes the survey task, and the valuation deadline includes the survey deadline; the survey task is issued to the target survey end, and the survey task countdown starts according to the survey deadline; within the survey deadline, based on the survey results returned by the survey task, the valuation end can return the valuation report in time based on the valuation process and the survey results. This method integrates multiple parties involved in property valuation into a full-process control system for property valuation, and can generate a valuation report corresponding to the property in time through the regulation of the process and deadline, thereby improving the efficiency of generating the valuation report. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments of the present invention will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative labor.
[0017] Figure 1 A schematic diagram of an application environment of a full-process control method for property valuation in one embodiment of the present invention is shown; Figure 2 A schematic diagram of the system architecture of a full-process control method for property valuation in one embodiment of the present invention is shown; Figure 3 A first flow chart of a full-process control method for property valuation in a first embodiment of the present invention is shown; Figure 4A schematic diagram of an appraisal report in a full-process control method for property appraisal in a first embodiment of the present invention is shown; Figure 5 A schematic diagram showing the types of optional valuation report templates in the full-process control method for property valuation in the first embodiment of the present invention is shown; Figure 6 A schematic diagram of the process of issuing an emergency survey task to a target survey terminal and an auxiliary survey terminal in the full process control method for property valuation in the first embodiment of the present invention is shown; Figure 7 A second flow chart of the full process control method for property valuation in the second embodiment of the present invention is shown; Figure 8 A schematic diagram of a full-process control system for property valuation in one embodiment of the present invention is shown; Fig. 9 A schematic diagram of an electronic device according to an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] The full process control method for property valuation provided by the embodiment of the present invention can be applied in the following aspects: Figure 1 In the application environment and using Figure 2 As shown in the system architecture, the full-process control method for property valuation is applied in a full-process control system for property valuation, and the full-process control system for property valuation includes a full-process control system end, and a request end, a configuration end, a target survey end and a valuation end which are respectively network-connected to the full-process control system end, wherein the full-process control system end can be implemented with an independent server or a server cluster consisting of multiple servers.
[0020] The valuation process of each property is basically the same. Taking real estate evaluation as an example, the offline real estate evaluation process is briefly introduced: 1. First, the purpose of real estate appraisal should be clarified, and the appraisal fees, appraisal reports, responsibilities of both parties and other matters should be understood; 2. After formulating the work plan, the surveyor conducts on-site survey of the real estate and keeps good survey records; 3. Real estate appraisers measure the price of real estate. In order to make the appraisal price more fair and reasonable, they generally use one appraisal method as the main method and multiple appraisal methods as the auxiliary methods. Among them, the appraisal methods include: 1) cost method; 2) market comparison method; 3) residual method; 4) income method; 5) hypothetical development method; 6) benchmark land price method; 7) route price method, etc. In addition, the factors affecting the property valuation also include the purpose of the house, the location of the building in the community, the age of the house, the surrounding housing prices, the surrounding supporting facilities, etc., which are the standard prices for the payment of taxes and fees for second-hand housing transactions and the appraisal standards for second-hand housing bank loans; different apartment types in different areas, different apartment types in the same area, and different locations also directly affect the appraisal price of the house.
[0021] 4. Conduct a comprehensive analysis of the real estate, determine the evaluation results, and finally write an evaluation report.
[0022] In one embodiment, if Figure 3 As shown, a full process control method for property valuation is provided, and the method is applied in Figure 1 The server in the example is used as an example, and the specific steps include the following: S110. Obtain the property valuation request sent by the requesting end, the property valuation request including the information of the property to be valued, the information of the requester and the valuation purpose, and send the property valuation request to the configuring end.
[0023] Among them, the requesting end can be open to banks, courts or governments to initiate property valuation requests.
[0024] The information of the property to be appraised includes the basic information of the property to be appraised provided by the user, including: (1) property rights information; (2) building information; (3) market transaction information; (4) land information and (5) legal and planning information, etc. Specifically including: The property's location, purpose, area, shape, structure, number of floors, area, usage, etc.; it also includes the valuation of the property's rights status, such as full ownership, incomplete ownership with certain other rights, the ownership of part of the walls of the house, etc. It also includes clarifying the scope of the valuation object, such as simply evaluating the value of the land, or simply evaluating the value of the house, or evaluating a certain part of a house, etc., so that the appraiser can fully understand the property.
[0025] The same real estate is often valued differently for different purposes. Therefore, the purpose of the valuation request must be clearly stated to distinguish valuations of different natures. The purpose of the valuation is the purpose of the valuation, such as mortgage, etc.
