Exchange beam bridge platform of pedestrian cableway bridge
By designing the main cable anchor section and anchor section of the convex composite curve on the exchange beam abutment of the pedestrian cable bridge, and introducing a penetrating elastic device, the problems of uneven connection between the bridge deck and difficulty in adjusting the length of the main cable are solved. , achieving smooth connection between the bridge deck and improving construction efficiency.
Patent Information
- Application Number
- CN202310523345.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-12
AI Technical Summary
The exchange beam abutment of existing pedestrian cable bridges has problems such as uneven connection between the span end bridge deck and difficulty in adjusting the length of the main cable, especially during the construction and construction of the barrier-free environment, which leads to long construction periods and high costs.
An exchange beam abutment for a pedestrian cable bridge was designed. The main cable and the anchor cable were anchored on the river bank side and the river center side of the exchange beam abutment respectively. The anchor section of the main cable adopts an upper convex composite curve structure, and the anchor cable is The anchor section is anchored on the surface of the river bank side, and a penetrating elastic device is installed at the anchor point, simplifying the adjustment process of the main cable length.
The smooth connection transition of the bridge deck is achieved, the adjustment of the main cable length is simplified, the construction period is shortened and the cost is reduced, and it is suitable for the construction and construction needs of barrier-free environments.
Smart Images

Figure CN118932846A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge engineering construction, and in particular to an exchange beam abutment of a pedestrian cableway bridge. Background Art
[0002] A cableway bridge is a bridge that uses multiple high-strength steel cables arranged in a transverse direction as the main load-bearing component. It is widely used as a temporary bridge structure in large-scale engineering construction and military combat readiness exercises. A number of permanent or semi-permanent pedestrian cableway bridges have also been built in rural areas and some scenic spots in southwest my country.
[0003] The loads of vehicles and people are transferred to the load-bearing main cables through the deck of the cableway bridge. The main cables transfer this action to the anchors anchored on both sides. The anchors mainly bear tension. Commonly used anchors include ridge type, anchor pile type, anchor rod and mixed anchor. In some pedestrian cableway bridges, the exchange beam abutment anchor structure is used, which belongs to the mixed anchor. This anchor structure combines the two components of the abutment and anchor of the traditional cableway bridge into one, but the existing bridges using this anchor structure have the following problems:
[0004] First, the transition of the bridge deck at the end of the pedestrian cableway bridge is very uneven, that is, a step transition section is set between the clear span bridge deck and the abutment bridge deck. This has brought great difficulties to the construction of a barrier-free environment that serves the needs of groups such as the disabled and the elderly. The reason for this phenomenon is that the anchorage structure center of the main cable and anchor cable is located above the intersection of the main cable of the clear span section and the surface of the structure on the river side of the exchange beam abutment, resulting in the elevation of the upper surface of the bridge deck on the clear span side of the bridge span end being significantly lower than the elevation of the top surface of the exchange beam abutment.
[0005] Second, once the main cable ends are initially anchored during bridge construction, it becomes very difficult to adjust the main cable length for the purpose of sag leveling of multiple cables in the span, whether during the construction process or during the subsequent operation. For this reason, the cable adjustment work often requires the use of special jacks, which makes the construction process very complicated, the construction period is long, and the cost is high. At present, there is no cable length adjuster that is closely matched with the existing cable anchor and has a simple structure. Summary of the invention
[0006] The technical problem to be solved by the present invention is: in view of the defects and shortcomings of the existing technology of exchange beam abutments, a exchange beam abutment for a pedestrian cableway bridge is provided, so that the bridge span ends are smoothly connected and the cable length is conveniently adjusted after the main cable is anchored.
[0007] The technical solution of the present invention for solving the above-mentioned technical problems is as follows: an exchange beam abutment of a pedestrian cableway bridge, the main cable and the anchor cable are respectively anchored on the structural surface of the exchange beam abutment on the river bank side and the river center side; the section where the main cable passes through the river center side of the exchange beam abutment and comes out from the river bank side until it is cut off behind the anchor is called the main cable anchoring section; the anchor cable passes through the river bank side of the exchange beam abutment and comes out from the river center side, which is opposite to the passing direction of the main cable, and is anchored on the surface of the structure on the river bank side, and this section of the anchor cable is called the anchor cable anchoring section.
