Steel wire mesh ton bag soil two-way water retaining cofferdam with anti-scour slope toe and construction method

Through the combination of wire mesh frame, steel pipe columns, tons of soil and anti-slope foot, the problems of difficult and high cost in the construction of traditional cofferdams in the tidal area are solved, and stable and economical and effective water flow control under tidal reciprocating flow conditions are achieved. , suitable for rapid deployment and environment-constrained occasions.

CN118933038APending Publication Date: 2024-11-12SHANGHAI WATER CONSERVANCY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411275046.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional anti-impact facilities are difficult to construct in areas with frequent tide changes, costly, and poor adaptability to the environment, making it difficult to meet the needs of rapid deployment and flexibility, especially in the conditions of tidal reciprocating flow, which is difficult to effectively control the water flow.

Method used

Using components such as wire mesh frame, steel pipe column, tons of soil, silty clay and anti-slope foot, combined with limit steel pipes, a two-way waterproof cofferdam of steel mesh frame is formed, through the installation of steel mesh frame, The staggered seams of bag soil and the setting of anti-slope foots of anti-slope feet achieve the stability and anti-seepage effect of the cofferdam.

Benefits of technology

It provides a highly stable cofferdam structure under tidal reciprocating flow conditions, simplifies construction processes, reduces costs, and is suitable for rapid deployment and environmentally restricted occasions, which can effectively absorb and disperse the impact force of the water flow and prevent moisture penetration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933038A_ABST
    Figure CN118933038A_ABST
Patent Text Reader

Abstract

The invention relates to the field of hydraulic engineering, in particular to a steel wire mesh ton bag soil two-way water retaining cofferdam with an anti-scour slope toe and a construction method.The structural component comprises a cofferdam framework, ton bag soil, a middle anti-seepage body, the anti-scour slope toe and a limiting steel pipe; the small circular rings on the steel pipe cross beams are connected with the steel pipe stand columns, the steel pipe stand columns are buckled with the buckles at the ends of the steel wire net frames and the small circular rings on the steel pipe cross beams to form a peripheral structure of the cofferdam, ton bag soil is stacked on the inner sides of the two sets of steel wire net frames in a staggered joint mode, and the space between the ton bag soil is filled with silty clay to form a middle anti-seepage body. The anti-scour slope toe is arranged at the bottom of the outer side of the steel wire net frame, the limiting steel pipes penetrate through the large circular rings on the steel pipe cross beams, it is ensured that the limiting steel pipes can penetrate through the anti-scour slope toe and are embedded into soil, and the problems that under the existing tidal reciprocating flow condition, a traditional cofferdam facility is large in construction difficulty, high in cost, poor in environmental adaptability and large in rapid deployment difficulty are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of water conservancy projects, in particular to a wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot and a construction method. Background Art

[0002] In marine engineering and water conservancy construction, the reciprocating tidal flow poses a major challenge to the stability and safety of structures. Traditional anti-scouring facilities are mostly made of concrete or heavy stone structures.

[0003] Although these structures have a certain anti-scouring effect, they are difficult to construct and costly in areas with frequent tidal changes, and have poor adaptability to the environment. In particular, in engineering situations that require rapid deployment and high flexibility, existing technologies are difficult to meet actual needs. Traditional cofferdam structures also have limitations in bidirectional water retention, and it is difficult to simultaneously meet the water flow control requirements under tidal reciprocating flow conditions. Summary of the invention

[0004] The purpose of the present invention is to provide a wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot and a construction method, which is used to solve the problems of traditional cofferdam facilities under existing tidal reciprocating flow conditions, such as high construction difficulty, high cost, poor environmental adaptability and difficulty in rapid deployment.

