Building energy management method and system capable of participating in power demand response

By introducing active power demand response devices and power supply scheduling models in the building energy management system, the problem that traditional methods cannot cope with fluctuations in power demand is solved, and more accurate power consumption demand forecasts and more stable power supply are achieved.

CN118920494AInactive Publication Date: 2024-11-08NORTH CHINA ELECTRIC POWER UNIV
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410982158.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional building energy management methods cannot effectively respond to fluctuations in electricity demand during seasonal, holiday cycles and emergencies, resulting in unstable energy allocation.

Method used

By using a method that can participate in the power demand response, by setting up an active response device for the power demand on the power demand side, managers can actively enter the power consumption demand for the next power allocation cycle, and summarize and predict through the building energy management server to establish an active-based Respond to the power supply scheduling model of the data, and make more accurate power consumption demand predictions.

Benefits of technology

It improves the accuracy of power demand forecasting, ensures power supply quality and stability, and avoids insufficient power supply caused by sudden changes in power consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920494A_ABST
    Figure CN118920494A_ABST
Patent Text Reader

Abstract

The invention discloses a building energy management method and system capable of participating in power demand response, and relates to the technical field of building energy management. A worker at each power demand side can actively input the power consumption demand of the next power supply period on the power demand active response device based on the own condition, and the condition that the overall power consumption is not predicted accurately due to sudden change of the power consumption condition under some non-predictable conditions is solved; the power supply scheduling model of the power demand gathers an active response power demand data set and a historical power consumption data set, predicts the total power consumption of the next power distribution period based on more accurate data, and adopts a multi-layer statistical model. The power generation amount or the power transmission amount is allocated by using the total power demand prediction data in the building area in the next power allocation period, and the power supply quality and the power supply stability in the building area are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building energy management, and in particular to a building energy management method and system capable of participating in power demand response. Background Art

[0002] Demand Response (DR) is a management method that guides power users to reduce electricity consumption or change their electricity usage patterns through price incentives or grid reliability requirements within a specific time period.

[0003] The traditional building energy management method adopts passive demand-side electricity demand forecasting, which is implemented based on the historical electricity consumption data of the previous period, and then the building energy distribution is planned based on the demand-side electricity demand forecasting data. The problem with this passive management model is that it cannot solve the problem of reasonable energy allocation in the case of large fluctuations in demand-side demand such as surges or plunges in seasonality, holiday cycles, emergencies, etc.

[0004] Therefore, there is an urgent need to design a building energy management method and system that can participate in electricity demand response and provide a more stable energy management solution. Summary of the invention

[0005] In order to solve the technical problems of the above-mentioned prior art building energy management, the present invention provides a building energy management method and system that can participate in power demand response. The following technical solutions are adopted:

[0006] A building energy management method capable of participating in power demand response, wherein a power demand active response device 1 is respectively arranged at a plurality of power demand sides 101, the power demand active response device 1 comprising a power demand input module and a communication module, and the power demand input module is connected to a building energy management server through the communication module;

[0007] The building energy management approach includes the following steps:

[0008] Step 1, power demand response entry, set the power demand response time period at the end of the power supply scheduling cycle, within the power demand response time period, each power demand side 101 management personnel estimates the power demand of the next power dispatch cycle, if it is determined that the power demand of the next power dispatch cycle relative to the power demand of the previous cycle changes by more than 20%, then the power demand of the next power dispatch cycle is entered through the power demand entry module, and the power demand entry module transmits the power demand of the next power dispatch cycle to the building energy management server;

[0009] Step 2, power demand aggregation. After the power demand response time period, the building energy management server aggregates the active response power demand of multiple power demand sides 101 to form an active response power demand data set. For multiple power demand sides 101 that have not entered power demand, the power consumption of the previous power supply scheduling cycle is aggregated as the power demand of the next power supply scheduling cycle to form a historical power consumption data set.

[0010] Step 3: predict the total power demand. Establish a power supply dispatching model based on power demand. Enter the power demand data obtained in step 2 into the power supply dispatching model. The power supply dispatching model outputs the total power demand forecast data in the building area in the next power dispatch cycle.

