Bridge deck pavement drip infiltration curing system and construction method thereof

Through the full-contour directional drip seepage health construction method of bridge deck system, the problems of high labor intensity and uneven water distribution in traditional health methods are solved, and uniform moist and efficient maintenance of bridge deck paving are achieved, improving the quality and durability of bridges are achieved. sex.

CN118932868APending Publication Date: 2024-11-12GANSU ROAD & BRIDGE CONSTR GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411134536.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional bridge deck paving health methods have high labor intensity, large water consumption and uneven water distribution, which leads to erosion and corrosion of bridge concrete, affecting the service life and driving safety of bridges.

Method used

The full-contour directional drip seepage health construction method of bridge deck system is adopted, including water source supply system, filtration system, main pipeline and branch pipe, drip irrigation belt and control system. By accurately controlling the water volume and moisture distribution, the uniform wetness of the bridge deck paving surface is ensured.

Benefits of technology

The uniformity of moisture distribution is achieved, manual intervention and waste of water resources are reduced, the quality and durability of bridge deck paving are improved, and the stable hydration reaction and strength improvement of concrete are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932868A_ABST
    Figure CN118932868A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of bridge deck drip-infiltration curing construction, in particular to a bridge deck pavement drip-infiltration curing system and a construction method thereof, and the construction method comprises the following steps: step 1, system installation and operation monitoring; 2, a water source system is installed; step 3, laying a dripping seepage pipe network; step 4, running test adjustment of the drip infiltration system; and step 5, initial running debugging. Compared with a traditional bridge deck pavement curing method and a dripping and permeating curing method, the dripping and permeating curing method has more remarkable advantages in five aspects of uniform moisture distribution, high automation level, water resource saving, stable curing effect and strong adaptability; the method has very good development prospects and application space in the field of improving the quality and durability of bridge deck pavement, and is worthy of deep exploration and communication.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge deck dripping and curing construction, and in particular to a bridge deck pavement dripping and curing system and a construction method thereof. Background Art

[0002] As an important part of modern transportation infrastructure, the quality and durability of bridges directly affect traffic safety and economic development. As a crucial bridge structure, the bridge deck pavement construction process plays a major role in protecting the bridge structure, preventing moisture and corrosive substances from eroding the bridge concrete, and providing safe driving. Its importance is unquestionable. In today's bridge construction projects, high-quality and high-level bridge deck pavement construction can not only extend the service life of the bridge, but also improve driving safety and comfort. However, it is not difficult to find in relevant research literature and later maintenance data in recent years that the main factor determining the quality of bridge deck pavement lies in the degree of later maintenance, and its quality is directly related to the service life and driving comfort of the bridge.

[0003] Therefore, how to correctly maintain high-quality bridge pavement has become an important topic in the field of bridges. In the early days, traditional bridge pavement maintenance methods such as covering with polyethylene film, covering with geotextiles, and artificial sprinkling were widely used. Although the quality of bridge pavement maintenance can be guaranteed to a certain extent, there are problems such as high labor intensity, large water consumption, and uneven maintenance effect. According to the feedback from later experimental data, this method has many shortcomings, such as uneven water distribution, cumbersome manual operation, and serious waste of water resources. In order to solve these problems, the full-contour directional drip infiltration maintenance construction method of the bridge deck came into being, becoming an important technological innovation in modern bridge construction. Summary of the invention

[0004] The purpose of the present invention is to provide a full-contour directional drip curing construction method for a bridge deck system in view of the above problems.

[0005] In order to achieve the above purpose, the technical solutions provided are as follows:

[0006] A bridge deck pavement drip irrigation system, characterized in that it includes a water supply system, a filtration system, a main pipe and branch pipes, a drip irrigation belt and a control system; the water supply system includes a water source and a water supply pump, the filtration system is used to remove impurities in the water, the main pipe is used to connect a water storage device and transport water to various areas of the bridge deck through a branch pipe system, the drip irrigation belt is responsible for evenly distributing water to the bridge deck pavement surface, and the control system includes a controller, a water pressure regulator and various sensors for controlling the operation of the system.

[0007] A construction method for a bridge deck pavement dripping curing system, characterized by comprising the following steps:

[0008] Step 1: System installation and operation monitoring, including the following steps:

[0009] (1) Construction preparation

[0010] Before installing the drip infiltration system, the construction site must be thoroughly cleaned. After cleaning, the permeable geotextile surface should be clean and flat. Then, the staff needs to accurately mark the installation locations of the components of the drip infiltration system according to the design drawings, including the main pipeline, branch pipes, and water storage equipment installation locations.

[0011] (2) Preparation of tools and equipment

[0012] The installation of the drip infiltration system requires a variety of professional tools and equipment. Before the formal installation begins, it is necessary to ensure that all necessary tools and equipment are ready. Each tool should be checked for its functional status to ensure that they are in good working condition. Check the power supply and temporary water facilities at the construction site in advance. It is necessary to ensure that there are sufficient power interfaces and stable power supply. If the power supply on site is insufficient, temporary power supply equipment may need to be arranged. During the installation and testing process, a large amount of water is required to flush the pipes, test the system pressure, etc. Therefore, it is necessary to ensure that there is a reliable water supply on site and prepare the necessary water pipes and connection equipment;

[0013] Step 2: Water source system installation, including the following steps:

[0014] (1) Water source access

[0015] The water source system is the starting point of the entire drip infiltration system. The quality of its installation directly affects the performance of the entire system. According to the specific requirements of the geographical location of the bridge, you can choose to connect to the municipal water supply or set up a self-supplied water source. If you choose to connect to the municipal water supply, you need to understand the situation of the local water supply network and determine the best access point. During the access process, you need to comply with relevant laws and regulations and technical standards to ensure the legality and safety of the connection. If you choose to provide your own water source, such as groundwater or surface water, you need to consider the stability and water quality of the water source. You may need to conduct a water quality test and decide whether additional water treatment equipment is needed based on the test results.

[0016] (2) Main pipeline installation

[0017] The installation of the main pipeline is the key link to connect the water source and the drip irrigation system. The connection between the main pipeline and the water storage system, the main drip irrigation belt, and the branch drip irrigation belt is another link that requires special attention. It needs to be carried out according to the standard operating procedures to ensure that each connection point is firm and reliable. After the connection is completed, a strict sealing test is required to ensure that there are no leaks.

