Construction method in shape of Chinese character'wang 'suitable for ascertaining trend of underground pipeline

Through the construction method of "Wangzi Method", manual excavation of trench exploration network is used to solve the destructive and cost-effective problems of underground pipeline exploration methods in traditional technology, and economical and rapid pipeline exploration and protection are achieved, suitable for underground Project construction.

CN118933025APending Publication Date: 2024-11-12THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410999877.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The methods for proving underground pipelines in traditional technology are very destructive, have long construction periods, high labor costs, and are not economical, making it difficult to effectively protect underground pipelines and meet urban renewal needs.

Method used

Using a construction method called "Wang's Character Method", by excavating longitudinal and horizontal trenches, using manual excavation tools such as shovels, small breaking hammers, and Luoyang shovels, forming a "Wang's Character trenches network to explore underground The pipeline is directed and protected when the pipeline is discovered to avoid large-scale excavation.

Benefits of technology

This method reduces labor costs by 60%, shortens construction period, reduces construction costs, and achieves accurate exploration and protection of underground pipelines, making it suitable for underground engineering construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933025A_ABST
    Figure CN118933025A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method shaped like a Chinese character'wang 'and suitable for ascertaining the trend of an underground pipeline. The construction method comprises the following steps that S1, a longitudinal exploring ditch is excavated; s2, a first transverse exploring ditch is excavated; s3, a second transverse exploring ditch is excavated; s4, excavating a third transverse exploring ditch; s5, detecting a pipeline; according to the method, the first transverse exploring ditch, the second transverse exploring ditch, the third transverse exploring ditch and the longitudinal exploring ditch form a Chinese character'wang ', so that the method is called as the'wang' exploring and digging method, compared with the prior art, large-range digging is not needed, meanwhile, the manufacturing cost is lower, the construction period is shorter, and the labor cost is saved by 60%.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a "Wangzi method" construction method suitable for finding the direction of underground pipelines. Background Art

[0002] The speed of urban renewal is very fast. In order to meet the daily needs of residents, each urban renewal requires the construction of new underground pipelines with various functions, especially the underground pipelines built in the 1970s and 1980s, whose directions are even more complicated. With the continuous development of the economy, the construction industry is booming, and large-scale underground engineering operations are needed. However, the protection of these pipelines has become a major problem that needs to be solved before the construction of underground projects. Then, the exploration and temporary protection of various pipelines has become the most prominent problem.

[0003] In traditional technology, the exploration of underground pipelines is carried out by large-scale excavation, which is highly destructive, has a long construction period, high labor costs, and is not economical. In order to solve the shortcomings of traditional technology, the inventor has developed a new construction method suitable for exploring the direction of underground pipelines after summarizing and studying. Summary of the invention

[0004] The present invention aims to provide a "Wangzi method" construction method suitable for finding the direction of underground pipelines in view of the deficiencies of the prior art, comprising the following steps: S1. Excavation of longitudinal trench: according to the need to explore the scope of underground space, draw the exploration scope line, draw a positioning line in the middle of the scope line, and excavate the longitudinal trench based on this positioning line; S2. Digging the first transverse trench: Sprinkle the first transverse trench positioning line with white lime in the vertical direction of the middle positioning line, and dig the trench manually; S3, digging a second transverse trench: Similarly, digging a second transverse trench, there is a gap between the first transverse trench and the second transverse trench; S4, digging the third transverse trench: Similarly, digging the third transverse trench, there is a gap between the second transverse trench and the third transverse trench; S5. Exploring existing pipelines: If existing pipelines are found buried underground during trench excavation, manual excavation will be carried out along the direction of the pipelines in the trench to find out their direction and protect them; S6. No existing pipelines are found in all the exploration trenches. If there are no existing pipelines within the burial depth of 1~2m in the entire exploration range, the construction of underground projects can be carried out.

[0005] Preferably, in step S1, the positioning line is formed by sprinkling white lime, and the longitudinal exploration channel is excavated by a shovel, a small demolition hammer, or a Luoyang shovel.

[0006] Preferably, in step S1, the longitudinal exploration trench has a width of 10 - 50 cm and a depth of generally 1 - 2 m.

[0007] Preferably, in step S2, the positioning line is formed by sprinkling white lime, and the first transverse exploration trench is excavated by manual excavation.

[0008] Preferably, in steps S3 and S4, the distance between the first transverse exploration trench and the second transverse exploration trench is 5 - 10 m, and the distance between the second transverse exploration trench and the third transverse exploration trench is 5 - 10 m.

[0009] Compared with the prior art, the beneficial effects of the present invention are as follows: the first, second, and third transverse exploration trenches of the present invention form the Chinese character 'Wang' with the longitudinal exploration trench, so it is called the 'Wang' character exploration method. Compared with the prior art, it does not require large-scale excavation, has lower cost and shorter construction period, and this method saves 60% of the labor cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] The drawings are used to provide a further understanding of the present invention, and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention, and do not constitute a limitation to the present invention. In the drawings: Figure 1 is a schematic structural diagram of the present invention In the figure: 1: longitudinal exploration trench; 2: first transverse exploration trench; 3: second transverse exploration trench; 4: third transverse exploration trench; 5: assumed water pipeline; 6: water pipeline; 7: assumed natural gas pipeline; 8: natural gas pipeline. DETAILED DESCRIPTION OF THE INVENTION

[0011] The technical solution of the present invention will be described in detail below with reference to the drawings, but the protection scope of the present invention is not limited to the embodiments.