[0011] By adopting the above technical scheme, the traditional scheme for predicting the total amount of electricity demand, which adopts the total amount of electricity demand prediction method of the estimation model based on historical data or holidays and other factors, adopts a method that can participate in the power demand response. Each staff member of the power demand side 101 can actively enter the power demand for the next power supply cycle on the power demand active response device 1 based on their own situation. This can solve the problem of inaccurate overall power consumption prediction caused by sudden changes in power consumption in some unpredictable situations. For example, a certain power demand side 101 is a small factory. Due to the surge in orders in the next power allocation cycle, the small factory has opened a new production line. It is estimated that the power demand in the next power allocation cycle will double. At this time, if the total amount of electricity demand of the estimation model is used to predict the total power consumption in the next power allocation cycle, it will cause insufficient power supply in the next power allocation cycle, affecting the power supply quality.

[0012] The power supply dispatch model for specific power demand collects active response power demand data sets and historical power consumption data sets, and predicts the total power consumption in the next power dispatch cycle based on more accurate data, greatly improving the accuracy of the total power consumption forecast in the power dispatch cycle. The total power demand forecast data in the building area in the next power dispatch cycle is used to dispatch power generation or transmission, so as to ensure the power supply quality and stability in the building area.

[0013] Optionally, the duration of the power demand response time period does not exceed twenty-four hours, and the power demand active response device 1 reminds the power demand side 101 twenty-four hours before the start of the power demand response time period.

[0014] By adopting the above technical solution, usually a power supply scheduling cycle is one month, and a power demand response time period is set at the end of the power supply scheduling cycle. In principle, this time period shall not exceed twenty-four hours. The power demand side 101 can be reminded twenty-four hours before the start of the power demand response time period. The reminder can be in the form of a screen display reminder of the power demand active response device 1 or a service SMS reminder of the power system. The management personnel should be properly informed or trained to avoid missing the power supply demand on the demand side.

[0015] Optionally, step 3 includes the following sub-steps:

[0016] Step 31, the building energy management server collects the active response power demand data set and the historical power consumption data set in step 2;

[0017] Step 32, for the active response electricity demand data set, determine whether it is abnormal based on the historical average electricity consumption of the corresponding power demand side 101 recorded by the building energy management server. If it is abnormal, the building energy management server will feedback the data to be confirmed to the corresponding power demand active response device 1. After the corresponding power demand active response device 1 confirms it, it will be adopted. If it is wrong, the power demand for the next power allocation cycle will be re-entered.

[0018] Optionally, in step 32, the method for actively responding to whether the power demand data set is abnormal is to assume that the historical power consumption of the power demand side 101 in the same period is E1, E2, ..., E t-1 , assuming that the active response power demand is FE t , determine the difference values ​​one by one, and record them as DE1, DE2, ..., DE t-1 , Set the difference value threshold DE max , if the difference values ​​are all greater than the difference threshold DE max , then it is judged as abnormal.

[0019] By adopting the above technical solution, for example, for the active response electricity demand data set, it is necessary to judge whether each data is abnormal. Since the active response electricity demand recorded itself is quite different from the data of the previous power supply cycle, the difference is calculated separately in all historical data. If there are large differences, there is a risk of mis-entry of the active response electricity demand. At this time, it needs to be fed back to the corresponding power demand active response device 1, and the management personnel needs to confirm again before it can be used to avoid the erroneous data caused by mis-entry affecting the prediction results.

[0020] Optionally, the power supply dispatch model in step 3 is a multi-layer statistical model based on time series analysis and power demand response data. The calculation formula of the multi-layer statistical model is:

[0021]

[0022] Where AD is the forecast data of the total electricity demand in the building area in the next power dispatch cycle, D is the redundancy coefficient, which ranges from 1.1 to 1.3, FE1, FE2, ..., FE x is the data set of active response electricity demand, x is the number of active response electricity demand data, CE1, CE2, ..., CE y is the historical electricity consumption dataset, y is the number of historical electricity consumption data, and C is the spare capacity.

[0023] Optionally, the reserve capacity C is 10%-15% of the total power consumption in the previous power supply cycle.

[0024] By adopting the above technical scheme, the multi-layer statistical model is divided into three layers of statistics. The first layer is the sum of the data sets of electricity demand that are actively responded to. The second layer is the sum of the historical electricity consumption data sets of all demand sides that have not actively responded. The third layer is the spare capacity, which is determined based on 10%-15% of the total electricity consumption in the previous power supply cycle. The first layer is based on the exact data of the demand side that is actively responded to. Although the second layer is not actively entered data, it is actually the default data on the data demand side based on the entry logic. The third layer is the regulation data. Therefore, the data source of the multi-layer statistical model uses relatively accurate data, and its output of the total electricity demand forecast data in the building area in the next power allocation cycle is more accurate.