[0005] To achieve the above-mentioned purpose, the present invention provides a wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot, comprising a cofferdam frame, ton bag soil, a middle anti-seepage body, an anti-scouring slope foot and a limiting steel pipe; The cofferdam skeleton includes a steel wire mesh frame, steel pipe columns and steel pipe cross beams. The steel wire mesh frame is provided with a plurality of concentric ring buckles at both vertical ends. The steel pipe columns vertically pass through the ring buckles, and the bottom ends are inserted into the soil for fixation. The steel pipe cross beams are welded with large and small rings, and the small rings are sleeved on the upper ends of the steel pipe columns. The ton bags of soil are located inside the two groups of cofferdam skeletons; The middle anti-seepage body is located between the ton bags of soil on both sides and includes silty clay; The anti-scouring slope foot is arranged at the outer bottom of the two groups of cofferdam frames, and the limiting steel pipe passes through the large circular ring, penetrates the anti-scouring slope foot and is embedded in the soil to realize stable limiting.

[0006] As a further solution of the present invention, the wire mesh frame includes a supporting profile and a steel wire mesh, and the supporting profile and the steel wire mesh are galvanized for corrosion protection.

[0007] As a further solution of the present invention, the inner diameter of the ring buckle is larger than the outer diameter of the steel pipe column, and the ring buckles on the sides of adjacent steel wire mesh frames are arranged alternately up and down.

[0008] As a further solution of the present invention, the large ring is located outside the small ring, the inner diameter of the large ring is larger than the outer diameter of the limiting steel pipe, and the inner diameter of the small ring is larger than the outer diameter of the steel pipe column.

[0009] As a further solution of the present invention, the ton bag soil comprises a ton bag, which is woven from polyester fibers and filled with original soil, and the ton bag is provided with a lifting lug.

[0010] As a further solution of the present invention, the ton bags of soil on both sides are stacked with staggered gaps.

[0011] As a further solution of the present invention, the anti-scouring slope foot includes geotube bags and ton bags of soil.

[0012] At the same time, the present invention also provides a construction method of a bidirectional water retaining cofferdam, which is applied to the above-mentioned wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot, comprising the following steps: At low tide, first install the wire mesh in place, align the concentricity of the ring buckles between adjacent wire meshes, insert the steel pipe column through the ring buckles at the end of the wire mesh and press it into the soil. The wire fence on the other side of the cofferdam is also erected in the same process. The same operation is continued until the designed length of the cofferdam is reached to form a stable skeleton structure. The small ring on the steel pipe cross beam is connected with the steel pipe column, and the steel pipe column is buckled with the ring buckle at the end of the wire mesh frame and the small ring on the steel pipe cross beam to form the outer structure of the cofferdam; Stack the ton bags of soil in two groups on the inside of the wire mesh frame in an staggered manner; Fill silty clay between the ton bags of soil to form a middle anti-seepage body; An anti-collision slope foot is provided at the bottom of the outer side of the wire mesh frame; Pass the limiting steel pipe through the large ring on the steel pipe beam to ensure that it can pass through the anti-collision slope foot and be embedded in the soil.

[0013] Compared with the prior art, the present invention provides a cofferdam structure that is highly stable under tidal reciprocating flow conditions through the combination of wire mesh frames and steel pipe columns and the use of limiting steel pipes. The specially designed anti-scouring slope foot can absorb and disperse the impact force of the water flow and protect the cofferdam from erosion. The middle anti-seepage body is composed of silty clay, which ensures the anti-seepage effect of the cofferdam and prevents the penetration of water. The simplified construction method and modular design make the production and installation of the cofferdam faster and shorten the construction period. Compared with traditional heavy materials, the use of ton bags of soil and ring-buckle wire mesh reduces the overall cost and provides a cost-effective solution. It is particularly suitable for tidal reciprocating flow environments and can cope with situations where construction time and site are limited. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1It is a schematic diagram of the overall structure of a bidirectional water-retaining cofferdam made of ring-lock wire mesh ton-bag soil with an anti-scouring slope foot under tidal reciprocating flow conditions.

[0015] Figure 2 The plan layout of a two-way water-retaining cofferdam of ring-locked wire mesh ton-bag soil with an anti-scouring slope foot under tidal reciprocating flow conditions.

