Method for synchronous construction of foundation pit and adjacent structure outside foundation pit

By setting up high-zone pile foundations at the bottom of the raft foundation in low-zone and extracting the soil layer in pieces, the problem of synchronous construction of adjacent foundation pits is solved, and the synchronous construction of foundation pits and adjacent structures outside the foundation pit is realized, which significantly accelerates the Construction progress and shorten the construction cycle.

CN118933016AActive Publication Date: 2024-11-12SHANGHAI CONSTRUCTION FIRST CONSTRUCTION (GROUP) CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411148670.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-12
Estimated Expiration
2044-08-21

AI Technical Summary

Technical Problem

In engineering construction, when adjacent foundation pits need to be constructed simultaneously, there are no relevant plans and implementations for synchronous construction, resulting in increased construction difficulty and extended progress.

Method used

By constructing pile foundations in high-areas below the bottom elevation line of the raft foundation in low-area, and excavating soil layers in pieces, synchronizing the construction of the foundation pit and its adjacent structures, including the raft foundation, pile bearing and column, to form a raft foundation, and Slab foundation and basement structure.

Benefits of technology

The synchronous construction of the foundation pit and the adjacent structure outside the foundation pit has been achieved, which significantly accelerates the construction progress and shortens the construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933016A_ABST
    Figure CN118933016A_ABST
Patent Text Reader

Abstract

The invention provides a method for synchronous construction of a foundation pit and an adjacent structure outside the foundation pit. The method comprises the steps that S1, a low-area pile foundation, an enclosure and a high-area pile foundation are constructed; wherein the bearing stratum of the high-area pile foundation is selected below the elevation line of the bottom of the low-area raft foundation; s2, sloping outside the foundation pits, synchronously excavating soil layers in the first batch of blocks of all the foundation pits to a low-area raft foundation bottom elevation line in a stripping manner, and constructing adjacent structures of the foundation pits at the same time; s3, raft foundations are formed in the first batch of blocks of all the foundation pits; and S4, stripping and synchronously excavating the soil layers in the second batch of blocks of all the foundation pits to the bottom elevation line of the low-area raft foundation, and meanwhile, constructing an upper structure adjacent to the foundation pits and a basement structure of the first batch of blocks. The supporting layer of the pile foundation in the high area of the foundation pit is arranged below the bottom of the raft foundation of the foundation pit in the low area, and the foundation pit is subjected to block stripping excavation, so that synchronous construction of the foundation pit and an adjacent structure outside the foundation pit is realized, the construction progress of the whole project is greatly accelerated, and the construction period is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit. Background Art

[0002] During the construction process, it is common to encounter situations where adjacent foundation pits need to be constructed at the same time in the same project. Usually, one foundation pit is excavated after the positive and negative zero is reached, and there are many construction cases. However, in special cases, adjacent foundation pits will face the problem of synchronous construction of foundation pits and adjacent structures outside the foundation pits. There is no relevant synchronous construction plan and implementation plan for this.

[0003] Therefore, how to carry out the synchronous construction of the foundation pit and the adjacent structures outside the foundation pit is a technical problem that technical personnel in this field need to solve urgently. Summary of the invention

[0004] The purpose of the present invention is to provide a method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit, so as to synchronously construct the foundation pit and the adjacent structure outside the foundation pit.

[0005] In order to solve the above technical problems, the present invention provides a method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit, and the method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit comprises the following steps:

[0006] S1: According to the design documents and construction plan, construct the low-zone pile foundation, enclosure and high-zone pile foundation; wherein the bearing layer of the high-zone pile foundation is selected below the bottom elevation line of the low-zone raft foundation;

[0007] S2: Slope the foundation pit, excavate the soil layer in the first batch of blocks of all foundation pits to the bottom elevation line of the low-level raft foundation, and construct the adjacent structures of the foundation pit at the same time, including: raft foundation, pile cap and column;

[0008] S3: forming raft foundations in the first batch of blocks of all foundation pits;

[0009] S4: Excavate the soil layers in the second batch of blocks of all foundation pits to the bottom elevation line of the raft foundation in the low area, and construct the adjacent superstructure of the foundation pit and the basement structure of the first batch of blocks at the same time; wherein the basement structure of the first batch of blocks and the adjacent superstructure both include: columns, beams and slabs.