[0008] Furthermore, the main cable anchoring section line is an upward convex composite curve, including straight line segments and circular arc segments tangent to the connection points; the anchoring structure centers of the main cable and the anchor cable on the side of the exchange beam abutment are located below the intersection of the main cable and the exchange beam abutment structure surface on the river side of the clear span section.
[0009] Furthermore, the straight section and the arc section of the main cable anchoring section are respectively located in the pre-buried steel pipes of the exchange beam abutment; the inner diameter of the pre-buried steel pipe of the straight section is 20 mm larger than the inner diameter of the pre-buried steel pipe of the arc section; and the pre-buried steel pipe of the arc section is lined with a polytetrafluoroethylene tube.
[0010] Furthermore, a main cable through-type tensioner is arranged between the steel cable anchor at the end of the main cable anchoring section and the anchor pad.
[0011] Furthermore, the main cables and anchor cables of the abutment anchoring section are arranged in a vertical layered manner and along the transverse direction of the bridge in the exchange beam abutment, and each layer of steel cables is arranged parallel to each other.
[0012] Furthermore, the distance between the top edge of the arc segment embedded steel pipe and the top surface of the exchange beam abutment is less than the thickness of the bridge deck in the clear span section.
[0013] Furthermore, spiral reinforcement is arranged in the outer concrete of the section of the straight segment embedded steel pipe close to the anchor plate, and a steel mesh is arranged in the concrete at the lower part of the arc segment embedded steel pipe.
[0014] Furthermore, the curve radius of the main cable arc section located at the abutment anchorage section is equal to the curvature radius at the end point of the main cable curve in the clear span section of the bridge completion state. The curve length of the main cable arc section is determined after structural analysis based on its curve radius, the main cable anchorage tension, and the local compressive strength of the exchange beam abutment concrete.
[0015] Furthermore, the through-type tensioner is mainly composed of an inner sleeve body and two outer sleeve bodies; the outer surface of the inner sleeve body is machined with a trapezoidal external thread, and the inner surface of the outer sleeve body is machined with a trapezoidal internal thread; the inner threads of the two outer sleeve bodies are left-handed and right-handed threads respectively.
[0016] Furthermore, the two outer sleeve bodies of the through-type tensioner are screwed into the left and right ends of the inner sleeve body through threads respectively, thereby realizing component connection.
[0017] Furthermore, axial stiffening ribs are provided on the outer surface of the outer sleeve of the through-type tensioner; wherein the two long stiffening ribs of the left outer sleeve body are located in the same plane, extending out of the left outer sleeve body and entering into the double stiffening rib brake groove on the surface of the right outer sleeve body; the length of the remaining stiffening ribs of the left outer sleeve body does not exceed the length of the left outer sleeve body; on the anchor plate, limit screws are provided at positions corresponding to the outer edges of the single stiffening rib on the surface of the right outer sleeve body and the short stiffening ribs on the surface of the left outer sleeve body.
[0018] Furthermore, the length of the stiffening ribs of the right end outer sleeve body of the through-type tensioner does not exceed the length of the right end outer sleeve body, wherein the four stiffening ribs form two groups of double stiffening ribs, each group of double stiffening ribs forms a brake groove, the width of the groove can just accommodate the thickness of the long stiffening ribs of the left end outer sleeve body, and the position of the brake groove corresponds to the long stiffening ribs of the left end outer sleeve body.
[0019] Furthermore, a pair of hexagonal wrench holes penetrating the sleeve wall in the radial direction of the sleeve are arranged at the center of the length of the middle inner sleeve body of the through-type tensioner.
[0020] Furthermore, the installation positions of the right end outer sleeve body and the left end outer sleeve body of the through-type tensioner can be interchanged.