[0025] A building energy management system capable of participating in power demand response is used to implement a building energy management method capable of participating in power demand response, including multiple power demand active response devices 1 and a building energy management server. The multiple power demand active response devices 1 are respectively installed at multiple power demand sides 101. The power demand active response devices 1 include a power demand entry module and a communication module. The power demand entry module is used for the power demand amount and confirmation feedback data of the management personnel of the power demand side 101 for the next power allocation cycle. The power demand entry module is connected to the building energy management server through the communication module. The building energy management server is provided with a building energy management program set in step 2 and step 3 of a building energy management method capable of participating in power demand response.

[0026] Optionally, the power demand entry module includes a touch display screen and a memory, the touch display screen is communicatively connected to the memory, and the memory is communicatively connected to the building energy management server via the communication module.

[0027] Optionally, the communication module is a wireless communication module or a wired communication module.

[0028] In summary, the present invention includes at least one of the following beneficial technical effects:

[0029] The present invention can provide a building energy management method and system that can participate in power demand response. By adopting a method that can participate in power demand response, each staff member on the power demand side can actively enter the power demand for the next power supply cycle on the power demand active response device based on their own situation, so as to solve the problem of inaccurate overall power consumption prediction caused by sudden changes in power consumption in some unpredictable situations;

[0030] The power supply dispatch model for power demand collects active response power demand data sets and historical power consumption data sets, and predicts the total power consumption of the next power dispatch cycle based on more accurate data.

[0031] The power supply dispatching model adopts a multi-layer statistical model, which is divided into three layers of statistics. The first layer is the sum of the data sets of active response electricity demand, the second layer is the sum of the historical electricity consumption data sets of all demand sides that have not actively responded, and the third layer is the spare capacity, which is determined based on 10%-15% of the total electricity consumption in the previous power supply cycle. The first layer is based on the exact data of the demand side that responds actively, the second layer is based on the input logic, which is actually the default data on the data demand side, and the third layer is the regulation data. The data source of the multi-layer statistical model uses relatively accurate data, and its output of the total electricity demand forecast data in the building area in the next power allocation cycle is more accurate. The total electricity demand forecast data in the building area in the next power allocation cycle is used to allocate power generation or transmission to ensure the power supply quality and stability in the building area. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a flow chart of a building energy management method that can participate in power demand response according to the present invention;

[0033] Figure 2 It is a schematic diagram of the component connection principle of a building energy management system that can participate in power demand response according to the present invention.

[0034] Explanation of the accompanying drawings: 1. Power demand active response device; 11. Power demand input module; 111. Touch screen; 112. Memory; 12. Communication module; 100. Building energy management server. DETAILED DESCRIPTION

[0035] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0036] The embodiment of the present invention discloses a building energy management method and system capable of participating in power demand response.

[0037] Reference Figure 1 and Figure 2, a building energy management method that can participate in power demand response, wherein a power demand active response device 1 is respectively set at multiple power demand sides 101, and the power demand active response device 1 includes a power demand input module 11 and a communication module 12, and the power demand input module 11 is connected to the building energy management server 100 through the communication module 12;

[0038] The building energy management approach includes the following steps:

[0039] Step 1, power demand response entry, set the power demand response time period at the end of the power supply scheduling cycle, within the power demand response time period, each power demand side 101 management personnel estimates the power demand of the next power dispatch cycle, if it is determined that the power demand of the next power dispatch cycle relative to the power demand of the previous cycle changes by more than 20%, then the power demand of the next power dispatch cycle is entered through the power demand entry module 11, and the power demand entry module 11 transmits the power demand of the next power dispatch cycle to the building energy management server 100;

[0040] Step 2, power demand aggregation. After the power demand response time period, the building energy management server 100 aggregates the active response power demand of multiple power demand sides 101 to form an active response power demand data set. For multiple power demand sides 101 that have not entered power demand, the power consumption of the previous power supply scheduling cycle is aggregated as the power demand of the next power supply scheduling cycle to form a historical power consumption data set.

[0041] Step 3: predict the total power demand. Establish a power supply dispatching model based on power demand. Enter the power demand data obtained in step 2 into the power supply dispatching model. The power supply dispatching model outputs the total power demand forecast data in the building area in the next power dispatch cycle.