[0012] A construction method applicable to exploring the underground pipeline alignment of the present invention includes the following steps: 1. Excavate the longitudinal exploration trench 1: According to the range of the underground space to be explored, draw the exploration range line. First, sprinkle a positioning line with white lime in the exact middle of the range line; excavate the longitudinal exploration trench along this positioning line, and select manual excavation tools such as shovels, small demolition hammers, and Luoyang shovels. The width of the longitudinal exploration trench should be 10 - 50 cm, and the depth is generally 1 - 2 m, so as to reduce the exploration workload.

[0013] 2. Excavate the first transverse exploration trench 2: Along the vertical direction of the middle positioning line, sprinkle the positioning line of the first transverse exploration trench with white lime, and excavate the trench by manual excavation.

[0014] 3. Excavate the second transverse exploration trench 3: Similarly, when excavating the second transverse exploration trench, considering that residential pipelines are generally laid in a straight line, to ensure the accuracy of underground pipeline detection, the distance between exploration trenches should not be too large, otherwise there may be undetected pipelines. Here, the distance between the first transverse exploration trench and the second transverse exploration trench is generally 5 - 10 m.

[0015] 4. Excavate the third transverse exploration trench 4: Similarly, when excavating the third transverse exploration trench, the distance between the third transverse exploration trenches is also 5 - 10 m.

[0016] 5. Detect pipelines: Assume that when excavating the exploration trenches, existing buried pipelines (assumed water pipeline 5 and assumed natural gas pipeline 7) are found, such as the water pipeline 6 in the longitudinal exploration trench and the natural gas pipeline 8 in the third transverse exploration trench as shown in the figure. Then, at this time, the manual excavation method should be adopted along the direction of the detected pipelines in the exploration trench to find out their directions and protect them to prevent damage during the engineering construction.

[0017] 6. Detect no pipelines: Assume that no existing pipelines are found in all the exploration trenches. Then, it can be concluded that there are no existing pipelines within the buried depth range of 1 - 2 m of the entire exploration area line, and the underground project construction can be carried out according to the plan.

[0018] Because the first, second, and third transverse exploration trenches and the longitudinal exploration trench form the Chinese character "Wang", it is thus called the "Wang" character exploration and excavation method.

[0019] As above, although the present invention has been shown and described with reference to specific preferred embodiments, it should not be construed as a limitation of the present invention itself. Various changes can be made in its form and details without departing from the spirit and scope of the present invention defined by the appended claims.

Claims

1. A "W-shaped" construction method suitable for finding the direction of underground pipelines, characterized in that: The steps include: S1. Excavation of longitudinal trench: according to the need to explore the scope of underground space, draw the exploration scope line, draw a positioning line in the middle of the scope line, and excavate the longitudinal trench based on this positioning line; S2. Digging the first transverse trench: Sprinkle the first transverse trench positioning line with white lime in the vertical direction of the middle positioning line, and dig the trench manually; S3, digging a second transverse trench: Similarly, digging a second transverse trench, there is a gap between the first transverse trench and the second transverse trench; S4, digging the third transverse trench: Similarly, digging the third transverse trench, there is a gap between the second transverse trench and the third transverse trench; S5. Exploring existing pipelines: If existing pipelines are found buried underground during trench excavation, manual excavation will be carried out along the direction of the pipelines in the trench to find out their direction and protect them; S6. No existing pipelines are found in all the exploration trenches. If there are no existing pipelines within the burial depth of 1~2m in the entire exploration range, the construction of underground projects can be carried out.

2. A "W-shaped" construction method suitable for finding the direction of underground pipelines according to claim 1, characterized in that: In step S1, the positioning line is formed by sprinkling white lime, and the longitudinal exploration channel is excavated by a shovel, a small demolition hammer, or a Luoyang shovel.

3. The "W-shaped" construction method for finding the direction of underground pipelines according to claim 1 is characterized in that: In step S1, the width of the longitudinal trench is 10-50 cm, and the depth is generally 1-2 m.

4. The "W-shaped" construction method for finding the direction of underground pipelines according to claim 1 is characterized in that: In step S2, the positioning line is formed by sprinkling white lime, and the first transverse exploration trench is excavated manually.

5. The "W-shaped" construction method for finding the direction of underground pipelines according to claim 1 is characterized in that: In step S3 and step S4, the distance between the first transverse trench and the second transverse trench is 5-10 m, and the distance between the second transverse trench and the third transverse trench is 5-10 m.

Citation Information

Patent Citations

  • Method for accurately detecting existing underground pipeline

    CN115185014A