[0021] Furthermore, the anchor cable is a pressure-dispersed prestressed anchor cable.
[0022] The specific process steps of the present invention applied to the cableway bridge are:
[0023] (1) Excavation of foundation pit for exchange beam abutment; drilling of anchor holes; preparation of steel bars, embedded steel pipes, main cables and anchor cables.
[0024] (2) Cast the cushion concrete of the exchange beam abutment and tie the abutment reinforcement; install the polytetrafluoroethylene tube lining the pre-buried steel pipe in the arc section, the pre-buried steel pipe in the main cable anchor section, the pre-buried steel pipe in the anchor cable anchor section, the anchor pad, the spiral reinforcement outside the pre-buried steel pipe in the straight section, and the steel mesh outside the pre-buried steel pipe in the arc section.
[0025] (3) Pour concrete for the exchange beam abutment.
[0026] (4) Anchor cable installation, tensioning pressure distribution type prestressed anchor cable.
[0027] (5) Main cable installation: The main cable passes through the embedded steel pipe, anchor plate, through-type tensioner and washer of the exchange beam abutment; after cutting off the excess length of the steel cable, a special jack is used to lock and anchor the main cable anchor.
[0028] (6) Install bridge deck components.
[0029] (7) Cable adjustment: Insert the hexagonal wrench into the hexagonal wrench hole of the through-type tensioner and rotate the middle inner sleeve to adjust the tightness of the main cable so that the main cable line shape meets the error limit specified in the design.
[0030] The beneficial effects of the present invention are as follows: compared with the existing pedestrian cableway bridge technology, the exchange beam abutment of the present invention realizes a smooth connection and transition between the clear span bridge deck and the abutment bridge deck, which is very beneficial to the construction of a barrier-free environment for transportation infrastructure; at the same time, a through-type tensioner with a simple structure is arranged at the main cable anchorage point of the exchange beam abutment, which not only realizes that the sag of the main cable can still be adjusted after anchorage, but also facilitates the cable adjustment construction, shortens the construction period, and reduces the cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of a longitudinal cross-section of the structure of the present invention; Figure 2 For the present invention Figure 1 A magnified view of the local structure at location I in FIG. Figure 3 For the present invention Figure 1 A magnified view of the local structure at position II; Figure 4 For the present invention Figure 1 The enlarged view of the local structure at location Ⅲ; Figure 5 The main cable through-type tensioner of the present invention is an elevation view; Figure 6 For the present invention Figure 5 NN side view in; Figure 7 It is a plan view of the main cable through-type tensioner of the present invention; Figure 8 For the present invention Figure 7 EE profile in ; Fig. 9 It is an elevation view of the left outer sleeve of the main cable through-type tensioner of the present invention; Fig.10 For the present invention Fig. 9 AA section view in; Fig.11 It is an elevation view of the right end outer sleeve of the main cable through-type tensioner of the present invention; Fig.12 For the present invention Fig.11 BB section diagram in; Fig.13 It is an elevation view of the middle inner sleeve of the main cable through-type tensioner of the present invention; Fig.14 For the present invention Fig.13 The CC plane section view in .
