Visual calibration method and device for field reconstruction of ultra-high voltage live working based on laser point cloud and geographic information

Through technology based on laser point cloud and geographic information, live-operated work sites are reconstructed, safe distance verification and operation simulation planning are carried out, and the problem of low informatization in traditional live-operated work is solved, providing effective operation risk prediction and safety guarantee , improves the safety of the job.

CN118918277APending Publication Date: 2024-11-08STATE GRID JIANGSU ELECTRIC POWER CO LTD MAINTENANCE BRANCH

Patent Information

Application Number
CN202410539408.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In traditional live operations, manual calculation and verification of safety distance analysis has a low degree of informatization, which is difficult to match the actual scenario, resulting in backward feasibility analysis technology before the operation, insufficient informatization, and lack of effective operation risk prediction and safety guarantee.

Method used

Using the ultra-ultra-high voltage live operation site reconstruction visual calibration method based on laser point cloud and geographic information, the site scene is reconstructed by acquiring and processing laser point cloud data, safe distance verification, operation simulation planning and mechanical analysis are carried out to generate visual reports , provide risk prediction and security guarantee.

Benefits of technology

Visual calibration of multiple scenarios is realized, effective operation risk prediction basis is generated, safety guarantees are provided for subsequent operations, and safety accidents are effectively prevented and reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118918277A_ABST
    Figure CN118918277A_ABST
Patent Text Reader

Abstract

The invention provides an ultra-high voltage live working field reconstruction visual calibration method and device based on laser point cloud and geographic information, and the method comprises the steps: obtaining point cloud data and geographic information, carrying out the live working scene restoration, and obtaining a live working field scene; based on the live working field scene, safety distance checking is carried out, and a safety distance checking result is visually output and displayed; performing operation simulation planning based on the live working field scene, and visually outputting and displaying a planning result; based on the live working site scene, mechanical analysis and checking are carried out, and a mechanical analysis and checking result is visually output and displayed; and based on the live working field scene, conducting and ground wire broken strand calculation is carried out, and conducting and ground wire broken strand calculation results are visually output and displayed. Visual calibration of multiple scenes is provided, an analysis report is generated according to the content of the visual calibration, and an effective operation risk prediction basis is provided for hot-line work.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method and a device for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information, belonging to the technical field of live working. Background Art

[0002] Before live working, safety distance analysis and mechanical analysis must be conducted on personnel, machinery, components, etc. that may enter the safety distance during construction work. Traditional live working methods use manual calculation and verification, with a low level of informatization, and safety verification results are difficult to match with real scenes. Pre-operation feasibility analysis technology is backward and has a low level of informatization.

[0003] Therefore, a visual calibration method that can reconstruct live working scenes is needed to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art, provide a method and device for on-site reconstruction of ultra-high voltage live operations based on laser point cloud and geographic information, provide visual calibration of multiple scenes, and generate analysis reports according to the contents of the visual calibration, thereby providing an effective basis for predicting operational risks in live operations and providing guarantees for the safety of subsequent operations.

[0005] To achieve the above object, the present invention is implemented by adopting the following technical solutions:

[0006] In a first aspect, the present invention provides a method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information, comprising:

[0007] Obtain laser point cloud data and geographic information of ultra-high voltage transmission line towers, and restore live working scenes to obtain live working site scenes;

[0008] Based on the live working scene, a safety distance check is performed, and the safety distance check result is output and displayed visually;

[0009] Based on the live working scene, operation simulation planning is performed, and the planning results are output and displayed visually.

[0010] Furthermore, the laser point cloud data and geographic information of the ultra-high voltage transmission line tower are obtained, and the live working scene is restored to obtain the live working scene, including:

[0011] Obtain laser point cloud data of ultra-high voltage transmission line towers;

[0012] Lightweight processing is performed on the laser point cloud data of the ultra-high voltage transmission line tower to obtain lightweight laser point cloud data of the transmission line tower;

[0013] Based on the lightweight rear-point transmission line tower laser point cloud data, loading and reconstructing are performed to obtain an ultra-ultra-high voltage transmission line tower laser point cloud model;

[0014] Based on the laser point cloud model of ultra-high voltage transmission line towers and basic geographic entities, the on-site scene of live working is simulated.

[0015] Furthermore, the method for lightweight processing of the laser point cloud data of the ultra-high voltage transmission line tower includes point cloud thinning or point cloud compression:

[0016] Furthermore, the point cloud thinning method includes:

[0017] Sampling-based thinning, distance-based thinning, grid-based thinning, clustering-based thinning, or reconstruction-based thinning.

[0018] Furthermore, the point cloud compression method includes:

[0019] Sampling-based compression: Similar to thinning, the amount of data is reduced by sampling the point cloud data.

[0020] Compression based on geometric features, data format conversion, optimization based on spatial indexes, processing based on GPU acceleration or streaming processing.

[0021] Furthermore, based on the live working scene, a safety distance check is performed, and the safety distance check result is visually output and displayed, including:

[0022] In the live working scenario, based on the laser point cloud model of the ultra-high voltage transmission line tower, the safety distance parameter is measured to obtain the safety distance parameter; the safety distance parameter includes the insulator length, the total length of the insulator string, the distance between the equipotential worker and the adjacent phase live body, the ground potential activity range, the equipotential activity range, the minimum combined gap, the total length of the insulator string, the minimum activity range considered, the side phase conductor distance to the tower, the middle phase conductor distance to the tower and the horizontal distance between the conductor hanging point and the tower body;

[0023] According to the safety distance parameters, the safety distance of the operation method is calculated; the safety distance includes the minimum safety distance, the minimum distance to the ground, the minimum phase distance and the minimum safe operation distance

[0024] Obtain the preset safety distance for each operation method;

[0025] Compare the safety distance of each operation method with the preset safety distance. If the safety distances are all greater than the preset safety distances, the safety distance check of the operation method passes. Otherwise, the safety distance check of the operation method fails.

