Device and method for monitoring volume weight of soil body in hydraulic reclamation process
By using an in-situ earth pressure gauge monitoring device and a data acquisition system, the problem of low efficiency in traditional manual sampling has been solved, enabling continuous and accurate monitoring of the bulk density of the dredged fill soil, thus improving construction quality and efficiency.
Patent Information
- Application Number
- CN202411039802.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-12
AI Technical Summary
Traditional manual sampling and testing of the bulk density of dredged fill soil is inefficient and lacks representativeness, making it difficult to achieve timely and effective monitoring of soil bulk density and affecting the quality of dredged fill construction.
An in-situ soil pressure gauge monitoring device is used, in which soil pressure gauges are deployed vertically and radially through a support device composed of rigid tubes and connecting tubes. Combined with a data acquisition and wireless transmission system, continuous monitoring and automated analysis of soil unit weight are achieved.
It enables continuous and accurate monitoring of the unit weight of dredged fill soil, improves data representativeness and reliability, reduces labor intensity and cost, adapts to different processes and materials, and promotes the improvement of dredged fill project quality.
Smart Images

Figure CN118932967A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of water transportation, water conservancy and geotechnical engineering, and relates to a device and a method for monitoring the bulk density of soil in a filling process. Background Art
[0002] The method of using silt to form land and soft foundation treatment to form construction land is widely used in coastal areas. The thickness of the silt is generally several meters or even dozens of meters thick. Affected by many factors such as the original topography, the layout of the filling pipes, and hydraulic sorting, the bulk density of the fill soil at different locations and depths is not the same. The bulk density of the fill soil has a great influence on the quality of subsequent foundation treatment. At present, the traditional practice generally uses manual sampling to detect the bulk density of the fill soil. There are problems such as low sampling efficiency, limited sampling location and sampling depth. It is difficult to obtain the bulk density data of the fill soil on the site in a timely and effective manner. How to effectively monitor the bulk density of the fill soil during the filling process and ensure that the site meets the subsequent construction requirements after filling is a difficulty in filling construction. Summary of the invention
[0003] The object of the present invention is to provide a device and method for monitoring the bulk density of soil during filling, so as to overcome the above-mentioned shortcomings and deficiencies of the prior art.
[0004] The technical solution adopted by the present invention is:
[0005] A device for monitoring the bulk density of soil during filling includes a base, wherein the base is composed of a bottom plate and a supporting device, the supporting device is fixed on the bottom plate, and a plurality of soil pressure gauges are arranged at intervals on the supporting device.
[0006] Optionally, the supporting device includes a main supporting rod and a plurality of sub-supporting rods arranged thereon.
[0007] Optionally, the main support rod is a rigid tube, and the sub-support rod is a connecting tube; one end of the rigid tube is formed into a drill bit, which vertically passes through the center of the base plate and is fixed to form a base of the monitoring device; on the rigid tube above the base plate, a plurality of connecting tubes are arranged at intervals, one end of each connecting tube is fixed to the rigid tube, and the other end is connected to support the soil pressure gauge fixing device; the soil pressure gauge is placed on the soil pressure gauge fixing device.
[0008] Optionally, a plurality of ribs are evenly spaced around the rigid tube below the bottom plate to reinforce and fix the rigid tube to the bottom plate.
[0009] Optionally, it also includes a wireless transmission device and a solar power supply system fixed to the other end of the rigid tube opposite to the drill bit.
[0010] Optionally, the cable of the soil pressure gauge is connected to the data acquisition and wireless transmission equipment and the solar power supply system through the channel inside the connecting tube and the channel inside the rigid tube, receives power from the solar power supply system, and transmits the soil pressure gauge data during the filling process to the outside through the wireless transmission equipment.
[0011] Optionally, four ribs evenly spaced apart are arranged around the rigid tube and are reinforced and fixed to the bottom plate, and the four ribs are evenly spaced apart from each other at 90 degrees around the rigid tube.
[0012] Optionally, the soil pressure gauge fixing device includes a round groove tray and fixing screws. The round groove tray is used to accommodate and place the soil pressure gauge. A plurality of fixing screws are provided to strengthen the fixation of the soil pressure gauge through holes on the round groove tray.
[0013] Optionally, three fixing screws are provided at 120 degrees apart from each other on the circumference to strengthen the fixation of the earth pressure gauge.