[0026] S120. In response to the valuation process returned by the configuration end based on the requester information and the valuation purpose, the valuation task and valuation period are generated in combination with the property information to be valued. The valuation task includes the inspection task, and the valuation period includes the inspection period.
[0027] Specifically, users on the configuration side can formulate valuation work plans, collect the data required for valuation, and generate valuation tasks based on the basic matters of valuation. Valuation tasks include making schedules for various tasks to be done for valuation, including arrangements for valuation work content, operators, time schedule, and required funds, so as to facilitate progress control and coordination.
[0028] The valuation period also includes: the system sets a reminder time for each business, that is, if the valuation report is not completed, the system will start reminding you how long it will take to complete the valuation report according to the completion time required by the specific requesting end.
[0029] Furthermore, different requesters have different valuation requirements. For example, some require that the calculation be done before the pre-evaluation. In this case, the appraiser on the valuation side needs to calculate first and then write the pre-evaluation. For some requesters, the calculation is done when making the report, and the appraiser only needs to give an approximate price during the pre-evaluation. Therefore, this system can generate different valuation processes according to different requester requirements, thus corresponding to different valuation tasks.
[0030] The survey period is the maximum time limit for the surveyor to complete the survey task.
[0031] Because the price of a property at a specific point in time. Therefore, the valuation point in time must be clearly identified. If the valuation point in time is not determined, the property valuation is meaningless. The survey time is the latest time limit for the survey end that issues the appraisal report to give the survey results. In other words, the appraisal report provided by this system also has a delivery deadline. The date of delivery of the appraisal report is generally proposed by the entrusting appraisal party, and can also be negotiated and determined by the entrusting appraisal party and the accepting appraisal party. The general working date of the appraisal report is seven to fifteen working days.
[0032] S130. Issue the survey task to the target survey terminal, and start the task countdown for the survey task according to the survey time limit.
[0033] The target survey end corresponds to the designated surveyor. The surveyor's work includes: to verify the relevant contents of the valuation object on the spot, and to objectively confirm the specific contents of the physical structure, rights status, and environmental conditions of the valuation object real estate.
[0034] S140. If the target survey end returns a survey result based on the survey task within the survey time limit, the survey result is sent to the valuation end, so that the valuation end returns a valuation report based on the valuation process and the survey result.
[0035] Among them, the survey results include at least survey information, property photos and property map annotations, property information, decoration information, traffic conditions and surrounding facilities, etc., and support photo uploading.
[0036] The valuation end corresponds to the designated appraiser. The appraiser's work includes: determining the valuation method, collecting information, comprehensive analysis and estimation, and finally estimating the real estate price and writing a valuation report. The valuation report can be freely set according to the requirements of the valuation reporter, and the length is not limited. Figure 4 Regardless of the form of the valuation report, at least the following items shall be recorded: 1. Name of the client, contact person, survey leader, and person responsible for undertaking the appraisal. 2. Detailed address of the appraisal object, appraisal date, report number, etc. 3. Land area, building area, and building type of the appraisal object, etc. 4. Analysis of the conditions of the appraisal object. 5. Basis of appraisal. 6. Appraisal results.
[0037] Furthermore, after returning the valuation report to the requesting end, the full-process control system for property valuation provided by this embodiment can also archive the valuation vouchers, information and materials collected during the on-site investigation, and the report draft.
[0038] Specifically, the system stores information related to registered appraisers or audited appraisers. Appraisers can be freely assigned by the system, or appraisers corresponding to any valuation end can be assigned.
[0039] Furthermore, the system also supports users to output different printing option results according to the report corresponding to the valuation report, such as business number, total assessment area, pre-assessment number and commission remarks.
[0040] The full-process control method for property valuation provided in this embodiment generates a valuation task and a valuation period through the valuation process returned after configuration by the configuration end based on the requester information and the valuation purpose, combined with the property information to be valued. The valuation task includes an inspection task, and the valuation period includes an inspection period; the inspection task is issued to the target inspection end, and the inspection task countdown starts according to the inspection period; within the inspection period, based on the inspection results returned by the inspection task, the valuation end can return the valuation report in time based on the valuation process and the inspection results. This method integrates multiple parties involved in property valuation into a full-process control system for property valuation, and can generate a valuation report corresponding to the property in time through the regulation of the process and time limit, thereby improving the efficiency of generating the valuation report.
[0041] This system makes the internal management and assessment work of the assessment agency more standardized and standardized, so as to achieve dual stability in work efficiency and quality.
