Offshore composite structure single pile and construction method thereof

By designing a monopile with a composite offshore structure, and utilizing the combination of peripheral piles and core piles, as well as the flushing and pumping technology of the pile driving components, the problems of soil disturbance and marine water quality impact under complex geological conditions in offshore wind power monopile foundations have been solved, achieving structural stability and environmental protection.

CN118933060APending Publication Date: 2024-11-12HUANENG RUDONG BAXIANJIAO OFFSHORE WIND POWER GENERATION CO LTD +2
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411231843.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-04
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

When driving piles for offshore wind power monopile foundations in silty soil and soft silty clay foundations, the soil is greatly disturbed, and grouting can easily cause serious impacts on marine water quality.

Method used

The marine composite structure monopile is adopted, including peripheral pile foundations and core piles. The pile driving components are used for flushing and pumping to form mud, which is then pumped away to reduce disturbance to the soil. Grouting is used to fill the mud to enhance the structural stability and bearing capacity.

Benefits of technology

It effectively disperses the axial and circumferential loads of monopile foundations, improves structural stability, reduces the impact on marine water quality, and adapts to complex geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933060A_ABST
    Figure CN118933060A_ABST
Patent Text Reader

Abstract

The invention provides an offshore combined structure single pile and a construction method thereof.The offshore combined structure single pile comprises a peripheral pile foundation, a single pile foundation and a pile sinking assembly, the peripheral pile foundation comprises a plurality of peripheral piles and a core pile, the peripheral piles are sequentially connected in the circumferential direction of the core pile and connected with the core pile, and the single pile foundation comprises a plurality of single piles; the axial direction of the peripheral pile is parallel to the axial direction of the core pile, the single-pile foundation is arranged in a central cavity of the core pile, a gap is formed between the outer peripheral wall of the single-pile foundation and the inner peripheral wall of the core pile, and the pile sinking assembly comprises a first flushing pipeline, a first water pumping pipeline, a second flushing pipeline and a second water pumping pipeline. The first flushing pipeline and the first water pumping pipeline are used for conducting flushing and mud pumping operation on surrounding piles, and the second flushing pipeline and the second water pumping pipeline are used for conducting flushing and mud pumping operation on a single-pile foundation. The offshore combined structure single pile is wide in application range, small in disturbance to soil and small in influence on ocean water quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pile foundations, and in particular to an offshore composite structure single pile and a construction method thereof. Background Art

[0002] Compared with traditional fossil fuels, wind energy is clean, low-cost, has a wide range of development, is safe, and has inexhaustible energy. Compared with onshore wind power, offshore wind power has the advantages of high wind speed, low turbulence, and does not occupy arable land.

[0003] In the related technologies, offshore wind power foundations mostly use single pile foundations, which are simple in design and mature in installation technology. However, as the geological conditions of offshore wind farms become more complicated, the driving of single pile foundations in silty soil, soft silty clay and other foundations will cause great disturbance to the soil, and the subsequent grouting will easily cause serious impact on the ocean water quality. Summary of the invention

[0004] The present invention aims to solve one of the technical problems in the related art at least to a certain extent. To this end, an embodiment of the present invention provides an offshore composite structure monopile, which has a wide range of applications, little disturbance to the soil, and reduces the impact on marine water quality.

[0005] The offshore composite structure monopile of the embodiment of the present invention comprises:

[0006] A peripheral pile foundation, wherein the peripheral pile foundation comprises peripheral piles and core piles, wherein the peripheral piles are multiple, the multiple peripheral piles are sequentially connected along the circumference of the core piles, and the peripheral piles are connected to the core piles, and the axial direction of the peripheral piles is parallel to the axial direction of the core piles;

[0007] A single pile foundation, wherein the single pile foundation is placed in the central cavity of the core pile, and a gap is provided between the outer peripheral wall of the single pile foundation and the inner peripheral wall of the core pile;

[0008] A pile driving assembly, the pile driving assembly comprising a first flushing water pipeline, a first pumping water pipeline, a second flushing water pipeline and a second pumping water pipeline, wherein the first end of the first flushing water pipeline is connected to a water pump, and the second end of the first flushing water pipeline is placed in the cavity of the peripheral pile, the first end of the first pumping water pipeline is connected to a mud pump, and the second end of the first pumping water pipeline is placed in the cavity of the peripheral pile,

[0009] The first end of the second flushing pipeline is connected to the water pump, and the second end of the second flushing pipeline is placed in the cavity of the single pile foundation. The first end of the second pumping pipeline is connected to the mud pump, and the second end of the second pumping pipeline is placed in the cavity of the single pile foundation.