[0010] Optionally, in the method for synchronously constructing a foundation pit and adjacent structures outside the foundation pit, in S1, the enclosure is Larsen steel sheet piles, cast-in-place piles, sheet piles or underground continuous walls.

[0011] Optionally, in the method for synchronously constructing the foundation pit and the adjacent structure outside the foundation pit, in S1, the process of constructing the high area pile foundation includes:

[0012] A high zone pile foundation of a predetermined length is constructed below the bottom elevation line of the low zone raft foundation. The bearing capacity of the high zone pile foundation of the predetermined length can meet the bearing requirements of the upper structure before the adjacent foundation pit exceeds ±0.000.

[0013] Optionally, in the method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit, in S2, the pile cap is a single pile cap, a three-pile cap, or a four-pile cap.

[0014] Optionally, in the method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit, in S2, the reinforcement of the pile cap in the adjacent structure outside the foundation pit is denser than the reinforcement of the raft foundation in the adjacent structure.

[0015] Optionally, in the method for synchronously constructing the foundation pit and the adjacent structure outside the foundation pit, in S2, the process of synchronously excavating the soil layer in the first batch of blocks of all foundation pits to the bottom elevation line of the low-area raft foundation includes:

[0016] When the excavation depth of the soil layer in the first batch of blocks reaches the predetermined depth, it is necessary to increase diagonal bracing or add additional supports.

[0017] Optionally, in the method for synchronously constructing the foundation pit and the adjacent structure outside the foundation pit, in S4, the process of synchronously excavating the soil layer in the second batch of blocks of all foundation pits to the bottom elevation line of the low-area raft foundation includes:

[0018] When the excavation depth of the soil layer in the second batch of blocks reaches the predetermined depth, it is necessary to increase diagonal bracing or add additional supports.

[0019] In the method for synchronous construction of foundation pit and adjacent structures outside the foundation pit provided by the present invention, the method includes: S1: constructing low-zone pile foundation, enclosure and high-zone pile foundation according to design documents and construction plan; wherein the bearing layer of the high-zone pile foundation is selected below the bottom elevation line of the low-zone raft foundation; S2: slope outside the foundation pit, excavate the soil layer in the first batch of blocks of all foundation pits to the bottom elevation line of the low-zone raft foundation, and construct adjacent structures of the foundation pit at the same time, wherein the adjacent structures include: raft foundation, pile cap and columns; S3: form raft foundation in the first batch of blocks of all foundation pits; S4: excavate the soil layer in the second batch of blocks of all foundation pits to the bottom elevation line of the low-zone raft foundation, and construct adjacent superstructure of the foundation pit and basement structure of the first batch of blocks at the same time; wherein the basement structure of the first batch of blocks and the adjacent superstructure both include: columns, beams and plates. By setting the bearing layer of the pile foundation in the high area of ​​the foundation pit below the bottom of the raft foundation in the low area of ​​the foundation pit, and excavating the foundation pit in blocks, the synchronous construction of the foundation pit and the adjacent structures outside the foundation pit is achieved, which greatly speeds up the construction progress of the entire project and shortens the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The above and other objects, features and advantages of the present disclosure will become more apparent through a more detailed description of exemplary embodiments of the present disclosure in conjunction with the accompanying drawings, wherein like reference numerals generally represent like components throughout the exemplary embodiments of the present disclosure.

[0021] Figure 1 is a flow chart of a method for synchronously constructing a foundation pit and adjacent structures outside the foundation pit in one embodiment of the present invention;

[0022] Figure 2 is a schematic diagram of a pile foundation enclosure plane in one embodiment of the present invention;

[0023] Figure 3 is a schematic cross-sectional view of a pile foundation enclosure in one embodiment of the present invention;

[0024] Figure 4 It is a schematic plan view of adjacent structure foundation and foundation pit earth excavation in one embodiment of the present invention;

[0025] Figure 5 It is a schematic cross-sectional view of adjacent structure foundation and foundation pit earth excavation in one embodiment of the present invention;

[0026] Figure 6 It is a schematic plan view of the foundation pit adjacent to the upper structure and the foundation pit basement backbuilding in one embodiment of the present invention;

[0027] Figure 7 It is a schematic cross-sectional diagram of the foundation pit adjacent superstructure and the foundation pit basement backbuilding in one embodiment of the present invention.