[0014] Optionally, the distances between the connecting tubes on the rigid tube are equal; and / or the earth pressure gauges are arranged at equal intervals in the vertical direction; and / or the connecting tubes are symmetrically distributed about the center of the rigid tube in the radial direction; preferably, the distance between the connecting tubes on the rigid tube is 1m, and the earth pressure gauges are arranged at intervals of 1m in the vertical direction; preferably, two connecting tubes are provided, which are respectively located at positions 180° apart on the circumference; or four connecting tubes are provided, which are respectively located at positions opposite to each other on the circumference.
[0015] Optionally, the base plate is a square, and the supporting device passes through the geometric center of the square.
[0016] Optionally, the rigid tube is a steel tube, the bottom plate is a steel plate, and the steel tube and the bottom plate are fixed by welding.
[0017] Optionally, the length of the steel pipe passing through the steel plate is greater than or equal to 50 cm.
[0018] The method for monitoring the bulk density of soil using the above-mentioned device is to arrange a number of soil pressure gauges at intervals of 1m in the vertical direction of the supporting device above the bottom plate. The soil pressure gauges are placed on the round groove tray and fixed by tightening the fixing screws. The cables of the soil pressure gauges are connected to the data acquisition device. The bulk density of the corresponding dredger fill soil layer is calculated based on the monitoring data and the following formula:
[0019] Assuming that there are 1 to N earth pressure gauges buried, the average bulk density of the dredger fill between any A and B earth pressure gauges is calculated as follows:
[0020]
[0021] γ—Average bulk density of dredger fill between A and B soil pressure gauges, kN / m3
[0022] H—vertical distance between soil pressures A and B, m
[0023] P1, P2—Vertical earth pressure values measured by A and B earth pressure gauges, kPa
[0024] The bulk density of the corresponding fill soil layer calculated from the soil pressure gauge data during the filling process is transmitted to the computer terminal through a wireless transmission device for monitoring.
[0025] The device and method for monitoring bulk density of dredged fill soil provided by the present invention have significant advantages and beneficial effects compared with the prior art, which are mainly reflected in the following aspects:
[0026] 1) Realize in-situ continuous monitoring of bulk density of dredger fill soil
[0027] The bulk density of the blown fill soil is a key indicator for evaluating the quality of the blown fill. Traditional bulk density monitoring mainly uses manual sampling and indoor testing methods, which have problems such as low monitoring frequency, poor timeliness, and insufficient representativeness. The present invention uses an earth pressure gauge to measure the pressure change of the blown fill soil in situ. Through reasonable arrangement and data analysis, it can realize continuous monitoring of the bulk density of the soil during the whole process of blowing fill, timely, accurately and comprehensively reflect the real state of the blown fill soil, and provide a reliable basis for quality control;
[0028] 2) Improve the representativeness and reliability of monitoring data
[0029] Dredged fill soil often has large spatial non-uniformity, and local sampling monitoring is difficult to reflect the change law of bulk density of the entire filling area. The present invention adopts a support device composed of a rigid tube and a connecting tube, realizes the multi-point layout of earth pressure gauges in the vertical and radial directions, and can comprehensively collect soil pressure data at different depths and directions. After reasonable spatial interpolation and statistical analysis, more representative and reliable bulk density monitoring results can be obtained;
[0030] 3) Reduce the difficulty and cost of manual sampling
[0031] Dredged fill soil usually has a high water content and low strength, making manual sampling difficult and labor-intensive. In addition, the sampling process easily disturbs the soil, affecting the accuracy of the monitoring data. The present invention uses a drill bit to press the monitoring device into the soil, and achieves indirect monitoring through a soil pressure gauge, avoiding the difficulty of direct sampling, reducing manual labor intensity and economic costs, while also minimizing the disturbance to the soil to the greatest extent, ensuring the reliability of the monitoring data.