[0010] The offshore composite structure single pile of the embodiment of the present invention uses a combination of multiple peripheral piles and a core pile as the pile group of the single pile foundation, so that the axial and circumferential loads of the single pile foundation are more dispersed, thereby enhancing the stability of the entire structure. The space inside the pile is flushed with water, so that the soil inside the pile is beaten into mud, and the mud is pumped away using a pumping pipeline to facilitate the subsequent grouting filling, which not only ensures the bearing capacity of the entire pile foundation, but also reduces the disturbance to the soil outside the pile, reduces the impact on the ocean water quality, and can adapt to more complex geology.

[0011] In some embodiments, the offshore composite structure single pile of the embodiment of the present invention also includes a top cover, which is used to seal the upper port of the peripheral pile, the second end of the first flushing pipeline passes through the top cover and is placed in the cavity of the peripheral pile, and the second end of the first pumping pipeline passes through the top cover and is placed in the cavity of the peripheral pile.

[0012] In some embodiments, the first flushing pipeline includes a first main pipeline, a first branch pipeline and a first secondary pipeline, the first main pipeline is connected to a water pump, there are multiple first secondary pipelines, and the multiple first secondary pipelines are arranged at circumferential intervals along the center line of the first main pipeline. The first secondary pipeline is connected to the first main pipeline through the first branch pipeline, and the extension direction of the first branch pipeline is consistent with the extension direction of the peripheral piles.

[0013] In some embodiments, the plurality of first branch pipes are divided into a plurality of first branch pipe groups, one first branch pipe group includes a plurality of first branch pipes, and in one first branch pipe group, two adjacent first branch pipes are connected via the first branch pipe.

[0014] In some embodiments, the wall of the first pipeline is provided with openings, and the openings are multiple, and the multiple openings are arranged at intervals along the extension direction of the first pipeline.

[0015] In some embodiments, the first flushing pipeline further includes a first extension tube, there are multiple first extension tubes, the multiple first extension tubes correspond one-to-one to the multiple openings, the first end of the first extension tube is connected to the opening, and the second end of the first extension tube extends toward the direction of the first main pipeline.

[0016] In some embodiments, an included angle is formed between the axial direction of the first extension tube and the axial direction of the first pipeline.

[0017] In some embodiments, the second flushing pipeline includes a second main pipeline, a second branch pipeline and a secondary pipeline, the second main pipeline is connected to a water pump, there are multiple secondary pipelines, and the multiple secondary pipelines are arranged at circumferential intervals along the center line of the second main pipeline. The secondary pipeline is connected to the second main pipeline through the second branch pipeline, and the extension direction of the second branch pipeline is consistent with the extension direction of the single pile foundation.

[0018] The construction method of the offshore composite structure monopile according to the embodiment of the present invention comprises the following steps:

[0019] S1: Transport the surrounding pile foundation to the designated location;

[0020] S2: Place the perimeter pile foundation and pump out the space within the perimeter piles;

[0021] S3: stop pumping and perform flushing operations;

[0022] S4: After the soil in the cavity of the surrounding piles is stirred into mud, the water flushing is stopped and the mud pumping operation is carried out;

[0023] S5: Repeat steps S3 and S4 until the surrounding pile foundation sinks to a preset depth;

[0024] S6: Install the monopile foundation;

[0025] S7: flushing and draining mud from the cavity of the monopile foundation;

[0026] S8: After suspending water flushing and mud pumping, pile driving is carried out for the single pile foundation;

[0027] S9: Repeat steps S7 and S8 until the monopile foundation sinks to a preset depth;

[0028] S10: Grouting is performed into the surrounding piles and single pile foundation.

[0029] In some embodiments, the construction method of the offshore composite structure single pile of the embodiment of the present invention further includes the following step: grouting into the gap between the single pile foundation and the core pile. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a structural schematic diagram of an offshore composite structure single pile according to an embodiment of the present invention.

