In-plane module laminated shear wall

Through the in-plane module overlapping shear wall technology, prefabricated wall leaves and steel mesh components are used to solve the problems of cumbersome construction process and excessive structure of high-rise buildings, the combination of convenient construction and high-strength structure is achieved, and the combination of convenient construction and high-strength structure is improved. Construction efficiency and cost-effectiveness.

CN118933213APending Publication Date: 2024-11-12SHENZHEN ANJU GROUP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411159009.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In prefabricated buildings, the construction process of cast-in-place shear walls is cumbersome, resulting in a long construction cycle, a large number of personnel, large material losses, and too hard and heavy structure, making it difficult to achieve convenient construction like building blocks.

Method used

Using in-plane module superimposed shear wall technology, the wall leaves and steel mesh, tensioning, inserting and other components are prefabricated in the factory to easily assemble on site to form a high-strength wall structure, and the steel mesh and tensioning are used to make steel mesh and tensioning. Cross arrangement and fork-like connection of the inserts improve structural stability and strength.

Benefits of technology

It shortens the construction cycle, reduces costs and improves structural strength, avoids tedious processes and material losses in on-site construction, and meets the structural needs of high-rise buildings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933213A_ABST
    Figure CN118933213A_ABST
Patent Text Reader

Abstract

The invention provides an in-plane module laminated shear wall, and belongs to the technical field of fabricated buildings. A wall body of the in-plane module laminated shear wall comprises a first module prefabricated wall leaf, a second module prefabricated wall leaf, reinforcing meshes, tie bars and joint bars, the first module prefabricated wall leaf and the second module prefabricated wall leaf are arranged in parallel at intervals, one reinforcing mesh is located in the first module prefabricated wall leaf, and the other reinforcing mesh is located in the second module prefabricated wall leaf. One part of the tie bars are connected with one reinforcing mesh, the other part of the tie bars are connected with the other reinforcing mesh, the joint bar is in a fork shape and is provided with two branches, one branch is inserted into the tie bar connected with one reinforcing mesh, and the other branch is inserted into the tie bar connected with the other reinforcing mesh. Part of acting force is dispersed to the reinforcing mesh in the other one of the first module prefabricated wall leaf and the second module prefabricated wall leaf through the multiple tie bars and the joint bars, so that the wall body can bear large acting force, and higher structural strength is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of prefabricated buildings, and in particular to an in-plane modular composite shear wall. Background Art

[0002] The development of prefabricated buildings is not only an important measure for the country to promote the supply-side structural reform of the construction industry, but also an important way to realize the modernization of the construction industry, improve the quality and efficiency of construction, and promote green development. Modular buildings integrate more than 90% of the construction process in an automated factory system. It is the most integrated and industrialized form of prefabricated buildings, and realizes the construction of houses in factories "like building cars". Its product characteristics perfectly fit the development direction of residential industrialization and are rapidly becoming one of the fastest growing markets in the construction industry.

[0003] The structural form of high-rise buildings is mostly affected by the market and industry of the project location, and the methods of prefabricated shear walls vary. According to the different ways of assembling shear walls, they can be divided into cast-in-place shear wall systems and prefabricated shear wall systems. High-rise modular buildings adopt a box formwork-cast-in-place shear wall system, replacing the formwork with the formwork shell, which is an integral cast-in-place shear wall. This feature makes the formwork shell (including truss bars) of the module box formwork only a permanent formwork and does not participate in the structural calculation, which will cause the structure to be too rigid and too heavy, but the on-site cast-in-place construction process is cumbersome, requiring steel bar tying, formwork support, concrete pouring, maintenance and demoulding, surface plastering, etc., resulting in long construction period and many on-site workers. There are also problems such as loss of materials such as formwork and a lot of construction waste, and it is not possible to build a house on site "like building blocks".

