Deepwater bare rock foundation construction device and method
By using sliding components and plug-in components in deep-water bare rock steel trests to shrink reinforcement ribs, and using the bladder and water pump system to prevent water from flowing in, the bubble problem during concrete pouring is solved, and the firmness and construction efficiency of concrete are improved.
Patent Information
- Application Number
- CN202411195166.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-12
AI Technical Summary
During the concrete pouring process of existing deep-water bare rock steel trests, the reinforcement ribs are fixed to the outer wall of the steel pipe pile, causing concrete to collide with reinforcement ribs, resulting in air bubbles, affecting the durability and firmness of the concrete.
Sliding components and plug-in components are used to ensure that the reinforcement ribs shrink inside the steel pipe piles before concrete pouring, and avoid water from flowing into the steel sleeve box through the bladder and water pump system to ensure the concrete solidification environment.
It effectively avoids the generation of bubbles in concrete, improves the firmness and service life of concrete, ensures the fit between the steel case and the bare rock, and simplifies the construction process.
Smart Images

Figure CN118933053A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bridge construction, and relates to a deep-water bare rock foundation construction device and method. Background Art
[0002] Deepwater bare rock steel trestle is a steel trestle structure built in deep water areas, oceans or rivers, especially when the bedrock is exposed. This trestle structure plays an important role in logistics transportation because it can provide high-strength bearing capacity.
[0003] A Chinese patent document with publication number CN110409281B discloses a deep-water bare rock steel trestle, including a trestle and steel pipe piles supporting the trestle, wherein the steel pipe piles are arranged on the trestle piers; the steel pipe piles are provided with tips driven into the bare rock, steel casings are arranged around the steel pipe piles, and concrete trestle piers are cast in the steel casings. The steel pipe piles driven into the bare rock are used to form an integrated steel pipe frame through horizontal support and oblique support, the trestle piers are cast through the sinking steel casings, and the bottom of the steel pipe piles is sealed with concrete.
[0004] The disadvantage of the above-mentioned disclosed solution is that: since the reinforcing bars in the disclosed solution are fixedly installed on the outer wall of the steel pipe pile, when pouring concrete, the concrete will collide with multiple reinforcing bars during the pouring process, which will lead to an increase in bubbles in the concrete. The large number of bubbles will affect the durability of the concrete, making the concrete prone to cracking and splitting, shortening the service life of the concrete and reducing the firmness of the concrete. Summary of the invention
[0005] In order to solve the problems existing in the background technology, the present invention proposes a deep-water bare rock foundation construction device and method.
[0006] In order to achieve the above-mentioned purpose, the technical scheme adopted by the present invention is as follows: comprising steel pipe piles and steel casings, four steel pipe piles form a group, and two groups of steel pipe piles are provided; a steel casing is slidably sleeved on the outer side of each group of steel pipe piles; sliding components are fixedly installed on the inner wall of the steel casing at positions corresponding to the four steel pipe piles; The inner bottom end of the steel pipe pile is provided with a plug-in assembly; The plug-in assembly includes a slide plate; the slide plate is slidably installed inside the steel pipe pile; a slider is fixedly installed on the bottom surface of the slide plate; four connecting plates are arranged at the bottom end of the steel pipe pile; the four connecting plates are rectangular when in contact with each other; a plurality of reinforcing ribs are fixedly installed on the opposite surfaces of the four connecting plates; through holes are opened on the outer surface of the bottom end of the steel pipe pile at positions corresponding to the plurality of reinforcing ribs; the end of the reinforcing rib away from the connecting plate is slidably installed inside the through hole.
[0007] Preferably, the sliding assembly includes two fixing seats, both of which are fixedly mounted on the inner wall of the steel casing, and a roller is rotatably mounted between the two fixing seats, and the roller is slidably matched with the outer side of the steel pipe pile.
[0008] Preferably, a groove is formed at the bottom end of the steel casing; a capsule is fixedly installed inside the groove.