[0018] (3) Installation of drip filtration system

[0019] In order to ensure the cleanliness of the water supply, a secondary filter device needs to be installed. The primary and secondary selection of the filter device needs to be determined according to the water quality of the water source and the requirements of the drip infiltration system. Since the water source of the water storage system is not uniform and will produce precipitated gravel, silt and aquatic plant debris after a long period of standing, in order to prevent clogging of the pipeline, a primary filter device is installed between the water storage system and the main pipeline to ensure the cleanliness of the water source from the water storage system to the main pipeline. The secondary filter device should be installed between the branch pipe drip irrigation belt and the main pipeline to perform a second filtration on the water flow of the drip infiltration system operation to ensure the cleanliness of the water source;

[0020] After the filtration system is installed, it needs to be fully debugged. The debugging process includes checking the filtration effect, testing the anti-clogging effect, and adjusting the filtration accuracy. Only by ensuring that the filtration system can operate normally can the long-term stable operation of the entire drip infiltration system be guaranteed.

[0021] Step 3: Laying of drip pipe network, including the following steps:

[0022] (1) Installation of main drip irrigation belt

[0023] The main drip irrigation tape is the aorta of the drip infiltration system. Its installation quality directly affects the performance of the entire system. According to the design drawings, during the laying process, special attention should be paid to the slope and direction of the main pipeline to conform to the longitudinal slope of the bridge. A reasonable slope can help empty the air in the pipeline and prevent the occurrence of air blockage.

[0024] Pipe material selection: needs to be selected based on health environment, water system pressure, and service life requirements;

[0025] Pipe diameter determination: According to the design flow and pressure loss calculation, the diameter of the main drip irrigation belt is determined to be 10cm to ensure that it can meet the water supply needs of the entire system;

[0026] Slope control: The main drip irrigation pipe should be laid out in accordance with the longitudinal slope of the bridge to facilitate exhaust and drainage;

[0027] Fixed support: Pipe supports need to be set at appropriate locations to prevent the pipes from changing their laying positions due to their own weight or water flow impact, causing the slope of the main drip irrigation belt to change and affecting the normal operation of the drip infiltration system;

[0028] On the main drip irrigation pipe, it is necessary to install a regional control valve to control the water supply in different areas and reasonably adjust the water flow in each branch pipe;

[0029] (2) Branch pipe drip irrigation belt layout

[0030] The branch pipe drip irrigation belt is connected to the main drip irrigation belt through a connector. Its layout directly affects the uniformity of drip infiltration. The layout of the branch pipe needs to follow the following principles:

[0031] Uniform spacing: The spacing between branch pipes should be consistent according to the design requirements, usually arranged in a row of 0.5 meters along the longitudinal direction of the bridge deck, and should be arranged as parallel as possible in the longitudinal slope direction to ensure uniform water pressure distribution and maintain consistent water flow;

[0032] Slope control: During the laying process, special attention should be paid to the slope and direction of the branch pipe drip irrigation belt to conform to the transverse slope of the bridge. A reasonable slope can help empty the air in the pipeline and prevent the occurrence of air blockage;

[0033] Connection control: At the connection between the branch drip irrigation belt and the main drip irrigation belt, a water flow control valve can be installed as needed to control the water supply of a separate branch drip irrigation belt and reasonably adjust the water flow of a single branch drip irrigation belt; in the subsequent pressure test process, in case of leakage, the valve can be directly closed to cut off the water flow. The installation position of these valves needs to be convenient for operation and maintenance;

[0034] Step 4: Test and adjust the drip infiltration system, including the following steps:

[0035] (1) Pipeline network water pressure test

[0036] The water pressure test of the pipe network is a key step to ensure the reliable operation of the entire drip infiltration system. This process usually includes the following steps:

[0037] Pipeline water filling: Open the main control valve of the water storage system, first slowly and evenly inject water into the entire pipe network to gradually expel the air in the pipe. This process takes a long time. The purpose of slow and even water injection is to avoid pipe rupture caused by the water hammer effect caused by rapid water filling;

[0038] Pressure test: After the pipe is filled with water, the system pressure can be gradually increased to about 1.5 times the design pressure and maintained for a certain period of time, usually 30 minutes to 1 hour. During this period, a dedicated person is required to carefully check whether there is any leakage in the entire drip seepage system, especially the location of each connection point;

[0039] Leakage treatment: If a leak is found, mark the location and quickly close the main drip irrigation belt area control valve and the branch drip irrigation belt water flow control valve, and repair it after reducing the pressure. After the repair is completed, re-pressurization test is required;

[0040] Pressure adjustment: After the test is completed, adjust the system pressure to the designed working pressure and conduct a final inspection;

[0041] (2) Drip penetration uniformity test

[0042] The uniformity of dripping directly affects the curing effect, so detailed testing is required. The test steps include:

[0043] Select sampling points: Select multiple representative test points on the bridge deck. Usually, sampling is done near the middle of the two drip irrigation belts to ensure the representativeness and reliability of the data. This strategy can effectively reflect the uniformity of the drip infiltration of the entire system.

[0044] Measuring flow rate: placing a collection device at each test point to collect the dripping water volume obtained in the same time. This time can directly reflect the real data of the dripping water volume at different positions, and can also determine to a certain extent whether the drip irrigation belt is laid in a reasonable position or damaged;

[0045] Data analysis: Multiple experiments can be conducted on the same dripping point, and the dripping flow rate of each experimental point can be calculated, and the coefficient of variation of the flow rate can be analyzed. The coefficient of variation is usually required to be no more than 10%;

[0046] Adjustment and optimization: If it is found that the drip infiltration in some areas is obviously too low or too high, it is necessary to check the corresponding drip infiltration system and make necessary adjustments or replacements to the drip irrigation tape or control valve according to the specific situation;

[0047] Step 5: Initial operation and debugging, including the following steps:

[0048] (1) Parameter setting

[0049] Before the drip infiltration system is put into use, parameters need to be set and adjusted according to different environmental conditions to achieve the best maintenance effect:

[0050] First, the setting of dripping frequency is a dynamic process, which needs to be adjusted according to the age of concrete and environmental conditions. In the initial stage of concrete pouring, due to the strong hydration reaction, more frequent dripping is required to maintain appropriate humidity; as the concrete gradually hardens, the dripping frequency can be gradually reduced; at the same time, environmental factors such as temperature, humidity and wind speed need to be considered. In hot and dry weather, the dripping frequency may need to be increased;

[0051] The setting of dripping time also needs to be fine-tuned. This parameter mainly depends on the area of ​​the bridge deck and the local evaporation rate. Larger bridge deck areas may require longer dripping time to ensure full coverage, while in areas with high evaporation rates, dripping time may need to be extended to replenish water losses. In addition, the water absorption performance of concrete needs to be considered to ensure that each dripping can fully penetrate but will not cause excess water.