[0016] Figure 3 This is the elevation view of the wire mesh frame.

[0017] Figure 4 This is a cross-sectional view of a wire mesh frame.

[0018] In the attached figure: 1-cofferdam frame, 2-ton bags of soil, 3-middle anti-seepage body, 4-anti-impedance slope foot, 5-limiting steel pipe, 6-wire mesh, 7-steel pipe column, 8-steel pipe beam, 9-ring buckle, 10-large ring, 11-small ring, 12-support profile, 13-wire mesh. DETAILED DESCRIPTION

[0019] The technical solution of the present invention is further described in detail below in conjunction with specific implementation methods.

[0020] like Figures 1 to 4 As shown, in an embodiment of the present invention, a wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot comprises a cofferdam frame 1, ton bag soil 2, a middle anti-seepage body 3, an anti-scouring slope foot 4 and a limiting steel pipe 5; The cofferdam skeleton 1 includes a steel wire mesh frame 6, a steel pipe column 7 and a steel pipe cross beam 8. The steel wire mesh frame 6 is provided with a plurality of concentric ring buckles 9 at both vertical ends. The steel pipe column 7 vertically passes through the ring buckles 9, and the bottom end is inserted into the soil for fixing. The steel pipe cross beam 8 is welded with a large circular ring 10 and a small circular ring 11, and the small circular ring 11 is sleeved on the upper end of the steel pipe column 7. The ton bags of soil 2 are located inside the two groups of cofferdam skeletons 1; The middle anti-seepage body 3 is located between the ton bags of soil 2 on both sides, and includes silty clay; The anti-scouring slope foot 4 is arranged at the outer bottom of the two groups of cofferdam frames 1, and the limiting steel pipe 5 passes through the large ring 10, penetrates the anti-scouring slope foot 4 and is embedded in the soil to achieve stable limiting.

[0021] like Figure 3 As shown, in the embodiment of the present invention, the wire mesh frame 6 includes a supporting profile 12 and a wire mesh 13, and the supporting profile 12 and the wire mesh 13 are galvanized for corrosion protection, the wire diameter of the wire mesh 13 is 4 mm, and the mesh size is 50 mm×50 mm.

[0022] like Figure 3As shown, in the embodiment of the present invention, the inner diameter of the ring buckle 9 is larger than the outer diameter of the steel pipe column 7, and the ring buckles 9 on the sides of adjacent wire mesh frames 6 are arranged alternately up and down. The inner diameter of the ring buckle 9 is 60mm, the wall thickness is 3mm, the length is 30mm, and the spacing is 500mm.

[0023] like Figure 1 and Figure 2 As shown, in the embodiment of the present invention, the large ring 10 is located outside the small ring 11, the inner diameter of the large ring 10 is larger than the outer diameter of the limiting steel pipe 5, and the inner diameter of the small ring 11 is larger than the outer diameter of the steel pipe column 7.

[0024] like Figure 1 and Figure 2 As shown, in an embodiment of the present invention, the ton bag soil 2 includes a ton bag, which is woven from polyester fiber and filled with undisturbed soil. The ton bag is provided with a lifting lug to meet the lifting strength requirements, and the specification is 1m*1m*1m (length*width*height), and it has salt resistance and durability.

[0025] like Figure 1 and Figure 2 As shown, in the embodiment of the present invention, the ton bags of soil 2 on both sides are staggered and stacked to form a staggered stacking pattern, which prolongs the path of water penetration, slows down the penetration speed, and improves the anti-seepage effect of the cofferdam.

[0026] like Figure 1 and Figure 2 As shown, in the embodiment of the present invention, the anti-scouring slope foot 4 includes geotextile tube bags and ton bags of soil 2. The anti-scouring slope foot 4 is constructed with geotextile tube bags or ton bags of soil 2, and its width on the outer river side is at least meters, and its width on the inner river side is at least 3 meters. A flexible protective structure with high durability and anti-scouring ability is formed, which effectively absorbs and disperses the impact force of water flow and reduces erosion on the slope foot.