[0026] Generate safety distance verification results and output them for display.

[0027] Furthermore, based on the live working scene, operation simulation planning is performed, and the planning results are visualized and output and displayed, including:

[0028] Based on the points on the laser point cloud model of the UHV transmission line tower, graphic simulations of the flat ladder method, soft ladder method and hanging basket method are performed respectively;

[0029] The graphic simulation of the horizontal ladder method includes: obtaining two points on the line tower point cloud model, drawing a straight line, calculating and outputting the horizontal ladder distance;

[0030] The graphic simulation of the soft ladder method includes: obtaining two points on the line tower point cloud model, drawing an arc, and calculating and outputting the vertical distance between the lowest point of the arc and the two points;

[0031] The graphic simulation of the hanging basket method includes: obtaining a point on the line tower point cloud model, drawing a straight line perpendicular to the ground, and calculating and outputting the distance from the point to the ground.

[0032] Furthermore, the method further includes: performing mechanical analysis verification based on the live working scene, and visually outputting and displaying the mechanical analysis verification results, including:

[0033] Obtain and calculate the total load of the insulator string, the total load of a single sub-conductor and the tension of the insulator string according to the parameters of the conductor, line and tower, and obtain the total load of the insulator string, the total load of a single sub-conductor and the tension of the insulator string;

[0034] Retrieve the pre-imported physical parameters of different types of conductors and insulators, obtain the model selection information of conductors and insulators, perform mechanical calculations based on the force analysis formula, and obtain the mechanical analysis verification results;

[0035] The mechanical analysis verification results are output and displayed.

[0036] Furthermore, the method further includes: based on the live working scene, calculating the conductor and ground wire breakage, and visually outputting and displaying the conductor and ground wire breakage calculation results, including:

[0037] Obtain the grade model and broken area of ​​the conductor and ground wire, and determine whether the conditions for live working are met based on the grade model and broken area ratio of the conductor and ground wire to the total cross-sectional area;

[0038] If the conditions for live working are met, the parameters of the conductor and ground wire are obtained, and the mechanical strength and safety distance of the conductor and ground wire breaking operation are checked. The calculation results of the conductor and ground wire breaking are obtained and displayed visually.

[0039] Through the pre-imported physical parameters of the conductor and terrain, and through some parameter selection, the broken strands are calculated, and the calculated values ​​are compared with the broken strand parameters to obtain the analysis results.

[0040] Furthermore, the method further comprises:

[0041] Based on the live working scene, line sag calculation is performed, and the line sag calculation result is output and displayed visually;

[0042] The methods for calculating line sag include:

[0043] The vertical distance from the arc point to the two-point straight line is calculated based on the input conductor level, basic parameters and the calculation point position calibrated in the laser point cloud model of the ultra-high voltage transmission line tower, the line sag calculation result is obtained, and the result is visualized and output for display.

[0044] Furthermore, the method further comprises:

[0045] Obtain the method for workers to enter the electric field;

[0046] Based on the operator's method of entering the electric field and the pre-imported work tool ledger, the corresponding work tools are matched according to the work content and work difficulty to obtain a work tool recommendation table;

[0047] Based on the work tool recommendation table, the input tool selection result is obtained to form a final work tool.

[0048] Furthermore, the method further comprises:

[0049] Obtain safety distance verification results, operation simulation planning results, mechanical analysis verification results, conductor and ground wire breakage calculation results, line sag calculation results, and operation tools;

[0050] The safety distance verification results, operation simulation planning results, mechanical analysis verification results, conductor and ground wire broken strand calculation results, line sag calculation results and operation tools are summarized in a pre-edited "Live Operation Feasibility Analysis Report" in a standardized compilation format to generate and output the "Live Operation Feasibility Analysis Report".

[0051] In a second aspect, the present invention provides a visual calibration system for reconstructing ultra-high voltage live working sites based on laser point cloud and geographic information, comprising:

[0052] Input module: used to obtain laser point cloud data and geographic information of ultra-high voltage transmission line towers, and restore the live working scene to obtain the live working scene;

[0053] Safety distance module: used to check the safety distance based on the live working scene, and to visualize and output the safety distance check result;

[0054] Operation simulation planning module: used to perform operation simulation planning based on the live operation scene, and to visualize and output the planning results.

[0055] Compared with the prior art, the present invention has the following beneficial effects:

[0056] The ultra-high voltage live working site reconstruction visualization calibration software based on laser point cloud and geographic information is an application that can simulate real live working scenes. It loads the on-site line tower data on the line tower three-dimensional point cloud through the integration of three-dimensional geographic information, completes the reconstruction of complex live working sites, provides visualization calibration of multiple scenes, and generates analysis reports according to the contents of visualization calibration, providing an effective basis for risk prediction of live working and guaranteeing the safety of subsequent operations.

[0057] Compared with the existing technology, it provides ultra-high voltage transmission line tower laser point cloud model and basic geographic entity simulation to restore the real live operation scene, which meets the requirements of visual display and analysis operation. It provides a strong risk basis for the complex scenes of subsequent live operation and effectively prevents and reduces the occurrence of safety accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 is to open the feasibility analysis diagram;

[0059] Figure 2 Is to select the feasibility analysis project diagram;

[0060] Figure 3 It is a schematic diagram for feasibility analysis;

[0061] Figure 4 It is a screenshot of feasibility analysis;

[0062] Figure 5 It is a schematic diagram of mechanical calculation;

[0063] Figure 6 This is a schematic diagram of broken stock calculation;

[0064] Figure 7 is a schematic diagram for selecting a recommended tool;

[0065] Figure 8 It is a schematic diagram of exporting report;

[0066] Fig. 9 is a schematic diagram of the process of this method;

[0067] Fig.10 It is a schematic diagram of horizontal distance;

[0068] Fig.11 It is a schematic diagram of vertical distance;

[0069] Fig.12 It is the safe distance calculation diagram when walking on the jump line;

[0070] Fig.13 It is the safe distance calculation when jumping the line Figure 2 ;

[0071] Fig.14 It is a schematic diagram of the combined gap. DETAILED DESCRIPTION

[0072] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0073] Embodiment 1:

[0074] This embodiment provides a visual calibration method for reconstructing ultra-high voltage live working sites based on laser point cloud and geographic information. The on-site line tower data is loaded on the three-dimensional point cloud of the line tower through a three-dimensional geographic information system to complete the reconstruction of complex live working sites, provide visual calibration of multiple scenes, and generate a feasibility analysis report according to the content of the visual calibration, thereby providing an effective basis for predicting the operational risks of live working and providing guarantee for the safety of subsequent operations.