[0031] Figure 2 1 is a schematic top view of a single offshore composite structure pile according to an embodiment of the present invention.

[0032] Figure 3 It is a schematic diagram of the top view of the peripheral piles of the offshore composite structure single pile according to an embodiment of the present invention.

[0033] Figure 4It is a schematic diagram of the internal structure of the peripheral piles of the offshore composite structure single pile according to an embodiment of the present invention.

[0034] Figure 5 It is a schematic diagram of the internal structure of the peripheral piles of the offshore composite structure single pile according to another embodiment of the present invention.

[0035] Reference numerals:

[0036] 1. Peripheral pile foundation, 11. Peripheral piles, 12. Core piles,

[0037] 2. Single pile foundation,

[0038] 3. Pile sinking assembly, 31. First flushing pipeline, 311. First main pipeline, 312. First branch pipeline, 313. First pipeline, 3131. Opening, 314. First extension pipe, 32. First pumping pipeline, 33. Second flushing pipeline, 331. Second main pipeline, 332. Second branch pipeline, 333. Second pipeline, 334. Second extension pipe, 34. Second pumping pipeline,

[0039] 4. Top cover, 41. Flush port, 42. Drain port. DETAILED DESCRIPTION

[0040] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0041] like Figure 1-Figure 5 As shown, the offshore composite structure single pile according to the embodiment of the present invention is described below based on the accompanying drawings.

[0042] The offshore composite structure monopile of the embodiment of the present invention comprises: a peripheral pile foundation 1 , a monopile foundation 2 and a pile sinking assembly 3 .

[0043] The peripheral pile foundation 1 includes a peripheral pile 11 and a core pile 12. There are multiple peripheral piles 11, and the multiple peripheral piles 11 are sequentially connected along the circumference of the core pile 12. The peripheral piles 11 are connected to the core piles 12, and the axial direction of the peripheral piles 11 is parallel to the axial direction of the core pile 12. The single pile foundation 2 is placed in the central cavity of the core pile 12, and there is a gap between the outer peripheral wall of the single pile foundation 2 and the inner peripheral wall of the core pile 12.

[0044] Specifically, Figure 1-Figure 4 As shown, a plurality of peripheral piles 11 are sequentially connected and arranged around a core pile 12, and two peripheral piles 11 and a peripheral pile 11 and a core pile 12 can be connected by welding to ensure overall stability. Preferably, the radial dimensions of the peripheral piles 11 and the core piles 12 are equal to facilitate the overall installation of the peripheral pile foundation 1.

[0045] It is understandable that if Figure 1-Figure 3 As shown, the radial dimension of the single pile foundation 2 is smaller than the radial dimension of the core pile 12. After the plurality of peripheral piles 11 are fixedly connected to the core pile 12, they can be used as a pile group of the single pile foundation 2, providing a good installation environment for the installation of the single pile foundation 2. After the peripheral pile foundation 1 is installed, the single pile foundation 2 is inserted into the cavity of the core pile 12, thereby completing the combination of the pile foundation.

[0046] The pile driving assembly 3 includes a first flushing water pipeline 31, a first pumping water pipeline, a second flushing water pipeline and a second pumping water pipeline 34. The first end of the first flushing water pipeline 31 is connected to the water pump, and the second end of the first flushing water pipeline 31 is placed in the cavity of the peripheral pile 11. The first end of the first pumping water pipeline is connected to the mud pump, and the second end of the first pumping water pipeline is placed in the cavity of the peripheral pile 11. The first end of the second flushing water pipeline is connected to the water pump, and the second end of the second flushing water pipeline is placed in the cavity of the single pile foundation 2. The first end of the second pumping water pipeline 34 is connected to the mud pump, and the second end of the second pumping water pipeline 34 is placed in the cavity of the single pile foundation 2.

[0047] It is understandable that if Figure 1-Figure 3 As shown, the first flushing pipeline 31 and the first pumping pipeline are used for flushing and pumping water in the peripheral piles 11 , respectively. The second flushing pipeline and the second pumping pipeline 34 are used for flushing and pumping water in the single pile foundation 2 , respectively.