[0042] In a specific embodiment, before step S130, that is, before issuing the survey task to the target survey terminal, the process further includes: S301. Push the remaining survey amount of each survey end to obtain the target survey end returned by the configuration end based on all the remaining survey amounts.
[0043] Among them, the remaining survey volume is the number of unfinished survey tasks corresponding to each surveyor.
[0044] It can be understood that the system provided in this embodiment can assign new survey tasks to surveyors with the least remaining target survey quantity.
[0045] In a specific embodiment, after step S130, that is, after starting the task countdown for the survey task according to the survey time limit, the process further includes: S3021. If the target survey end does not return the survey result based on the survey task within the survey time limit, the survey progress of the target survey end is extracted.
[0046] S3022. Based on the survey progress, determine whether to assign the survey task to other survey terminals.
[0047] S3023. If the survey task is assigned to other survey terminals, the step of starting the task countdown for the survey task according to the survey time limit is repeated.
[0048] The survey result is the survey report returned by the surveyor based on the survey task. The survey progress is the progress of the survey task, for example, whether the survey task has been completed halfway or not yet completed.
[0049] It is understandable that unexecuted or less than half-executed survey tasks can be assigned to other survey terminals to improve the flexibility and applicability of the full-process control for property valuation and improve the efficiency of completing valuation tasks.
[0050] In a specific embodiment, if Figure 5 As shown, in step S140, the valuation end returns a valuation report based on the valuation process and the survey results, including: S141. The valuation end generates a process report based on the valuation process and survey results, generates a valuation report using a valuation report template corresponding to the valuation purpose, and returns it.
[0051] Different processes correspond to different reports, such as test reports or land valuation reports.
[0052] Specifically, different valuation purposes correspond to different valuation report templates, such as: judicial appraisal, mortgage or transfer templates, etc.
[0053] This embodiment can generate a valuation report from a process report according to different valuation report templates with one click, thereby improving the valuation efficiency of the valuation system.
[0054] In a specific embodiment, after step S140, that is, after the valuation end returns the valuation report based on the survey result, the following is further included: S1401. Send the valuation report to the auditing end so that the auditing end can audit the valuation report and return the audited version of the report.
[0055] In this embodiment, the valuation report can be sent to the review end for further review and confirmation to ensure the correctness of the valuation report.
[0056] In a specific embodiment, the survey task includes the task urgency. Figure 6 As shown, in step S130, the survey task is issued to the target survey terminal, including: S131. If the task urgency is an urgent task, the survey task is issued to the target survey terminal and the auxiliary survey terminal.
[0057] Specifically, when assigning a survey, you can fill in the survey level based on the degree of urgency and select the main surveyor. If the survey business is relatively important and requires assistance, the survey task can be sent to one or more auxiliary surveyors, and other relevant information can be saved through notes.
[0058] In a specific embodiment, if Figure 7 As shown, after step S120, that is, after the valuation process returned in response to the configuration end based on the requester information and the valuation purpose, it also includes: S1201. Obtain historical survey information of the property to be appraised.
[0059] S1202. If there is historical survey information of the property information to be appraised, and the historical survey information is within the valid survey period, the historical survey information is extracted as the survey result, and the survey result is directly sent to the valuation end, so that the valuation end returns a valuation report based on the valuation process and the survey result.
[0060] Among them, after inspecting any property, in order to avoid repeated inspections, an effective inspection period can be set for the inspection results based on the current property inspection status, that is, the inspection results are valid during the subsequent effective inspection period.
[0061] Furthermore, the system can also regularly perform statistics based on quantitative valuation tasks and generate experience decisions. Business decisions are to evaluate the company's business and revenue, and to make statistical reports based on different dimensions, such as "customer analysis", "salesman business volume statistics", "appraiser business volume statistics" and "surveyor business volume statistics"; it can also regularly generate customer analysis for the requesting end, including the total business volume and revenue statistics based on the classification of customer companies; statistics for salesman business volume, including total business volume and commission, etc.; generate business volume statistics for appraisers, including total business volume and commission, etc.
[0062] Specifically, in the appraisal business, it is often the case that the same property is mortgaged multiple times and requires multiple inspections, but its basic information is effectively fixed. If all the information is re-inspected and filled in again, there will be duplication of work. The "historical inspection" function provided by this system can be used to reuse the historical inspection data to save time and improve work efficiency.
[0063] It should be understood that the order of execution of the steps in the above embodiment does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present invention.