[0075] (1) Live working scene restoration, including:

[0076] Obtain laser point cloud data of ultra-high voltage transmission line towers;

[0077] Lightweight processing is performed on the laser point cloud data of the ultra-high voltage transmission line tower to obtain lightweight laser point cloud data of the transmission line tower;

[0078] Based on the laser point cloud data of the lightweight rear-point transmission line tower, loading and reconstruction are performed to obtain a laser point cloud model of the ultra-high voltage transmission line tower.

[0079] Based on the laser point cloud model of ultra-high voltage transmission line towers and basic geographic entities, the on-site scene of live working is simulated.

[0080] Specifically, the main steps and methods of the point cloud data lightweight process are:

[0081] Point cloud thinning:

[0082] Sampling-based thinning: A portion of points are selected from the original point cloud data to be retained through methods such as random sampling, uniform sampling, or sampling based on motion estimation, thereby reducing the number of points.

[0083] Distance-based thinning: According to the density information in the point cloud, for point clouds that are too dense in a certain area, only a part of the points are retained, and the remaining points can be represented by the distance between the point and the neighboring points.

[0084] Grid-based thinning: organize the point cloud data according to a certain grid division method, and then merge the points in the grid or select representative points to reduce the amount of data.

[0085] Clustering-based thinning: Group the point cloud data according to a clustering algorithm, and then select the center point or representative point of each cluster to achieve thinning and simplification of the point cloud information.

[0086] Reconstruction-based thinning: Under the premise of ensuring data accuracy, surface reconstruction or voxelization technology is used to achieve data thinning. This method can remove redundant information and ensure the accuracy and reliability of the thinned data.

[0087] Point Cloud Compression:

[0088] Sampling-based compression: Similar to thinning, the amount of data is reduced by sampling the point cloud data.

[0089] Compression based on geometric features: point cloud data is regarded as a two-dimensional grid image with geometric structure, and the point cloud data is compressed by analyzing and compressing the geometric structure. This includes compression algorithms based on curvature and compression algorithms based on polyhedron fitting.

[0090] (1) Data format conversion: Convert point cloud data of different formats into a unified format or a format more suitable for subsequent processing. Common point cloud data formats include XYZ, LAS, PLY, OBJ, etc. During the conversion process, it is necessary to ensure that the geometric and topological structure of the point cloud data is preserved.

[0091] (2) Optimization based on spatial index: Use the spatial relationship of point clouds to establish corresponding spatial index structures (such as KD-tree, Octree, etc.) to improve the speed of data access and processing. Through spatial segmentation and organization, relevant point cloud data can be quickly accessed and processed.

[0092] GPU-accelerated processing: Utilize the parallel computing and graphics rendering capabilities of the GPU to accelerate the processing of point cloud data. This can significantly improve the speed and efficiency of the point cloud lightweighting process.

[0093] (3) Streaming processing: For large-scale point cloud data, streaming processing technology can be used for block and stream processing. This method can achieve fast data processing and optimization while reducing memory usage.

[0094] (2) Safety distance verification

[0095] The tower model can be used to measure equipotential distance, ground potential distance and minimum phase-to-phase distance.

[0096] The distance between two points is automatically calculated by clicking the point on the point cloud model with the mouse. The equipotential distance is to select two points at the equipotential position and automatically calculate the safe distance. The ground potential is to select the point and the grounding point and automatically calculate the safe distance.

[0097] Specifically, it includes:

[0098] In the live working scenario, based on the laser point cloud model of the ultra-high voltage transmission line tower, the safety distance parameter is measured to obtain the safety distance parameter; the safety distance parameter includes the insulator length, the total length of the insulator string, the distance between the equipotential worker and the adjacent phase live body, the ground potential activity range, the equipotential activity range, the minimum combined gap, the total length of the insulator string, the minimum activity range considered, the side phase conductor distance to the tower, the middle phase conductor distance to the tower and the horizontal distance between the conductor hanging point and the tower body;

[0099] The safety distance of the operation method is calculated according to the safety distance parameters; the safety distance includes the minimum safety distance, the minimum distance to the ground, the minimum phase-to-phase distance and the minimum safe operation distance.

[0100] Obtain the preset safety distance for each operation method;

[0101] Compare the safety distance of each operation method with the preset safety distance. If the safety distances are all greater than the preset safety distances, the safety distance check of the operation method passes. Otherwise, the safety distance check of the operation method fails.

[0102] Generate safety distance verification results and output them for display.

[0103] (3) Operation simulation planning

[0104] The tower model can be calculated using methods such as the horizontal ladder method, the soft ladder method, and the hanging basket method for operators to enter the electric field, and simulated operation planning.

[0105] After the operator clicks on the corresponding method (flat ladder method, soft ladder method and hanging basket method), he or she obtains the points on the model, performs intuitive graphic simulation and calculation, and finally outputs the results of different methods.