[0048] That is to say, after the peripheral pile foundation 1 is installed at the preset position, the seawater in the peripheral pile 11 is first pumped out by the first pumping pipeline, and then the internal space of the peripheral pile 11 is impacted by the first flushing pipeline 31, so that the soil in the peripheral pile forms mud under the impact of high-pressure water. After the flushing is stopped, the mud is pumped out by the first pumping pipeline, so that the peripheral pile 11 sinks. The flushing and mud pumping work is repeated in this way to sink the peripheral pile foundation 1 to a specified depth for the subsequent installation of the single pile foundation 2. Among them, the single pile foundation 2 adopts the same sinking scheme as the peripheral pile 11 for sinking operation. In addition, during the installation of the single pile foundation 2, the pile hammer is used to drive the single pile foundation 2 so that the single pile foundation 2 can sink to the specified depth.

[0049] It should be noted that after the peripheral pile foundation 1 and the single pile foundation 2 are installed, the first flushing water pipeline 31 and the second flushing water pipeline can be used to perform grouting operations on the single pile foundation 2 of the peripheral pile foundation 1 respectively, that is, the first flushing water pipeline 31 is used to grout the peripheral piles 11, and the second flushing water pipeline is used to perform grouting operations on the single pile foundation 2, so as to complete the overall construction of the structure.

[0050] That is to say, the offshore composite structure single pile of the embodiment of the present invention adopts a combination of multiple peripheral piles 11 and a core pile 12 as the pile group of the single pile foundation 2, so that the axial and circumferential loads of the single pile foundation 2 are more dispersed, thereby enhancing the stability of the entire structure. The space inside the pile is flushed with water, so that the soil inside the pile is beaten into mud, and the mud is pumped away by a pumping pipeline to facilitate the subsequent grouting filling, which not only ensures the bearing capacity of the entire pile foundation, but also reduces the disturbance to the soil outside the pile, reduces the impact on the ocean water quality, and can adapt to more complex geology.

[0051] In some embodiments, the offshore composite structure single pile of the embodiment of the present invention also includes a top cover 4, which is used to seal the upper port of the peripheral pile 11, the second end of the first flushing pipeline 31 passes through the top cover 4 and is placed in the cavity of the peripheral pile 11, and the second end of the first pumping pipeline passes through the top cover 4 and is placed in the cavity of the peripheral pile 11.

[0052] Specifically, if Figure 1-Figure 4 As shown, the top cover 4 is connected to the upper port of the peripheral pile 11, and the top cover 4 can completely block the upper port of the peripheral pile 11. A flushing port 41 and a pumping port 42 are provided on the top cover 4. The lower end of the first flushing pipe 31 passes through the flushing port 41 and is placed in the cavity of the peripheral pile 11. The lower end of the first pumping pipe passes through the pumping port 42 and is placed in the cavity of the peripheral pile 11. In addition, the outer peripheral wall of the first flushing pipe 31 is sealedly connected to the peripheral wall of the flushing port 41, and the outer peripheral wall of the first pumping pipe is sealedly connected to the peripheral wall of the pumping port 42.

[0053] It is understandable that if Figure 1-Figure 4 As shown, the top cover 4 is connected to the upper end of the peripheral pile 11, so that when the peripheral pile 11 is sinking, the cavity of the peripheral pile 11 forms a sealed space, so that when the first pumping pipeline is used for pumping, a pressure difference is generated inside and outside the peripheral pile 11, and the peripheral pile 11 itself has a certain weight. Therefore, the sinking operation of the peripheral pile 11 can be carried out under the action of the pressure difference and its own gravity, thereby improving the sinking efficiency, avoiding the use of hammering equipment, and improving the pile sinking efficiency.

[0054] In addition, during the flushing operation, the first flushing pipeline 31 impacts the soil inside the cavity of the peripheral pile 11, reducing the disturbance to the soil outside the peripheral pile 11. The first pumping pipeline is used to extract the mud formed by the impact inside the peripheral pile, which is convenient for the subsequent grouting operation and ensures the bonding force between the peripheral pile 11 and the surrounding objects.