[0004] The in-plane modular composite shear wall is a type of wall that is automatically produced in the factory and then overlapped on site. It only requires convenient construction on site, which reduces the number of on-site workers and greatly shortens the construction period. In modular buildings, some concrete module boxes are close to the center of the building, and some are close to the outermost side of the building. Depending on the position of the concrete module box in the building, the requirements for structural strength of the concrete module box are also different. The wall leaves of the adjacent concrete module boxes on the side close to each other are connected to each other to form a composite shear wall. In the design process, the composite shear wall needs to be convenient for construction and also ensure that its structural strength meets the requirements without being too conservative and resulting in excessive costs. Summary of the invention

[0005] The embodiment of the present application provides an in-plane modular laminated shear wall, which can improve the structural strength of the shear wall and has low cost. The technical solution is as follows:

[0006] An embodiment of the present application provides an in-plane modular composite shear wall, the in-plane modular composite shear wall includes a wall body, the wall body includes a first module prefabricated wall leaf, a second module prefabricated wall leaf, two steel meshes, a plurality of tie bars and a plurality of dowel bars, the first module prefabricated wall leaf and the second module prefabricated wall leaf are arranged in parallel and spaced apart, and the orthographic projection of the first module prefabricated wall leaf on the second module prefabricated wall leaf coincides with the second module prefabricated wall leaf, one of the steel meshes is located in the first module prefabricated wall leaf, and the other of the steel meshes is located in the second module prefabricated wall leaf, a part of the tie bars is connected to one of the steel meshes, and another part of the tie bars is connected to the other of the steel meshes, the plurality of dowel bars are located between the first module prefabricated wall leaf and the second module prefabricated wall leaf, the dowel bars are forked, and have at least two branches, one of the branches is inserted in the tie bars connected to one of the steel meshes, and the other of the branches is inserted in the tie bars connected to the other of the steel meshes.

[0007] In some examples, the steel mesh includes a plurality of horizontal steel bars arranged in parallel and a plurality of vertical steel bars arranged in parallel, the plurality of horizontal steel bars and the plurality of vertical steel bars are cross-arranged in a mesh shape, and the horizontal steel bars are connected to the vertical steel bars at the intersection;

[0008] The connection point between each of the tension bars and at least one of the steel meshes is located outside the intersection of the horizontal steel bars and the vertical steel bars.

[0009] In some examples, the plane where the tie rods are located is perpendicular to the first module prefabricated wall leaf.

[0010] In some examples, the plane where the tension reinforcement is located is perpendicular to the vertical reinforcement or the horizontal reinforcement.

[0011] In some examples, the tie rod is triangular or rectangular.

[0012] In some examples, the in-plane modular composite shear wall further includes a connecting rod connected to a plurality of the dowels arranged in a collinear manner.

[0013] In some examples, the in-plane modular composite shear wall further includes a plurality of cables, a same cable is movably connected to a same steel mesh, and the cable is located between the two branches.

[0014] In some examples, the wall body further includes a plurality of one-way locking rings, the one-way locking rings are connected to the steel mesh, the pull cable passes through a plurality of the one-way locking rings, and one end of the pull cable is fixedly connected to the steel mesh.

[0015] In some examples, the cable is wrapped around the branch at least once.

[0016] In some examples, the in-plane module composite shear wall also includes a plurality of tension screws, the tension screws including a rod body, two baffles and two fastening nuts, the rod body passes through the two baffles, the two fastening nuts are sleeved outside the rod body, and the two fastening nuts are located on the outside of the two baffles, the rod body passes through the first module prefabricated wall leaf and the second module prefabricated wall leaf, one baffle is located on the side of the first module prefabricated wall leaf away from the second module prefabricated wall leaf and is in contact with the first module prefabricated wall leaf, and the other baffle is located on the side of the second module prefabricated wall leaf away from the first module prefabricated wall leaf and is in contact with the second module prefabricated wall leaf.

[0017] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:

[0018] By respectively arranging steel meshes in the prefabricated wall leaves of the first module and the prefabricated wall leaves of the second module, the strength and stability of the prefabricated wall leaves of the first module and the prefabricated wall leaves of the second module can be improved. By respectively connecting tie bars on the two steel meshes, one branch of the inserted bar is inserted into the tie bar connected to one steel mesh, and the other branch is inserted into the tie bar connected to the other steel mesh, so that the prefabricated wall leaves of the first module and the prefabricated wall leaves of the second module are connected as a whole by using multiple inserted bars. When one of the prefabricated wall leaves of the first module and the prefabricated wall leaves of the second module is subjected to horizontal force, part of the force can be dispersed to the steel mesh in the other of the prefabricated wall leaves of the first module and the prefabricated wall leaves of the second module through multiple tie bars and inserted bars, so that the wall body can withstand a larger force and have a higher structural strength. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0020] Figure 1 It is a partial structural schematic diagram of a modular building provided in an embodiment of the present application;