[0106] The horizontal ladder method obtains two points on the line tower point cloud model, draws a straight line, and automatically calculates the horizontal ladder distance; the soft ladder method obtains two points on the line tower point cloud model, draws an arc, and automatically calculates the vertical distance from the lowest point of the arc to the two points. The hanging basket method obtains a point on the line tower point cloud model, draws a straight line perpendicular to the ground, and automatically calculates the distance to the ground.

[0107] For specific operation simulation planning, please refer to CN202311384112.7:

[0108] Step 1: Obtaining point cloud data:

[0109] Obtain high-precision laser point cloud data of towers, transmission lines and hardware;

[0110] Step 2: Construction of electric field calculation model:

[0111] Based on the laser point cloud data obtained in step 1, a three-dimensional electric field calculation model is constructed;

[0112] Step 3: Calculate the area division:

[0113] Taking the conductor to be entered as the center, four areas are divided into I, II, III, and IV, which are the areas where operators can enter the equipotential area. All areas are divided into calculation grids;

[0114] Step 4: Calculation of electric field distribution of operators:

[0115] Calculate the electric field distribution on the operator's body surface when the operator is located in different areas and different nodes;

[0116] Step 5: Calculation of the electric field mean value of different paths:

[0117] After determining the entry area, calculate the average electric field strength under different entry paths;

[0118] Step 6: Enter path selection:

[0119] The average electric field strength values ​​of different entry paths are compared, and the path corresponding to the smallest average electric field strength value is taken as the optimal path to enter the equipotential.

[0120] In the step 3, all areas are divided into calculation grids of N×N, and the number of grids and the grid size L can be adjusted as needed. The intersection node R(i×j) is the location of the human body model, wherein i,j=1···N, and N is the number of horizontal or vertical division lines; in the step 4, when the workers are located in different areas and different grid nodes R(i×j), an overall three-dimensional calculation model of the human body located at the corresponding position of the tower is constructed, and the electrostatic field calculation is performed using ANSYS software to obtain the electric field distribution on the worker's body surface when the workers are located in different areas and different nodes.

[0121] In step 5, when the entry angle is δ, there are multiple intersections between the path and the longitudinal dividing line, and the maximum electric field strength Ei at the intersection is extracted. Ei can be obtained by interpolating the electric fields of two adjacent nodes; finally, the mean of the electric fields at all intersections is calculated, which is the mean size of the electric field when the operator enters the path.

[0122] In step 6, the mean values ​​of different entry paths are compared, such as δ=0°, 15°, 30°, 45°, 60°, 75°, and 90°, and the path corresponding to the smallest mean value is taken as the optimal path to enter the isoelectric potential.

[0123] (4) Mechanical analysis verification

[0124] According to the parameters of the conductor, line and tower, the corresponding level can be selected to quickly calculate the total load of the insulator string, the total load of a single conductor and the tension of the insulator string. The back end pre-imports the physical parameters of different types of conductors and insulators, and performs mechanical calculations by selecting different conductors and insulators and combining force analysis formulas.

[0125] Specifically include:

[0126] Obtain and calculate the total load of the insulator string, the total load of a single sub-conductor and the tension of the insulator string according to the parameters of the conductor, line and tower, and obtain the total load of the insulator string, the total load of a single sub-conductor and the tension of the insulator string;

[0127] Retrieve the pre-imported physical parameters of different types of conductors and insulators, obtain the model selection information of conductors and insulators, perform mechanical calculations based on the force analysis formula, and obtain the mechanical analysis verification results;

[0128] The mechanical analysis verification results are output and displayed.

[0129] (5) Calculation of broken conductors and ground wires

[0130] Select the corresponding level of the conductor, input the span parameters, basic parameters, etc., and quickly perform the feasibility analysis and calculation of the conductor and ground wire breaking operation. Through the pre-imported conductor and terrain physical parameters, through some parameter selection, the broken strands are calculated, and the calculated values ​​are compared with the broken strand parameters to obtain the analysis results.

[0131] The specific steps include:

[0132] Obtain the grade model and broken area of ​​the conductor and ground wire, and determine whether the conditions for live working are met based on the grade model and broken area ratio of the conductor and ground wire to the total cross-sectional area;

[0133] If the conditions for live working are met, the parameters of the conductor and ground wire are obtained, and the mechanical strength and safety distance of the conductor and ground wire breaking operation are checked. The calculation results of the conductor and ground wire breaking are obtained and displayed visually.

[0134] Through the pre-imported physical parameters of the conductor and terrain, and through some parameter selection, the broken strands are calculated, and the calculated values ​​are compared with the broken strand parameters to obtain the analysis results.

[0135] (6) Line sag calculation

[0136] Select the corresponding level of the conductor, input basic parameters, and obtain the line sag change according to the position of the calculation point. Import the conductor physical parameters in advance, input basic parameters, obtain two points on the conductor, automatically calculate the vertical distance from the arc fixed point to the straight line between the two points, and obtain the result of the sag change.

[0137] The specific steps include: obtaining and calculating the vertical distance from the arc point to the two-point straight line based on the input conductor level, basic parameters and the calculation point position calibrated in the laser point cloud model of the ultra-high voltage transmission line tower, obtaining the line sag calculation result, and visually outputting it for display.

[0138] (7) Recommended tools and equipment

[0139] According to the way the operator enters the electric field, a list of tools can be recommended. The tool selection results can be incorporated into the live work safety verification report. The final report can be used as one of the basis for the maintenance strategy plan. Import the work tool ledger in advance, match the corresponding work tools according to the work content and work difficulty, and get a recommended work tool table.

[0140] (8) Generation of feasibility report for live working

[0141] The relevant verification and calculation results can be integrated to evaluate the feasibility analysis results of the operation in accordance with the provisions of the "State Grid Corporation Electric Power Safety Work Regulations Line Part", and automatically form a standardized compilation format "Live Work Feasibility Analysis Report". Get all the results of the previous steps 1 to 7, summarize them in the live work feasibility analysis report template, and automatically generate the "Live Work Feasibility Analysis Report".