[0028] In the figure:

[0029] 1- low area pile foundation; 2- enclosure; 3- low area raft foundation bottom elevation line; 4- high area pile foundation; 5- pile cap; 6- raft foundation; 7- column; 8- slope; 9- beam; 10- plate; 11- compartment joint;

[0030] S1-the first batch of blocks; S2-the second batch of blocks

[0031] Ln-predetermined length. DETAILED DESCRIPTION

[0032] The method for synchronous construction of a foundation pit and an adjacent structure outside the foundation pit proposed by the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the present invention will become clearer according to the following description and claims. It should be noted that the drawings are all in a very simplified form and are not in precise proportions, and are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention.

[0033] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0034] In the description of the invention, it is necessary to understand that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the invention.

[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0036] In the invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to the specific circumstances.

[0037] Please refer to Figure 1 , which is a schematic diagram of the structure of the method for synchronously constructing a foundation pit and adjacent structures outside the foundation pit according to the present invention. Figure 1 As shown, the method for synchronously constructing the foundation pit and the adjacent structure outside the foundation pit includes:

[0038] First, please refer to Figure 1 and Figure 2 , execute step S1, construct low-zone pile foundation 1, enclosure 2 and high-zone pile foundation 4 according to the design documents and construction plan; wherein the bearing layer of the high-zone pile foundation 4 is selected below the bottom elevation line 3 of the low-zone raft foundation; wherein the enclosure 2 is Larsen steel sheet pile, cast-in-place pile, sheet pile or underground continuous wall.

[0039] The process of constructing the high area pile foundation 4 includes:

[0040] A high-area pile foundation 4 of a predetermined length Ln is constructed below the bottom elevation line 3 of the low-area raft foundation (i.e., the red portion of the high-area pile foundation 4 below the bottom elevation line 3 of the low-area raft foundation in the figure). The bearing capacity of the high-area pile foundation 4 of the predetermined length Ln can meet the bearing requirements of the upper structure before the adjacent foundation pit is ±0.000 (i.e., the portion of the high-area pile foundation 4 located below the bottom elevation line 3 of the low-area raft foundation needs to meet the bearing capacity requirements), so as to ensure the stability and bearing capacity of the high-area pile foundation 4. It is understandable that when selecting the bearing layer of the high-area pile foundation, the physical properties of the soil layer, such as compressibility, strength and stability, etc., should be considered.

[0041] Next, please refer to Figure 3 and Figure 4 , execute step S2, slope the foundation pit 8, excavate the soil layer in the first batch of blocks S1 of all foundation pits to the bottom elevation line 3 of the low-level raft foundation, and construct the adjacent structures of the foundation pit at the same time, the adjacent structures include: raft foundation 6, pile cap 5 and column 7; specifically, the pile cap 5 is a single pile cap, a three-pile cap or a four-pile cap. In this embodiment, four pile caps are preferred, and the specific number and configuration of piles can be determined based on engineering requirements and geological conditions to ensure the stability and safety of the structure.

[0042] Preferably, the reinforcement of the pile cap 5 in the adjacent structure outside the construction pit is denser than the reinforcement of the raft foundation 6 in the adjacent structure.

[0043] Next, please refer to Figure 5 and Figure 6 , execute step S3 to form a raft foundation 6 in the first batch of blocks S1 of all foundation pits.

[0044] Next, please refer to Figure 5 and Figure 6 , execute step S4, excavate the soil layer in the second batch of blocks S2 of all foundation pits to the bottom elevation line 3 of the low-area raft foundation, and construct the adjacent superstructure of the foundation pit and the basement structure of the first batch of blocks S1 at the same time; wherein the basement structure of the first batch of blocks S1 and the adjacent superstructure both include: columns 7, beams 9 and slabs 10. The construction of the basement structure of the first batch of blocks S1 is specifically to build back the columns 7, beams 9 and slabs 10 of the basement structure.

[0045] Figure 4 and Figure 6 The dividing line between the first batch of blocks S1 and the second batch of blocks S2 is the compartment seam 11.

[0046] By setting the bearing layer of the pile foundation in the high area of ​​the foundation pit below the bottom of the raft foundation in the low area of ​​the foundation pit, and excavating the foundation pit in blocks, the foundation pit and the adjacent structures outside the foundation pit (adjacent structures and adjacent superstructures) are constructed simultaneously, which greatly speeds up the construction progress of the entire project and shortens the construction period.