[0021] Figure 2 It is a structural schematic diagram of two adjacent concrete modular boxes provided in an embodiment of the present application;

[0022] Figure 3 It is a schematic diagram of the decomposed structure of an in-plane modular composite shear wall provided in an embodiment of the present application;

[0023] Figure 4 It is a schematic diagram of the structure of a reinforcement provided in an embodiment of the present application;

[0024] Figure 5 It is a schematic diagram of a partial structure of a wall body provided in an embodiment of the present application;

[0025] Figure 6 It is a schematic diagram of a partial structure of a wall body provided in an embodiment of the present application;

[0026] Figure 7 It is a structural schematic diagram of a floor slab and a circular connecting rib provided in an embodiment of the present application;

[0027] Figure 8 It is a partial structural schematic diagram of an in-plane modular composite shear wall provided in an embodiment of the present application;

[0028] Fig. 9 It is a schematic diagram of the local structure of an in-plane modular composite shear wall provided in an embodiment of the present application.

[0029] Figure Number:

[0030] Concrete module box: 100; wall body: 10; first module prefabricated wall leaf: 11; second module prefabricated wall leaf: 12; steel mesh: 20; tie rod: 30; inserted rod: 80; branch: 81; connecting rod: 82; cable: 90; one-way locking ring: 91; horizontal steel bar: 21; vertical steel bar: 22; first tie rod: 301; second tie rod: 302; floor slab: 41; circular connecting rod: 42; tension screw: 70; rod body: 701: baffle: 702; fastening nut: 703. DETAILED DESCRIPTION

[0031] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0032] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0033] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it can be directly on the other element or indirectly on the other element. When an element is referred to as being "connected to" another element, it can be directly connected to the other element or indirectly connected to the other element.

[0034] It should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0035] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0036] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways. "Multiple" means two or more.

[0037] Figure 1 is a schematic diagram of a partial structure of a modular building provided in an embodiment of the present application, such as Figure 1 Shown is a top view, the modular building comprises a plurality of concrete module boxes 100 . Figure 1 Only a part of one layer of a modular building is shown in the figure. In the height direction, the concrete module boxes 100 can also be stacked. The multiple concrete module boxes 100 can be divided into edge modules and in-plane modules according to different distribution positions. The edge modules refer to the concrete module boxes 100 that are closest to the outermost side of the building, for example Figure 1 The in-plane modules refer to the concrete module boxes 100 located near the center of the building, for example Figure 1 Two concrete module boxes 100 located inside.

[0038] Figure 2 is a schematic diagram of the structure of two adjacent concrete modular boxes provided in an embodiment of the present application, Figure 2The two concrete modular boxes are properly separated. The embodiment of the present application provides an in-plane module composite shear wall, which constitutes the wall of the side where two in-plane modules are close to each other, that is, the in-plane module composite shear wall is the common wall of the two in-plane modules.

[0039] Figure 3 Schematic diagram of the decomposition structure of an in-plane modular composite shear wall provided in an embodiment of the present application. Figure 3 As shown, the in-plane modular composite shear wall includes a wall body 10. The wall body 10 includes a first module prefabricated wall leaf 11 and a second module prefabricated wall leaf 12. The first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 are the wall leaves on the side of the adjacent concrete module boxes close to each other.

[0040] The in-plane modular composite shear wall also includes two steel meshes 20, a plurality of tie bars 30 and a plurality of dowel bars 80. In order to show the steel meshes 20, at least a portion of the first module prefabricated wall leaf 11 and a portion of the second module prefabricated wall leaf 12 are omitted in the drawings provided in the embodiment of the present application.

[0041] The first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 are arranged in parallel and spaced apart. When the in-plane module composite shear wall is constructed on site, the space between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 is used for pouring concrete. The orthographic projection of the first module prefabricated wall leaf 11 on the second module prefabricated wall leaf 12 coincides with the second module prefabricated wall leaf 12.