[0142] This embodiment uses the following calculation example to specifically illustrate the specific steps of the calculation method of the present invention:

[0143] Mechanical calculations:

[0144] (I) Line load calculation

[0145] Input parameters:

[0146] (1) Wire parameters

[0147]

[0148]

[0149] Output calculation results:

[0150] (1) Horizontal load on insulator string on straight tower

[0151] (2) Load on insulator string on tension tower

[0152] (II) Line load calculation example

[0153] It is carried out in good weather, without ice, and the wind speed is not more than level 5. Therefore, when making relevant calculations, only the weight of the conductors and hardware and the load caused by wind pressure are considered.

[0154] 1. Straight tower force calculation

[0155] (1) Conductor deadweight load (g) 1 )

[0156]

[0157] Where: G 0 —Weight of conductor per meter (kg / km);

[0158] S—the total cross-sectional area of ​​the conductor (mm 2 ).

[0159] (2) Wind pressure load ratio

[0160] The wind pressure on the conductor is caused by the kinetic energy of the air. The horizontal wind pressure in the direction perpendicular to the line is:

[0161]

[0162] Where: α—uneven coefficient of wind speed, taken as 1.0;

[0163] V—wind speed, take 10m / s;

[0164] F—projection of the windward surface on the plane perpendicular to the wind direction;

[0165] θ—horizontal angle between wind direction and wind-receiving projection surface. When calculating, it is assumed that wind direction is perpendicular to the direction of power line. 2 θ = 1;

[0166] K—aerodynamic coefficient, take 1.1.

[0167] From this we get: wind pressure load ratio

[0168]

[0169] (3) Comprehensive load ratio

[0170]

[0171] (4) Vertical load on insulator string:

[0172] <![CDATA[Q=g 1 Sl z +W=30.31×10 -3 ×775.4×320×6+373×9.8=48777N]]> (1-5)

[0173] Where: W is the weight of spacers, pull plates, wire clamps and equipotential workers, approximately 200 kg (the weight of composite insulators is not considered, and the ±800 kV UHV line has six split conductors).

[0174] (5) Horizontal load on insulator string:

[0175] P = g 4 S p =(32.13×10 -3 ×775.41×426.5×6)=63754.7N (1-6)

[0176] (6) The total load on the insulator string is

[0177]

[0178] (7) Total load on a single conductor

[0179] G 1 =G / n=80.3 / 6=13.3kN (1-7)

[0180] Where n is the number of split wires, the unity root.

[0181] 2. Force calculation and analysis of tension insulator replacement

[0182] Assume that the temperature under known meteorological conditions is t m , specific load is g m , the stress is σ m , let the temperature under the required meteorological conditions be t n , specific load is g n , the stress is σ n , then the conductor state equation is:

[0183]

[0184] make

[0185] but

[0186] Where:

[0187] α—thermal expansion coefficient of conductor;

[0188] β—elastic elongation coefficient of the conductor, 154×10 -6 (mm 2 / 9.8N);

[0189] l—represents the gear distance (m).

[0190] The representative span is 448m. From the conductor installation curve, the stress at a temperature of -5°C and a wind speed of 10m / s is: m =46.4N / mm 2 (ie 4.73kg / mm 2 ), calculate the stress and tension of the conductor when the meteorological conditions are a wind speed of 10m / s and a temperature of -15℃.

[0191]

[0192]

[0193]

[0194] Calculate σ using the program n =4.86kg / mm 2 =47.6N / mm 2 .

[0195] The conductor tension is T = 36910N. The ±800kV DC transmission line generally has six split conductors, and three are connected in a string. The tension of the insulator string is T 4 =T*6=221460N=221.4kN.

[0196] (III) Calculation of force and distance when handling broken conductors and ground wires

[0197] The ground wire model is LBGJ-180 / 20AC (2 of 19 strands are broken), and the broken strand area accounts for 10.5% of the total cross-sectional area. According to Q / GDW 225-2008 "110~750kV Overhead Transmission Line Construction and Acceptance Specifications", the damaged cross-sectional area is less than 12.5%, so it is moderately damaged and meets the conditions for live working. In order to accurately analyze the feasibility of live working, it is necessary to check the mechanical strength and safety distance of the ground wire after the strands are broken.

[0198] 1. Mechanical strength verification and analysis

[0199] According to the conductor stress, load ratio and air temperature before and after the soft ladder (flying car) is not hung, the conductor stress after hanging the flying car is calculated using the following state equation:

[0200]

[0201] The sag of the ground wire of the suspended ladder (flying car) in the continuous gear can be calculated by the following formula

[0202]

[0203] Check the relevant data of the ground wire: the ground wire model is LBGJ-180-20AC, the elastic modulus E = 139500MPa, and the linear expansion coefficient is g = 12.6×10 -6 , ground wire cross-sectional area s = 182.8mm 2 , deadweight load The specific data are shown in the following table

[0204] Table 1 LBGJ-180-20AC ground wire model

[0205]

[0206] After 2 of the 19 ground wires are broken, the rate of change of the breaking force of the ground wire is

[0207] After the ground wire section loses 2 strands, the breaking force is T = (1-η)T p =183245.9N

[0208] Safety factor is K = 2.5, allowable stress [σ] = 183245.9 / 182.8 / 2.5 = 400.97 (N / mm 2 ), height difference angle Approximately zero, the total weight of the flying car, people and carrying tools is 200kg.

[0209] From the ground wire installation curve, we can get l D =530.2m, temperature 15℃, no ice and no wind, ground stress (i.e. stress before hanging the ladder)σ 1 =125.8N / mm 2 .

[0210] Calculate the span l of the suspended load operation gear using the formula x = Ground stress after using soft ladder in 421m

[0211]

[0212]

[0213] By compiling relevant calculation programs, we can calculate: 2 =134.66(N / mm 2 )<[σ]

[0214] Therefore, operators can use the ground wire to fly when the mechanical strength of the ground wire meets the requirements.