[0052] (2) Operation observation

[0053] Close observation during the initial operation of the system is essential to timely detection and resolution of problems. This phase requires comprehensive and detailed monitoring:

[0054] First, the operating status of key components of the system is continuously recorded. The switch status of the valve, whether it can accurately respond to the control signal; the working condition of the drip irrigation belt, whether there is blockage or leakage. These records help to detect potential equipment problems early;

[0055] Secondly, closely observe the water distribution on the bridge deck. Ideally, the entire bridge deck should be evenly moist. Pay special attention to whether there are obvious dry areas or waterlogged areas. Dry areas may mean insufficient dripping, and the control valves in the corresponding areas need to be adjusted to increase the water flow. Waterlogged areas may indicate poor local drainage or excessive dripping, and the control valves need to be adjusted to reduce the water flow.

[0056] (3) Parameter Optimization

[0057] The normal operation results of the drip infiltration system can be observed and summarized daily, and the system parameters can be adjusted. If it is observed that some areas of the bridge deck are too dry, it may be necessary to increase the drip infiltration frequency or extend the drip infiltration time in that area. On the contrary, if water accumulation is found, it may be necessary to reduce the drip infiltration volume or increase the drip infiltration interval. These adjustments need to be meticulous and may require different parameter settings for different areas.

[0058] Optimization of control logic is the key to improving system responsiveness and accuracy. If it is found that the system's response to environmental changes is not timely or accurate enough, the control algorithm may need to be adjusted.

[0059] Compared with the traditional bridge deck pavement curing method, the beneficial effects of the present invention are:

[0060] Even distribution of water: Traditional manual watering methods often result in uneven distribution of water, which leads to uneven distribution of water on the surface of the bridge deck, which directly affects the uniform curing effect of concrete. The dripping system can be adjusted manually to precisely control the amount of water and the dripping position, ensuring that every part of the bridge deck surface can obtain even water supply, which not only greatly improves the uniform distribution of water on the pavement surface, but also ensures the overall quality and performance of the concrete.

[0061] High degree of automation: drip infiltration systems usually choose adjustable control devices to achieve automatic operation, which means that during the curing process, the system can automatically supply water according to the set time interval and water volume, greatly reducing the dependence on manual intervention. This automated operation not only improves work efficiency, but also reduces labor costs and ensures the consistency and reliability of the curing process;

[0062] Save water resources: Traditional manual watering methods require spraying water over a large area, which will cause large-scale water evaporation in hot weather, resulting in a large amount of water waste. The drip infiltration system significantly reduces the waste of water resources through precise water delivery and achieves efficient water management. This precise water use not only helps protect the environment, but also reduces construction costs;

[0063] Stable curing effect: Continuous and uniform water supply can effectively promote the stable progress of cement hydration reaction, thereby improving the consistency of curing effect. This stable curing effect helps to improve the strength and durability of concrete, ensuring the long-term performance of bridge deck pavement;

[0064] Strong adaptability: The drip infiltration system can be flexibly adjusted according to different bridge deck pavement types and environmental conditions to meet various curing needs. Whether in a dry high-temperature environment or a humid low-temperature environment, the drip infiltration system can be adjusted according to actual conditions to ensure the best effect of the concrete curing process;

[0065] In summary, compared with traditional curing methods, the drip infiltration curing method has shown more significant advantages in five aspects, including uniform moisture distribution, high level of automation, water resource conservation, stable curing effect and strong adaptability. It has very good development prospects and application space in improving the quality and durability of bridge deck pavement, and is worthy of in-depth exploration and communication. BRIEF DESCRIPTION OF THE DRAWINGS

[0066] Figure 1 It is a structural schematic diagram of the bridge deck pavement dripping curing system of the present invention;

[0067] Figure 2 This is a flow chart of the construction method of the bridge deck pavement drip irrigation system of the present invention; in the figure, 1 is the main drip irrigation belt, and 2 is the branch drip irrigation belt;

[0068] Figure 3 This is a comparison chart of concrete strength under the same environment for 15 days in an embodiment of the present invention;

[0069] Figure 4 This is a comparison diagram of concrete surface humidity under the same environment for 15 days in an embodiment of the present invention; DETAILED DESCRIPTION

[0070] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0071] Embodiment 1

[0072] A bridge deck pavement drip curing system, such as Figure 1 As shown, it includes a water supply system, a filtration system, a main pipe and branch pipes, a drip irrigation belt and a control system; the water supply system: includes a water source (such as tap water, a water storage tank) and a water supply pump, the filtration system is used to remove impurities in the water to prevent them from entering the drip infiltration system and causing blockage, thereby affecting the normal operation of the health system, the main pipe is connected to the water storage device and transports water to various areas of the bridge deck through the branch pipe system to ensure uniform moisture distribution, the drip irrigation belt is responsible for evenly distributing water to the bridge deck pavement surface, and the control system includes a controller, a water pressure regulator and various sensors for controlling system operation.