[0042] One steel mesh 20 is located in the first module prefabricated wall leaf 11, and another steel mesh 20 is located in the second module prefabricated wall leaf 12. A portion of the tie bars 30 is connected to one steel mesh 20, and another portion of the tie bars 30 is connected to the other steel mesh 20.

[0043] A plurality of dowel bars 80 are located between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12. The dowel bars 80 are forked, and have at least two branches 81, one of which is inserted into the tie bar 30 connected to one steel mesh 20, and the other branch 81 is inserted into the tie bar 30 connected to another steel mesh 20.

[0044] By respectively arranging steel meshes 20 in the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12, the strength and stability of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 can be improved. By respectively connecting tie bars 30 on the two steel meshes 20, one branch 81 of the inserted bar 80 is inserted into the tie bar 30 connected to one steel mesh 20, and the other branch 81 is inserted into the tie bar 30 connected to the other steel mesh 20, so that the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 are connected as a whole by using multiple inserted bars 80. When one of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 is subjected to horizontal force, part of the force can be dispersed to the steel mesh 20 in the other of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 through multiple tie bars 30 and inserted bars 80, so that the wall body 10 can withstand a larger force and has a higher structural strength.

[0045] Taking the state after the in-plane module composite shear wall is installed as an example, the lower edge of the first module prefabricated wall leaf 11 is flush with the lower edge of the second module prefabricated wall leaf 12; the upper edge of the first module prefabricated wall leaf 11 is flush with the upper edge of the second module prefabricated wall leaf 12. The vertical side of the first module prefabricated wall leaf 11 is also flush with the vertical side of the second module prefabricated wall leaf 12.

[0046] The first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 can both be prefabricated concrete panels, for example, they can be prefabricated by a mold. In the process of preparing the first module prefabricated wall leaf 11, the steel mesh 20 is placed in the mold in advance, and after the concrete poured into the mold solidifies, it forms a whole with the first module prefabricated wall leaf 11. The preparation method of the second module prefabricated wall leaf 12 can be the same as that of the first module prefabricated wall leaf 11.

[0047] like Figure 3 As shown, the in-plane modular composite shear wall further includes a plurality of tension screws 70. The plurality of tension screws 70 are located between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12, the tension screws 70 penetrate the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12, and the tension screws 70 are connected to the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12, respectively.

[0048] By setting a plurality of tension screws 70, the tension screws 70 penetrate the first module prefabricated wall leaves 11 and the second module prefabricated wall leaves 12, and are respectively connected to the first module prefabricated wall leaves 11 and the second module prefabricated wall leaves 12, so that the first module prefabricated wall leaves 11 and the second module prefabricated wall leaves 12 can withstand a larger horizontal force, and the first module prefabricated wall leaves 11 and the second module prefabricated wall leaves 12 are better connected to the concrete cast between the first module prefabricated wall leaves 11 and the second module prefabricated wall leaves 12 as a whole to withstand the load, so that the wall body 10 can withstand a larger force and has a higher structural strength.

[0049] Figure 4 Schematic diagram of the structure of a reinforcement provided by an embodiment of the present application. Figure 4 As shown, the tension screw 70 includes a rod body 701, two baffles 702 and two fastening nuts 703. The rod body 701 passes through the two baffles 702, and the two fastening nuts 703 are sleeved outside the rod body 701, and the two fastening nuts 703 are located outside the two baffles 702. The rod body 701 passes through the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12, one baffle 702 is located on the side of the first module prefabricated wall leaf 11 away from the second module prefabricated wall leaf 12, and is in close contact with the first module prefabricated wall leaf 11; the other baffle 702 is located on the side of the second module prefabricated wall leaf 12 away from the first module prefabricated wall leaf 11, and is in close contact with the second module prefabricated wall leaf 12.

[0050] By tightening the fastening nuts 703, the two fastening nuts 703 are brought close to each other and pressed against the surface of the baffle 702, so as to prevent the distance between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 from expanding, thereby ensuring the integrity of the in-plane module composite shear wall structure. The baffle 702 serves to increase the contact area and prevent the fastening nuts 703 from damaging the surfaces of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12.

[0051] like Figure 3 As shown, a plurality of tie rods 30 are arranged in an array. In the horizontal direction and the vertical direction, the tie rods 30 and the tension screws 70 are arranged alternately.