[0032] 4) Adapt to different filling processes and filling materials
[0033] There are many different processes and filling materials used in filling construction, and the change characteristics of soil bulk density under different working conditions vary greatly. The monitoring device of the present invention has a simple structure and flexible layout. By changing the length of the support device, the number and position of the connecting pipes and other parameters, it can adapt to the monitoring needs of different filling processes (such as secondary filling, layered filling, etc.) and filling materials (such as sand, silt, silt, etc.), and has good applicability and versatility;
[0034] 5) Realize automation and informatization of the monitoring process
[0035] The traditional manual sampling monitoring method is cumbersome in on-site operation, low in data processing efficiency, and difficult to achieve real-time feedback and dynamic control. The present invention uses an electric earth pressure gauge, which can realize automatic reading and wireless transmission through a data acquisition instrument, and combines computer software for data analysis and visual display, realizing the automation and informatization of the monitoring process, greatly improving the monitoring efficiency and management level, and providing timely and accurate decision support for filling construction;
[0036] 6) Promote the quality improvement and technological progress of filling projects
[0037] Dynamic monitoring of the bulk density of the fill soil is an important means to achieve refined management and quality control of the fill project. The present invention provides a scientific, reliable and efficient monitoring method and technical equipment for owners, supervisors, construction and other parties, which helps to timely discover and solve quality risks in the fill construction, continuously optimize the construction process and filling materials, promote the advancement of fill technology and the healthy development of the industry, and improve the overall quality and performance of the fill project.
[0038] To sum up, the blown fill soil bulk density monitoring device and monitoring method provided by the present invention have broken through the limitations of traditional manual sampling monitoring, realized the in-situ continuous monitoring of the soil bulk density throughout the whole process of blowing and filling, improved the representativeness and reliability of the monitoring data, reduced the difficulty and cost of manual sampling, adapted to the needs of different blowing and filling processes and filling materials, realized the automation and informatization of the monitoring process, and solved the problem that traditional processes are difficult to effectively sample and monitor the bulk density of blown fill soil during the blowing and filling process. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following drawings are provided for display:
[0040] Figure 1 The figure is a schematic elevation view of an embodiment of the present invention.
[0041] Figure 2 for Figure 1 AA section view of the embodiment shown.
[0042] Figure 3 for Figure 1Section BB in the illustrated embodiment.
[0043] Figure 4 This is a partially enlarged view of a fixing device according to an embodiment of the present invention.
[0044] Markings in the figure: 1. Steel pipe; 2. Steel plate; 3. Rib plate; 4. Connecting pipe; 5. Earth pressure gauge fixing device; 5-1. Round groove tray; 5-2. Fixing screws; 6. Earth pressure gauge; 7. Data acquisition and wireless transmission equipment; 8. Solar power supply system; 9. Earth pressure gauge cable. DETAILED DESCRIPTION
[0045] In order to make the purpose, technical solution and beneficial effects of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0046] For ease of description, spatially relative terms, such as "under", "below", "down", "above", "upper", etc., will be used when necessary to describe the relationship of one element or feature relative to another element or feature shown in the drawings. The spatially relative terms are intended to include different orientations of the device in use or operation other than the orientation shown in the drawings. For example, if the device in the figure is turned over, elements described as being "under" or "beneath" other elements or features will be oriented as being "above" the other elements or features.
[0047] Unless otherwise defined, the terms used herein have the same meaning as commonly understood by ordinary technicians in the field to which the invention belongs, and the terms should be understood to have the same meaning as in the context of the relevant technology and should not be understood in an idealized or overly formal way, except where explicitly defined in the present invention.
[0048] See also Figures 1 to 4 The present invention discloses a device for monitoring the bulk density of soil during filling, comprising a steel pipe 1, a steel plate 2, a rib plate 3, a connecting pipe 4, an earth pressure gauge fixing device 5, a round groove tray 5-1, a fixing screw 5-2, an earth pressure gauge 6, a data acquisition and wireless transmission device 7, a solar power supply system 8, and an earth pressure gauge cable 9.
[0049] One end of the steel pipe 1 is formed into a steel drill bit, which vertically passes through the center of the steel plate 2 and is fixed to form the base of the monitoring device. On the side of the steel plate 2 close to the ground, a number of ribs 3 are evenly spaced around the steel pipe 1 to strengthen the connection and fixation with the steel plate 2; on the other side of the steel plate 2, that is, the upper part of the steel pipe 1, a connecting pipe 4 is arranged at a certain distance, one end of the connecting pipe 4 is fixed on the steel pipe 1, and the other end is connected to the supporting soil pressure gauge fixing device 5; the soil pressure gauge 6 is placed on the soil pressure gauge fixing device 5, and a soil pressure gauge 6 can be placed on each soil pressure gauge fixing device 5. The soil pressure gauge cable 9 is connected to the data acquisition and wireless transmission equipment 7 and the solar power supply system 8 through the channel inside the connecting pipe 4 and the channel inside the steel pipe 1, and receives power from the solar power supply system 8. In addition, during the filling process, the soil pressure gauge data is transmitted to the computer terminal through the wireless transmission equipment 7; the wireless transmission equipment 7 and the solar power supply system 8 are fixed to the upper part of the steel pipe 1, that is, the other end opposite to the steel drill bit.