[0042] Different from the traditional total electricity demand forecasting method that uses an estimation model to forecast total electricity demand based on historical data or holidays and other factors, this method uses a method that can participate in electricity demand response. Each staff member on the electricity demand side 101 can actively enter the electricity demand for the next power supply cycle on the electricity demand active response device 1 based on their own situation. This can solve the problem of inaccurate overall electricity consumption forecast caused by sudden changes in electricity consumption in some unpredictable situations. For example, a certain electricity demand side 101 is a small factory. Due to a surge in orders in the next electricity allocation cycle, the small factory has opened a new production line, and it is estimated that the electricity demand in the next electricity allocation cycle will double. At this time, if the total electricity demand of the estimation model is used to predict the total electricity consumption in the next electricity allocation cycle, it will result in insufficient power supply in the next power allocation cycle, affecting the power supply quality.

[0043] The power supply dispatch model for specific power demand collects active response power demand data sets and historical power consumption data sets, and predicts the total power consumption in the next power dispatch cycle based on more accurate data, greatly improving the accuracy of the total power consumption forecast in the power dispatch cycle. The total power demand forecast data in the building area in the next power dispatch cycle is used to dispatch power generation or transmission, so as to ensure the power supply quality and stability in the building area.

[0044] The duration of the power demand response time period does not exceed twenty-four hours, and the power demand active response device 1 reminds the power demand side 101 twenty-four hours before the start of the power demand response time period.

[0045] Usually a power supply scheduling cycle is one month. At the end of the power supply scheduling cycle, a power demand response time period is set. In principle, this time period shall not exceed twenty-four hours. The power demand side 101 may be reminded twenty-four hours before the start of the power demand response time period. The reminder may be in the form of a screen display reminder of the power demand active response device 1 or a service SMS reminder of the power system. Management personnel shall be properly informed or trained to avoid omission of power supply demand on the demand side.

[0046] Step 3 includes the following sub-steps:

[0047] Step 31, the building energy management server 100 collects the active response power demand data set and the historical power consumption data set in step 2;

[0048] Step 32, for the active response electricity demand data set, determine whether it is abnormal based on the historical average electricity consumption of the corresponding power demand side 101 recorded by the building energy management server 100. If it is abnormal, the building energy management server 100 will feedback the data to be confirmed to the corresponding power demand active response device 1. After the corresponding power demand active response device 1 confirms it, it will be adopted. If it is wrong, the power demand for the next power allocation cycle will be re-entered.

[0049] In step 32, the method for actively responding to whether the power demand data set is abnormal is to assume that the historical power consumption of the power demand side 101 in the same period is E1, E2, ..., E t-1 , assuming that the active response power demand is FE t , determine the difference values ​​one by one, and record them as DE1, DE2, ..., DE t-1 , Set the difference value threshold DE max , if the difference values ​​are all greater than the difference threshold DE max , then it is judged as abnormal.

[0050] For example, for a data set of active response electricity demand, it is necessary to determine whether each data is abnormal. Since the active response electricity demand recorded itself is quite different from the data of the previous power supply cycle, the difference is calculated separately in all historical data. If there are large differences, there is a risk of mis-entry of the active response electricity demand. At this time, it needs to be fed back to the corresponding power demand active response device 1, and the management personnel needs to confirm it again before it can be used to avoid the erroneous data caused by mis-entry affecting the prediction results.

[0051] The power supply dispatch model in step 3 is a multi-layer statistical model based on time series analysis and power demand response data. The calculation formula of the multi-layer statistical model is:

[0052]

[0053] Where AD is the forecast data of the total electricity demand in the building area in the next power dispatch cycle, D is the redundancy coefficient, which ranges from 1.1 to 1.3, FE1, FE2, ..., FE x is the data set of active response electricity demand, x is the number of active response electricity demand data, CE1, CE2, ..., CE y is the historical electricity consumption dataset, y is the number of historical electricity consumption data, and C is the spare capacity.

[0054] The reserve capacity C is 10%-15% of the total power consumption in the previous power supply cycle.

[0055] The multi-layer statistical model is divided into three layers of statistics. The first layer is the sum of the data sets of actively responded electricity demand. The second layer is the sum of the historical electricity consumption data sets of all demand sides that did not actively respond. The third layer is the spare capacity, which is determined based on 10%-15% of the total electricity consumption in the previous power supply cycle. The first layer is based on the exact data of the demand side that responds actively. Although the second layer is not actively entered data, it is actually the default data on the data demand side based on the entry logic. The third layer is the regulation data. Therefore, the data source of the multi-layer statistical model uses relatively accurate data, and its output of the total electricity demand forecast data in the building area for the next power allocation cycle is more accurate.

