Experimental device for researching explosion prevention and control measures of prefabricated cabin energy storage power station

By designing explosion-proof laboratories and anti-leakage fast connectors and other devices, the diffusion and explosion load distribution of thermal runaway gas in lithium batteries is simulated, and the problems of high experimental costs and high safety risks in the existing technology are solved, and a safe and reliable multi-functional experimental device is realized , able to simulate real scenes and provide multi-parameter impact.

CN118918756APending Publication Date: 2024-11-08NANJING UNIV OF SCI & TECH

Patent Information

Application Number
CN202411032108.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the prior art, the research on the explosion incident of prefabricated chamber energy storage power stations mainly relies on numerical simulation, with high experimental costs and high safety risks, and lack of effective experimental devices to simulate the diffusion and explosion load distribution of thermal runaway gas in lithium batteries, affecting the energy storage compartment. safety design.

Method used

An experimental device including explosion-proof laboratory, anti-leakage fast connector, humidifier, vacuum pump and gas storage tank was designed. The automatic sealing structure was realized through the anti-leakage fast connector, which simulated the diffusion and explosion load distribution of thermal runaway gas in lithium batteries, combined with Ignifiers and industrial cameras simulate explosion scenarios under different environmental conditions.

Benefits of technology

It realizes testing the explosion load distribution and structural response under closed conditions, can adjust the environmental factors in the cabin, simulate real scenes, and provide the impact of multiple parameters on the explosion load and structural dynamic response. The test effect is good and safe and reliable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118918756A_ABST
    Figure CN118918756A_ABST
Patent Text Reader

Abstract

The invention discloses an experimental device for researching explosion prevention and control measures of a prefabricated cabin energy storage power station, which is characterized in that an explosion-proof laboratory is provided with a plurality of explosion-proof transparent windows and a plurality of interfaces, the interfaces are in threaded connection with anti-leakage quick connectors, the rest interfaces are sealed through plugs, and a humidifier, a vacuum pump and an air pump are respectively connected with one anti-leakage quick connector. The gas storage tank is connected with the gas pump, and the gas pump pumps gas in the gas storage tank into the explosion-proof laboratory. According to the invention, the explosion load distribution under the closed condition can be tested, the explosion discharge research can be carried out, the structural response of related materials can be tested, and the purpose of multiple functions is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an experimental device for studying explosion prevention and control measures for a prefabricated cabin energy storage power station. Background Art

[0002] In recent years, electrochemical energy storage power stations have developed rapidly. At the same time, due to the inherent flammability of organic electrolytes, diaphragms, graphite and other bulk materials in lithium batteries, fire and explosion accidents caused by thermal runaway of lithium batteries occur frequently, which seriously affects the safe and stable operation of the energy storage industry. In ground electrochemical energy storage systems, battery energy storage containers are usually used for the convenience of transportation and installation. They are simple internal modifications based on standard container structures, but ignore the resistance requirements under extreme disasters such as fire and explosion.

[0003] At present, the research on explosion events of prefabricated cabin energy storage power stations is mostly based on numerical simulation, but the prototype experiment is costly, and the safety risks and costs are high during the experiment. Therefore, it is necessary to design a scaled-down simulation experimental device for energy storage cabins to simulate the diffusion process and concentration distribution law of thermal runaway gas of lithium batteries, and to study the size and distribution law of explosion loads in energy storage cabins, as well as the response law of structures, to provide data reference for the safety design of energy storage cabins. Summary of the invention

[0004] The present invention aims to solve the problems existing in the above-mentioned prior art and to provide an experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power stations.

[0005] The technical solutions adopted in the present invention are: An experimental device for studying explosion prevention and control measures of a prefabricated cabin energy storage power station comprises an explosion-proof laboratory and an anti-leakage quick connector, a humidifier, a vacuum pump, an air pump and a gas storage tank. The explosion-proof laboratory is provided with a plurality of explosion-proof transparent windows and a plurality of interfaces, a plurality of interfaces are threadedly connected with the anti-leakage quick connector, and the remaining interfaces are sealed by plugs. The humidifier, the vacuum pump and the air pump are respectively connected with an anti-leakage quick connector, and the gas storage tank is connected with the air pump, and the air pump extracts the gas in the gas storage tank into the explosion-proof laboratory.

