Expansion method of FPSO upper module

By determining the leg spacing and calculating bearing capacity, planning the spatial framework and expansion module interface, the problem of poor adaptability to the expansion of the upper FPSO module is solved, and the effect of flexible expansion and shortening of the construction cycle is achieved.

CN118928671APending Publication Date: 2024-11-12OFFSHORE OIL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411201937.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The expansion of the existing FPSO upper module has poor adaptability, large project volume and long cycle, which affects normal operation.

Method used

By determining the leg spacing, calculating and analyzing bearing capacity, planning the spatial framework and reserved expansion module interfaces, designing the connection structure of the basic module and expansion module to achieve flexible expansion and support of the module.

Benefits of technology

It has reduced the initial investment in FPSO projects, achieved flexible expansion and expansion, shortened the construction cycle, and reduced the use and development costs of large-scale construction tools.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928671A_ABST
    Figure CN118928671A_ABST
Patent Text Reader

Abstract

The invention discloses an extension method for an FPSO upper module. The extension method for the FPSO upper module comprises the following steps that S1, the distance between supporting legs of the upper module is determined according to the positions of FPSO ship body transverse ribs and ship body longitudinal ribs; s2, carrying out computational analysis; s3, according to the budget load and arrangement, the sizes of decks, layers and floor heights of the basic module structures are determined; s4, basic module supporting legs, stand columns, cross beams and inclined struts are planned to form a space frame, and expansion module interfaces are reserved; s5, carrying out computational analysis; s6, determining a module expansion direction according to the function requirements of the expansion module, and planning the structure of the expansion module; s7, expansion module supporting legs are installed in the expansion direction, and the expansion modules are hoisted and integrated; and S8, connecting a connection structure between the basic module and the extension module to complete the extension operation of the upper module. According to the extension method of the FPSO upper module, decomposition and integration operation of the large module are achieved, the project development and construction cost is reduced, and meanwhile the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of offshore oil development, and in particular relates to an expansion method for an FPSO upper module. Background Art

[0002] FPSO is a key facility for offshore oil development, mainly used for the exploitation, processing, storage, and transportation of offshore oil, natural gas and other energy. FPSO is generally composed of a lower hull and an upper module. Among them, the upper module is composed of different functional modules, which are used to complete the exploitation, processing and transportation of oil and gas. The production allocation used in the FPSO design stage is a predicted value. After the FPSO is put into production, it is often necessary to expand or transform the upper module to adapt to the impact of later changes in production allocation. The conventional upper module structure scheme has poor adaptability to module expansion, and the module expansion project is large and the cycle is long, which has a relatively large impact on the normal operation of FPSO.

[0003] Therefore, it is urgent to design an expansion method for the upper module of FPSO to solve the problems of poor adaptability to module expansion, large engineering workload and long period in the above-mentioned prior art. Summary of the invention

[0004] In order to solve the technical problems mentioned in the background technology that the prior art has poor adaptability to module expansion, large engineering workload and long period of module expansion, a method for expanding the upper module of FPSO is provided to solve the above problems.

[0005] To achieve the above-mentioned purpose, the specific technical scheme of the expansion method of the FPSO upper module of the present invention is as follows: A method for expanding an upper module of an FPSO, wherein the upper module comprises a basic module, an expansion module and a connection structure, and the method comprises the following steps: S1. Determine the leg spacing of the upper module according to the position of the transverse ribs and longitudinal ribs of the FPSO hull; S2. Carry out calculation and analysis to determine the bearing capacity of the hull structure at the outrigger position; S3. Determine the dimensions of the basic module structure deck, layers and floor heights according to the estimated load and layout; S4. Plan the basic module legs, columns, beams and diagonal braces to form a space frame, and reserve interfaces for expansion modules; S5. Carry out calculation and analysis, determine the specifications and dimensions of structural members, and complete the basic module design; S6. Determine the module expansion direction and plan the expansion module structure according to the functional requirements of the expansion module; S7. Install the expansion module legs in the expansion direction, and hoist and integrate the expansion module; S8. Connect the connection structure between the basic module and the expansion module to complete the upper module expansion operation.

[0006] Furthermore, the basic module and the extension module are connected via a connecting structure, and the basic module and the extension module are supported by legs.