[0064] In one embodiment, a full-process control system for property valuation is provided, and the full-process control system for property valuation corresponds one-to-one with the full-process control method for property valuation in the above embodiment. Figure 8 As shown, the full-process control system for property valuation includes: a full-process control system end, and a request end, a configuration end, a target survey end and a valuation end respectively connected to the full-process control system end through a network, wherein the full-process control system end includes: a valuation request acquisition module 110, a survey task generation module 120, a survey task issuance module 130 and a survey result sending module 140. The functional modules are described in detail as follows: The valuation request acquisition module 110 is used to acquire a property valuation request sent by a requesting end, wherein the property valuation request includes information of the property to be valued, information of the requester, and the valuation purpose, and send the property valuation request to the configuration end; The survey task generating module 120 is used to generate a valuation task and a valuation period in response to the valuation process returned by the configuration end after configuration based on the requester information and the valuation purpose, combined with the to-be-valued property information, wherein the valuation task includes a survey task, and the valuation period includes a survey period; The survey task issuing module 130 is used to issue the survey task to the target survey terminal and start the task countdown for the survey task according to the survey time limit; The survey result sending module 140 is used to send the survey result to the valuation end if the target survey end returns the survey result based on the survey task within the survey time limit, so that the valuation end returns a valuation report based on the valuation process and the survey result.
[0065] Specifically, the full-process control system terminal may also include functional modules such as business registration, pre-assessment report, formal report, report printing, business reminder, investigation, business decision-making and system settings. Among them, the business registration module may also include a sub-module for converting inquiry to business.
[0066] The function of the inquiry-to-business submodule is: after the inquiry is converted to business, if no allocation is required, the valuation report can be obtained directly; if allocation is required, it can be allocated to the corresponding appraiser to prepare the valuation report in the business registration.
[0067] Preferably, the full process control system for property valuation also includes: The target survey end acquisition module is used to push the remaining survey amount of each survey end and to acquire the target survey end returned by the configuration end based on all the remaining survey amounts.
[0068] Preferably, the full process control system for property valuation also includes: The survey progress extraction module is used to extract the survey progress of the target survey end if the target survey end fails to return the survey result based on the survey task within the survey time limit.
[0069] The survey task determination and assignment module is used to determine whether to assign the survey task to other survey terminals based on the survey progress.
[0070] The survey task re-execution module is used to repeatedly execute the steps of starting the task countdown for the survey task according to the survey time limit if the survey task is assigned to other survey terminals.
[0071] Preferably, the survey result sending module 140 includes: The estimation report return submodule is used by the valuation side to generate a process report based on the valuation process and survey results, and to generate and return the valuation report using the valuation report template corresponding to the valuation purpose.
[0072] Preferably, the full process control system for property valuation also includes: The audit version report return module is used to send the valuation report to the audit end so that the audit end can audit the valuation report and return the audit version report.
[0073] Preferably, the survey task issuing module 130 includes: The survey task issuing submodule is used to issue the survey task to the target survey terminal and the auxiliary survey terminal if the task urgency is an urgent task.
[0074] Preferably, the full process control system for property valuation also includes: The historical survey information acquisition module is used to obtain historical survey information of the property to be appraised.
[0075] The survey result direct execution sending module is used to extract the historical survey information as the survey result if there is historical survey information of the property information to be appraised and the historical survey information is within the valid survey period, and directly execute the step of sending the survey result to the valuation end, so that the valuation end returns the valuation report based on the valuation process and the survey result.
[0076] For the specific definition of the full-process control system for property valuation, please refer to the definition of the full-process control method for property valuation mentioned above, which will not be repeated here. Each module in the above-mentioned full-process control system for property valuation can be implemented in whole or in part through software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the electronic device in the form of hardware, or can be stored in the memory of the electronic device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0077] In one embodiment, an electronic device is provided. The electronic device may be a server, and its internal structure diagram may be as shown in FIG. Fig. 9 As shown. The electronic device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile medium and an internal memory. The non-volatile medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile medium. The database of the electronic device is used for data related to the full-process control method of property valuation. The network interface of the electronic device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a full-process control method for property valuation is implemented.
[0078] In one embodiment, an electronic device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the full-process control method for property valuation in the above embodiment is implemented, for example Figure 2 Alternatively, when the processor executes the computer program, the functions of each module / unit of the full process control system for property valuation in the above-mentioned embodiment are realized, for example Figure 8 The functions of the modules 10 to 140 are shown in Figure 1. To avoid repetition, they will not be described in detail here.