[0006] Furthermore, the anti-leakage quick connector includes a first connector, a second connector, a locking sleeve, a ball and a first spring. The outer wall of the first connector is provided with a plurality of ball holes, and the balls are placed in the ball holes. A limiting groove is provided on the outer wall of the second connector. The second connector and the first connector are plugged into each other, and the balls pass through the ball holes and are placed in the limiting grooves, thereby realizing axial limiting between the first connector and the second connector. The locking sleeve is elastically sleeved on the first connector through the first spring, and the locking sleeve radially limits the balls in the ball holes. A displacement groove is provided on the inner wall of the locking sleeve. The locking sleeve is axially moved and the displacement groove is placed on one side of the ball to release the radial limiting of the balls, thereby releasing the axial limiting between the first connector and the second connector.

[0007] Furthermore, a positioning step surface and a retaining spring are provided on the outer wall of the first connector, the locking sleeve is axially positioned on the first connector through the positioning step surface and the retaining spring, and the first spring sleeve is provided on the first connector and placed between the first connector and the locking sleeve.

[0008] Furthermore, the first connector and the second connector are both provided with sealing valve cores. After the second connector is plugged into the first connector, the two sealing valve cores contact each other, and the first connector and the second connector are connected to each other.

[0009] Furthermore, the sealing valve core includes a sealing head, a second spring and a positioning block. A sealing step surface and an installation step are provided in the first connecting head and the second connecting head. The second spring is sleeved on the sealing head, and the head end presses the sealing head against the sealing step surface, and the tail end presses the positioning block against the installation step. The two sealing heads press against each other to keep the sealing heads away from the sealing step surface, thereby correspondingly connecting the first connecting head and the second connecting head.

[0010] Furthermore, the mounting step is integrally formed with the corresponding first connecting head and second connecting head, two mounting openings are provided on the mounting step, and radially protruding positioning ears are provided on the outer wall of the positioning block. The positioning ears are inserted through the mounting openings, and the positioning block is rotated to stagger the positioning ears and the mounting openings. Through the elastic force of the second spring, the positioning ears are abutted against the mounting step.

[0011] Furthermore, the explosion-proof laboratory is also connected to an igniter joint, in which an igniter is plugged.

[0012] Furthermore, a first sealing sleeve is fixed on the outer wall of the igniter joint, a sealing slot is formed between the inner wall surface of the first sealing sleeve and the outer wall surface of the igniter joint, a second sealing sleeve is fixed on the outer wall of the igniter, the igniter is inserted into the igniter joint, and the outer wall of the second sealing sleeve is threadedly connected to the inner wall of the first sealing sleeve.

[0013] Furthermore, the explosion-proof laboratory is provided with a liquid flow channel, the explosion-proof transparent window on the explosion-proof laboratory is explosion-proof glass, and an industrial camera is arranged on one side of the explosion-proof laboratory.

[0014] Furthermore, the explosion-proof laboratory is also provided with a pressure sensor, a temperature and humidity sensor and a valve.

[0015] The present invention has the following beneficial effects: 1) The present invention can not only test the explosion load distribution under closed conditions, but also conduct explosion release research, and at the same time test the structural response of related materials, thus achieving the purpose of multi-function; 2) The pressure in the cabin can be adjusted to simulate the air pressure at different altitudes, and changes in environmental conditions such as indoor temperature and humidity can be adjusted through liquid circulation, humidifiers, etc.; therefore, the present invention is a device with adjustable environmental factors, which is used to simulate real scenes and obtain the influence of multiple parameters on explosion loads and structural dynamic responses.

[0016] 3) An anti-leak quick connector is provided, which automatically closes when the connector is disengaged to prevent gas backflow, resulting in a good test effect and easy disassembly and assembly between the first connector and the second connector.

[0017] 4) The igniter is equipped with a special sealing structure, which is resistant to explosion and pressure and has good use effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 This is a structural diagram of the present invention.

[0019] Figure 2 This is the floor plan of the explosion-proof laboratory.

[0020] Figure 3 This is the structural diagram of the leak-proof quick connector.

[0021] Figure 4 Exploded view of the leak-proof quick connector.