[0009] Preferably, a water pump is fixedly installed on one side of the top of the steel casing; a water pipe interface is fixedly connected to the input end of the water pump; a second drain pipe is fixedly connected to the output end of the water pump; one end of the second drain pipe away from the water pump is fixedly connected to the bladder body; the second drain pipe is communicated with the interior of the bladder body.
[0010] A first drain pipe is fixedly connected to the outer surface of the steel casing at a position corresponding to the bladder body, and the first drain pipe is communicated with the interior of the bladder body; a pressure relief valve is fixedly installed on the first drain pipe; and the bottom end of the bladder body extends out of the interior of the groove.
[0011] Preferably, the bottom end of the steel pipe pile is conical; the top end of the steel pipe pile is open.
[0012] Preferably, the bottom end of the slider is in the shape of a quadrangular pyramid; the top ends of the four connecting plates are all in the shape of arcs; and the top ends of the four connecting plates are in sliding cooperation with the bottom end of the slider.
[0013] Preferably, a truss is fixedly connected to the top of two steel pipe piles at adjacent positions; a trestle bracket is fixedly installed on the top of the two groups of steel pipe piles, and a trestle is fixedly installed on the top of the two trestle brackets.
[0014] The deep-water bare rock foundation construction method includes the following steps: S1. Install steel pipe piles. Use external equipment to drive each group of steel pipe piles into the bare rock, and make the top surfaces of the steel pipe piles at the same level.
[0015] S2. Install the steel casing, and use external lifting equipment to set the steel casing on the outside of a group of steel pipe piles, so that the four rollers on the inner wall of the steel casing correspond to the four steel pipe piles. After the steel casing contacts the surface of the bare rock, start the water pump, use the expansion of the bladder to fill the low-lying areas on the surface of the bare rock, and pump out the water inside the steel casing.
[0016] S3. Filling concrete: fill the steel casing with concrete. After filling, extend the reinforcement into the concrete. When the concrete solidifies, install the truss, take out the steel casing, and then install the trestle bracket and the trestle.
[0017] Compared with the prior art, the present invention has the following beneficial effects: 1. The deep-water bare rock foundation construction device is provided with a slider, a reinforcing bar, a through hole, a connecting plate and a slide plate. When pouring concrete, the reinforcing bar shrinks inside the steel pipe pile; when the concrete is poured but not solidified, the reinforcing bar extends into the concrete, avoiding bubbles generated by the collision between the concrete and the reinforcing bar during the concrete pouring process, thereby improving the firmness of the concrete.
[0018] 2. The deep-water bare rock foundation construction device is provided with a bladder, a first drainage pipe, a water pump and a second drainage pipe. Water is injected into the bladder through the water pump to expand the bladder, so that the bladder is completely fitted with the surface of the bare rock, thereby preventing water from flowing into the steel casing and facilitating the solidification of concrete.
[0019] 3. The deep-water bare rock foundation construction device is provided with a fixed seat and rollers, so that when the steel casing is lowered, the rollers will roll along the outer wall of the steel pipe pile, which is convenient for the installation of the steel casing. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the position of the water pump in the present invention; Figure 3 The present invention Figure 2 A magnified schematic diagram of the middle part; Figure 4 It is a schematic diagram showing the position of the slider of the present invention; Figure 5 The present invention Figure 4 The enlarged schematic diagram of the middle B part; Figure 6 is a schematic diagram of the position of the second drain pipe of the present invention; Figure 7 The present invention Figure 6 Schematic diagram of the enlarged view of the middle C part; Figure 8 It is a schematic diagram of the shape of the slider of the present invention; Fig. 9 It is a schematic diagram of the shape of the connecting plate of the present invention.
[0021] In the figure: 1. trestle; 2. trestle support; 3. steel pipe pile; 4. truss; 5. fixed seat; 6. steel casing; 7. bladder; 8. first drain pipe; 9. water pump; 10. water pipe interface; 11. roller; 12. slider; 13. reinforcement rib; 14. through hole; 15. connecting plate; 16. second drain pipe; 17. groove; 18. pressure relief valve; 19. slide plate. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] like Figure 1-Figure 9 As shown, the technical solution adopted by the present invention is as follows: a deep-water bare rock foundation construction device includes steel pipe piles 3 and steel casings 6, four steel pipe piles 3 form a group, and two groups of steel pipe piles 3 are provided; the outer side of each group of steel pipe piles 3 is slidably sleeved with a steel casing 6.
