Early soil backfilling construction method for garage roof with settlement post-cast strip not meeting sealing condition

By temporarily fixing steel support on the rear pouring belt of the garage roof and installing flexible waterproof sealing materials, the problem of flooding caused by rainfall in the plum rain season is solved, and the advance backfilling of the garage roof is achieved, the construction efficiency is improved and the steel support is reproducible. use.

CN118933027APending Publication Date: 2024-11-12SHANGHAI BAOYE BUILDING DECORATION CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411175412.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-26
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During construction, rainfall during the rainy season leads to waterlogging, and the unclosed pouring belt after settlement affects the waterproofing and backfill construction of the garage roof panel, and the traditional sealing method is time-consuming and cannot be reused.

Method used

By calculating the lateral pressure of the earth, selecting suitable steel plates and channel steel, temporarily fixing the steel support on the waterproof protective layer on both sides of the rear pouring belt, and filling the gap with flexible waterproof sealing materials, installing horizontal support and welding to achieve earthwork Backfilling in advance.

Benefits of technology

Improve construction efficiency, shorten construction time, and steel support is easy to disassemble and assemble, and can be reused, avoiding the waste of time and resources of traditional methods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933027A_ABST
    Figure CN118933027A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method for backfilling soil in advance on a garage roof under the condition that a settlement post-cast strip does not meet a closed condition, which comprises the following steps of: calculating the lateral pressure of earthwork according to the backfilling height and the reserved width of the post-cast strip in a drawing, and selecting proper steel plates and channel steel; temporarily fixing steel supports on the constructed waterproof protection layers on the two sides of the post-cast strip; a gap between every two adjacent steel supports is filled with a flexible waterproof sealing material; after the steel supports are in place, a horizontal diagonal brace is installed between the two oppositely-arranged steel supports, and the two opposite ends of the horizontal diagonal brace are welded to the two oppositely-arranged steel supports correspondingly; performing earthwork layered backfilling; compared with a traditional plugging method, the construction efficiency is improved, and the construction time is shortened; meanwhile, the steel support is convenient to disassemble and assemble and can be reused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a construction method for backfilling soil in advance on a garage roof when a post-cast zone does not meet a closing condition. Background Art

[0002] At present, during the construction process, during the rainy season, a large amount of rainwater will seep into the underground space through the pouring strip, causing waterlogging, which will cost a lot of manpower and material resources to clean up. This phenomenon will occur every time it rains. The pouring strip is not closed after settlement, which also affects the construction processes of garage roof waterproofing, waterproof protective layer, backfill soil, etc.

[0003] Due to the progress of on-site construction, the garage roof backfill needs to be carried out as soon as possible. However, since the concrete pouring time on both sides of the post-cast joint of the underground garage has not reached the age of 42 days, the post-cast joint needs to be sealed.

[0004] The traditional sealing method is to seal with bricks, and then waterproof the outside of the brick wall and then backfill the earth. The brick and stone masonry is heavy, the surface needs to be plastered, and the mortar needs to be cured for a period of time to reach strength. In addition, the bricks are removed later and cannot be reused. Summary of the invention

[0005] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a construction method for early backfilling of garage roof when the settlement post-cast zone does not meet the closing conditions. The advantage is that the construction efficiency can be improved and the construction time can be shortened. At the same time, the method is easy to disassemble and assemble and can be reused.

[0006] The above-mentioned invention object of the present invention is achieved through the following technical scheme: a construction method for backfilling the garage roof in advance when the post-casting zone does not meet the closing condition, comprising the following steps:

[0007] According to the backfill height and the width of the post-casting strip in the drawings, calculate the lateral pressure of the earthwork and select the appropriate types of steel plates and channel steels;

[0008] Temporarily fix the steel supports on the waterproof protective layers constructed on both sides of the post-cast strip; fill the gap between two adjacent steel supports with flexible waterproof sealing materials;

[0009] After the steel supports are in place, a horizontal brace is installed between the two oppositely disposed steel supports, and opposite ends of the horizontal brace are respectively welded to the two oppositely disposed steel supports;

[0010] After the installation of the horizontal braces is completed, the earth is backfilled in layers.

[0011] Preferably, the method for backfilling the roof of a garage in advance when the settlement post-cast strip does not meet the closing condition provided by the present invention, after calculating the lateral pressure of the earthwork according to the backfill height and the width of the post-cast strip in the drawing, and selecting the appropriate steel plate and channel steel, before temporarily fixing the steel support on the waterproof protective layer constructed on both sides of the post-cast strip, also includes:

[0012] Design the reinforcement method of the steel support and verify the resistance to lateral earth pressure;

[0013] The steel support is machined.