[0073] Embodiment 2

[0074] A construction method for a bridge deck pavement drip curing system, such as Figure 2 As shown, the following steps are included:

[0075] Step 1: System installation and operation monitoring, including the following steps:

[0076] (1) Construction preparation

[0077] Before starting to install the drip infiltration system, the first task is to conduct a comprehensive cleaning of the construction site. The staff needs to carefully check the entire bridge deck and remove all debris and contaminants on the geotextile that may affect the installation. During the cleaning process, appropriate cleaning tools and methods should be used to ensure that no damage is caused to the bridge deck; after the cleaning is completed, the permeable geotextile surface should be clean and flat; the staff needs to make precise marks on the bridge deck according to the design drawings. These marks will indicate the installation locations of the various components of the drip infiltration system, including the main pipes, branch pipes, and the locations where the water storage equipment is installed. The marking work needs to be highly accurate because it will directly affect the layout and efficiency of the entire system. Use professional measuring tools and marking materials to ensure that the marks are clearly visible and not easily erased;

[0078] (2) Preparation of tools and equipment

[0079] The installation of the drip infiltration system requires a variety of professional tools and equipment. Before the formal installation begins, it is necessary to ensure that all necessary tools and equipment are ready. Each tool should be checked for its functional status to ensure that they are in good working condition. Check the power supply and temporary water facilities at the construction site in advance. It is necessary to ensure that there are sufficient power interfaces and stable power supply. If the power supply on site is insufficient, temporary power supply equipment may need to be arranged. During the installation and testing process, a large amount of water is required to flush the pipes, test the system pressure, etc. Therefore, it is necessary to ensure that there is a reliable water supply on site and prepare the necessary water pipes and connection equipment;

[0080] Step 2: Water source system installation, including the following steps:

[0081] (1) Water source access

[0082] The water source system is the starting point of the entire drip infiltration system. The quality of its installation directly affects the performance of the entire system. According to the specific requirements of the geographical location of the bridge, you can choose to connect to the municipal water supply or set up a self-supplied water source. If you choose to connect to the municipal water supply, you need to understand the situation of the local water supply network and determine the best access point. During the access process, you need to comply with relevant laws and regulations and technical standards to ensure the legality and safety of the connection. If you choose to provide your own water source, such as groundwater or surface water, you need to consider the stability and water quality of the water source. You may need to conduct a water quality test and decide whether additional water treatment equipment is needed based on the test results.

[0083] Because the bridge is located in a plateau desert, this method selects a self-provided water source (high-performance pollution-free environmentally friendly water storage tank) and installs a water meter and a main valve. The water meter is used to accurately measure the water consumption, which is very important for subsequent system operation analysis and cost control. The main valve is used to control the water supply of the entire system and can quickly cut off the water source in an emergency.

[0084] (2) Installation of main water supply pipeline

[0085] The installation of the main water supply pipeline is the key link to connect the water source and the drip infiltration system. The connection between the main water supply pipeline and the water storage system, the main drip irrigation belt, and the branch drip irrigation belt is another link that requires special attention. It needs to be carried out according to the standard operating procedures to ensure that each connection point is firm and reliable. After the connection is completed, a strict sealing test is required to ensure that there are no leaks.

[0086] (3) Installation of drip filtration system

[0087] In order to ensure the cleanliness of the water supply, a secondary filter device needs to be installed. The primary and secondary selection of the filter device needs to be determined according to the water quality of the water source and the requirements of the drip infiltration system. Since the water source of the water storage system is not uniform and will produce precipitated gravel, silt and aquatic plant debris after a long period of standing, in order to prevent the pipe from being blocked, a primary filter device is installed between the water storage system and the main water supply pipe to ensure the cleanliness of the water source from the water storage system to the main water supply pipe. The secondary filter device should be installed between the branch pipe drip irrigation belt and the main water supply pipe to perform a second filtration on the water flow of the drip infiltration system operation to ensure the cleanliness of the water source;

[0088] After the filtration system is installed, it needs to be fully debugged. The debugging process includes checking the filtration effect, testing the anti-clogging effect, adjusting the filtration accuracy, etc. Only by ensuring that the filtration system can operate normally can the long-term stable operation of the entire drip infiltration system be guaranteed.

[0089] Step 3: Laying of drip pipe network, including the following steps:

[0090] (1) Installation of main drip irrigation belt

[0091] The main drip irrigation tape is the aorta of the drip infiltration system. Its installation quality directly affects the performance of the entire system. According to the design drawings, during the laying process, special attention should be paid to the slope and direction of the main pipeline to conform to the longitudinal slope of the bridge. A reasonable slope can help empty the air in the pipeline and prevent the occurrence of air blockage.

[0092] Pipe material selection: needs to be selected based on factors such as health environment, water flow system pressure, service life requirements, etc.

[0093] Pipe diameter determination: According to the design flow and pressure loss calculation, the diameter of the main drip irrigation belt is determined to be 10cm to ensure that it can meet the water supply needs of the entire system;

[0094] Slope control: The main drip irrigation pipe should be laid out in accordance with the longitudinal slope of the bridge to facilitate exhaust and drainage;

[0095] Fixed support: Pipe supports need to be set at appropriate locations to prevent the pipes from changing their laying positions due to their own weight or water flow impact, causing the slope of the main drip irrigation belt to change and affecting the normal operation of the drip infiltration system;

[0096] On the main drip irrigation pipe, it is necessary to install a regional control valve to control the water supply in different areas and reasonably adjust the water flow in each branch pipe;

[0097] (2) Branch pipe drip irrigation belt layout

[0098] The branch pipe drip irrigation belt is connected to the main drip irrigation belt through a connector. Its layout directly affects the uniformity of drip infiltration. The layout of the branch pipe needs to follow the following principles:

[0099] Uniform spacing: The spacing between branch pipes should be consistent according to the design requirements, usually arranged in a row of 0.5 meters along the longitudinal direction of the bridge deck, and should be arranged as parallel as possible in the longitudinal slope direction to ensure uniform water pressure distribution and maintain consistent water flow;

[0100] Slope control: During the laying process, special attention should be paid to the slope and direction of the branch pipe drip irrigation belt to conform to the transverse slope of the bridge. A reasonable slope can help empty the air in the pipeline and prevent the occurrence of air blockage;

[0101] Connection control: At the connection between the branch drip irrigation belt and the main drip irrigation belt, a water flow control valve can be installed as needed to control the water supply of a separate branch drip irrigation belt and reasonably adjust the water flow of a single branch drip irrigation belt; in the subsequent pressure test, in case of leakage, the valve can be directly closed to cut off the water flow. The installation position of these valves needs to be convenient for operation and maintenance.