[0055] In some embodiments, the first flushing pipeline 31 includes a first main pipeline 311, a first branch pipeline 312 and a first pipeline 313. The first main pipeline 311 is connected to a water pump. There are multiple first pipelines 313. The multiple first pipelines 313 are arranged at circumferential intervals along the center line of the first main pipeline 311. The first pipeline 313 is connected to the first main pipeline 311 through the first branch pipeline 312. The extension direction of the first branch pipeline 312 is consistent with the extension direction of the surrounding piles 11.

[0056] Specifically, if Figure 1-Figure 4 As shown, the first main pipeline 311 is arranged vertically, the first primary pipeline 313 is also arranged vertically, the first branch pipeline 312 corresponds to the first primary pipeline 313 one by one, and the first branch pipeline 312 connects the first primary pipeline 313 and the first main pipeline 311. That is, when performing a flushing operation, the water pump injects high-pressure water into the first main pipeline 311 and discharges it through the first primary pipeline 313 and the first primary pipeline 313 in sequence to flush the inner cavity of the surrounding piles 11. Of course, when performing a grouting operation, the first main pipeline 311 can be connected to the grouting pipeline, so as to realize the reuse of the first flushing pipeline 31.

[0057] Preferably, the distance between the lower end of the first pipeline 313 and the lower end of the peripheral pile 11 is greater than 1 meter and less than or equal to 3 meters.

[0058] Preferably, the plurality of first secondary pipes 313 are divided into a plurality of first pipe groups, one first pipe group includes a plurality of first secondary pipes 313 , and in one first pipe group, two adjacent first secondary pipes 313 are connected via a first branch pipe 312 .

[0059] Specifically, if Figure 1-Figure 4 As shown, one first pipe group includes three first pipes 313. That is, a plurality of first pipes 313 are provided in one first pipe group, so that the number of first pipes 313 is increased, thereby increasing the coverage area of ​​the water flow during the flushing operation, and making it easier to use the impact force of the water flow to stir the soil in the surrounding piles 11 into mud, which is convenient for the subsequent mud pumping work.

[0060] In some embodiments, a wall of the first secondary pipe 313 is provided with openings 3131 , and there are a plurality of openings 3131 , which are arranged at intervals along the extension direction of the first secondary pipe 313 .

[0061] Specifically, if Figure 1-Figure 4As shown, an opening 3131 is provided near the lower end of the first pipe 313, so that the opening 3131 is closer to the lower end of the peripheral pile 11, so that the distance between the opening 3131 and the soil is smaller, which is convenient for impact disturbance of the soil. In addition, the opening 3131 on each first pipe 313 is arranged toward the center line direction of the peripheral pile 11, and the water flow discharged through the opening 3131 intensifies the disturbance of the soil in the peripheral pile 11, improves the disturbance effect, ensures the effect of stirring the soil, and facilitates the subsequent mud pumping operation.

[0062] In other embodiments, the first flushing pipe 31 also includes a first extension pipe, there are multiple first extension pipes, the multiple first extension pipes correspond one-to-one to the multiple openings 3131, the first end of the first extension pipe is connected to the opening 3131, and the second end of the first extension pipe extends toward the direction of the first main pipe 311.

[0063] Specifically, if Figure 5 As shown, one end of the first extension tube is connected to the opening 3131, and the other end of the first extension tube extends toward the center line of the peripheral pile 11. In other words, connecting the first extension tube to the opening 3131 can prevent the soil in the peripheral pile 11 from entering the primary pipe 313 during the sinking process of the peripheral pile 11 (when the flushing operation is suspended), thereby preventing the primary pipe 313 from being blocked.

[0064] Optionally, the axial direction of the first extension tube has an angle with the axial direction of the first pipeline 313. It is understandable that the first extension tube can be arranged obliquely upward, or the first extension tube can be arranged obliquely downward, or the first extension tube is arranged perpendicular to the first pipeline 313 (as shown in the figure).

[0065] In some embodiments, the second flushing pipeline includes a second main pipeline, a second branch pipeline and a secondary pipeline. The second main pipeline is connected to a water pump. There are multiple secondary pipelines, and the multiple secondary pipelines are arranged at circumferential intervals along the center line of the second main pipeline. The second pipeline is connected to the second main pipeline through a second branch pipeline, and the extension direction of the second branch pipeline is consistent with the extension direction of the single pile foundation 2.