[0050] In one embodiment, four ribs 3 are evenly spaced around the steel pipe 1 and are connected and fixed to the steel plate 2 for reinforcement, that is, the four ribs 3 are evenly spaced around the steel pipe 1 at 90 degrees.
[0051] In one embodiment, the distance between each connecting pipe 4 on the steel pipe 2 is 1m, that is, the earth pressure gauges are arranged at intervals of 1m in the vertical direction; in the radial direction, several connecting pipes are symmetrically distributed about the center of the steel pipe. For example, two connecting pipes can be set, which are located 180° apart on the circumference; or four connecting pipes can be set, which are located at positions opposite to each other on the circumference.
[0052] In one embodiment, the earth pressure gauge fixing device 5 includes a circular groove tray 5-1 and fixing screws 5-2. The circular groove tray 5-1 is used to accommodate and place the earth pressure gauge 6. A plurality of fixing screws 5-2 can strengthen the fixing of the earth pressure gauge 6 through the holes on the circular groove tray 5-1. In one embodiment, three fixing screws 5-2 can be used to strengthen the fixing of the earth pressure gauge 6 at uniform intervals on the circumference (120 degrees apart from each other), such as Figure 2 shown.
[0053] In one embodiment, the steel pipe 1 and the steel plate 2 are fixed by welding, and the length of the steel pipe 1 passing through the steel plate 2 is greater than or equal to 50 cm.
[0054] In one embodiment, the steel plate 2 is a square, and the steel pipe 1 passes through the geometric center of the square.
[0055] A method for monitoring soil bulk density during filling process, comprising the following steps:
[0056] 1) Weld the steel pipe and steel plate to form a base, and add rib welding;
[0057] 2) Install the earth pressure gauge on the round groove tray and tighten the fixing screws;
[0058] 3) Use a connecting pipe to connect the earth pressure gauge fixture to the steel pipe;
[0059] 4) Install the solar power supply system, data collection and wireless transmission equipment, and assemble the entire device;
[0060] 5) Place the device at the preset location of the site to be filled and wait for the site filling construction;
[0061] 6) During the filling process, the soil pressure value of each measuring point is monitored and sent to the computer terminal;
[0062] 7) Calculate the corresponding bulk density of the fill soil and provide feedback for the fill construction.
[0063] Pass one end of the steel pipe through the steel plate and fix it to form the base of the monitoring device. The steel pipe and the steel plate are fixed by welding. The length of the steel pipe passing through the steel plate should not be less than 50cm, and welded ribs are added to ensure the fixing effect. Soil pressure gauges are arranged on the steel pipe on the upper part of the steel plate at a spacing of 1m. The soil pressure gauges are placed on the round groove tray and fixed with screws. The round groove tray and the steel pipe are rigidly connected by a connecting pipe. The cable of the soil pressure gauge is connected to the top data acquisition and wireless transmission device through the holes reserved in the connecting pipe and the steel pipe. The bulk density of the corresponding dredged fill soil layer is calculated based on the monitoring data and relevant physical and mechanical formulas. The specific calculation process and calculation formula are as follows:
[0064] Assuming that there are 1 to N earth pressure gauges buried, the average bulk density of the dredger fill between any A and B earth pressure gauges is calculated as follows:
[0065]
[0066] γ—Average bulk density of dredger fill between A and B soil pressure gauges, kN / m 3
[0067] H—vertical distance between soil pressures A and B, m
[0068] P1, P2—Vertical earth pressure values measured by A and B earth pressure gauges, kPa
[0069] The bulk density of the corresponding fill soil layer calculated from the soil pressure gauge data during the filling process is transmitted to the computer terminal through a wireless transmission device for monitoring.
[0070] A land reclamation project plans to use seabed silt to form land. The average depth of the silt is about 6m. In order to ensure the uniformity and stability of the filled soil, the device and method of the present invention are used to dynamically monitor the bulk density of the soil.
[0071] At each monitoring point, a soil bulk density monitoring device is installed according to the method proposed in the present invention. According to the actual situation of the filling area, the average depth of the filling mud is about 6m. Each monitoring device is equipped with 6 soil pressure gauges, which are arranged at equal intervals in the vertical direction, and the distance between two adjacent soil pressure gauges is 1m.