[0052] In some other possible implementations, the tie bars 30 and the tension screws 70 are alternately distributed in the horizontal direction or the vertical direction.

[0053] The tension screws 70 and the tension bars 30 are arranged in an alternating distribution manner, so that the forces acting on the in-plane modular composite shear wall are more dispersed, thereby avoiding excessive forces acting on local positions and causing damage to the wall structure.

[0054] like Figure 3As shown, the steel mesh 20 includes a plurality of horizontal steel bars 21 arranged in parallel and a plurality of vertical steel bars 22 arranged in parallel. The plurality of horizontal steel bars 21 and the plurality of vertical steel bars 22 are cross-arranged to form a mesh, and the horizontal steel bars 21 and the vertical steel bars 22 are connected at the intersection.

[0055] Exemplarily, the horizontal steel bars 21 and the vertical steel bars 22 may be connected at the intersection by at least one of welding and bundling.

[0056] The steel mesh 20 may include a single-layer steel mesh, or may include a multi-layer steel mesh formed by stacking a plurality of steel meshes. In the example where the steel mesh 20 includes a single-layer steel mesh, the horizontal steel bar 21 may be a single steel bar, and the vertical steel bar 22 may also be a single steel bar; in the example where the steel mesh 20 includes a multi-layer steel mesh, the horizontal steel bar 21 may include a plurality of steel bars connected together, and the plurality of steel bars in the horizontal steel bar 21 may be welded or tied together; the vertical steel bar 22 may also include a plurality of steel bars connected together, and the plurality of steel bars in the vertical steel bar 22 may be welded or tied together.

[0057] The number of steel meshes included in the steel mesh 20 can be set according to the structural strength requirements of the in-plane modular composite shear wall. Usually, in situations where the structural strength requirements are different, the number of steel meshes included in the steel mesh 20 is larger in the in-plane modular composite shear wall with higher structural strength requirements.

[0058] like Figure 3 As shown, the connection between each tie bar 30 and at least one steel mesh 20 is located outside the intersection of the horizontal steel bar 21 and the vertical steel bar 22.

[0059] The outer side of the intersection of the horizontal steel bars 21 and the vertical steel bars 22 in one steel mesh 20 refers to the side of the intersection away from the other steel mesh 20 .

[0060] Connecting the tie bars 30 at the intersection of the horizontal steel bars 21 and the vertical steel bars 22 can better disperse the force of the tie bars 30 on the steel mesh 20 to various parts of the steel mesh 20, which is beneficial to further improve the ability of the in-plane modular composite shear wall to withstand horizontal loads.

[0061] In some examples, the plane where the tie rods 30 are located is perpendicular to the first module prefabricated wall leaf 11 .

[0062] The first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 are arranged in parallel, and the plane where the tie rod 30 is located can be perpendicular to the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12.

[0063] The tie rod 30 may be triangular. For example, the tie rod 30 may be a steel bar bent into a triangle, and both ends of the steel bar may be connected to form a triangular frame structure.

[0064] The tensioning bar 30 is set to be a triangle, one side of the triangle can be connected to the steel mesh 20, and the branch 81 of the inserted bar 80 can be located at a corner of the triangle, so that the tensioning bar 30 and the inserted bar 80 can be more stable when transmitting tension.

[0065] As an example, the tie bar 30 may include a single steel bar bent into a triangular frame, or may include a plurality of stacked steel bars bent into a triangular frame. In the example where the tie bar 30 includes a plurality of stacked steel bars bent into a triangular frame, the plurality of steel bars bent into a triangular frame may be welded or tied to each other.

[0066] The plane where the tie rod 30 is located is perpendicular to the prefabricated wall leaf 11 of the first module and the prefabricated wall leaf 12 of the second module, so that when the in-plane module composite shear wall is subjected to horizontal loads, the force exerted by the tie rod 30 on the prefabricated wall leaf 11 of the first module and the prefabricated wall leaf 12 of the second module is perpendicular to the prefabricated wall leaf 11 of the first module and the prefabricated wall leaf 12 of the second module.

[0067] like Figure 3 As shown, in some examples, the plane where the tie bars 30 are located is perpendicular to the vertical reinforcement 22. That is, the tie bars 30 are arranged horizontally.