[0102] Step 4: Test and adjust the drip infiltration system, including the following steps:

[0103] (1) Pipeline network water pressure test

[0104] The water pressure test of the pipe network is a key step to ensure the reliable operation of the entire drip infiltration system. This process usually includes the following steps:

[0105] Pipeline water filling: Open the main control valve of the water storage system. The first step is to slowly and evenly fill the entire pipe network with water to gradually expel the air in the pipe. This process takes a long time. The purpose of slow and even water filling is to avoid pipe rupture caused by the water hammer effect caused by rapid water filling;

[0106] Pressure test: After the pipe is filled with water, the system pressure can be gradually increased to about 1.5 times the design pressure and maintained for a certain period of time (usually 30 minutes to 1 hour). During this period, a dedicated person is required to carefully check whether there is any leakage in the entire drip seepage system, especially the location of each connection point;

[0107] Leakage treatment: If a leak is found, mark the location and quickly close the main drip irrigation belt area control valve and the branch drip irrigation belt water flow control valve, and repair it after reducing the pressure. After the repair is completed, re-pressurization test is required;

[0108] Pressure adjustment: After the test is completed, adjust the system pressure to the designed working pressure and perform a final check.

[0109] (2) Drip penetration uniformity test

[0110] The uniformity of dripping directly affects the curing effect, so detailed testing is required. The test steps include:

[0111] Select sampling points: Select multiple representative test points on the bridge deck. Usually, sampling is done near the middle of the two drip irrigation belts to ensure the representativeness and reliability of the data. This strategy can effectively reflect the uniformity of the drip infiltration of the entire system.

[0112] Measuring flow rate: placing a collection device at each test point to collect the dripping water volume obtained in the same time. This time can directly reflect the real data of the dripping water volume at different positions, and can also determine to a certain extent whether the drip irrigation belt is laid in a reasonable position or damaged;

[0113] Data analysis: Multiple experiments can be conducted on the same dripping point, and the dripping flow rate of each experimental point can be calculated, and the coefficient of variation of the flow rate can be analyzed. The coefficient of variation is usually required to be no more than 10%;

[0114] Adjustment and optimization: If it is found that the drip infiltration in some areas is obviously too low or too high, it is necessary to check the corresponding drip infiltration system and make necessary adjustments or replacements to the drip irrigation tape or control valve according to the specific situation;

[0115] Step 5: Initial operation and debugging, including the following steps:

[0116] (1) Parameter setting

[0117] Before the drip infiltration system is put into use, parameters need to be set and adjusted according to different environmental conditions to achieve the best maintenance effect:

[0118] First, the setting of dripping frequency is a dynamic process, which needs to be adjusted according to the age of concrete and environmental conditions. In the initial stage of concrete pouring, due to the strong hydration reaction, more frequent dripping is required to maintain appropriate humidity; as the concrete gradually hardens, the dripping frequency can be gradually reduced; at the same time, environmental factors such as temperature, humidity and wind speed need to be considered. In hot and dry weather, the dripping frequency may need to be increased;

[0119] The setting of dripping time also needs to be fine-tuned. This parameter mainly depends on the area of ​​the bridge deck and the local evaporation rate. Larger bridge deck areas may require longer dripping time to ensure full coverage, while in areas with high evaporation rates, dripping time may need to be extended to replenish water losses. In addition, the water absorption performance of concrete needs to be considered to ensure that each dripping can fully penetrate but will not cause excess water.

[0120] (2) Operation observation

[0121] Close observation during the initial operation of the system is essential to detect and resolve problems in a timely manner. This phase requires comprehensive and detailed monitoring:

[0122] First, the operating status of key components of the system is continuously recorded. The switch status of the valve, whether it can accurately respond to the control signal; the working condition of the drip irrigation belt, whether there is blockage or leakage. These records help to detect potential equipment problems early;

[0123] Secondly, closely observe the water distribution on the bridge deck. Ideally, the entire bridge deck should be evenly moist. Pay special attention to whether there are obvious dry areas or waterlogged areas. Dry areas may mean insufficient dripping, and the control valves in the corresponding areas need to be adjusted to increase the water flow. Waterlogged areas may indicate poor local drainage or excessive dripping, and the control valves need to be adjusted to reduce the water flow.

[0124] (3) Parameter Optimization

[0125] The normal operation results of the drip infiltration system can be observed and summarized daily, and the system parameters can be adjusted. If it is observed that some areas of the bridge deck are too dry, it may be necessary to increase the drip infiltration frequency or extend the drip infiltration time in that area; on the contrary, if water accumulation is found, it may be necessary to reduce the drip infiltration volume or increase the drip infiltration interval. These adjustments need to be meticulous and may require different parameter settings for different areas;

[0126] Optimization of control logic is the key to improving system responsiveness and accuracy. If you find that the system's response to environmental changes is not timely or accurate enough, you may need to adjust the control algorithm.

[0127] Example 3 Monitoring data

[0128] 1. Environmental comparison

[0129] Under the same environment, natural factors such as temperature and weather also play an important role in concrete curing and are directly related to the strength development of concrete.

[0130] In the same outdoor environment, two bridge decks were cured by drip seepage and traditional artificial sprinkling as control groups. Concrete strength was monitored in the same fixed experimental area on different bridge decks every 2 days, and the change in concrete strength after 15 days was plotted to analyze the superiority of different curing methods. Figure 3 It is not difficult to find from the data analysis that this picture shows the comparison of the changes in concrete compressive strength under two different methods in the same environment for 15 days.

[0131] -The orange curve represents the compressive strength of the “drip infiltration health care”.

[0132] -The green curve represents the compressive strength of “traditional health care”.

[0133] - The vertical axis represents the compressive strength (unit: MPa), and the horizontal axis represents the number of days (1 to 15 days).

[0134] As can be seen from the figure:

[0135] 1. During the period from day 1 to day 7, the intensity value of traditional health care (green curve) was stable at a low level and gradually increased, while the intensity value of drip infiltration health care (orange curve) was significantly higher.

[0136] 2. After the 8th day, the strength value of drip infiltration health care increased significantly, higher than the strength level of traditional health care, and the gap in compressive strength between the two methods gradually widened.

[0137] 3. By the 15th day, the compressive strength of the drip infiltration health care reached 58.1MPa, while that of the traditional health care was only 50.6MPa.

[0138] In summary:

[0139] -The drip curing method can significantly improve the compressive strength of concrete within the first 15 days, which has more significant advantages than traditional curing methods.

[0140] -Drip curing can improve the early strength of concrete more quickly and maintain a high strength growth rate throughout the process.