[0014] Preferably, the method for constructing a garage roof with early backfilling of soil when the settlement post-cast strip does not meet the closing conditions provided by the present invention, the steel support comprises a steel plate and a plurality of back ribs, a plurality of the back ribs are welded to the side of the steel plate facing the horizontal support, the plurality of back ribs are spaced apart along the extension direction of the steel plate, and a preset distance is spaced between each two adjacent back ribs.

[0015] Preferably, in the construction method for backfilling the garage roof in advance when the post-cast settlement strip does not meet the closing condition provided by the present invention, the preset distance ranges from 3m to 4m.

[0016] Preferably, in the construction method for backfilling the garage roof in advance when the settlement post-cast strip does not meet the closing conditions provided by the present invention, the horizontal brace adopts a first channel steel, the extension direction of the first channel steel is perpendicular to the steel plate, and the end of the first channel steel is welded to the back rib in the steel support.

[0017] Preferably, in the construction method for early backfilling of garage roof provided by the present invention when the settlement post-cast strip does not meet the closing conditions, the length of the first channel steel is greater than the length of the post-cast strip, and the difference between the length of the first channel steel and the length of the post-cast strip is a preset difference a.

[0018] Preferably, in the construction method for backfilling the garage roof in advance when the post-cast settlement strip does not meet the closing conditions provided by the present invention, the preset difference a ranges from 800 mm to 1000 mm.

[0019] Preferably, in the construction method for backfilling the garage roof in advance when the post-cast settlement strip does not meet the closing conditions provided by the present invention, the back rib adopts the second channel steel.

[0020] Preferably, in the construction method for backfilling the garage roof in advance when the post-cast settlement strip does not meet the closing conditions provided by the present invention, the model of the first channel steel is smaller than the model of the second channel steel.

[0021] Preferably, the method for constructing a garage roof with backfilling in advance when the settlement post-cast strip does not meet the closing condition provided by the present invention, wherein the steel support is temporarily fixed on the waterproof protective layer constructed on both sides of the post-cast strip, comprises:

[0022] Arrange a steel support positioning line on the side of the post-casting strip;

[0023] A flexible waterproof sealing material is laid on the waterproof protective layer on both sides of the post-cast strip, and the steel support is erected on the flexible waterproof sealing material to temporarily fix the steel support.

[0024] In summary, the beneficial technical effects of the present invention are as follows: the construction method for backfilling the roof of a garage in advance when the settlement post-cast strip does not meet the closing conditions provided in the present application includes the following steps: calculating the lateral pressure of the earth according to the backfill height and the width of the post-cast strip in the drawing, and selecting suitable steel plates and channel steels; temporarily fixing steel supports on the waterproof protective layer that has been constructed on both sides of the post-cast strip; filling the gap between two adjacent steel supports with flexible waterproof sealing materials; after the steel supports are in place, installing horizontal braces between the two oppositely arranged steel supports, and the opposite ends of the horizontal braces are respectively welded to the two oppositely arranged steel supports; backfilling the earth in layers; compared with traditional sealing methods, the construction efficiency is improved and the construction time is shortened; at the same time, the steel supports are easy to disassemble and assemble and can be reused. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a flow chart of a construction method for backfilling the garage roof in advance when the post-cast zone of settlement does not meet the closing conditions provided by an embodiment of the present invention.

[0026] Figure 2 It is a front view of the connection between the steel support and the horizontal brace in the construction method of the garage roof backfill in advance when the settlement post-cast zone does not meet the closing conditions provided by an embodiment of the present invention.

[0027] Figure 3 It is a side view of the connection between steel supports and horizontal braces in the construction method for early backfilling of garage roof in which the post-cast settlement strip does not meet the closing conditions provided by an embodiment of the present invention.

[0028] Figure 4 It is a top view of the connection between steel supports and horizontal braces in a construction method for early backfilling of garage roofs in which the post-cast settlement strip does not meet the closing conditions provided by an embodiment of the present invention.

[0029] In the figure, 1. Steel support; 10. Steel plate; 11. Back rib; 2. Horizontal bracing. DETAILED DESCRIPTION

[0030] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0031] Reference Figures 1 to 4 , a construction method for backfilling the top slab of a garage in advance when the post-casting zone does not meet the closing conditions disclosed by the present invention, comprises the following steps:

[0032] S101. Calculate the lateral pressure of the earthwork according to the backfill height and the width of the post-casting strip in the drawings, and select the appropriate types of steel plates 10 and channel steels.