[0072] For the convenience of identification and data analysis, the earth pressure gauges are numbered from bottom to top according to depth. Among them, the earth pressure gauge at the deepest point (i.e., the original beach surface) is numbered 1, and the earth pressure gauge No. 2 is located 1m above the original beach surface, and No. 3 is located 2m above the original beach surface. And so on, the earth pressure gauge at the shallowest point (i.e., 5m above the original beach surface) is numbered 6.
[0073] Taking a typical monitoring point as an example, when the depth of the blown silt is 2m, the data measured by the No. 1 and No. 2 soil pressure gauges are 29.3kPa and 14.5kPa respectively. Based on the data of the adjacent soil pressure gauges, the average bulk density of each soil layer can be calculated as follows:
[0074] The average bulk density of the soil layer 0-1m above the original beach surface is: (29.3-14.5) / 9.8=1.51kN / m 3
[0075] The average bulk density of the soil layer 1-2m above the original beach surface is: (14.5-0) / 9.8=1.48kN / m 3
[0076] As above, when the depth of the blown silt is 4m, the data measured by the No. 1, No. 2, No. 3, and No. 4 soil pressure gauges are 59.8kPa, 44.5kPa, 29.4kPa, and 14.6kPa respectively. The average bulk density of each soil layer is calculated as follows:
[0077] The average bulk density of the soil layer 0-1m above the original beach surface is: (59.8-44.5) / 9.8=1.56kN / m 3
[0078] The average bulk density of the soil layer 1-2m above the original beach surface is: (44.5-29.4) / 9.8=1.54kN / m 3
[0079] The average bulk density of the soil layer 2-3m above the original beach surface is: (29.4-14.6) / 9.8=1.51kN / m 3
[0080] The average bulk density of the soil layer 3-4m above the original beach surface is: (14.6-0) / 9.8=1.49kN / m 3
[0081] Finally, when the depth of the blown silt was 6m, the data measured by the No. 1, No. 2, No. 3, No. 4, No. 5, and No. 6 earth pressure gauges were 90.3 kPa, 74.7 kPa, 59.3 kPa, 44.1 kPa, 29.1 kPa, and 14.4 kPa, respectively. The average bulk density of each soil layer was calculated as follows:
[0082] The average bulk density of the soil layer 0-1m above the original beach surface is: (90.3-74.7) / 9.8=1.59kN / m 3
[0083] The average bulk density of the soil layer 1-2m above the original beach surface is: (74.7-59.3) / 9.8=1.57kN / m 3
[0084] The average bulk density of the soil layer 2-3m above the original beach surface is: (59.3-44.1) / 9.8=1.55kN / m 3
[0085] The average bulk density of the soil layer 3-4m above the original beach surface is: (44.1-29.1) / 9.8=1.53kN / m 3
[0086] The average bulk density of the soil layer 4-5m above the original beach surface is: (29.1-14.4) / 9.8=1.50kN / m 3
[0087] The average bulk density of the soil layer 4-5m above the original beach surface is: (14.4-0) / 9.8=1.47kN / m 3
[0088] By applying the soil bulk density monitoring device and method of the present invention in a land reclamation project, the following remarkable effects were achieved:
[0089] (1) Dynamic monitoring of soil bulk density during the entire filling process was achieved, which timely discovered and solved the problem of under-compaction of local soil layers and improved the uniformity and stability of the filled soil.
[0090] (2) The filling process parameters, such as filling rate and mud concentration, were optimized, which improved filling efficiency and quality and shortened the construction period;
[0091] (3) It reduces the workload of manual sampling and on-site testing, saves manpower and material resources, and improves the reliability and timeliness of monitoring data;
[0092] (4) It provides important data support for the consolidation settlement analysis of the fill soil and the formulation of subsequent foundation treatment plans, ensuring the quality and safety of the entire land reclamation project.
[0093] In summary, the soil bulk density monitoring device and method proposed in the present invention are fully feasible and effective and can be applied to land reclamation projects.
[0094] The above description of the embodiments is to facilitate the understanding and use of the present invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the protection scope of the present invention.
Claims
1. A device for monitoring soil bulk density during filling, characterized in that: The utility model comprises a base, which is composed of a bottom plate and a supporting device, the supporting device is fixed on the bottom plate, and a plurality of soil pressure gauges are arranged on the supporting device at intervals.