[0215] 2Safety distance verification analysis

[0216] The gear spacing is 421 meters. The formula is used to calculate the distance between the ground wire and the conductor when the flying car is suspended at 30 meters, 80 meters and 137 meters near the ground wire suspension point of the 421-meter gear. Approximately zero.

[0217]

[0218]

[0219]

[0220] According to the insulator assembly drawing, the insulator string length is 13 meters, the angle between the insulators is 90°, and the lower plane of the cross arm in the hardware is meters; and the height of the lower plane of the cross arm from the ground is 6 meters, so the distance between the hardware and the ground is 15.19 meters.

[0221] The distance between the ground wire and the conductor when the flying car is suspended at 30 meters, 80 meters and 137 meters

[0222] Calculation point position (m) 30 80 137 Conductor sag (m) 3.986 9.27 13.22 Ground wire sag(m) 5.795 13.47 19.22 Ground wire hanging point distance (m) 15.19 15.19 15.19 Ground wire distance (m) 13.381 10.983 9.19

[0223] Calculation of safety distance and combined clearance for voltage levels of 500 kV and above:

[0224] (I) Horizontal distance calculation

[0225] Parameters to be entered:

[0226] (1) Horizontal distance from the center of the tower to the edge of the tower

[0227] (2) Horizontal distance from the center of the tower to the edge of the tower

[0228] Output calculation results:

[0229] Horizontal distance from the center of the conductor to the edge of the tower

[0230] (II) Vertical distance calculation

[0231] Parameters to be entered:

[0232] (1) Jumper insulator length

[0233] (2) Length of jumper insulator connection fittings

[0234] (3) Tower cross arm width

[0235] (4) Horizontal length of cage hoop

[0236] Output calculation results:

[0237] Vertical distance when entering the jumper

[0238] (III) Combined gap calculation

[0239] Hanging basket method of entry:

[0240] Parameters to be entered:

[0241] (1) Human activity margin

[0242] (2) Basket length and width

[0243] Output calculation results:

[0244] Combined gap

[0245] Specific calculation method and example:

[0246] Safety distance and combination clearance verification

[0247] 1. Horizontal distance

[0248] The horizontal distance from the end of the cross arm to the center of the tower is L, the horizontal distance from the center of the tower to the edge of the tower is L1, and the horizontal distance from the vertical point of the jumper line center on the lower plane of the tower to the edge of the tower is L2. The calculation results are:

[0249] L=24900mm

[0250] L 1 =5180 / 2mm=2590mm

[0251] S p =(24900-2590) / 2mm=11155mm;

[0252] From the calculation results, it can be seen that the distance between the equipotential working personnel and the tower body meets the requirement of Q / GDW1799.2-2013 "State Grid Corporation Electric Power Safety Work Regulations Line Part" that the safety distance must not be less than 6.8m.

[0253] 2. Vertical distance

[0254] The hardware assembly model is Z20XT12, the insulator length is 14450mm, and due to the addition of the PT adjustment plate 1600mm, the insulator string length is 16310mm. 1 , the vertical distance is H, and we get

[0255]

[0256] When walking on the cage hoop, firstly, the safe distance when walking on the M section is considered, and the minimum value is the vertical distance H. The above calculation meets the safety distance requirement; secondly, when climbing on the N section of the cage hoop, the minimum distance is L. Since L ≥ l, it is sufficient to calculate l. Assume that the width of the tower cross arm is K and the horizontal length of the cage hoop is M.

[0257]

[0258] From the calculation results, it can be seen that the distance between the equipotential working personnel and the plane under the crossarm meets the requirement of Q / GDW1799.2-2013 "State Grid Corporation Electric Power Safety Work Regulations Line Part" that the safety distance must not be less than 6.8m.

[0259] 3. Combined clearance check

[0260] When the equipotential workers enter and exit the electric field, the combined gaps are shown in the figure below. 0 +S 1 and S 0 +S 2 ,therefore:

[0261] When workers enter and exit the equipotential process, there are several combinations of combined gaps:

[0262] S 组1 =S 0 +S 1 ………………(1)

[0263] S 组2 =S 0 +S 2 ………………(2)

[0264] Considering that equipotential personnel use a hanging basket to enter and exit the electric field, the width of the hanging basket is b = 600mm and h = 1200mm.

[0265] The above two combined gaps are analyzed.

[0266] S 组1 =S 0 +S 1 >Hh=11987-1200=10787mm

[0267] S 组2 =S 0 +S 2 >S P -b=10103-600=9803mm

[0268] S 组1 and S 组2 It meets the requirement of Q / GDW1799.2-2013 "State Grid Corporation Electric Power Safety Work Regulations Line Part" that the combined clearance shall not be less than 6.6m.

[0269] The operating method of this operation adopts the equipotential operating method, and the method of entering the electric field is determined to be the hanging basket method, which can meet the operating requirements.

[0270] Calculation of safety distance and combined clearance between 220 kV and 500 kV:

[0271] 1. Safety distance calculation

[0272] 1. Soft ladder method to enter the electric field

[0273] (1) Input parameters:

[0274] Project Content wire Insulator length A Total length of insulator string B The distance between the equipotential workers and the adjacent charged parts C Ground potential range D Equipotential activity range E Minimum combination gap F Consider the minimum range of motion G

[0275] (2) Safety distance verification

[0276] 1. Minimum safety distance: The minimum distance between ground potential workers and charged objects should be B (Insulator length)>1800mm.

[0277] 2. Minimum distance to ground: The minimum distance between the personnel working on the charged object and the surrounding grounding body should be B

[0278] >1800mm.

[0279] 3. Minimum phase-to-phase distance: The minimum distance that should be maintained between the equal potential operator on the charged body and the adjacent charged body is about C

[0280] >2500mm.