[0033] Specifically, according to the backfill height of the garage roof and the width of the post-cast strip in the drawings, the lateral pressure of the earth is calculated, and the reasonable types of steel plates 10 and channel steels are selected.

[0034] S102. Temporarily fix steel supports 1 on the constructed waterproof protective layer on both sides of the post-cast zone;.

[0035] Among them, S102, temporarily fixing steel supports 1 on the waterproof protective layer constructed on both sides of the post-casting belt, including:

[0036] S1021. Lay out steel support 1 positioning line on the side of the post-cast zone.

[0037] S1022. Lay flexible waterproof sealing material on the waterproof protective layer on both sides of the post-cast strip, stand the steel support 1 on the flexible waterproof sealing material, and temporarily fix the steel support 1.

[0038] Specifically, the steel support 1 is hoisted onto the flexible waterproof sealing material by hoisting equipment, and the steel support 1 is temporarily fixed.

[0039] Furthermore, in this embodiment, after S101, calculating the lateral earth pressure according to the backfill height and the width of the post-cast strip in the drawing and selecting the appropriate steel plate 10 and channel steel, S102, before temporarily fixing the steel support 1 on the waterproof protective layer constructed on both sides of the post-cast strip, also includes: designing a reinforcement method for the steel support 1, verifying the resistance to the lateral earth pressure; and processing the steel support 1.

[0040] S103, filling the gap between two adjacent steel supports 1 with a flexible waterproof sealing material.

[0041] S104, after the steel support 1 is in place, a horizontal brace 2 is installed between two oppositely disposed steel supports 1, and opposite ends of the horizontal brace 2 are respectively welded to the two oppositely disposed steel supports 1.

[0042] Furthermore, in this embodiment, the steel support 1 includes a steel plate 10 and a plurality of back ribs 11. The steel plate 10 is welded with a plurality of back ribs 11 on one side facing the horizontal support 2. The plurality of back ribs 11 are arranged at intervals along the extension direction of the steel plate 10, and a preset distance is provided between each two adjacent back ribs 11.

[0043] The preset distance is in the range of 3m-4m. That is to say, a section of back ribs 11 is vertically welded at an interval of 3-4m between two adjacent back ribs 11 to form the vertical back ribs 11.

[0044] Furthermore, in the present embodiment, the horizontal brace 2 is made of a first channel steel, the extension direction of the first channel steel is perpendicular to the steel plate 10 , and the end of the first channel steel is welded to the back rib 11 in the steel support 1 .

[0045] Among them, according to the size of the post-cast strip on site, the length of the first channel steel is greater than the length of the post-cast strip, and the difference between the length of the first channel steel and the length of the post-cast strip is the preset difference a, and the range of the preset difference a is 800mm to 1000mm.

[0046] Furthermore, in this embodiment, the back rib 11 uses a second channel steel, wherein the model of the first channel steel is smaller than that of the second channel steel; such a configuration facilitates welding of the first channel steel and the second channel steel.

[0047] Specifically, the model of the first channel steel is one size smaller than the model of the second channel steel.

[0048] S105. After the installation of the horizontal brace 2 is completed, backfill the soil in layers.

[0049] It should be noted that it is prohibited to backfill the earth to the top of the steel support 1 at one time.

[0050] Among them, after the pouring of the post-cast strip (construction joint) is completed, the steel support 1 and the horizontal support 2 are hoisted out of the backfill soil as a whole by a lifting device, and then divided and dismantled. The specific process of the construction method of early backfilling of the garage roof when the settlement post-cast strip does not meet the closing conditions provided in this embodiment is: according to the backfill height of the garage roof backfill soil and the width of the post-cast strip in the drawing, the lateral pressure of the earth is calculated, and the reasonable type of steel plate 10 and channel steel are selected; the reinforcement method of the steel support 1 is designed, and the resistance to the lateral pressure of the earth is verified; the steel support 1 is processed, that is, the back rib 11 is welded on the side of the steel plate 10 facing the horizontal support 2; after the back rib 11 is welded, the steel plates 10 in the two steel supports 1 are respectively placed on the waterproof protective layer on both sides of the post-cast strip, and the steel A flexible waterproof sealing material is laid on the bottom end of the plate 10. After the steel plates 10 on both sides of the post-cast strip are positioned, the opposite ends of the horizontal brace 2 are respectively welded to the back ribs 11 in the two oppositely arranged steel supports 1; the vertical gap between the two adjacent steel plates 10 is filled with the same flexible waterproof sealing material to increase the sealing and waterproof effect; after the installation of the horizontal brace 2 welded to the steel supports 1 on both sides of the post-cast strip is completed, the garage roof on both sides is backfilled; after the post-cast strip is poured, the steel support 1 and the horizontal brace 2 are lifted out with lifting equipment and dismantled in a safe environment.