[0032] In the accompanying drawings, the components represented by the reference numerals are listed as follows: 1. Through-type tensioner; 110. Left outer sleeve; 111. Short stiffening rib; 113. Long stiffening rib; 120. Right outer sleeve; 121. Single stiffening rib; 123. Double stiffening rib; 130. Middle inner sleeve; 131. Hexagon wrench hole; 140. Washer; 141. Anchor plate; 150. Spiral rib; 151. Steel mesh; 210. Arc segment embedded steel pipe; 220. Straight segment embedded steel pipe ; 230, polytetrafluoroethylene tube; 301, upper anchor cable; 302, lower anchor cable; 4, steel cable anchor; 410, clear span section main cable; 412, dividing point between clear span section main cable and abutment anchor section main cable; 420, abutment anchor section main cable; 432, straight and curved dividing point of main cable abutment anchor section; 501, manhole cover; 502, bridge deck; 503, railing; 6, exchange beam abutment; 7, ground line. Implementation
[0033] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0034] like Figures 1 to 4 As shown, the exchange beam abutment 6 of a pedestrian cableway bridge is a reinforced concrete structure. The main cable anchoring section line shape is an upward convex composite curve, including a straight line segment and an arc segment tangent to the connection point, which are respectively located in the straight line segment embedded steel pipe 220 and the arc segment embedded steel pipe 210 of the reinforced concrete structure. The anchoring structure center of the main cable on the river bank side is located below the intersection of the main cable of the clear span section and the surface of the structure on the river center side of the exchange beam abutment (i.e., the dividing point 412 between the main cable of the clear span section and the main cable of the abutment anchoring section); the anchoring structure center of the anchor cable on the river bank side of the reinforced concrete structure is also set below the intersection of the main cable of the clear span section and the surface of the structure on the river center side of the exchange beam abutment (i.e., the dividing point 412 between the main cable of the clear span section and the main cable of the abutment anchoring section).
[0035] In order to make the structural pressure caused by the sinking anchoring of the main cable end be borne by the reinforced concrete structure of the arc segment pre-embedded steel pipe area, the inner diameter of the straight segment pre-embedded steel pipe 220 is at least 20 mm larger than the inner diameter of the arc segment pre-embedded steel pipe 210. The arc segment pre-embedded steel pipe 210 is lined with a polytetrafluoroethylene tube 230 to avoid damage to the steel cable and its anti-corrosion protective layer due to sliding friction between the main cable and the steel pipe during the tensioning and anchoring process.
[0036] A main cable through-type tensioner 1 is arranged between the cable anchor 4 at the end of the main cable anchoring section and the anchor pad 141. A washer 140 is arranged between their contact surfaces to disperse the contact pressure.
[0037] In order to optimize the internal force distribution of the structure and simplify the design and construction, the main cable 420 of the abutment anchoring section, the upper anchor cable 301 and the lower anchor cable 302 are arranged in a vertical layered manner and along the transverse direction of the bridge in the exchange beam abutment 6, and each layer of steel cables is arranged parallel to each other.
[0038] The main cables 4, upper anchor cables 301 and lower anchor cables 302 of the abutment anchoring section are arranged in a vertical layered distribution manner and along the transverse direction of the bridge in the exchange beam abutment, and each layer of cables is arranged parallel to each other.
[0039] The upper anchor cable 301 and the lower anchor cable 302 in the present invention are preferably pressure-dispersed anchor cables. The pressure-dispersed anchor cable has a greater bearing capacity than the wire rope anchor cable, which can reduce the difficulty of arranging the upper anchor cable 301 and the lower anchor cable 302 and facilitate routine inspection and adjustment of the upper anchor cable 301 and the lower anchor cable 302.
[0040] The distance between the top edge of the arc segment embedded steel pipe 210 and the top surface of the exchange beam abutment 6 is less than the thickness of the clear span section bridge deck 502, which is a prerequisite for achieving a smooth transition between the clear span section bridge deck and the abutment bridge deck.
[0041] In order to improve the local compressive strength of the reinforced concrete structure, spiral reinforcement 150 is provided in the outer concrete of the straight segment embedded steel pipe 220 near the anchor plate 141, and a steel mesh 151 is provided in the concrete at the lower part of the arc segment embedded steel pipe 210.
[0042] The arc curve radius of the main cable 420 of the abutment anchorage section is equal to the curvature radius at the end point of the clear span section main cable curve in the bridge state (i.e., the dividing point 412 between the clear span section main cable and the abutment anchorage section main cable), and the arc curve length is determined after structural analysis based on the curve radius, the main cable anchorage tension, and the local bearing strength of the concrete of the exchange beam abutment 6. The dividing point 412 between the clear span section main cable and the abutment anchorage section main cable and the straight and curved dividing point 432 of the main cable abutment anchorage section are also determined accordingly.