[0056] A building energy management system capable of participating in power demand response is used to implement a building energy management method capable of participating in power demand response, comprising a plurality of power demand active response devices 1 and a building energy management server 100. The plurality of power demand active response devices 1 are respectively installed at a plurality of power demand sides 101. The power demand active response devices 1 comprise a power demand entry module 11 and a communication module 12. The power demand entry module 11 is used for the management personnel of the power demand side 101 to record the power demand and confirm feedback data of the next power allocation cycle. The power demand entry module 11 is connected to the building energy management server 100 through the communication module 12. The building energy management server 100 is provided with a building energy management program set in step 2 and step 3 of a building energy management method capable of participating in power demand response.

[0057] The power demand input module 11 includes a touch screen display 111 and a memory 112 . The touch screen display 111 is communicatively connected to the memory 112 . The memory 112 is communicatively connected to the building energy management server 100 via the communication module 12 .

[0058] The communication module 12 is a wireless communication module or a wired communication module.

[0059] The following is a specific case to illustrate the implementation principle of a building energy management method and system that can participate in power demand response:

[0060] The target building area includes several power demand sides 101. A power demand response time period is set in the last 24 hours of the power supply scheduling cycle. During the power demand response time period, the manager of each power demand side 101 estimates the power demand in the next power dispatching cycle.

[0061] In the power demand response time period of the last 24 hours of the Nth power supply cycle, the managers of the x power demand sides 101 determine that the change rate of the power demand of the next power dispatch cycle relative to the power demand of the previous cycle exceeds 20%, and the managers of the x power demand sides 101 enter the power demand of the next power dispatch cycle through the power demand entry module 11, and the power demand entry module 11 of the x power demand sides 101 transmits the power demand of the next power dispatch cycle to the building energy management server 100;

[0062] After the power demand response time period, the building energy management server 100 aggregates the active response power demand of the x power demand sides 101 to form an active response power demand data set. For the y power demand sides 101 that have not entered the power demand, the power consumption of the previous power supply scheduling cycle is aggregated as the power demand of the next power supply scheduling cycle to form a historical power consumption data set.

[0063] For the active response power demand data set, in the abnormal judgment of the active response power demand data, the active response power demand of the x-2 power demand side 101 is FE t , respectively calculated with FE t The multiple electricity consumptions in the same period of history are E1, E2, ..., E t-1 The difference value of It is found that the difference values ​​are all greater than the difference value threshold DE max , where DE max It is set to 20%, and it is found that the electricity demand in the same period of history is quite different. The reason is that the active response electricity demand of the x-2th power demand side 101 is 2.5 times that of the previous power supply scheduling cycle. Therefore, the abnormality is identified, and the building energy management server 100 feeds back the data to be confirmed to the corresponding power demand active response device 1. After receiving the feedback confirmation data, the manager of the power demand side 101 believes that there is no error in recording according to its own production adjustment situation, so the feedback confirmation data is confirmed. The building energy management server 100 receives the confirmation information and lifts the abnormal judgment of the active response electricity demand.

[0064] Establish a power supply dispatching model based on power demand, enter the power demand data obtained in step 2 into the power supply dispatching model, and the power supply dispatching model outputs the total power demand forecast data in the building area in the next power dispatching cycle. The power supply dispatching model uses the following formula for calculation;

[0065]

[0066] Where AD is the forecast data of the total electricity demand in the building area in the next power dispatch cycle, D is the redundancy coefficient, which ranges from 1.1 to 1.3, FE1, FE2, ..., FE x is the data set of active response electricity demand, x is the number of active response electricity demand data, CE1, CE2, ..., CE y is the historical electricity consumption dataset, y is the number of historical electricity consumption data, and C is the spare capacity.

[0067] The power dispatching model outputs the forecast data AD of the total power demand in the building area in the next power dispatching cycle. The management personnel coordinate the power generation or power transmission required in the building area in the next power dispatching cycle based on AD.

[0068] The above are all preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Therefore, any equivalent changes made based on the structure, shape, and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A building energy management method that can participate in power demand response, Features: An active power demand response device (1) is respectively provided on a plurality of power demand sides (101), the active power demand response device (1) comprising a power demand input module (11) and a communication module (12), the power demand input module (11) being communicatively connected to a building energy management server (100) via the communication module (12); The building energy management approach includes the following steps: Step 1, power demand response entry, setting a power demand response time period at the end of the power supply scheduling cycle. During the power demand response time period, the management personnel of each power demand side (101) estimates the power demand of the next power dispatch cycle. If it is determined that the power demand of the next power dispatch cycle has a change rate of more than 20% relative to the power demand of the previous cycle, the power demand of the next power dispatch cycle is entered through the power demand entry module (11). The power demand entry module (11) transmits the power demand of the next power dispatch cycle to the building energy management server (100); Step 2, power demand aggregation, after the power demand response time period, the building energy management server (100) aggregates the active response power demand of multiple power demand sides (101) to form an active response power demand data set, and for multiple power demand sides (101) that have not entered power demand, aggregate the power consumption of the previous power supply scheduling cycle as the power demand of the next power supply scheduling cycle to form a historical power consumption data set; Step 3: predict the total power demand. Establish a power supply dispatching model based on power demand. Enter the power demand data obtained in step 2 into the power supply dispatching model. The power supply dispatching model outputs the total power demand forecast data in the building area in the next power dispatch cycle.