[0007] Furthermore, the basic module and the extension module are respectively provided with basic module legs and extension module legs. The basic module is supported by the basic module legs, and the extension module is supported by the extension module legs.

[0008] Furthermore, according to the positions of the transverse ribs and longitudinal ribs of the FPSO hull, the spacing of the upper module legs is determined, and the basic module legs of the upper module are arranged at the intersection of the transverse ribs and longitudinal ribs of the FPSO hull, and the spacing of the basic module legs of the upper module is consistent with the rib spacing.

[0009] Furthermore, calculation and analysis are carried out to determine the bearing capacity of the hull structure at the basic module leg position through ultimate bearing capacity verification, and the maximum bearing capacity of the basic module legs at different hull transverse ribs and hull longitudinal ribs is determined to obtain the allowable bearing capacity value as the limit value of the reaction force of the basic module legs.

[0010] Furthermore, the dimensions of the deck, layers and floor height of the basic module structure are determined according to the budgeted load and layout. The bearing capacity of the basic module legs is determined according to the budgeted load and S2. The minimum number of basic module legs is preliminarily determined. The length and width of the deck and the layers are determined according to the equipment layout. The floor height of the expansion module is determined according to the equipment and pipeline layout.

[0011] Furthermore, the basic module legs, columns, beams and braces are planned to form a spatial structural frame, and the expansion module interface is reserved to build the upper module according to the dimensions of the basic module structural deck, layering and floor height.

[0012] Furthermore, calculation and analysis are carried out to determine the specifications and dimensions of the structural members and complete the basic module design. The analysis and calculation in situ and during the construction phase are carried out according to the structural framework determined by S4, and the structural model is iteratively optimized.

[0013] Furthermore, the module expansion direction is along the hull length direction or along the hull width direction, and the expansion scale is the same as the rib spacing, so that the expansion module legs are set to support the module.

[0014] Furthermore, installing the expansion module legs in the expansion direction, hoisting and integrating the expansion module means first installing the expansion module legs to provide a support platform for the expansion module to be in place, while avoiding interference with the deck structure and equipment on the hull during the installation of the expansion module.

[0015] The expansion method of the FPSO upper module of the present invention has the following advantages: The application of the present invention can reduce the initial investment in the FPSO project. After it is put into production, the upper modules of the FPSO can be flexibly expanded and extended according to the production situation to meet the production needs. At the same time, the present invention can be applied in the construction stage to reduce the use of large-scale construction machinery and implement the decomposition and integration of large modules, reduce the project development and construction costs, and shorten the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a flow chart of the expansion method of the FPSO upper module of the present invention; Figure 2 It is a schematic structural diagram of the FPSO upper module of the present invention.

[0017] Description of the markings in the figure: 1. Basic module; 2. Extension module; 3. Connection structure; 4. Hull transverse ribs; 5. Hull longitudinal ribs; 6. Basic module legs; 7. Columns; 8. Beams; 9. Diagonal braces; 10. Extension module legs. DETAILED DESCRIPTION

[0018] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0019] Those skilled in the art will appreciate that, although some embodiments herein include certain features included in other embodiments but not other features, the combination of features of different embodiments is meant to be within the scope of the present invention and form different embodiments. For example, in the claims, any one of the claimed embodiments may be used in any combination.

[0020] Please refer to the attached Figure 1 and attached Figure 2 The expansion method of the FPSO topside module of the present invention is described.

[0021] like Figure 1 and Figure 2 As shown, a method for expanding an upper module of an FPSO in the present invention, the upper module comprises a basic module 1, an expansion module 2 and a connection structure 3, and the method comprises the following steps: S1. Determine the leg spacing of the upper module according to the positions of the FPSO hull transverse ribs 4 and the hull longitudinal ribs 5; S2. Carry out calculation and analysis to determine the bearing capacity of the hull structure at the outrigger position; S3. Determine the dimensions of the structural deck, layers and floor height of the basic module 1 according to the estimated load and layout; S4, plan the basic module legs 6, columns 7, beams 8 and diagonal braces 9 to form a space frame, and reserve an interface for the expansion module 2; S5. Carry out calculation and analysis, determine the specifications and dimensions of structural members, and complete the design of basic module 1; S6. Determine the module expansion direction and plan the structure of the expansion module 2 according to the functional requirements of the expansion module 2; S7, installing the expansion module legs 10 in the expansion direction, hoisting and integrating the expansion module; S8, connecting the connection structure 3 between the basic module 1 and the expansion module 2 to complete the upper module expansion operation.