[0043] like Figures 5 to 14 As shown, the through-type tensioner 1 is mainly composed of a middle inner sleeve body 130, a right outer sleeve body 120 and a left outer sleeve body 110; the outer surface of the middle inner sleeve body 130 is machined with a trapezoidal external thread, and the inner surfaces of the right outer sleeve body 120 and the left outer sleeve body 110 are machined with a trapezoidal internal thread; the inner threads of the two outer sleeve bodies are left-hand and right-hand threads respectively; the right outer sleeve body 120 and the left outer sleeve body 110 are respectively screwed in from the left and right ends of the middle inner sleeve body 130 through threads, thereby realizing component connection.
[0044] The outer surface of the outer sleeve of the through-type tensioner 1 is provided with axial stiffening ribs to increase its compressive strength and stability. The two long stiffening ribs 113 of the left outer sleeve body 110 are located in the same plane, extending out of the left outer sleeve body 110 and entering the double stiffening rib 123 braking groove on the surface of the right outer sleeve body 120; the length of the short stiffening rib 111 of the left outer sleeve body 110 does not exceed the length of the left outer sleeve body 110; on the anchor plate 141, the position corresponding to the single stiffening rib 121 on the surface of the right outer sleeve body 120 and the short stiffening rib 111 on the surface of the left outer sleeve body 110 is provided with a limit screw. The single stiffening rib 121 and the double stiffening rib 123 of the right outer sleeve body 120 of the through-type tensioner 1 do not exceed the length of the right outer sleeve body 120, wherein the four stiffening ribs form two groups of double stiffening ribs 123, and each group of double stiffening ribs 123 forms a braking groove, and the width of the groove can just accommodate the thickness of the long stiffening rib 113 of the left outer sleeve body 110. In this way, when the middle inner sleeve body 130 is rotated with an inner hexagonal wrench to adjust the cable length, the right outer sleeve body 120 and the left outer sleeve body 110 will not rotate with it, and the stroke of each rotation of the middle inner sleeve body 130 will also be close to 180 degrees, and the operation efficiency is higher.
[0045] The installation positions of the right outer sleeve body 120 and the left outer sleeve body 110 can be interchanged without affecting the working performance of the main rope through-type tensioner 1.
[0046] A pair of hexagonal wrench holes 131 are provided in the center of the length of the inner sleeve body 130 of the through-type tensioner 1, which penetrate the sleeve body radially through the wall to provide a position for the hexagonal wrench to adjust the cable. The through-type tensioner 1 is made of metal material, preferably high-strength alloy steel.
[0047] The structural parameters of components such as washers 140, anchor plates 141, spiral bars 150, steel meshes 151, arc segment embedded steel pipes 210, straight segment embedded steel pipes 220 are determined after local pressure analysis of reinforced concrete structures in contact with main cables; the structural parameters of components such as exchange beam abutments 6, manhole covers 501 and railings 503 are determined based on the results of internal force analysis.
[0048] The depth of the inspection well on the riverbank side of the exchange beam abutment 6 is determined to be just enough to provide an anchoring operation working surface for the steel cable anchor 4 .
[0049] In the description of the present invention, it is necessary to understand that the terms "center", "length", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "inside", "outside", "peripheral", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred system or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0050] In the description of the present invention, “plurality” means at least two, for example, two, three, etc., unless otherwise clearly and specifically defined.
[0051] In the present invention, unless otherwise clearly specified and limited, the terms "install", "set", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0052] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0053] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. An exchange beam abutment of a pedestrian cableway bridge, wherein the main cable and the anchor cable are anchored on the structural surface of the exchange beam abutment (6) on the river bank side and the river center side respectively, and the section where the main cable enters the exchange beam abutment on the river center side and exits from the river bank side until it is cut off behind the anchor is called the main cable anchoring section, characterized in that: The main cable anchoring section is an upward convex composite curve, including a straight section and an arc section, which are respectively located in the straight section pre-buried steel pipe (220) and the arc section pre-buried steel pipe (210) of the reinforced concrete exchange beam abutment (6); the anchoring structure centers of the main cable and the anchor cable are both located below the intersection of the main cable and the exchange beam abutment structure surface on the river center side in the clear span section; and a main cable through-type tensioner (1) is provided between the steel cable anchor (4) and the anchor pad (141) at the end of the main cable anchoring section.