[0022] Figure 5 A cross-sectional view of a leak-proof quick connector.

[0023] Figure 6 This is the assembly drawing of the sealing valve core and the installation step.

[0024] Figure 7 This is the assembly drawing of the sealing valve core and the installation step.

[0025] Figure 8 This is the assembly drawing of the igniter connector and the igniter. DETAILED DESCRIPTION

[0026] The present invention will be further described below in conjunction with the accompanying drawings.

[0027] like Figure 1 and Figure 2 The present invention discloses an experimental device for studying explosion prevention and control measures of a prefabricated cabin energy storage power station, comprising an explosion-proof laboratory 1, an anti-leakage quick connector 2, a humidifier 5, a vacuum pump 6, an exhaust pump 7 and a gas tank 8. The explosion-proof laboratory 1 is made of metal material, and is provided with a plurality of explosion-proof transparent windows 11 and a plurality of interfaces 12. The anti-leakage quick connectors 2 are threadedly connected to a plurality of interfaces 12, and the remaining interfaces 12 are sealed by plugs. The humidifier 5, the vacuum pump 6 and the exhaust pump 7 are respectively connected to an anti-leakage quick connector 2, and the gas tank 8 is connected to the exhaust pump 7, and the exhaust pump extracts the gas in the gas tank 8 into the explosion-proof laboratory 1.

[0028] like Figures 3 to 5 The anti-leakage quick connector 2 of the present invention comprises a first connector 21, a second connector 22, a locking sleeve 23, a ball 24 and a first spring 25. A plurality of ball holes are provided on the outer wall of the first connector 21. The cross section of the ball holes is V-shaped. After the ball 24 is placed in the ball hole, a part of the ball 24 extends into the first connector 21.

[0029] A limiting groove 221 is formed on the outer wall of the second connector 22 . The second connector 22 and the first connector 21 are plugged into each other, and the ball 24 is placed in the limiting groove 221 .

[0030] The locking sleeve 23 is elastically sleeved on the first connector 21 through the first spring 25. The locking sleeve 23 radially limits the ball 24 in the ball hole. After the ball 24 is radially limited, the axial limit between the first connector 21 and the second connector 22 is achieved. A displacement groove 231 is provided on the inner wall of the locking sleeve 23. The locking sleeve 23 is axially moved and the displacement groove 231 is placed on one side of the ball 24 to release the radial limitation of the ball. After the ball 24 is radially limited and contacted, the axial limitation between the first connector 21 and the second connector 22 can be released, and finally the first connector 21 and the second connector 22 can be separated.

[0031] In order to realize axial positioning of the locking sleeve 23 on the first connecting head 21, a positioning step surface 212 and a retaining spring 213 are provided on the outer wall of the first connecting head 21. The locking sleeve 23 is axially positioned on the first connecting head 21 through the positioning step surface 212 and the retaining spring 213. The first spring 25 is sleeved on the first connecting head and placed between the first connecting head and the locking sleeve.

[0032] The first connector 21 is threadedly connected to the interface 12 (a rubber ring is provided at the joint to ensure sealing), and the second connector 22 is sealedly connected to the hose, and the hose is connected to the corresponding humidifier 5 or vacuum pump 6 or suction pump 7. The anti-leakage quick connector 2 in the present invention is an "automatic sealing structure", that is, the anti-leakage quick connector 2 can be turned on only after the first connector 21 and the second connector 22 are plugged into each other, and after the first connector 21 and the second connector 22 are separated from each other, the first connector 21 and the second connector 22 can both achieve automatic sealing. The structure of automatic sealing is: Combination Figure 6 and Figure 7 A sealing valve core 26 is provided in each of the first connector 21 and the second connector 22. After the second connector 22 is plugged into the first connector 21, the two sealing valve cores 26 contact each other, and the first connector 21 and the second connector 22 are connected to each other.

[0033] The sealing valve core 26 includes a sealing head 261, a second spring 262 and a positioning block 263. A sealing step surface 271 and an installation step 272 are provided in the first connector 21 and the second connector 22. The installation step 272 is integrally formed with the corresponding first connector 21 and the second connector 22. The second spring 262 is sleeved on the sealing head 261, and the head end of the sealing head 261 contacts the sealing step surface 271, thereby achieving the sealing of the first connector 21 or the second connector 22. The tail end of the second spring 262 contacts the positioning block 263 on the installation step 272. When the first connector 21 and the second connector 22 are plugged into each other, the two sealing heads 261 contact each other to keep the sealing heads 261 away from the sealing step surface 271, and the first connector 21 and the second connector 22 are connected.