[0047] Furthermore, in the execution of steps S2 and S4, the process involves synchronously excavating the soil layer in the first batch of blocks S1 and the second batch of blocks S2 of all foundation pits to the bottom elevation line 3 of the low-area raft foundation. If the excavation depth reaches the predetermined depth, it is necessary to consider adding diagonal braces or additional supports to ensure the stability and safety of the foundation pit wall, prevent soil collapse and deformation, and at the same time control the deformation and settlement of the foundation pit, prevent damage to surrounding buildings, and ensure the personal safety of construction workers.

[0048] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.

[0049] In summary, in the method for synchronous construction of a foundation pit and adjacent structures outside the foundation pit provided by the present invention, the bearing layer of the pile foundation in the high area of ​​the foundation pit is set below the bottom of the raft foundation of the low area foundation pit, and the foundation pit is excavated in blocks, thereby achieving synchronous construction of the foundation pit and adjacent structures outside the foundation pit, greatly accelerating the construction progress of the entire project and shortening the construction period.

[0050] The above description is only a description of the preferred embodiments of the present invention, and is not intended to limit the scope of the present invention. Any changes or modifications made by a person skilled in the art in the field of the present invention based on the above disclosure shall fall within the scope of protection of the claims.

Claims

1. A method for synchronous construction of a foundation pit and adjacent structures outside the foundation pit, characterized in that: The following steps are involved: S1: According to the design documents and the construction plan, construct the low-area pile foundation (1), the enclosure (2) and the high-area pile foundation (4); wherein the bearing layer of the high-area pile foundation (4) is selected below the bottom elevation line (3) of the low-area raft foundation; S2: slope the foundation pit (8), excavate the soil layer in the first batch of blocks (S1) of all foundation pits to the bottom elevation line of the low-level raft foundation (3), and construct the adjacent structures of the foundation pit at the same time, including: raft foundation (6), pile cap (5) and columns (7); S3: forming raft foundations (6) in the first batch of blocks (S1) of all foundation pits; S4: excavating the soil layer in the second batch of blocks (S2) of all foundation pits to the bottom elevation line (3) of the low-level raft foundation, and constructing the adjacent superstructure of the foundation pit and the basement structure of the first batch of blocks (S1) at the same time; wherein the basement structure of the first batch of blocks (S1) and the adjacent superstructure both include: columns (7), beams (9) and slabs (10).

2. The method for synchronously constructing a foundation pit and adjacent structures outside the foundation pit as claimed in claim 1, characterized in that: In S1, the enclosure (2) is Larsen steel sheet piles, cast-in-place piles, sheet piles or underground continuous walls.

3. The method for synchronously constructing a foundation pit and adjacent structures outside the foundation pit as claimed in claim 1, characterized in that: In S1, the process of constructing the high area pile foundation (4) includes: A high area pile foundation (4) of a predetermined length (Ln) is constructed below the bottom elevation line (3) of the low area raft foundation. The bearing capacity of the high area pile foundation (4) of the predetermined length (Ln) can meet the bearing requirements of the upper structure of the adjacent foundation pit before ±0.

000.

4. The method for synchronously constructing a foundation pit and adjacent structures outside the foundation pit as claimed in claim 1, characterized in that: In S2, the pile cap (5) is a single pile cap, a three-pile cap or a four-pile cap.

5. The method for synchronously constructing a foundation pit and adjacent structures outside the foundation pit as claimed in claim 1, characterized in that: In S2, the reinforcement of the pile cap (5) in the adjacent structure outside the construction pit is denser than the reinforcement of the raft foundation (6) in the adjacent structure.

6. The method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit according to any one of claims 1 to 5, characterized in that: In S2, the process of simultaneously excavating the soil layer in the first batch of blocks (S1) of all foundation pits to the bottom elevation line (3) of the low-level raft foundation includes: When the excavation depth of the soil layer in the first batch of blocks (S1) reaches a predetermined depth, it is necessary to increase diagonal bracing or add additional supports.

7. The method for synchronously constructing a foundation pit and an adjacent structure outside the foundation pit according to any one of claims 1 to 5, characterized in that: In S4, the process of simultaneously excavating the soil layer in the second batch of blocks (S2) of all foundation pits to the bottom elevation line (3) of the low-area raft foundation includes: When the excavation depth of the soil layer in the second batch of blocks (S2) reaches a predetermined depth, it is necessary to increase diagonal bracing or add additional supports.

Citation Information

Patent Citations

  • Construction method for excavating two-layer soil in advance in post-excavation area when bottom plate is completed in pre-excavation area