[0024] It should be noted that the height of the steel casing 6 is greater than the depth of the water; after the steel casing 6 is stabilized on the upper surface of the bare rock, the top of the steel casing 6 is higher than the water surface.
[0025] Sliding components are fixedly installed at positions corresponding to the four steel pipe piles 3 on the inner wall of the steel casing 6 .
[0026] Furthermore, the sliding assembly includes two fixing seats 5 , both of which are fixedly mounted on the inner wall of the steel casing 6 , and a roller 11 is rotatably mounted between the two fixing seats 5 , and the roller 11 is slidably matched with the outer side of the steel pipe pile 3 .
[0027] A groove 17 is formed at the bottom of the steel casing 6 ; the capsule 7 is fixedly installed inside the groove 17 .
[0028] It should be noted that the bladder 7 is made of thermoplastic polyurethane; after water is injected, it can expand rapidly. While having softness and elasticity, it also has the characteristics of wear resistance and tear resistance. After water is injected, due to the self-gravity of the steel casing 6, the bladder 7 expands and is squeezed, thereby filling the uneven areas of the bare rock surface, preventing water from entering the interior of the steel casing 6 from the gap between the bottom of the steel casing 6 and the bare rock surface.
[0029] A water pump 9 is fixedly installed on one side of the top of the steel casing 6; a water pipe interface 10 is fixedly connected to the input end of the water pump 9; a second drain pipe 16 is fixedly connected to the output end of the water pump 9; the end of the second drain pipe 16 away from the water pump 9 is fixedly connected to the sac 7; the second drain pipe 16 is communicated with the interior of the sac 7; a first drain pipe 8 is fixedly connected to the outer surface of the steel casing 6 at a position corresponding to the sac 7, and the first drain pipe 8 is communicated with the interior of the sac 7; a pressure relief valve 18 is fixedly installed on the first drain pipe 8; the bottom end of the sac 7 extends out of the interior of the groove 17.
[0030] Furthermore, the bottom end of the steel pipe pile 3 is conical; the conical end is convenient for insertion into bare rock; the top of the steel pipe pile 3 is open; and a plug-in assembly is provided at the bottom of the steel pipe pile 3 .
[0031] Furthermore, the plug-in assembly includes a slide plate 19; the slide plate 19 is sealed and slidably installed inside the steel pipe pile 3; a slider 12 is fixedly installed on the bottom surface of the slide plate 19; and the bottom end of the slider 12 is in the shape of a quadrangular pyramid.
[0032] Furthermore, four connecting plates 15 are provided at the inner bottom end of the steel pipe pile 3; the four connecting plates 15 are in a rectangular shape when in contact with each other; the top ends of the four connecting plates 15 are all arc-shaped; the top ends of the four connecting plates 15 are slidably matched with the bottom end of the slider 12; and a plurality of reinforcing ribs 13 are fixedly installed on the opposite surfaces of the four connecting plates 15.
[0033] Furthermore, through holes 14 are provided on the outer surface of the bottom end of the steel pipe pile 3 at positions corresponding to the plurality of reinforcing ribs 13 ; and one end of the reinforcing rib 13 away from the connecting plate 15 is slidably mounted inside the through hole 14 .
[0034] It should be noted that the reinforcing ribs 13 have a certain friction force in the through holes 14 , and in the absence of external force, the reinforcing ribs 13 will not slide in the through holes 14 .
[0035] By pouring concrete first and inserting the reinforcing bar 13 into the concrete before the concrete solidifies, it is avoided that during the concrete pouring process, a large number of bubbles are generated in the concrete due to the influence of the reinforcing bar 13, thereby affecting the firmness of the concrete.
[0036] Furthermore, a truss 4 is fixedly connected to the top of two steel pipe piles 3 at adjacent positions; a trestle bracket 2 is fixedly installed on the top of the two groups of steel pipe piles 3 , and a trestle 1 is fixedly installed on the top of the two trestle brackets 2 .