2. A building energy management method capable of participating in power demand response according to claim 1, Features: The duration of the power demand response time cycle does not exceed twenty-four hours, and the power demand active response device (1) reminds the power demand side (101) twenty-four hours before the start of the power demand response time cycle.

3. A building energy management method capable of participating in power demand response according to claim 2, Features: Step 3 includes the following sub-steps: Step 31, the building energy management server (100) collects the active response electricity demand data set and the historical electricity consumption data set in step 2; Step 32, for the active response electricity demand data set, determine whether it is abnormal based on the historical average electricity consumption of the corresponding power demand side (101) recorded by the building energy management server (100). If it is abnormal, the building energy management server (100) will feedback the data to be confirmed to the corresponding power demand active response device (1). After the corresponding power demand active response device (1) confirms it, it will be adopted. If it is wrong, the power demand for the next power allocation cycle will be re-entered.

4. A building energy management method capable of participating in power demand response according to claim 3, Features: In step 32, the method for actively responding to whether the power demand data set is abnormal is to set the multiple power consumptions of the corresponding power demand side (101) in the same period of history as E 1 、E 2 ,……,E t-1 , assuming that the active response power demand is FE t , judge the difference value one by one, and record them as DE 1 ,DE 2 ,……,DE t-1 , Set the difference value threshold DE max , if the difference values ​​are all greater than the difference threshold DE max , then it is judged as abnormal.

5. A building energy management method capable of participating in power demand response according to claim 4, Features: The power supply dispatch model in step 3 is a multi-layer statistical model based on time series analysis and power demand response data. The calculation formula of the multi-layer statistical model is: AD is the forecast data of total electricity demand in the building area in the next power dispatch cycle. is the redundancy factor, ranging from 1.1 to 1.3, FE 1 , FE 2 ,……,FE x is the active response electricity demand data set, x is the number of active response electricity demand data, CE 1 ,CE 2 ,……,CE y is the historical electricity consumption dataset, y is the number of historical electricity consumption data, and C is the spare capacity.

6. A building energy management method capable of participating in power demand response according to claim 5, Features: The reserve capacity C is 10%-15% of the total power consumption in the previous power supply cycle.

7. A building energy management system that can participate in power demand response, Features: A building energy management method capable of participating in power demand response as described in claim 6, comprising a plurality of active power demand response devices (1) and a building energy management server (100), wherein the plurality of active power demand response devices (1) are respectively installed at a plurality of power demand sides (101), wherein the active power demand response devices (1) comprise a power demand entry module (11) and a communication module (12), wherein the power demand entry module (11) is used for the management personnel of the power demand side (101) to record the power demand amount and confirm feedback data of the next power allocation cycle, wherein the power demand entry module (11) is connected to the building energy management server (100) through the communication module (12), and the building energy management server (100) is provided with a building energy management program set in step 2 and step 3 of a building energy management method capable of participating in power demand response as described in claim 6.

8. A building energy management system capable of participating in power demand response according to claim 7, Features: The power demand input module (11) comprises a touch display screen (111) and a memory (112); the touch display screen (111) is communicatively connected to the memory (112); and the memory (112) is communicatively connected to the building energy management server (100) via the communication module (12).

9. A building energy management system capable of participating in power demand response according to claim 8, Features: The communication module (12) is a wireless communication module or a wired communication module.

Citation Information

Patent Citations

  • Power demand monitoring platform and monitoring method for supporting client-side energy consumption control system

    CN114725947A

  • Smart energy management method and system based on demand response

    CN116523277A

  • Multi-source data interaction management system and method based on big data

    CN116719861A

  • Intelligent park energy dynamic scheduling method and system based on artificial intelligence

    CN116896083A

  • Energy management system, method for managing energy and method for predicting energy demand

    KR1020180053453A