[0068] As another example, Figure 5 2 is a schematic diagram of a partial structure of a wall body provided in an embodiment of the present application. In this example, the plane where the tie bars 30 are located is perpendicular to the horizontal steel bars 21. That is, the tie bars 30 are arranged vertically.

[0069] That is to say, the tie rod 30 can be placed horizontally or vertically. When the tie rod 30 is placed vertically or horizontally, there will be certain differences in the mechanical properties of the in-plane modular composite shear wall, for example, there will be certain differences in anti-bending and anti-torsion. The appropriate arrangement can be selected according to different occasions. The arrangement of the tie rod 30 is different, and the arrangement of the dowel rod 80 is also different. The embodiment of the present application takes the tie rod 30 arranged horizontally as an example for explanation.

[0070] Figure 6 is a partial structural diagram of a wall body provided in an embodiment of the present application, Figure 6 In order to better show the structure, the distance between the two steel mesh sheets 20 is increased. Figure 6 As shown, in this example, the tie bars 30 in the two steel meshes 20 are arranged horizontally. One side of the tie bar 30 can be overlapped and connected with the horizontal steel bars 21 of one of the steel meshes 20, which is conducive to forming a larger range of connection between the tie bar 30 and the steel mesh 20, thereby further improving the structural stability and strength of the in-plane modular composite shear wall.

[0071] In some examples, the tensioning reinforcement 30 is at least wrapped around two adjacent vertical reinforcements 22 in one reinforcement mesh 20 .

[0072] In this example, a portion of the tie bars 30 are sleeved outside the vertical steel bars 22 of the steel mesh 20 located in the prefabricated wall leaf 11 of the first module, and another portion of the tie bars 30 are sleeved outside the vertical steel bars 22 of the steel mesh 20 located in the prefabricated wall leaf 12 of the second module.

[0073] The tensioning bars 30 are sleeved outside the vertical steel bars 22 so that the tensioning bars 30 can exert a large tensile force on the steel mesh 20 without causing damage to the connection.

[0074] Optionally, the plurality of reinforcing bars 30 include a first reinforcing bar 301 and a second reinforcing bar 302. The first reinforcing bar 301 is a reinforcing bar 30 sleeved outside two adjacent vertical reinforcing bars 22 in one reinforcing mesh 20, and the second reinforcing bar 302 is a reinforcing bar 30 sleeved outside two adjacent vertical reinforcing bars 22 in another reinforcing mesh 20.

[0075] like Figure 3 As shown, the in-plane modular composite shear wall further includes a connecting rod 82, and the connecting rod 82 is connected to a plurality of dowel bars 80 arranged in a colinear manner.

[0076] In this example, the connecting rod 82 is arranged parallel to the vertical reinforcement 22. After the connecting rod 82 is connected to the plurality of dowel bars 80, the plurality of dowel bars 80 form a whole, which not only facilitates the arrangement of the dowel bars 80, but also further improves the stability of the overall structure.

[0077] Exemplarily, the connecting rod 82 is connected to the dowel 80 by welding or binding.

[0078] For the example in which the tension reinforcement 30 is arranged vertically, the dowel rod 80 and the connecting rod 82 are arranged parallel to the horizontal reinforcement 21 .

[0079] like Figure 3 As shown, the in-plane module composite shear wall further includes a plurality of loop-shaped connecting ribs 42 . Figure 7 is a schematic diagram of the structure of a floor slab and a circular connecting rib provided in an embodiment of the present application, such as Figure 7 As shown, the meandering connecting ribs 42 are arranged along the height direction of the wall body 10, and the middle parts of the plurality of meandering connecting ribs 42 are respectively connected to the floor slabs 41. The floor slabs 41 are the top slabs of the two adjacent concrete modular boxes at the lower layer, and the top slabs of the two adjacent concrete modular boxes at the lower layer form a whole, namely the floor slabs 41, during the pouring process.

[0080] One end of the meandering connecting rib 42 is located between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 , and the other end of the meandering connecting rib 42 extends out from the edge of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 .

[0081] During construction, different in-plane modular composite shear walls will be connected. For example, the in-plane modular composite shear wall located in the middle layer of the building will be connected to the in-plane modular composite shear wall of the adjacent lower layer and the in-plane modular composite shear wall of the adjacent upper layer. A plurality of circular connecting ribs 42 are used to connect the wall bodies 10 of the in-plane modular composite shear walls of two adjacent layers into one.