2. The device for monitoring soil bulk density during filling according to claim 1, characterized in that: The supporting device comprises a main supporting rod and a plurality of sub-supporting rods arranged thereon.
3. The device for monitoring soil bulk density during filling according to claim 2, characterized in that: The main support rod is a rigid tube, and the sub-support rod is a connecting tube; one end of the rigid tube is formed into a drill bit, which vertically passes through the center of the base plate and is fixed to form a base of the monitoring device; on the rigid tube above the base plate, a plurality of connecting tubes are arranged at intervals, one end of each connecting tube is fixed on the rigid tube, and the other end is connected to support the soil pressure gauge fixing device; the soil pressure gauge is placed on the soil pressure gauge fixing device.
4. The device for monitoring soil bulk density during filling according to claim 3 is characterized in that: A plurality of ribs are evenly spaced around the rigid tube below the bottom plate and are connected and fixed to the bottom plate for reinforcement.
5. The device for monitoring soil bulk density during filling according to claim 3, characterized in that: The invention also comprises a wireless transmitting device and a solar power supply system which are fixed to the other end of the rigid tube opposite to the drill bit.
6. The device for monitoring soil bulk density during filling according to claim 3, characterized in that: The cable of the soil pressure gauge is connected to the data acquisition and wireless transmission equipment and the solar power supply system through the channel inside the connecting tube and the channel inside the rigid tube, receives power from the solar power supply system, and transmits the soil pressure gauge data during the filling process to the outside through the wireless transmission equipment.
7. The device for monitoring soil bulk density during filling according to claim 4, characterized in that: Four ribs evenly spaced around the rigid tube are connected and fixed to the bottom plate for reinforcement, and the four ribs are evenly spaced 90 degrees around the rigid tube.
8. The device for monitoring soil bulk density during filling according to claim 3, characterized in that: The soil pressure gauge fixing device comprises a round groove tray and fixing screws. The round groove tray is used to accommodate and place the soil pressure gauge. A plurality of fixing screws are provided to strengthen the fixing of the soil pressure gauge through holes on the round groove tray.
9. The device for monitoring soil bulk density during filling according to claim 8, characterized in that: Three fixing screws are provided at intervals of 120 degrees from each other on the circumference to strengthen the fixation of the earth pressure gauge.
10. The device for monitoring soil bulk density during filling according to claim 3, characterized in that: The distances between the connecting tubes on the rigid tube are equal; and / or the earth pressure gauges are arranged at equal intervals in the vertical direction; and / or the connecting tubes are symmetrically distributed about the center of the rigid tube in the radial direction; preferably, the distance between the connecting tubes on the rigid tube is 1m, and the earth pressure gauges are arranged at intervals of 1m in the vertical direction; preferably, two connecting tubes are provided, which are respectively located at positions 180° apart on the circumference; or four connecting tubes are provided, which are respectively located at positions opposite to each other on the circumference.
11. The device for monitoring soil bulk density during filling process according to claim 1, characterized in that: The bottom plate is a square, and the supporting device passes through the geometric center of the square.
12. The device for monitoring soil bulk density during filling process according to claim 3, characterized in that: The rigid tube is made of a steel tube, the bottom plate is made of a steel plate, and the steel tube and the bottom plate are fixed by welding.
13. The device for monitoring soil bulk density during filling process according to claim 12, characterized in that: The length of the steel pipe passing through the steel plate is greater than or equal to 50 cm.
14. A method for monitoring soil bulk density using the device of claim 1, characterized in that: Several earth pressure gauges are arranged at intervals of 1m in the vertical direction of the support device above the bottom plate. The earth pressure gauges are placed on the round groove tray and fixed with fixing screws. The cables of the earth pressure gauges are connected to the data acquisition device. The bulk density of the corresponding dredger fill soil layer is calculated based on the monitoring data and the following formula: Assuming that there are 1 to N earth pressure gauges buried, the average bulk density of the dredger fill between any A and B earth pressure gauges is calculated as follows: γ—Average bulk density of dredger fill between A and B soil pressure gauges, kN / m 3 H—vertical distance between soil pressures A and B, m P1, P2—Vertical earth pressure values measured by A and B earth pressure gauges, kPa The bulk density of the corresponding fill soil layer calculated from the soil pressure gauge data during the filling process is transmitted to the computer terminal through a wireless transmission device for monitoring.