[0037] Working principle: During use, due to the uneven surface of the bare rock, the depth of each steel pipe pile 3 driven into the bare rock layer is different. It is necessary to measure the depth of each steel pipe pile 3 extending into the bare rock layer through external equipment. After the measurement is completed, the steel pipe pile 3 is driven into the bare rock layer through the external equipment, and the top surface of the steel pipe pile 3 is at the same horizontal plane; The steel casing 6 is hoisted above the steel pipe pile 3 by external equipment, such as a crane, and each roller 11 is respectively aligned with the steel pipe pile 3, and then the steel casing 6 is lowered. During the lowering process of the steel casing 6, the roller 11 rolls along the outer wall of the steel pipe pile 3, and under the restriction of the four steel pipe piles 3, the steel casing 6 will not tilt during the lowering process.
[0038] When the bottom surface of one side of the steel casing 6 drops to contact with the bare rock, the steel casing 6 stops descending. Due to the uneven surface of the bare rock, the bottom surface of the steel casing 6 cannot completely fit with the surface of the bare rock. At this time, an external water pipe is connected to the water pipe interface 10, and the other end of the external water pipe is placed in the water inside the steel casing 6; then the water pump 9 is started, so that the water in the steel casing 6 is pumped into the bladder 7 through the external water pipe, the water pump 9, and the second drain pipe 16, and the bladder 7 expands. When the bladder 7 expands to completely fit with the low-lying part of the bare rock, as the water in the bladder 7 is continuously pumped in, the pressure relief valve 18 will automatically open. At this time, the water in the steel casing 6 will be discharged from the steel casing 6 through the external water pipe, the water pump 9, the second drain pipe 16, and the first drain pipe 8 until the water in the steel casing 6 is completely discharged, and the pressure relief valve 18 and the water pump 9 are closed.
[0039] Then, concrete can be poured in the steel casing 6. After the concrete pouring is completed (the concrete has not solidified at this time), gas is injected into the steel pipe pile 3 through an external air pump, so that the air pressure in the steel pipe pile 3 increases, and then the slide plate 19 moves downward, and the slide plate 19 drives the slider 12 to move downward, so that the bottom end of the slider 12 pushes the four connecting plates 15 toward the inner wall of the steel pipe pile 3, and the connecting plates 15 drive the reinforcing ribs 13 to pass through the corresponding through holes and extend into the concrete.
[0040] When the concrete solidifies, the truss 4 can be fixedly connected between every two steel pipe piles 3, then the steel casing 6 can be taken out, after which the trestle support 2 is fixedly installed on the steel pipe piles 3, and finally the trestle 1 is installed on the trestle support 2.
[0041] The deep-water bare rock foundation construction method includes the following steps: S1. Install the steel pipe piles 3. Drive each group of steel pipe piles 3 into the bare rock using external equipment, and make the top surfaces of the steel pipe piles 3 be at the same level.
[0042] S2. Install the steel casing 6, and use external lifting equipment to set the steel casing 6 on the outside of a group of steel pipe piles 3, so that the four rollers 11 on the inner wall of the steel casing 6 correspond to the four steel pipe piles 3. After the steel casing 6 contacts the surface of the bare rock, start the water pump 9, use the expansion of the bladder 7 to fill the low-lying areas of the bare rock surface, and pump out the water inside the steel casing 6.
[0043] S3. Filling concrete: Fill the steel casing 6 with concrete. After filling, extend the reinforcement 13 into the concrete. When the concrete solidifies, install the truss 4, remove the steel casing 6, and then install the trestle bracket 2 and the trestle 1.