[0082] As an example, during on-site construction, for two adjacent layers of in-plane modular composite shear walls, one end of the circular connecting bar 42 of the upper layer in-plane modular composite shear wall extends out of the edge of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 and is inserted into the wall body 10 of the lower layer. In the lower layer in-plane modular composite shear wall, after the concrete between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 is poured and cured, the circular connecting bar 42 is fixed in the wall body 10 of the lower layer. Then, concrete is poured between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 of the upper layer in-plane modular composite shear wall.

[0083] In some examples, the in-plane modular composite shear wall further includes a connecting core column, which may be located at the edge of the wall body 10 and arranged along the height direction of the wall body 10. One end of the connecting core column is located between the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12, and the other end extends out of the edge of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12. When splicing adjacent in-plane modular composite shear walls, the end of the connecting core column extending out of the edge of the first module prefabricated wall leaf 11 and the second module prefabricated wall leaf 12 is used to be inserted into the wall body 10 of the lower in-plane modular composite shear wall.

[0084] Exemplarily, the connecting core column may be a rectangular steel structure.

[0085] Figure 8 It is a schematic diagram of the local structure of an in-plane modular composite shear wall provided in an embodiment of the present application. Figure 8 The steel mesh 20 shown in the figure may be the steel mesh 20 in the prefabricated wall leaf 11 of the first module, or may be the steel mesh 20 in the prefabricated wall leaf 12 of the second module.

[0086] like Figure 8 As shown, in this example, the in-plane modular composite shear wall further includes a plurality of cables 90 , and the same cable 90 is movably connected to the same steel mesh 20 , and the cable 90 is located between two branches 81 of the inserted reinforcement 80 .

[0087] By setting the cable 90 to cooperate with the inserted rebar 80, after a branch 81 of the inserted rebar 80 is inserted between the cable 90 and the steel mesh 20 connected to the cable 90, the cable 90 is tightened to pull the inserted rebar 80 toward the direction of the steel mesh 20 connected to the cable 90. Figure 8 The cable 90 is shown in an untensioned state.

[0088] Each dowel bar 80 cooperates with two cables 90, one of which is connected to the steel mesh 20 in the first module prefabricated wall leaf 11, and the other is connected to the steel mesh 20 in the second module prefabricated wall leaf 12. The two cables 90 tighten the same dowel bar 80 in opposite directions, so that the dowel bar 80 can better transmit the forces acting on the two steel meshes 20.

[0089] Exemplarily, the cable 90 may be a steel wire rope.

[0090] In some examples, the cable 90 is wound around the branch 81 of the dowel 80 for at least one turn. By winding the cable 90 around the branch 81, the dowel 80 can be made more stable.

[0091] Fig. 9 Schematic diagram of the partial structure of an in-plane modular composite shear wall provided in an embodiment of the present application. Fig. 9 As shown, the wall body 10 further includes a plurality of one-way locking rings 91 , which are connected to the steel mesh 20 , and the cable 90 passes through the plurality of one-way locking rings 91 , and one end of the cable 90 is fixedly connected to the steel mesh 20 .

[0092] Exemplarily, the one-way locking ring 91 can be welded to the steel mesh 20. The one-way locking ring 91 can be an annular metal piece, and the inner wall of the one-way locking ring 91 can have an undercut so that the cable 90 can only pass through the one-way locking ring 91 in one direction to prevent the cable 90 from loosening.

[0093] The branch 81 may be located between adjacent one-way locking rings 91. By fixing one end of the cable 90 to the steel mesh 20, and providing a plurality of one-way locking rings 91 on the steel mesh 20, passing the cable 90 through the plurality of one-way locking rings 91, and tightening the other end of the cable 90, the portion of the cable 90 located between adjacent one-way locking rings 91 can be tightened, thereby tightening the inserted rebar 80. After tightening the inserted rebar 80, the other end of the cable 90 may also be fixed to the steel mesh 20.