[0022] The application of the present invention can reduce the initial investment in the FPSO project. After it is put into production, the upper modules of the FPSO can be flexibly expanded and extended according to the production situation to meet the production needs. At the same time, the present invention can be applied in the construction stage to reduce the use of large-scale construction machinery and implement the decomposition and integration of large modules, reduce the project development and construction costs, and shorten the construction period.

[0023] Further, if Figure 1 and Figure 2 As shown, the basic module 1 and the extension module 2 can be designed as a whole or separately. The basic module 1 and the extension module 2 are supported by legs. The basic module 1 and the extension module 2 are respectively provided with basic module legs 6 and extension module legs 10. The basic module 1 is supported by the basic module legs 6, and the extension module 2 is supported by the extension module legs 10. The basic module 1 and the extension module 2 are connected by a connecting structure 3 to transfer a small amount of load. The extension module 2 can be built simultaneously with the basic module 1 and hoisted and integrated separately. It can also be designed, built and constructed according to needs after the FPSO is put into production to meet the newly added functional requirements after the FPSO is put into production.

[0024] Further, if Figure 1 and Figure 2 As shown, the spacing of the upper module legs is determined according to the positions of the FPSO hull transverse ribs 4 and the hull longitudinal ribs 5 to ensure that the basic module legs 6 of the upper module are effectively supported. The basic module legs 6 of the upper module are arranged at the intersection of the FPSO hull transverse ribs 4 and the hull longitudinal ribs 5, and the spacing of the basic module legs 6 of the upper module is consistent with the rib spacing.

[0025] Further, if Figure 1 and Figure 2As shown, calculation and analysis are carried out to determine the bearing capacity of the hull structure at the position of the basic module leg 6. The ultimate bearing capacity is checked to determine the maximum bearing capacity of the basic module leg 6 at different positions of the hull transverse ribs 4 and the hull longitudinal ribs 5. At the same time, a certain safety factor can be considered as a later reserve. Finally, the allowable bearing capacity value is obtained as a reference for subsequent module planning and the limit value of the reaction force of the basic module leg 6 of the upper module.

[0026] Further, if Figure 1 and Figure 2 As shown, the dimensions of the structural deck, layers and layer height of the basic module 1 are determined according to the budgeted load and layout. The bearing capacity of the basic module legs 6 is determined according to the budgeted load and S2. The minimum number of basic module legs 6 is preliminarily determined. The length and width of the deck and the layering are determined according to the equipment layout. The layer height of the expansion module 2 is determined according to the equipment and pipeline layout.

[0027] Further, if Figure 1 and Figure 2 As shown, the basic module legs 6, columns 7, beams 8 and braces 9 are planned to form a spatial structural frame, and the interface of the expansion module 2 is reserved. The structural model of the upper module is built according to the dimensions of the structural deck, layering and floor height of the basic module 1. The basic module legs 6, columns 7, beams 8 and braces 9 are used to form a frame system of the upper module to meet the load-bearing and stability requirements of the upper module structure.

[0028] Further, if Figure 1 and Figure 2 As shown, calculation analysis is carried out to determine the specifications and dimensions of the structural members, and the design of the basic module 1 is completed. The various analysis and calculations in the in-situ and construction stages are carried out according to the structural framework determined by S4, and the structural model is iteratively optimized. In order to meet the bearing capacity and stability requirements of the entire cycle of the upper module, the specifications of the structural members, such as the basic module legs 6, columns 7, beams 8 and braces 9, are finally determined based on the analysis and calculation results.

[0029] Further, if Figure 1 and Figure 2 As shown, according to the functional requirements of the expansion module 2, the module expansion direction is determined. Planning the expansion module 2 structure refers to referring to steps S1 to S4, and planning and designing the functional module according to the function of the expansion module 2. It should be further explained that the expansion direction of the expansion module 2 can be along the length direction of the hull or along the width direction of the hull, and the expansion scale can generally be the same as the rib spacing, so as to better set the expansion module legs 10 for module support. It should be further explained that the design of the expansion module 2 also needs to take into special consideration the relationship with the basic module 1 and the structure, pipelines, and electrical and instrument cable interfaces to facilitate subsequent connection operations.