[0141] 2. Humidity monitoring

[0142] Moisture monitoring is one of the core indicators for evaluating the effect of drip curing. It directly reflects the moisture status on the surface and inside of the concrete, which is crucial to ensure the quality of curing.

[0143] Fixed-point monitoring is the most basic humidity monitoring method. At 2 pm every day, concrete humidity is monitored in the same fixed experimental area on different bridge decks, and the changes in concrete surface humidity over 15 days are plotted to analyze the superiority of different curing methods. These monitoring points should cover different areas of the bridge deck, including the central area, edge areas, and areas where special conditions may exist (such as direct sunlight or shadow areas). Fixed-point monitoring can provide long-term, continuous data, which is helpful for analyzing humidity change trends.

[0144] Figure 4 The figure shows the comparison of surface humidity changes in the same environment over 15 days using two different methods.

[0145] -The orange curve represents the humidity condition of “drip infiltration health care”.

[0146] -The green curve represents the humidity situation of "traditional health care".

[0147] - The vertical axis represents humidity value (%Rh), and the horizontal axis represents days (1 to 15 days).

[0148] As can be seen from the figure:

[0149] 1. The humidity value of "drip infiltration health care" is relatively stable, above 90%Rh most of the time, and finally reaches 98%.

[0150] 2. The humidity value of "traditional health care" fluctuated greatly. The humidity was higher in the initial stage, but then there was a clear downward trend, reaching the lowest value of 42%Rh on the 9th day, and then it rose slightly but still remained at a low humidity level, and finally stabilized at 42%Rh.

[0151] In summary, the "drip infiltration health care" method is significantly better than the "traditional health care" method in maintaining surface humidity and can maintain high humidity continuously.

[0152] 3. Summary of concrete strength

[0153] Concrete strength test is the most direct method to evaluate the curing effect, which reflects the actual impact of drip curing on concrete quality. By comparing and analyzing the two charts of surface humidity and compressive strength, it can be seen that drip curing has shown significant superiority in maintaining surface humidity and improving concrete compressive strength, and can continuously maintain high humidity and high strength. This method shows its obvious advantages in construction projects, especially when high initial strength needs to be achieved quickly.

[0154] First, from the perspective of surface humidity, the drip infiltration method can maintain a high and stable humidity level throughout the 15-day test period. The orange curve remained above 90%Rh for most of the time, and even reached 98% on the 15th day. In contrast, although the traditional curing method can also achieve high humidity in the early stage, the humidity value fluctuates greatly afterwards and drops to a minimum of 42%Rh on the 9th day. Although it rebounded in the later period, it finally stabilized at a lower level. Obviously, drip infiltration can effectively control humidity and provide a more constant and suitable curing environment throughout the process.

[0155] Further, from the comparative analysis of compressive strength, it can be seen that the drip curing method also has a significant effect on improving concrete strength. In the first 7 days, the strength value of drip curing was always higher than that of traditional curing, and the rising speed was faster. By the 15th day, the strength of drip curing reached 58.1MPa, while that of traditional curing was only 50.6MPa, with a difference of 7.5MPa. This shows that drip curing not only provides faster strength growth in the early stages, but also maintains a higher strength level throughout the curing process.

[0156] In summary, the drip curing method provides superior curing conditions by more effectively controlling the humidity on the concrete surface, thereby significantly promoting the improvement of concrete strength. It is not only suitable for projects that need to quickly reach high initial strength, but also demonstrates its superiority in long-term curing. Therefore, drip curing is undoubtedly a more ideal and efficient choice, especially in modern construction, and its application prospects are broad, providing a strong guarantee for project quality.

[0157] The use of drip bridge deck pavement curing construction technology has greatly improved the quality and curing time of the bridge deck pavement, saved construction time, and created benefits for the project during the construction of Fengma Construction Project No. 2.

[0158] Example 4 Benefit Analysis

[0159] 1. Economic Benefits

[0160] The use of drip-seepage bridge deck curing construction technology has the advantages of uniform water distribution, reduced water resource waste, labor saving, rapid concrete strength improvement, short curing cycle, high bridge deck pavement quality and obvious economic benefits. Take the Qingshagou bridge deck curing as an example:

[0161] 1.1 Material costs

[0162] The main materials used for drip bridge deck health care are drip irrigation tape and water storage system. Take the third bridge deck pavement of the left section of Qingshagou Bridge in Fengma Construction II as an example. The bridge deck is 100 meters long and the bridge deck pavement width is 11.75 meters. The price of a 100-meter-long, 10-cm-diameter drip irrigation tape is 200 yuan, and a roll of 100-meter-long, 2-cm-diameter branch drip irrigation tape is 50 yuan. The branch drip irrigation tape is arranged at a horizontal spacing of 50 cm. A total of 33 groups with a length of 11.5 meters are arranged, totaling 100 yuan. The water storage tank with a size of 2*0.5*1 meter costs 300 yuan, and the cost of other parts is 100 yuan, with a total price of 700 yuan.

[0163] 1.2 Labor costs and equipment costs

[0164] Taking the third bridge deck pavement of the left section of Qingshagou Bridge, the second bid of Fengma Construction, as an example, the current price of water is 3.7 yuan per ton, and the overall bridge deck maintenance cycle is 15 days.

[0165] 1. Take a bridge paving as an example

[0166] The labor cost for traditional bridge deck maintenance is 200 yuan / person per day, with a total cost of 200*15=3000 yuan. Water cost: 10 tons of water per day, with a total cost of 3.7*10*15=555 yuan. The tank truck freight is 200 yuan / day, with a cost of 200*15=3000 yuan, and a total expenditure of 6555 yuan.

[0167] There is no labor cost for the curing of dripping bridge deck pavement. The cost of ordering 3 sets of materials is 2,100 yuan, which can be recycled. The water fee is 4 tons of water per day, 3.7*4*15=222 yuan, and the water pump is 1,000 yuan, a total of 3,322 yuan

[0168] By comparison, each link saves 8233 yuan

[0169] Take the maintenance of the 10-span bridge deck on the left and right sides of Qingshagou Bridge as an example.

[0170] Normally 5 layers can be laid in one month and completed in 2 months.