2. The exchange beam abutment of the pedestrian ropeway bridge according to claim 1, characterized in that: The inner diameter of the straight segment pre-buried steel pipe (220) is at least 20 mm greater than the inner diameter of the arc segment pre-buried steel pipe (210); the arc segment pre-buried steel pipe (210) is lined with a polytetrafluoroethylene pipe (230).
3. The exchange beam abutment of the pedestrian ropeway bridge according to claim 1, characterized in that: Spiral reinforcement (150) is arranged in the concrete outside the section of the straight segment embedded steel pipe (220) close to the anchor plate (141), and a steel mesh (151) is arranged in the concrete at the bottom of the arc segment embedded steel pipe (210).
4. The exchange beam abutment of the pedestrian cableway bridge according to claim 1, characterized in that: The distance between the top edge of the arc segment embedded steel pipe (210) and the top surface of the exchange beam abutment (6) is less than the thickness of the bridge deck (502) in the clear span section.
5. The exchange beam abutment of the pedestrian cableway bridge according to claim 1, characterized in that: The arc segment curve radius of the main cable (420) of the abutment anchoring section is equal to the curvature radius at the end point of the main cable curve in the clear span section of the bridge in the completed state; the arc segment curve length is determined after structural analysis based on the curve radius, the main cable anchoring tension, and the local bearing strength of the concrete of the exchange beam abutment (6).
6. The exchange beam abutment of the pedestrian cableway bridge according to claim 1, characterized in that: The through-type tensioner (1) is mainly composed of a middle inner sleeve body (130), a right outer sleeve body (120) and a left outer sleeve body (110); the outer surface of the middle inner sleeve body (130) is machined with a trapezoidal external thread, and the inner surfaces of the right outer sleeve body (120) and the left outer sleeve body (110) are machined with a trapezoidal internal thread; the inner threads of the two outer sleeve bodies are left-handed and right-handed threads respectively; the right outer sleeve body (120) and the left outer sleeve body (110) are connected to each other by screwing in from the left and right ends of the middle inner sleeve body (130) through threads.
7. The through-type tensioner (1) according to claims 1 and 6, characterized in that: Axial stiffening ribs are arranged on the outer surface of the outer sleeve; the two long stiffening ribs (113) of the left outer sleeve body (110) are located in the same plane, extending out of the left outer sleeve body (110) and entering into the double stiffening rib (123) braking groove on the surface of the right outer sleeve body (120); the length of the short stiffening rib (111) of the left outer sleeve body (110) does not exceed the length of the left outer sleeve body (110); and limit screws are arranged on the anchor plate (141) at positions corresponding to the outer edges of the single stiffening rib (121) on the surface of the right outer sleeve body (120) and the short stiffening rib (111) on the surface of the left outer sleeve body (110).
8. The through-type tensioner (1) according to claims 1 and 6, characterized in that: The single stiffening rib (121) and the double stiffening rib (123) of the right outer sleeve body (120) do not exceed the length of the right outer sleeve body (120), wherein the four stiffening ribs form two groups of double stiffening ribs (123), each group of double stiffening ribs (123) forms a braking groove, the width of the groove can just accommodate the thickness of the long stiffening rib (113) of the left outer sleeve body (110), and the position of the braking groove corresponds to the long stiffening rib (113) of the left outer sleeve body (110).
9. The through-type tensioner (1) according to claims 1 and 6, characterized in that: A pair of hexagonal wrench holes (131) are provided at the center of the length of the middle inner sleeve body (130) and penetrate the sleeve wall in the radial direction of the sleeve body.
10. The through-type tensioner (1) according to claims 1 and 6, characterized in that: The installation positions of the right outer sleeve body (120) and the left outer sleeve body (110) can be interchanged.