[0066] Specifically, if Figure 1 As shown, the second main pipeline is arranged vertically, the secondary pipeline is also arranged vertically, the second branch pipeline corresponds to the secondary pipeline one by one, and the second branch pipeline connects the secondary pipeline and the second main pipeline. That is to say, when performing the flushing operation, the water pump injects high-pressure water into the second main pipeline and discharges it through the secondary pipeline and the secondary pipeline in sequence to flush the inner cavity of the single pile foundation 2. Of course, when performing the grouting operation, the second main pipeline can be connected to the grouting pipeline, so as to realize the reuse of the second flushing pipeline.

[0067] Optionally, a plurality of second extension pipes are provided at the lower end of the secondary pipeline, and the plurality of second extension pipes are arranged at intervals in the extension direction of the secondary pipeline so as to fully impact the soil in the single pile foundation 2, thereby facilitating subsequent mud pumping operations.

[0068] In addition, during the grouting operation, grouting is also performed on the gap between the single pile foundation 2 and the core pile 12 to ensure the integrity of the structure and the tightness of the gap filling with grouting material.

[0069] The following describes a construction method for a single pile of an offshore composite structure according to an embodiment of the present invention.

[0070] The construction method of the offshore composite structure monopile according to the embodiment of the present invention comprises the following steps:

[0071] S1: Transport the peripheral pile foundation to the designated location. The single pile foundation and the welded peripheral pile foundation can be transported to the designated location using a floating crane.

[0072] S2: Place the peripheral pile foundation and pump water from the space inside the peripheral piles. First, sink the peripheral pile foundation, and pump water from the space inside the peripheral piles while sinking, so that the peripheral pile foundation penetrates 2 to 4 meters into the soil before stopping.

[0073] S3: Stop pumping and start flushing. Introduce high-pressure water into the first flushing pipeline to impact and stir the soil in the surrounding piles to form mud.

[0074] S4: After the soil in the cavity of the surrounding piles is stirred into mud, stop flushing and carry out mud pumping operations.

[0075] S5: Repeat steps S3 and S4 until the peripheral pile foundation sinks to a preset depth. That is, after the peripheral piles sink by their own weight, the flushing and mud pumping operations are repeated, so that the peripheral piles continue to sink to the preset depth under their own gravity and the pressure difference inside and outside the peripheral piles, so as to complete the pile sinking operation of the peripheral pile foundation.

[0076] S6: Install the monopile foundation. Use a floating crane to insert the monopile foundation into the core pile, and ensure that there is a certain gap between the monopile foundation and the core pile.

[0077] S7: Flushing and draining mud from the cavity of the monopile foundation.

[0078] S8: After suspending flushing and mud pumping, pile driving is carried out for the single pile foundation.

[0079] S9: Repeat steps S7 and S8 until the single pile foundation sinks to a preset depth. In other words, the soil in the single pile foundation is processed by the same flushing and pumping operations as the surrounding piles to facilitate the subsequent grouting operations.

[0080] S10: Grouting is performed into the peripheral piles and the single pile foundation. That is, the first flushing water pipeline and the second flushing water pipeline can be used to perform grouting into the peripheral piles and the single pile foundation respectively.

[0081] In some embodiments, the construction method of the offshore composite structure monopile of the embodiment of the present invention further includes the following step: grouting the gap between the monopile foundation and the core pile. In other words, grouting is also performed on the gap between the monopile foundation and the core pile to ensure the integrity of the structure and the tightness of the gap grouting material filling.

[0082] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0083] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0084] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0085] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0086] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0087] Although the above embodiments have been shown and described, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations on the present invention. Changes, modifications, substitutions and variations of the above embodiments by those of ordinary skill in the art are all within the scope of protection of the present invention.