[0051] The present application provides a construction method for backfilling the roof of a garage in advance when the settlement post-cast strip does not meet the closing conditions, comprising the following steps: calculating the lateral pressure of the earth according to the backfill height and the width of the post-cast strip in the drawing, and selecting suitable steel plates 10 and channel steels; temporarily fixing the steel supports 1 on the waterproof protective layer that has been constructed on both sides of the post-cast strip; filling the gap between two adjacent steel supports 1 with flexible waterproof sealing materials; after the steel supports 1 are in place, installing horizontal braces 2 between the two oppositely arranged steel supports 1, and the opposite ends of the horizontal braces 2 are respectively welded to the two oppositely arranged steel supports 1; backfilling the earth in layers; compared with the traditional blocking method, the construction efficiency is improved and the construction time is shortened; at the same time, the steel supports 1 are easy to disassemble and assemble and can be reused.

[0052] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0053] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.

Claims

1. A construction method for backfilling the garage roof in advance when the post-casting belt does not meet the closing conditions. Features: The steps include: According to the backfill height and the width of the post-casting strip in the drawings, calculate the lateral pressure of the earthwork and select the appropriate types of steel plates and channel steels; Temporarily fix the steel support on the waterproof protective layer constructed on both sides of the post-casting belt; Filling the gap between two adjacent steel supports with a flexible waterproof sealing material; After the steel supports are in place, a horizontal brace is installed between the two oppositely disposed steel supports, and opposite ends of the horizontal brace are respectively welded to the two oppositely disposed steel supports; After the installation of the horizontal braces is completed, the earth is backfilled in layers.

2. The construction method for backfilling the garage roof in advance when the settlement post-casting zone does not meet the closing conditions according to claim 1, Features: After calculating the lateral earthwork pressure according to the backfill height and the width of the post-casting strip in the drawings and selecting the appropriate steel plate and channel steel, and before temporarily fixing the steel support on the waterproof protective layer constructed on both sides of the post-casting strip, the method also includes: Design the reinforcement method of the steel support and verify the resistance to lateral earth pressure; The steel support is machined.

3. The construction method for backfilling the garage roof in advance when the settlement post-cast zone does not meet the closing conditions according to any one of claims 1-2, Features: The steel support includes a steel plate and a plurality of back ribs. The steel plate is welded with a plurality of back ribs on one side facing the horizontal support. The plurality of back ribs are spaced apart along the extension direction of the steel plate, and a preset distance is spaced between each two adjacent back ribs.

4. The construction method for backfilling the garage roof in advance when the settlement post-cast zone does not meet the closing conditions according to claim 3, Features: The preset distance ranges from 3m to 4m.

5. The construction method for backfilling the garage roof in advance when the settlement post-casting zone does not meet the closing conditions according to claim 4, Features: The horizontal brace adopts a first channel steel, the extension direction of the first channel steel is perpendicular to the steel plate, and the end of the first channel steel is welded to the back rib in the steel support.

6. The construction method for backfilling the garage roof in advance when the settlement post-cast zone does not meet the closing conditions according to claim 5, Features: The length of the first channel steel is greater than the length of the post-cast strip, and the difference between the length of the first channel steel and the length of the post-cast strip is a preset difference a.

7. The method for backfilling the garage roof in advance when the settlement post-cast zone does not meet the closing conditions according to claim 6, Features: The preset difference a ranges from 800 mm to 1000 mm.

8. The construction method for backfilling the garage roof in advance when the settlement post-cast zone does not meet the closing conditions according to claim 5, Features: The back rib adopts the second channel steel.

9. The construction method for backfilling the garage roof in advance when the settlement post-cast zone does not meet the closing conditions according to claim 1, Features: The model of the first channel steel is smaller than the model of the second channel steel.

10. The construction method for backfilling the garage roof in advance when the post-cast zone does not meet the closing conditions according to claim 1, Features: The temporary fixing of the steel support on the waterproof protective layer constructed on both sides of the post-cast belt includes: Arrange a steel support positioning line on the side of the post-casting strip; A flexible waterproof sealing material is laid on the waterproof protective layer on both sides of the post-cast strip, and the steel support is erected on the flexible waterproof sealing material to temporarily fix the steel support.