[0027] At the same time, the present invention also provides a construction method of a bidirectional water retaining cofferdam, which is applied to the above-mentioned wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot, comprising the following steps: At low tide, first install the wire mesh frame 6 in place, align the concentricity of the ring buckles 9 between the adjacent wire mesh frames 6, insert the steel pipe column 7 through the ring buckles 9 at the end of the wire mesh frame 6 and press it into the soil, and the wire fence on the other side of the cofferdam also undergoes the same erection process, and the same operation is performed continuously until the designed length of the cofferdam is reached to form a stable skeleton structure; the small ring 11 on the steel pipe cross beam 8 is connected to the steel pipe column 7, and the steel pipe column 7 is buckled with the ring buckle 9 at the end of the wire mesh frame 6 and the small ring 11 on the steel pipe cross beam 8 to form the outer structure of the cofferdam; stagger the inner sides of the two groups of wire mesh frames 6 with ton bags of soil 2; fill the ton bags of soil 2 with silty clay to form a middle anti-seepage body 3; set an anti-scouring slope foot 4 at the bottom of the outer side of the wire mesh frame 6; pass the limiting steel pipe 5 through the large ring 10 on the steel pipe cross beam 8 to ensure that it can penetrate the anti-scouring slope foot 4 and embed into the soil; Specifically, the construction steps are as follows: Step 1: Site preparation: Clean the construction area, remove debris, level the site, and ensure that the construction environment meets the requirements.

[0028] Step 2: Survey and lay out: According to the design drawings and specification requirements, use surveying tools to calibrate the boundary lines and key control points of the cofferdam on site.

[0029] Step 3, cofferdam skeleton 1 construction: At low tide, first use the lifting equipment to install the wire mesh frame 6 in place, align the concentricity of the ring buckles 9 between the adjacent wire mesh frames 6, and then use the inserting machine to insert the steel pipe column 7 through the ring buckle 9 at the end of the wire mesh frame 6 and press it into the soil to ensure that the burial depth meets the design specification requirements. The wire fence on the other side of the cofferdam also undergoes the same erection process, and the same operation is performed continuously until the design length of the cofferdam is reached to form a stable skeleton structure. Finally, build the steel pipe crossbeam 8, and connect the small ring 11 on the steel pipe crossbeam 8 to the steel pipe column 7. The steel pipe column 7 is buckled with the ring buckle 9 at the end of the wire mesh frame 6 and the small ring 11 on the steel pipe crossbeam 8 to form the outer structure of the cofferdam.

[0030] Step 4, filling ton bags with soil 2: put the original soil into ton bags, use lifting equipment to lift the ton bags, and stack them in staggered positions on both sides of the inner and outer rivers to ensure the uniform distribution and stability of the ton bags of soil 2.

[0031] Step 5: Construction of the middle anti-seepage body 3: Fill silty clay between the ton bags of soil 2 to form the middle anti-seepage body 3 to prevent water penetration.

[0032] Step 6, setting of anti-scouring slope foot 4: anti-scouring slope foot 4 is set at the bottom of the inner and outer river sides of the cofferdam frame 1 to enhance the resistance to water flow impact. The anti-scouring slope foot 4 adopts geotextile tube bag or ton bag soil technology, and is filled with sand, gravel or soil and other materials to form a flexible protective structure with high durability and anti-scouring ability, which effectively absorbs and disperses the impact of water flow and reduces erosion of the slope foot.

[0033] Step 7, installation of the limiting steel pipe 5: pass the limiting steel pipe 5 through the large ring 10 on the steel pipe cross beam 8, ensure that it can pass through the anti-collision slope foot 4 and be embedded in the soil. The burial depth meets the requirements of the design specifications to achieve stable limiting.