[0034] The sealing head 261 in the present invention is a detachable structure in the first connector 21 and the second connector 22. Since the first connector 21 and the second connector 22 are both rotatable structures (i.e., tubular structures), in order to facilitate the rapid assembly and disassembly of the sealing head 261, two mounting ports 270 are provided on the mounting step 272, and radially protruding positioning ears 264 are provided on the outer wall of the positioning block 263. When the sealing head 261 is installed, the positioning ears 264 are inserted through the mounting ports 270. At this time, the second spring 262 is in a compressed state. The positioning block 263 is rotated at a certain angle to stagger the positioning ears 264 and the mounting ports 270. The positioning ears 264 are in contact with the mounting step 272 through the resetting elastic force of the second spring 262.

[0035] The present invention provides two installation openings 270 on the installation step 272 and corresponding positioning ears 264 on the positioning block 263, so as to facilitate the quick installation and removal of the sealing head 261 without making the first connector 21 or the second connector 22 into a split structure, and is very convenient to use.

[0036] The explosion-proof laboratory 1 is also sealed and connected to an igniter connector 3, into which an igniter 4 is inserted. Figure 8 In order to ensure the sealing between the igniter joint 3 and the igniter 4, a first sealing sleeve 31 is fixed on the outer wall of the igniter joint 3, a sealing slot is formed between the inner wall surface of the first sealing sleeve 31 and the outer wall surface of the igniter joint 3, a second sealing sleeve 41 is fixed on the outer wall of the igniter 4, the igniter 4 is inserted into the igniter joint 3, and the outer wall of the second sealing sleeve 41 is threadedly connected with the inner wall of the first sealing sleeve 31. Compared with directly setting a rubber ring, the sealing of this structure is more beneficial to the compressive strength and the structure is more stable.

[0037] During the experiment, it is necessary to simulate a high temperature environment. For this purpose, the present invention provides a liquid flow channel (not shown in the figure) on the explosion-proof laboratory 1. The liquid flow channel connects two water joints. By injecting flowing high-temperature liquid (generally water) into the liquid flow channel, the temperature of the explosion-proof laboratory 1 is increased. The liquid flow channel ensures that the explosion-proof laboratory 1 is heated more evenly.

[0038] The explosion-proof transparent window 11 on the explosion-proof laboratory 1 is explosion-proof glass, and an industrial camera is arranged on one side of the explosion-proof laboratory 1. The industrial camera is used to record the simulation situation in the laboratory.

[0039] The explosion-proof laboratory 1 is also equipped with pressure sensors, temperature and humidity sensors and valves.

[0040] There are three main types of thermal runaway triggers for lithium batteries, namely thermal abuse, overcharging and puncture. This experimental device is mainly aimed at thermal abuse and overcharging. The battery is placed inside an explosion-proof laboratory. Two prefabricated threaded wires are reserved on the explosion-proof laboratory 1 to connect the positive and negative poles of the battery and the positive and negative poles of the external power supply. Overcharging and thermal abuse cause the battery to have thermal runaway inside the explosion-proof laboratory and release a large amount of gas.

[0041] There are two main ways to obtain combustible gas in the cabin: 1. Direct thermal runaway of the battery, which releases flammable gases of various components; Second, obtain the main ratio of released gas components through literature or previous battery thermal runaway experiments, and obtain multi-component gas with the same composition by mixing multiple gases to simulate the gas composition released after battery thermal runaway.

[0042] Lithium batteries are generally divided into lithium iron phosphate batteries and ternary lithium batteries. The thermal runaway of lithium iron phosphate batteries is mainly to release smoke, and they rarely produce sparks. Therefore, when they accumulate in a confined space and encounter other ignition sources to a certain extent, they are mainly explosion accidents. The components of ternary lithium batteries are more active, and their thermal runaway process is faster and more violent. When the thermal runaway process releases gas, sparks will be generated to ignite the thermal runaway gas, forming a jet fire, accompanied by a local explosion, and its main accident mode is fire.