[0044] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A deep-water bare rock foundation construction device, characterized in that: The invention comprises steel pipe piles (3) and a steel casing (6), wherein the steel pipe piles (3) are arranged in two groups; four steel pipe piles (3) form one group, and the outer side of each group of steel pipe piles (3) is slidably sleeved with a steel casing (6); and sliding components are fixedly installed at positions corresponding to the four steel pipe piles (3) on the inner wall of the steel casing (6); The inner bottom end of each steel pipe pile (3) is provided with a plug-in assembly; The plug-in assembly comprises a slide plate (19); the slide plate (19) is slidably mounted inside the steel pipe pile (3); a slider (12) is fixedly mounted on the bottom surface of the slide plate (19); four connecting plates (15) are arranged at the bottom end of the steel pipe pile (3); the four connecting plates (15) are in a rectangular shape when in contact with each other; a plurality of reinforcing ribs (13) are fixedly mounted on the opposite surfaces of the four connecting plates (15); through holes (14) are provided on the outer surface of the bottom end of the steel pipe pile (3) at positions corresponding to the plurality of reinforcing ribs (13); and one end of the reinforcing rib (13) away from the connecting plate (15) is slidably mounted inside the through hole (14) in correspondence.
2. The deep-water bare rock foundation construction device according to claim 1 is characterized in that: The sliding assembly comprises two fixed seats (5), both of which are fixedly mounted on the inner wall of the steel casing (6), a roller (11) is rotatably mounted between the two fixed seats (5), and the roller (11) is slidably matched with the outer side of the steel pipe pile (3).
3. The deep-water bare rock foundation construction device according to claim 1 is characterized in that: A groove (17) is formed at the bottom end of the steel casing (6); a capsule (7) is fixedly mounted inside the groove (17).
4. The deep-water bare rock foundation construction device according to claim 3 is characterized by: A water pump (9) is fixedly mounted on one side of the top end of the steel casing (6); a water pipe interface (10) is fixedly connected to the input end of the water pump (9); a second drainage pipe (16) is fixedly connected to the output end of the water pump (9); an end of the second drainage pipe (16) away from the water pump (9) is fixedly connected to the capsule (7); the second drainage pipe (16) is communicated with the interior of the capsule (7); a first drainage pipe (8) is fixedly connected to the outer surface of the steel casing (6) at a position corresponding to the capsule (7), and the first drainage pipe (8) is communicated with the interior of the capsule (7); a pressure relief valve (18) is fixedly mounted on the first drainage pipe (8); and the bottom end of the capsule (7) extends out of the interior of the groove (17).
5. The deep-water bare rock foundation construction device according to claim 1, characterized in that: The bottom end of the steel pipe pile (3) is conical; the top end of the steel pipe pile (3) is open.
6. The deep-water bare rock foundation construction device according to claim 1, characterized in that: The bottom end of the slider (12) is in the shape of a quadrangular pyramid; the top ends of the four connecting plates (15) are all in the shape of arcs; and the top ends of the four connecting plates (15) are in sliding cooperation with the bottom end of the slider (12).
7. The deep-water bare rock foundation construction device according to claim 1, characterized in that: A truss (4) is fixedly connected to the top of each of the two steel pipe piles (3) at adjacent positions; a trestle bracket (2) is fixedly mounted on the top of each of the two groups of steel pipe piles (3); and a trestle (1) is fixedly mounted on the top of each of the two trestle brackets (2).
8. A deep-water bare rock foundation construction method, characterized by: Using the deep-water bare rock foundation construction device according to any one of claims 1 to 7 comprises the following steps: S1. Installing steel pipe piles (3), driving each set of steel pipe piles (3) into the bare rock using external equipment, and making the top surface of the steel pipe piles (3) at the same horizontal plane; S2. Install the steel casing (6), and use external lifting equipment to set the steel casing (6) on the outside of a group of steel pipe piles (3), so that the four rollers (11) on the inner wall of the steel casing (6) correspond to the four steel pipe piles (3). After the steel casing (6) contacts the surface of the bare rock, start the water pump (9), use the expansion of the bladder (7) to fill the low-lying areas of the bare rock surface, and pump out the water inside the steel casing (6); S3. Concrete is poured into the steel casing (6). After the concrete is poured, the reinforcing bar (13) is extended into the concrete. When the concrete solidifies, the truss (4) is installed, the steel casing (6) is removed, and then the trestle bracket (2) and the trestle (1) are installed.