[0171] The total labor cost of traditional health care is 12,000 yuan, water fee is 5,550 yuan, tank truck freight is 12,000 yuan, and the total is 29,550 yuan

[0172] The total cost of dripping bridge deck pavement curing water is 2,200 yuan, excluding labor costs, material costs 2,100 yuan, water pumps 1,000 yuan, a total of 5,322 yuan

[0173] By comparison, the cost of paving the left and right sides of Qingshagou Bridge was saved by 24,228 yuan.

[0174] Table 1 Comparison of the cost of traditional health care and drip infiltration health care

[0175]

[0176]

[0177] Embodiment 5 Application Example

[0178] 1. Project Introduction

[0179] G312 Line Fengle to Mayingkou Section (including Yongchang Transit) Project FMSG-2

[0180] 1.1 Project location: Yongchang County, Jinchang City, Gansu Province

[0181] 1.2 Project cost: 640 million yuan

[0182] 1.3 Contract period: December 10, 2022 - December 10, 2024

[0183] 1.4 Project Overview: The project route starts at stake number K26+800 and ends at stake number K51+600, with a total length of 25km. The main projects include roadbed engineering, bridge engineering, pavement engineering, and greening engineering. All bridge decks of the project are cured by drip infiltration, except for one section of the bridge deck that is used as a comparison data and traditional curing is used.

[0184] 2. Application effect

[0185] The dripping bridge deck curing system has obvious advantages over the traditional watering curing system. The dripping system not only improves the strength and durability of concrete through precise moisture control and automated management, but also reduces the waste of water resources and labor intensity. The long-term water-saving effect and reduced management costs give it obvious advantages in both economic and environmental protection. With the continuous development of technology, dripping curing is expected to be promoted in more concrete curing projects, further improving the curing effect and resource utilization efficiency.

[0186] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A bridge deck pavement dripping curing system, characterized by: It includes a water supply system, a filtration system, a main pipe and branch pipes, a drip irrigation belt and a control system; the water supply system includes a water source and a water supply pump, the filtration system is used to remove impurities in the water, the main pipe is used to connect a water storage device, and transports water to various areas of the bridge deck through a branch pipe system, the drip irrigation belt is responsible for evenly distributing water to the bridge deck pavement surface, and the control system includes a controller, a water pressure regulator and various sensors for controlling the operation of the system.

2. A construction method for a bridge deck pavement drip curing system, characterized in that: The steps include: Step 1: System installation and operation monitoring; Step 2: Water source system installation; Step 3: Laying of drip pipe network; Step 4: Test and adjust the drip infiltration system. Step 5: Initial operation and debugging.

3. The construction method of a bridge deck pavement dripping curing system according to claim 2 is characterized in that: In step one, the following steps are specifically included: (1) Construction preparation Before installing the drip infiltration system, the construction site must be thoroughly cleaned. After cleaning, the permeable geotextile surface should be clean and flat. Then, the staff needs to accurately mark the installation locations of the components of the drip infiltration system according to the design drawings, including the main pipeline, branch pipes, and water storage equipment installation locations. (2) Preparation of tools and equipment The installation of a drip infiltration system requires a variety of professional tools and equipment. Before officially starting the installation, you must ensure that all necessary tools and equipment are ready. Each tool should be checked for its functional status to ensure that they are in good working condition. Check the power supply and temporary water facilities at the construction site in advance. You must ensure that there are sufficient power interfaces and stable power supply. If the power supply on site is insufficient, temporary power supply equipment may need to be arranged. During the installation and testing process, a large amount of water is required to flush the pipes, test the system pressure, etc. Therefore, it is necessary to ensure that there is a reliable water supply on site and prepare the necessary water pipes and connecting equipment.

4. The construction method of a bridge deck pavement dripping curing system according to claim 2 is characterized in that: In step 2, the following steps are specifically included: (1) Water source access The water source system is the starting point of the entire drip infiltration system. The quality of its installation directly affects the performance of the entire system. According to the specific requirements of the geographical location of the bridge, you can choose to connect to the municipal water supply or set up a self-supplied water source. If you choose to connect to the municipal water supply, you need to understand the situation of the local water supply network and determine the best access point. During the access process, you need to comply with relevant laws and regulations and technical standards to ensure the legality and safety of the connection. If you choose to provide your own water source, such as groundwater or surface water, you need to consider the stability and water quality of the water source. You may need to conduct a water quality test and decide whether additional water treatment equipment is needed based on the test results. (2) Main pipeline installation The installation of the main pipeline is the key link to connect the water source and the drip irrigation system. The connection between the main pipeline and the water storage system, the main drip irrigation belt, and the branch drip irrigation belt is another link that requires special attention. It needs to be carried out according to the standard operating procedures to ensure that each connection point is firm and reliable. After the connection is completed, a strict sealing test is required to ensure that there are no leaks. (3) Installation of drip filtration system In order to ensure the cleanliness of the water supply, a secondary filter device needs to be installed. The primary and secondary selection of the filter device needs to be determined according to the water quality of the water source and the requirements of the drip infiltration system. Since the water source of the water storage system is not uniform and will produce precipitated gravel, silt and aquatic plant debris after a long period of standing, in order to prevent clogging of the pipeline, a primary filter device is installed between the water storage system and the main pipeline to ensure the cleanliness of the water source from the water storage system to the main pipeline. The secondary filter device should be installed between the branch pipe drip irrigation belt and the main pipeline to perform a second filtration on the water flow of the drip infiltration system operation to ensure the cleanliness of the water source; After the filtration system is installed, it needs to be fully debugged. The debugging process includes checking the filtration effect, testing the anti-clogging effect, and adjusting the filtration accuracy. Only by ensuring that the filtration system can operate normally can the long-term stable operation of the entire drip infiltration system be guaranteed.