[0030] Further, if Figure 1and Figure 2 As shown, the expansion module legs 10 are installed in the expansion direction. The expansion module is hoisted and integrated, which means that the expansion module legs 10 are installed first to provide a support platform for the expansion module 2 to be in place, while avoiding interference between the expansion module 2 and the deck structure and equipment on the hull during installation.

[0031] Further, if Figure 1 and Figure 2 As shown, the connection structure 3 between the basic module 1 and the extension module 2 is connected to complete the upper module extension operation, which means that after the extension module 2 is in place, the extension module 2 is connected to the reserved structure, pipelines and electric and instrument cables of the basic module 1 respectively, and the extension module 2 is combined with the basic module 1 to form a whole to meet the use function of FPSO.

[0032] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A method for expanding an FPSO upper module, characterized in that: The upper module includes a basic module, an extension module and a connection structure, and the method includes the following steps: S1. Determine the leg spacing of the upper module according to the position of the transverse ribs and longitudinal ribs of the FPSO hull; S2. Carry out calculation and analysis to determine the bearing capacity of the hull structure at the outrigger position; S3. Determine the dimensions of the basic module structure deck, layers and floor heights according to the estimated load and layout; S4. Plan the basic module legs, columns, beams and diagonal braces to form a space frame, and reserve interfaces for expansion modules; S5. Carry out calculation and analysis, determine the specifications and dimensions of structural members, and complete the basic module design; S6. Determine the module expansion direction and plan the expansion module structure according to the functional requirements of the expansion module; S7. Install the expansion module legs in the expansion direction, and hoist and integrate the expansion module; S8. Connect the connection structure between the basic module and the expansion module to complete the upper module expansion operation.

2. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: The basic module and the extension module are connected via a connecting structure, and the basic module and the extension module are supported by legs.

3. The method for expanding the upper module of a FPSO according to claim 2, characterized in that: The basic module and the extension module are respectively provided with basic module legs and extension module legs. The basic module is supported by the basic module legs, and the extension module is supported by the extension module legs.

4. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: The spacing of the upper module legs is determined according to the positions of the transverse ribs and longitudinal ribs of the FPSO hull. The basic module legs of the upper module are arranged at the intersection of the transverse ribs and longitudinal ribs of the FPSO hull. The spacing of the basic module legs of the upper module is consistent with the spacing of the rib positions.

5. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: Carry out calculation and analysis to determine the bearing capacity of the hull structure at the basic module leg position. This is done by checking the ultimate bearing capacity, determining the maximum bearing capacity of the basic module legs at different hull transverse ribs and hull longitudinal ribs, and obtaining the allowable bearing capacity value as the limit value of the basic module leg reaction force.

6. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: The dimensions of the deck, layers and floor height of the basic module structure are determined according to the budgeted load and layout. The bearing capacity of the basic module legs is determined according to the budgeted load and S2. The minimum number of basic module legs is preliminarily determined. The length, width and layering of the deck are determined according to the equipment layout. The floor height of the expansion module is determined according to the equipment and pipeline layout.

7. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: The basic module legs, columns, beams and braces are planned to form a spatial structural frame, and the expansion module interface is reserved to build the upper module according to the dimensions of the basic module structural deck, layering and floor height.

8. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: Carry out calculation and analysis, determine the specifications and dimensions of structural members, and complete the basic module design. Carry out analysis and calculation in the in-situ and construction stages based on the structural framework determined by S4, and iteratively optimize the structural model.

9. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: The module expansion direction is along the length direction of the hull or along the width direction of the hull, and the expansion scale is the same as the rib spacing, so that the expansion module legs are set to support the module.

10. The method for expanding the upper module of a FPSO according to claim 1, characterized in that: Installing the expansion module legs in the expansion direction, hoisting and integrating the expansion module means first installing the expansion module legs to provide a supporting platform for the expansion module to be in place, while avoiding interference with the deck structure and equipment on the hull during the installation of the expansion module.