[0034] In summary, the present invention provides a cofferdam structure that is highly stable under tidal reciprocating flow conditions through the combination of wire mesh frames 6 and steel pipe columns 7, as well as the use of limiting steel pipes 5. The specially designed anti-impact slope foot 4 can absorb and disperse the impact force of the water flow, protecting the cofferdam from erosion. The middle anti-seepage body 3 is composed of silty clay, which ensures the anti-seepage effect of the cofferdam and prevents the penetration of water. The simplified construction method and modular design make the production and installation of the cofferdam faster and shorten the construction period. Compared with traditional heavy materials, the use of ton bags of soil, ring buckles and wire mesh reduces the overall cost and provides a cost-effective solution, which is particularly suitable for tidal reciprocating flow environments and can cope with situations where construction time and site are limited.

[0035] The preferred embodiments of the present invention are described in detail above, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention.

Claims

1. A two-way water retaining cofferdam made of steel mesh ton bags with an anti-scouring slope foot. It is characterized in that It includes cofferdam frame, ton bags of soil, middle anti-seepage body, anti-scouring slope foot and limit steel pipe; The cofferdam skeleton includes a steel wire mesh frame, steel pipe columns and steel pipe cross beams. The steel wire mesh frame is provided with a plurality of concentric ring buckles at both vertical ends. The steel pipe columns vertically pass through the ring buckles, and the bottom ends are inserted into the soil for fixation. The steel pipe cross beams are welded with large and small rings, and the small rings are sleeved on the upper ends of the steel pipe columns. The ton bags of soil are located inside the two groups of cofferdam skeletons; The middle anti-seepage body is located between the ton bags of soil on both sides and includes silty clay; The anti-scouring slope foot is arranged at the outer bottom of the two groups of cofferdam frames, and the limiting steel pipe passes through the large circular ring, penetrates the anti-scouring slope foot and is embedded in the soil to realize stable limiting.

2. A wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot according to claim 1, It is characterized in that The wire mesh frame includes a supporting profile and a steel wire mesh, and the supporting profile and the steel wire mesh are galvanized for corrosion protection.

3. A wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot according to claim 1, It is characterized in that The inner diameter of the ring buckle is larger than the outer diameter of the steel pipe column, and the ring buckles on the sides of adjacent steel wire mesh frames are arranged alternately up and down.

4. A wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot according to claim 1, It is characterized in that The large circular ring is located outside the small circular ring, the inner diameter of the large circular ring is larger than the outer diameter of the limiting steel pipe, and the inner diameter of the small circular ring is larger than the outer diameter of the steel pipe column.

5. A wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot according to claim 1, It is characterized in that The ton bag soil comprises a ton bag, which is woven from polyester fibers and filled with original soil. The ton bag is provided with lifting ears.

6. A wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot according to claim 1, It is characterized in that The ton bags of soil on both sides are stacked with staggered gaps.

7. A wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot according to claim 1, It is characterized in that The anti-scouring slope foot includes geotube bags and ton bags of soil.

8. A construction method for a bidirectional water retaining cofferdam, It is characterized in that A wire mesh ton bag soil bidirectional water retaining cofferdam with an anti-scouring slope foot as described in any one of claims 1 to 7 comprises the following steps: At low tide, first install the wire mesh in place, align the concentricity of the ring buckles between adjacent wire meshes, insert the steel pipe column through the ring buckles at the end of the wire mesh and press it into the soil. The wire fence on the other side of the cofferdam is also erected in the same process. The same operation is continued until the designed length of the cofferdam is reached to form a stable skeleton structure. The small ring on the steel pipe cross beam is connected with the steel pipe column, and the steel pipe column is buckled with the ring buckle at the end of the wire mesh frame and the small ring on the steel pipe cross beam to form the outer structure of the cofferdam; Stack the ton bags of soil in two groups on the inside of the wire mesh frame in an staggered manner; Fill silty clay between the ton bags of soil to form a middle anti-seepage body; An anti-collision slope foot is provided at the bottom of the outer side of the wire mesh frame; Pass the limiting steel pipe through the large ring on the steel pipe beam to ensure that it can pass through the anti-collision slope foot and be embedded in the soil.