5. The construction method of a bridge deck pavement dripping curing system according to claim 2 is characterized in that: In step three, the following steps are specifically included: (1) Installation of main drip irrigation belt The main drip irrigation tape is the aorta of the drip infiltration system. Its installation quality directly affects the performance of the entire system. According to the design drawings, during the laying process, special attention should be paid to the slope and direction of the main pipeline to conform to the longitudinal slope of the bridge. A reasonable slope can help empty the air in the pipeline and prevent the occurrence of air blockage. Pipe material selection: needs to be selected based on health environment, water system pressure, and service life requirements; Pipe diameter determination: According to the design flow and pressure loss calculation, the diameter of the main drip irrigation belt is determined to be 10cm to ensure that it can meet the water supply needs of the entire system; Slope control: The main drip irrigation pipe should be laid out in accordance with the longitudinal slope of the bridge to facilitate exhaust and drainage; Fixed support: Pipe supports need to be set at appropriate locations to prevent the pipes from changing their laying positions due to their own weight or water flow impact, causing the slope of the main drip irrigation belt to change and affecting the normal operation of the drip infiltration system; On the main drip irrigation pipe, it is necessary to install a regional control valve to control the water supply in different areas and reasonably adjust the water flow in each branch pipe; (2) Branch pipe drip irrigation belt layout The branch pipe drip irrigation belt is connected to the main drip irrigation belt through a connector. Its layout directly affects the uniformity of drip infiltration. The layout of the branch pipe needs to follow the following principles: Uniform spacing: The spacing between branch pipes should be consistent according to the design requirements, usually arranged in a row of 0.5 meters along the longitudinal direction of the bridge deck, and should be arranged as parallel as possible in the longitudinal slope direction to ensure uniform water pressure distribution and maintain consistent water flow; Slope control: During the laying process, special attention should be paid to the slope and direction of the branch pipe drip irrigation belt to conform to the transverse slope of the bridge. A reasonable slope can help empty the air in the pipeline and prevent the occurrence of air blockage; Connection control: At the connection between the branch drip irrigation belt and the main drip irrigation belt, a water flow control valve can be installed as needed to control the water supply of a separate branch drip irrigation belt and reasonably adjust the water flow of a single branch drip irrigation belt; in the subsequent pressure test, in case of leakage, the valve can be directly closed to cut off the water flow. The installation position of these valves needs to be convenient for operation and maintenance.

6. The construction method of a bridge deck pavement dripping curing system according to claim 2 is characterized in that: In step 4, the following steps are specifically included: (1) Pipeline network water pressure test The water pressure test of the pipe network is a key step to ensure the reliable operation of the entire drip infiltration system. This process usually includes the following steps: Pipeline water filling: Open the main control valve of the water storage system, first slowly and evenly inject water into the entire pipe network to gradually expel the air in the pipe. This process takes a long time. The purpose of slow and even water injection is to avoid pipe rupture caused by the water hammer effect caused by rapid water filling; Pressure test: After the pipe is filled with water, the system pressure can be gradually increased to about 1.5 times the design pressure and maintained for a certain period of time, usually 30 minutes to 1 hour. During this period, a dedicated person is required to carefully check whether there is any leakage in the entire drip seepage system, especially the location of each connection point; Leakage treatment: If a leak is found, mark the location and quickly close the main drip irrigation belt area control valve and the branch drip irrigation belt water flow control valve, and repair it after reducing the pressure. After the repair is completed, re-pressurization test is required; Pressure adjustment: After the test is completed, adjust the system pressure to the designed working pressure and conduct a final inspection; (2) Drip penetration uniformity test The uniformity of dripping directly affects the curing effect, so detailed testing is required. The test steps include: Select sampling points: Select multiple representative test points on the bridge deck. Usually, sampling is done near the middle of the two drip irrigation belts to ensure the representativeness and reliability of the data. This strategy can effectively reflect the uniformity of the drip infiltration of the entire system. Measuring flow rate: placing a collection device at each test point to collect the dripping water volume obtained in the same time. This time can directly reflect the real data of the dripping water volume at different positions, and can also determine to a certain extent whether the drip irrigation belt is laid in a reasonable position or damaged; Data analysis: Multiple experiments can be conducted on the same dripping point, and the dripping flow rate of each experimental point can be calculated, and the coefficient of variation of the flow rate can be analyzed. The coefficient of variation is usually required to be no more than 10%; Adjustment and optimization: If it is found that the drip infiltration in certain areas is obviously too low or too high, it is necessary to check the corresponding drip infiltration system and make necessary adjustments or replacements to the drip irrigation tape or control valve according to the specific situation.

7. The construction method of a bridge deck pavement dripping curing system according to claim 2, characterized in that: In step 4, the following steps are specifically included: (1) Parameter setting Before the drip infiltration system is put into use, parameters need to be set and adjusted according to different environmental conditions to achieve the best maintenance effect: First, the setting of dripping frequency is a dynamic process, which needs to be adjusted according to the age of concrete and environmental conditions. In the initial stage of concrete pouring, due to the strong hydration reaction, more frequent dripping is required to maintain appropriate humidity; as the concrete gradually hardens, the dripping frequency can be gradually reduced; at the same time, environmental factors such as temperature, humidity and wind speed need to be considered. In hot and dry weather, the dripping frequency may need to be increased; The setting of dripping time also needs to be fine-tuned. This parameter mainly depends on the area of ​​the bridge deck and the local evaporation rate. Larger bridge deck areas may require longer dripping time to ensure full coverage, while in areas with high evaporation rates, dripping time may need to be extended to replenish water losses. In addition, the water absorption performance of concrete needs to be considered to ensure that each dripping can fully penetrate but will not cause excess water. (2) Operation observation Close observation during the initial operation of the system is essential to detect and resolve problems in a timely manner. This phase requires comprehensive and detailed monitoring: First, the operating status of key components of the system is continuously recorded. The switch status of the valve, whether it can accurately respond to the control signal; the working condition of the drip irrigation belt, whether there is blockage or leakage. These records help to detect potential equipment problems early; Secondly, closely observe the water distribution on the bridge deck. Ideally, the entire bridge deck should be evenly moist. Pay special attention to whether there are obvious dry areas or waterlogged areas. Dry areas may mean insufficient dripping, and the control valves in the corresponding areas need to be adjusted to increase the water flow. Waterlogged areas may indicate poor local drainage or excessive dripping, and the control valves need to be adjusted to reduce the water flow. (3) Parameter Optimization The normal operation results of the drip infiltration system can be observed and summarized daily, and the system parameters can be adjusted. If it is observed that some areas of the bridge deck are too dry, it may be necessary to increase the drip infiltration frequency or extend the drip infiltration time in that area. On the contrary, if water accumulation is found, it may be necessary to reduce the drip infiltration volume or increase the drip infiltration interval. These adjustments need to be meticulous and may require different parameter settings for different areas. Optimization of control logic is the key to improving system responsiveness and accuracy. If it is found that the system's response to environmental changes is not timely or accurate enough, the control algorithm may need to be adjusted.