[0043] Thermal runaway gases mainly include hydrogen, methane, propane, electrolyte vapor and other components. A certain volume of premixed gas of thermal runaway gas components is configured in the gas tank 8 by partial pressure method. During the test simulation, in order to achieve the gas distribution in the explosion-proof laboratory 1, the air inside the explosion-proof laboratory 1 is first extracted by a vacuum pump 6 to a certain negative pressure condition, and then a certain volume of premixed gas in the gas tank 8 is introduced to obtain a mixture of combustible gas and air with the desired volume concentration. Observe whether the pressure gauge on the explosion-proof laboratory is the required air pressure condition. The size of the air pressure in the explosion-proof laboratory can simulate different altitudes. After the combustible gas is introduced, let it stand for a period of time to ensure the uniformity of the gas mixing.

[0044] After completing the above steps, unplug the second connector 22, and the first connector 21 automatically closes. The reason for disconnecting the anti-leak quick connector 2 is to prevent gas reflux and affect the experimental effect. Turn on industrial cameras and computers and other equipment to trigger the igniter 4 to detonate the premixed gas or thermal runaway gas in the explosion-proof laboratory.

[0045] When conducting the next test, open the valve on the explosion-proof laboratory and discharge the reacted gas in the explosion-proof laboratory to the open area outside (a purification net can be set up to reduce the emission of toxic gases). When the pressure reaches normal pressure, there is still residual gas inside. This part of the gas is extracted by connecting to the vacuum pump 6 and then enters the clean air. This can be repeated three times to exhaust the gas completely.

[0046] It is worth noting that the vacuum pump, humidifier and liquid flow channel on the explosion-proof laboratory 1 are used to adjust the environmental parameters (temperature, pressure, humidity) in the explosion-proof laboratory to simulate the actual situation of the energy storage cabin under different environmental conditions (plateaus, plains, environmental changes in different seasons and regions).

[0047] During the air intake process of the explosion-proof laboratory 1, the method of pumping negative pressure gas distribution by vacuum pump is only applicable to closed environments, and the situation where the explosion-proof laboratory 1 is installed with an explosion venting plate is not considered, because in the case of an explosion venting plate, a certain negative pressure is likely to cause the explosion venting plate to rupture, and the next test cannot be carried out. For the case of an explosion venting plate, a certain concentration of premixed gas can be pre-configured in the gas tank, and the explosion-proof laboratory is initially filled with air. The gas tank 8, vacuum pump 6, vacuum pump 7, and explosion-proof laboratory are connected in series through PU pipes to form a cycle. The volume of the gas tank 8 and the volume of the energy storage cabin are known, and the concentration of the gas can be calculated. During the ignition experiment, the ball valves of the gas tank and the vacuum pump are closed respectively, and then the explosion test is triggered by triggering the ignition source.

[0048] For inert explosion suppression gases (nitrogen, carbon dioxide, argon, perfluorohexanone, etc.), they are pre-configured through gas tanks or installed on the wall of the explosion-proof laboratory 1 through devices such as fire spray to test their explosion suppression effects.

[0049] The above description is only a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements without departing from the principle of the present invention, and these improvements should also be regarded as within the protection scope of the present invention.

Claims

1. An experimental device for studying explosion prevention and control measures for prefabricated cabin energy storage power stations, characterized in that: The invention comprises an explosion-proof laboratory (1), an anti-leakage quick connector (2), a humidifier (5), a vacuum pump (6), an air pump (7) and a gas storage tank (8). The explosion-proof laboratory (1) is provided with a plurality of explosion-proof transparent windows (11) and a plurality of interfaces (12). The anti-leakage quick connectors (2) are threadedly connected to a plurality of interfaces (12). The remaining interfaces (12) are sealed by plugs. The humidifier (5), the vacuum pump (6) and the air pump (7) are respectively connected to an anti-leakage quick connector (2). The gas storage tank (8) is connected to the air pump (7). The air pump extracts the gas in the gas storage tank (8) into the explosion-proof laboratory (1).

2. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 1, characterized in that: The anti-leakage quick connector (2) comprises a first connector (21), a second connector (22), a locking sleeve (23), a ball (24) and a first spring (25); a plurality of ball holes are provided on the outer wall of the first connector (21); the balls (24) are placed in the ball holes; a limiting groove (221) is provided on the outer wall of the second connector (22); the second connector (22) and the first connector (21) are plugged into each other; the balls (24) pass through the ball holes and are placed in the limiting groove (221); the first connector (21) is locked. The locking sleeve (23) is elastically sleeved on the first connecting head (21) through a first spring (25), the locking sleeve (23) radially limits the ball (24) in the ball hole, and a displacement groove (231) is provided on the inner wall of the locking sleeve (23). The locking sleeve (23) is axially moved and the displacement groove (231) is placed on one side of the ball (24), thereby releasing the radial limit on the ball and releasing the axial limit between the first connecting head (21) and the second connecting head (22).

3. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 2, characterized in that: A positioning step surface (212) and a retaining spring (213) are provided on the outer wall of the first connecting head (21); the locking sleeve (23) is axially positioned on the first connecting head (21) via the positioning step surface (212) and the retaining spring (213); and the first spring (25) is sleeved on the first connecting head and disposed between the first connecting head and the locking sleeve.

4. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 2, characterized in that: The first connector (21) and the second connector (22) are both provided with sealing valve cores (26); after the second connector (22) and the first connector (21) are plugged into each other, the two sealing valve cores (26) abut against each other, thereby allowing the first connector (21) and the second connector (22) to communicate with each other.

5. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 4, characterized in that: The sealing valve core (26) comprises a sealing head (261), a second spring (262) and a positioning block (263). A sealing step surface (271) and a mounting step (272) are provided in the first connecting head (21) and the second connecting head (22). The second spring (262) is sleeved on the sealing head (261), and the head end of the second spring abuts the sealing head (261) against the sealing step surface (271), and the tail end of the second spring abuts the positioning block (263) against the mounting step (272). The two sealing heads (261) abut against each other so that the sealing head (261) is away from the sealing step surface (271), thereby correspondingly conducting the first connecting head (21) and the second connecting head (22).

6. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 5, characterized in that: The mounting step (272) is integrally formed with the corresponding first connector (21) and second connector (22); two mounting openings (270) are provided on the mounting step (272); radially protruding positioning ears (264) are provided on the outer wall of the positioning block (263); the positioning ears (264) are inserted through the mounting openings (270); the positioning block (263) is rotated to stagger the positioning ears (264) and the mounting openings (270); and the positioning ears (264) are pressed against the mounting step (272) by the elastic force of the second spring (262).

7. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 1, characterized in that: The explosion-proof laboratory (1) is also connected to an igniter connector (3), and an igniter (4) is plugged into the igniter connector (3).

8. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 7, characterized in that: A first sealing sleeve (31) is fixed on the outer wall of the igniter joint (3), a sealing slot is formed between the inner wall surface of the first sealing sleeve (31) and the outer wall surface of the igniter joint (3), a second sealing sleeve (41) is fixed on the outer wall of the igniter (4), the igniter (4) is inserted into the igniter joint (3), and the outer wall of the second sealing sleeve (41) is threadedly connected to the inner wall of the first sealing sleeve (31).

9. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 1, characterized in that: The explosion-proof laboratory (1) is provided with a liquid flow channel, the explosion-proof transparent window (11) on the explosion-proof laboratory (1) is explosion-proof glass, and an industrial camera is arranged on one side of the explosion-proof laboratory (1).

10. The experimental device for studying explosion prevention and control measures of prefabricated cabin energy storage power station according to claim 1, characterized in that: The explosion-proof laboratory (1) is also provided with a pressure sensor, a temperature and humidity sensor and a valve.

Citation Information

Patent Citations

  • Quick butt joint connector

    CN103162046A

  • Anti-leakage female joint

    CN103162049A

  • Visual experiment testing device for simulating explosion evolution process of underground electrochemical energy storage system

    CN118191015A

  • Convenient water pipe quick connector

    CN218480298U

  • Integrated hydraulic joint

    CN220102427U

Cited By

  • Oil-gas-water mixed transportation pressurization three-phase metering skid

    CN120139786A

  • Oil, gas and water mixed transportation pressurization three-phase metering skid