[0079] In one embodiment, a computer readable medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the full process control method for property valuation in the above embodiment is implemented, for example Figure 2 Alternatively, when the computer program is executed by the processor, the functions of each module / unit in the full process control system for property valuation in the above system embodiment are realized, for example Figure 8 The functions of the modules 10 to 140 are shown in Figure 1. To avoid repetition, they will not be described in detail here.
[0080] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments of the present application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0081] Those skilled in the art will clearly understand that for the sake of convenience and brevity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the system can be divided into different functional units or modules to complete all or part of the functions described above.
[0082] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.
Claims
1. A full process control method for property valuation, It is characterized in that include: Acquire a property valuation request sent by a requesting end, the property valuation request including information of the property to be valued, information of the requester, and the valuation purpose, and send the property valuation request to a configuring end; In response to the valuation process returned by the configuration end after configuration based on the requester information and the valuation purpose, generating a valuation task and a valuation period in combination with the to-be-valuated property information, wherein the valuation task includes an inspection task and the valuation period includes an inspection period; The survey task is issued to the target survey terminal, and a task countdown for the survey task is started according to the survey time limit; If the target survey end returns a survey result based on the survey task within the survey time limit, the survey result is sent to the valuation end, so that the valuation end returns a valuation report based on the valuation process and the survey result.
2. The full process control method for property valuation according to claim 1, It is characterized in that Before issuing the survey task to the target survey terminal, the method further includes: The remaining survey amount of each survey end is pushed to obtain the target survey end returned by the configuration end based on all the remaining survey amounts.
3. According to the full process control method for property valuation according to claim 1, It is characterized in that After the task countdown for the survey task begins according to the survey time limit, the method further includes: If the target survey end fails to return a survey result based on the survey task within the survey time limit, extracting the survey progress of the target survey end; Based on the survey progress, determining whether to assign the survey task to other survey terminals; If the survey task is assigned to other survey terminals, the step of starting task countdown for the survey task according to the survey time limit is repeated.
4. The full process control method for property valuation according to claim 1, It is characterized in that The valuation end returns a valuation report based on the valuation process and the survey results, including: The valuation end generates a process report based on the valuation process and the survey result, generates a valuation report from the process report through a valuation report template corresponding to the valuation purpose, and returns the report.
5. The full process control method for property valuation according to claim 1, It is characterized in that After the valuation end returns the valuation report based on the survey result, the method further includes: The valuation report is sent to the audit end, so that the audit end audits the valuation report and returns the audit version report.
6. The full process control method for property valuation according to claim 1, It is characterized in that The survey task includes task urgency; The step of issuing the survey task to the target survey terminal includes: If the task urgency is an urgent task, the survey task is issued to the target survey terminal and the auxiliary survey terminal.
7. The full process control method for property valuation according to claim 1, It is characterized in that After the valuation process is returned in response to the configuration end performing configuration based on the requester information and the valuation purpose, the method further includes: Obtaining historical survey information of the property to be appraised; If there is historical survey information of the property information to be appraised, and the historical survey information is within the valid survey period, the historical survey information is extracted as the survey result, and the step of directly sending the survey result to the valuation end is executed so that the valuation end returns a valuation report based on the valuation process and the survey result.
8. A full process control system for property valuation, It is characterized in that include: A full process control system end, and a request end, a configuration end, a target survey end and an evaluation end respectively connected to the full process control system end through a network, wherein the full process control system end includes: An appraisal request acquisition module is used to acquire a property appraisal request sent by a requesting end, wherein the property appraisal request includes information of the property to be appraised, information of the requester and the purpose of the appraisal, and send the property appraisal request to the configuring end; An investigation task generation module, for generating an investigation task and an investigation period in response to the valuation process returned by the configuration end after configuration based on the requester information and the valuation purpose, and in combination with the to-be-valuated property information, wherein the valuation task includes an investigation task and the valuation period includes an investigation period; A survey task issuing module is used to issue the survey task to the target survey terminal and start the task countdown for the survey task according to the survey time limit; The survey result sending module is used to send the survey result to the valuation end if the target survey end returns the survey result based on the survey task within the survey time limit, so that the valuation end returns a valuation report based on the valuation process and the survey result.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the full-process control method for property valuation as described in any one of claims 1 to 7 is implemented.
10. A computer-readable medium storing a computer program. It is characterized in that When the computer program is executed by a processor, the full-process control method for property valuation as described in any one of claims 1 to 7 is implemented.