[0094] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. An in-plane modular composite shear wall, characterized in that: The invention comprises a wall body (10), wherein the wall body (10) comprises a first module prefabricated wall leaf (11), a second module prefabricated wall leaf (12), two steel mesh sheets (20), a plurality of tie bars (30) and a plurality of dowel bars (80), wherein the first module prefabricated wall leaf (11) and the second module prefabricated wall leaf (12) are arranged in parallel and spaced apart, and the orthographic projection of the first module prefabricated wall leaf (11) on the second module prefabricated wall leaf (12) coincides with the second module prefabricated wall leaf (12), one of the steel mesh sheets (20) is located in the first module prefabricated wall leaf (11), and the other of the steel mesh sheets (20) is located in the second module prefabricated wall leaf (12). In the second module prefabricated wall leaf (12), a portion of the tension bars (30) are connected to one of the steel mesh sheets (20), and another portion of the tension bars (30) are connected to another of the steel mesh sheets (20); the plurality of inserted bars (80) are located between the first module prefabricated wall leaf (11) and the second module prefabricated wall leaf (12); the inserted bars (80) are forked and have at least two branches (81); one of the branches (81) is inserted into the tension bars (30) connected to one of the steel mesh sheets (20), and the other branch (81) is inserted into the tension bars (30) connected to another of the steel mesh sheets (20).

2. The in-plane modular composite shear wall according to claim 1, characterized in that: The steel mesh (20) comprises a plurality of horizontal steel bars (21) arranged in parallel and a plurality of vertical steel bars (22) arranged in parallel, the plurality of horizontal steel bars (21) and the plurality of vertical steel bars (22) are arranged crosswise to form a mesh, and the horizontal steel bars (21) and the vertical steel bars (22) are connected at the intersection; The connection point between each of the tension bars (30) and at least one of the steel mesh sheets (20) is located outside the intersection of the horizontal steel bars (21) and the vertical steel bars (22).

3. The in-plane modular composite shear wall according to claim 2, characterized in that: The plane where the tie rods (30) are located is perpendicular to the first module prefabricated wall leaf (11).

4. The in-plane modular composite shear wall according to claim 3, characterized in that: The plane where the tension reinforcement (30) is located is perpendicular to the vertical reinforcement (22) or the horizontal reinforcement (21).

5. The in-plane modular composite shear wall according to any one of claims 1 to 4, characterized in that: The tie rod (30) is triangular or rectangular.

6. The in-plane modular composite shear wall according to any one of claims 1 to 4, characterized in that: It also includes a connecting rod (82), wherein the connecting rod (82) is connected to a plurality of the dowels (80) arranged in a colinear manner.

7. The in-plane modular composite shear wall according to any one of claims 1 to 4, characterized in that: It also includes a plurality of cables (90), wherein the same cable (90) is movably connected to the same steel mesh (20), and the cable (90) is located between the two branches (81).

8. The in-plane modular composite shear wall according to claim 7, characterized in that: The wall body (10) further comprises a plurality of one-way locking rings (91), wherein the one-way locking rings (91) are connected to the steel mesh (20), the pull cable (90) passes through a plurality of the one-way locking rings (91), and one end of the pull cable (90) is fixedly connected to the steel mesh (20).

9. The in-plane modular composite shear wall according to claim 7, characterized in that: The cable (90) is wound around the branch (81) for at least one circle.

10. The in-plane modular composite shear wall according to any one of claims 1 to 4, characterized in that: The invention also comprises a plurality of tensioning screw rods (70), wherein the tensioning screw rods (70) comprise a rod body (701), two baffles (702) and two fastening nuts (703); the rod body (701) passes through the two baffles (702); the two fastening nuts (703) are sleeved outside the rod body (701), and the two fastening nuts (703) are located on the outside of the two baffles (702); the rod body (701) passes through the first module prefabricated wall leaf (11) and the second module prefabricated wall leaf (12); one baffle (702) is located on a side of the first module prefabricated wall leaf (11) away from the second module prefabricated wall leaf (12) and is in close contact with the first module prefabricated wall leaf (11); the other baffle (702) is located on a side of the second module prefabricated wall leaf (12) away from the first module prefabricated wall leaf (11) and is in close contact with the second module prefabricated wall leaf (12).

Citation Information

Cited By

  • Lock rib sleeve shear wall structure, modular house and construction method of modular house

    CN122215470A

  • Locked-rib shear wall structure, modular housing and its construction methods

    CN122215470B