Claims

1. A single pile of offshore composite structure, It is characterized in that include: A peripheral pile foundation, wherein the peripheral pile foundation comprises peripheral piles and core piles, wherein the peripheral piles are multiple, the multiple peripheral piles are sequentially connected along the circumference of the core piles, and the peripheral piles are connected to the core piles, and the axial direction of the peripheral piles is parallel to the axial direction of the core piles; A single pile foundation, wherein the single pile foundation is placed in the central cavity of the core pile, and a gap is provided between the outer peripheral wall of the single pile foundation and the inner peripheral wall of the core pile; A pile driving assembly, the pile driving assembly comprising a first flushing water pipeline, a first pumping water pipeline, a second flushing water pipeline and a second pumping water pipeline, wherein the first end of the first flushing water pipeline is connected to a water pump, and the second end of the first flushing water pipeline is placed in the cavity of the peripheral pile, the first end of the first pumping water pipeline is connected to a mud pump, and the second end of the first pumping water pipeline is placed in the cavity of the peripheral pile, The first end of the second flushing pipeline is connected to the water pump, and the second end of the second flushing pipeline is placed in the cavity of the single pile foundation. The first end of the second pumping pipeline is connected to the mud pump, and the second end of the second pumping pipeline is placed in the cavity of the single pile foundation.

2. The offshore composite structure monopile according to claim 1, It is characterized in that It also includes a top cover, which is used to seal the upper port of the peripheral pile. The second end of the first flushing pipeline passes through the top cover and is placed in the cavity of the peripheral pile. The second end of the first pumping pipeline passes through the top cover and is placed in the cavity of the peripheral pile.

3. The offshore composite structure monopile according to claim 2, It is characterized in that The first flushing pipeline includes a first main pipeline, a first branch pipeline and a first pipeline. The first main pipeline is connected to a water pump. There are multiple first pipelines, which are arranged at intervals in the circumferential direction along the center line of the first main pipeline. The first pipeline is connected to the first main pipeline through the first branch pipeline. The extension direction of the first branch pipeline is consistent with the extension direction of the peripheral piles.

4. The offshore composite structure monopile according to claim 3, It is characterized in that The plurality of first branch pipes are divided into a plurality of first branch pipe groups. One first branch pipe group includes a plurality of first branch pipes. In one first branch pipe group, two adjacent first branch pipes are connected via the first branch pipe.

5. The offshore composite structure monopile according to claim 4, It is characterized in that The wall of the first pipeline is provided with openings, and the openings are multiple and arranged at intervals along the extension direction of the first pipeline.

6. The offshore composite structure monopile according to claim 5, It is characterized in that The first flushing pipeline also includes a first extension pipe. There are multiple first extension pipes, and the multiple first extension pipes correspond one-to-one to the multiple openings. The first end of the first extension pipe is connected to the opening, and the second end of the first extension pipe extends toward the first main pipeline.

7. The offshore composite structure monopile according to claim 6, It is characterized in that An included angle is formed between the axial direction of the first extension tube and the axial direction of the first pipeline.

8. The offshore composite structure monopile according to claim 1, It is characterized in that The second flushing pipeline includes a second main pipeline, a second branch pipeline and a secondary pipeline. The second main pipeline is connected to a water pump. There are multiple secondary pipelines, and the multiple secondary pipelines are arranged at intervals in the circumferential direction along the center line of the second main pipeline. The secondary pipeline is connected to the second main pipeline through the second branch pipeline. The extension direction of the second branch pipeline is consistent with the extension direction of the single pile foundation.

9. A construction method for a single pile of an offshore composite structure, It is characterized in that The following steps are involved: S1: Transport the surrounding pile foundation to the designated location; S2: Place the perimeter pile foundation and pump out the space within the perimeter piles; S3: stop pumping and perform flushing operations; S4: After the soil in the cavity of the surrounding piles is stirred into mud, the water flushing is stopped and the mud pumping operation is carried out; S5: Repeat steps S3 and S4 until the surrounding pile foundation sinks to a preset depth; S6: Install the monopile foundation; S7: flushing and draining mud from the cavity of the monopile foundation; S8: After suspending water flushing and mud pumping, pile driving is carried out for the single pile foundation; S9: Repeat steps S7 and S8 until the monopile foundation sinks to a preset depth; S10: Grouting is performed into the surrounding piles and single pile foundation.

10. The method for constructing a single pile of an offshore composite structure according to claim 9, It is characterized in that It also includes the following steps: Grouting is performed into the gap between the monopile foundation and the core pile.

Citation Information

Cited By

  • Sludge-suctioning inserting tip based on offshore wind power jacket foundation and construction method of mud-suctioning inserting tip

    CN120486462A