[0281] 4. Minimum safe working distance: Taking into account the necessary activities at work, the minimum distance that ground potential workers should maintain between themselves and the charged body during the operation. D+A

[0282] 5. Minimum combination gap

[0283] When the equipotential personnel are about to enter the electric field, the combined gap is the smallest. At this time, the minimum combined gap is the distance from the human body to the tower body:

[0284] F=B+E (at this time, the hanging point of the soft ladder should be as close to the shock-absorbing hammer as possible).

[0285] Therefore, when personnel with equal potential enter the electric field along the soft ladder, the minimum combined gap must meet the requirement of not less than 2.1m.

[0286] 2. Straight-line flat ladder method to enter the electric field

[0287] (1) Input parameters

[0288] Project Content wire Insulator length A Total length of insulator string B The distance between the equipotential workers and the adjacent charged parts C Ground potential range D Equipotential activity range E Minimum combination gap F Total length of insulator string G Consider the minimum range of motion H Side phase conductor distance tower I Medium phase conductor distance tower J Horizontal distance between wire hanging point and tower K

[0289] (2) Safety distance verification

[0290] 1. Minimum safety distance: The minimum distance between ground potential workers and charged objects should be B (Insulator length)>1800mm.

[0291] 2. Minimum distance to ground: The minimum distance between the personnel working on the charged object and the surrounding grounding body should be A >

[0292] 1800mm.

[0293] 3. Minimum phase-to-phase distance: The minimum distance that should be maintained between the equal potential operator on the charged body and the adjacent charged body is about C

[0294] >2500mm.

[0295] 4. Minimum safe working distance: Taking into account the necessary activities at work, the minimum distance that ground potential workers should maintain between themselves and the charged body during the operation. D+A

[0296] 5. Minimum combination gap

[0297] When using the ladder method, the human activity distance is E, and the minimum combined clearance is as follows.

[0298] When working at the edge: IE;

[0299] During mid-phase operation: JE.

[0300] Therefore, when personnel with equal potential enter the electric field along the soft ladder, the minimum combined gap must meet the requirement of not less than 2.1m.

[0301] 3. Tension ladder method

[0302] 1. Minimum safety distance: The minimum distance between ground potential workers and live objects should be A (insulator length) > 1800mm.

[0303] 2. Minimum distance to ground: The minimum distance that should be maintained between personnel working at equal potential on a live object and the surrounding grounding objects is A>1800mm.

[0304] 3. Minimum phase-to-phase distance: The minimum distance that should be maintained between the personnel working on the equipotential on the live body and the live body of the adjacent phase is approximately C (the distance between the middle phase and the lower phase conductors) > 2500mm.

[0305] 4. Minimum safe working distance: Taking into account the necessary activities during work, the minimum distance that ground potential workers should maintain between themselves and the charged body during work is D+A.

[0306] 5. Minimum combination gap

[0307] All three phases enter the electric field by means of a horizontal ladder (500mm away from the tension clamp), and the width of the horizontal ladder is 800mm;

[0308] When close to the electric field, the minimum combined gap is ≥4000-357=3643mm>2100mm

[0309] Therefore, the equipotential personnel enter the electric field along the ladder from the horizontal plane of the conductor, and the minimum combined gap meets the requirement of not less than 2.1m.

[0310] Embodiment 2:

[0311] This embodiment provides a visual calibration system for reconstructing ultra-high voltage live working sites based on laser point cloud and geographic information, including:

[0312] Input module: used to obtain laser point cloud data and geographic information of ultra-high voltage transmission line towers, and restore the live working scene to obtain the live working scene;

[0313] Safety distance module: used to check the safety distance based on the live working scene, and to visualize and output the safety distance check result;

[0314] Operation simulation planning module: used to perform operation simulation planning based on the live operation scene, and output and display the planning results visually;

[0315] Mechanical analysis and verification module: used to perform mechanical analysis and verification based on the live working scene, and to visualize and output the mechanical analysis and verification results;

[0316] Broken strand calculation module: used to calculate the broken strands of the conductor and ground wire based on the live working scene, and visualize the output and display of the calculation results of the broken strands of the conductor and ground wire.

[0317] The device of this embodiment can be used to implement the method described in the first embodiment.

[0318] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0319] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0320] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0321] The computer program instructions for performing the operation of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages, such as Smalltalk, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. Computer-readable program instructions may be executed completely on a user's computer, partially on a user's computer, as an independent software package, partially on a user's computer, partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect via the Internet). In some embodiments, an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA), may be customized by utilizing the state information of the computer-readable program instructions, and the electronic circuit may execute the computer-readable program instructions, thereby realizing various aspects of the present disclosure.

[0322] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.

[0323] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information, characterized in that: include: Obtain laser point cloud data and geographic information of ultra-high voltage transmission line towers, and restore live working scenes to obtain live working site scenes; Based on the live working scene, a safety distance check is performed, and the safety distance check result is output and displayed visually; Based on the live working scene, operation simulation planning is performed, and the planning results are output and displayed visually.

2. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 1 is characterized in that: Obtain the laser point cloud data and geographic information of the UHV transmission line tower, and restore the live working scene to obtain the live working scene, including: Obtain laser point cloud data of ultra-high voltage transmission line towers; Lightweight processing is performed on the laser point cloud data of the ultra-high voltage transmission line tower to obtain lightweight laser point cloud data of the transmission line tower; Based on the lightweight rear-point transmission line tower laser point cloud data, loading and reconstructing are performed to obtain an ultra-ultra-high voltage transmission line tower laser point cloud model; Based on the laser point cloud model of ultra-high voltage transmission line towers and basic geographic entities, the on-site scene of live working is simulated.

3. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 2 is characterized in that: The method for lightweight processing of the laser point cloud data of the ultra-high voltage transmission line tower includes point cloud thinning or point cloud compression: The point cloud thinning method comprises: Sampling-based thinning, distance-based thinning, grid-based thinning, clustering-based thinning, or reconstruction-based thinning; The point cloud compression method comprises: Sampling-based compression: Similar to thinning, the amount of data is reduced by sampling the point cloud data; Compression based on geometric features, data format conversion, optimization based on spatial indexes, processing based on GPU acceleration or streaming processing.

4. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 1 is characterized in that: Based on the live working scene, the safety distance is checked and the safety distance check result is output and displayed visually, including: In the live working scenario, based on the laser point cloud model of the ultra-high voltage transmission line tower, the safety distance parameter is measured to obtain the safety distance parameter; the safety distance parameter includes the insulator length, the total length of the insulator string, the distance between the equipotential worker and the adjacent phase live body, the ground potential activity range, the equipotential activity range, the minimum combined gap, the total length of the insulator string, the minimum activity range considered, the side phase conductor distance to the tower, the middle phase conductor distance to the tower and the horizontal distance between the conductor hanging point and the tower body; Calculate the safety distance of each operation method according to the safety distance parameter; the safety distance includes the minimum safety distance, the minimum distance to the ground, the minimum phase-to-phase distance and the minimum safe operation distance; Obtain the preset safety distance for each operation method; Compare the safety distance of each operation method with the preset safety distance. If the safety distances are all greater than the preset safety distances, the safety distance check of the operation method passes. Otherwise, the safety distance check of the operation method fails. Generate safety distance verification results and output them for display; and / or, Based on the live working scene, the operation simulation planning is carried out, and the planning results are output and displayed visually, including: Based on the points on the laser point cloud model of the UHV transmission line tower, graphic simulations of the flat ladder method, soft ladder method and hanging basket method are performed respectively; The graphic simulation of the horizontal ladder method includes: obtaining two points on the line tower point cloud model, drawing a straight line, calculating and outputting the horizontal ladder distance; The graphic simulation of the soft ladder method includes: obtaining two points on the line tower point cloud model, drawing an arc, and calculating and outputting the vertical distance between the lowest point of the arc and the two points; The graphic simulation of the hanging basket method includes: obtaining a point on the line tower point cloud model, drawing a straight line perpendicular to the ground, and calculating and outputting the distance from the point to the ground.

5. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 1 is characterized in that: The method further comprises: Based on the live working scene, mechanical analysis and verification are carried out, and the results of mechanical analysis and verification are visually output and displayed, including: Obtain and calculate the total load of the insulator string, the total load of a single sub-conductor and the tension of the insulator string according to the parameters of the conductor, line and tower, and obtain the total load of the insulator string, the total load of a single sub-conductor and the tension of the insulator string; Retrieve the pre-imported physical parameters of different types of conductors and insulators, obtain the model selection information of conductors and insulators, perform mechanical calculations based on the force analysis formula, and obtain the mechanical analysis verification results; The mechanical analysis verification results are output and displayed.

6. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 1 is characterized in that: The method further comprises: Based on the live working scene, the conductor and ground wire broken strands are calculated, and the conductor and ground wire broken strands calculation results are visualized and output and displayed, including: Obtain the grade model and broken area of ​​the conductor and ground wire, and determine whether the conditions for live working are met based on the grade model and broken area ratio of the conductor and ground wire to the total cross-sectional area; If the conditions for live working are met, the parameters of the conductor and ground wire are obtained, and the mechanical strength and safety distance of the conductor and ground wire breaking operation are checked, and the calculation results of the conductor and ground wire breaking are obtained and displayed visually; Through the pre-imported physical parameters of the conductor and terrain, and through some parameter selection, the broken strands are calculated, and the calculated values ​​are compared with the broken strand parameters to obtain the analysis results.

7. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 1 is characterized in that: The method further comprises: Based on the live working scene, line sag calculation is performed, and the line sag calculation result is output and displayed visually; The methods for calculating line sag include: The vertical distance from the arc point to the two-point straight line is calculated based on the input conductor level, basic parameters and the calculation point position calibrated in the laser point cloud model of the ultra-high voltage transmission line tower, the line sag calculation result is obtained, and the result is visualized and output for display.

8. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 1 is characterized in that: The method further comprises: Obtain the method for workers to enter the electric field; Based on the operator's method of entering the electric field and the pre-imported work tool ledger, the corresponding work tools are matched according to the work content and work difficulty to obtain a work tool recommendation table; Based on the work tool recommendation table, the input tool selection result is obtained to form a final work tool.

9. The method for visual calibration of ultra-high voltage live working site reconstruction based on laser point cloud and geographic information according to claim 1 is characterized in that: The method further comprises: Obtain safety distance verification results, operation simulation planning results, mechanical analysis verification results, conductor and ground wire breakage calculation results, line sag calculation results, and operation tools; The safety distance verification results, operation simulation planning results, mechanical analysis verification results, conductor and ground wire broken strand calculation results, line sag calculation results and operation tools are summarized in a pre-edited "Live Operation Feasibility Analysis Report" in a standardized compilation format to generate and output the "Live Operation Feasibility Analysis Report".

10. A visual calibration system for reconstruction of ultra-high voltage live working site based on laser point cloud and geographic information, characterized in that: include: Input module: used to obtain laser point cloud data and geographic information of ultra-high voltage transmission line towers, and restore the live working scene to obtain the live working scene; Safety distance module: used to check the safety distance based on the live working scene, and to visualize and output the safety distance check result; Operation simulation planning module: used to perform operation simulation planning based on the live operation scene, and to visualize and output the planning results.

Citation Information

Patent Citations

  • Power transmission line equipotential hot-line work entry path planning method based on laser point cloud and electric field distribution

    CN117669843A

Cited By

  • Power transmission line completion acceptance measurement method and device based on laser point cloud, and medium

    CN122240866A