Efficient steel bar binding wire binding device for building construction
By introducing a two-stage guide rod and winding ring structure into the steel bar wire tying device, the problem of exposed wire winding and knotted parts is solved, the labor intensity and risk of injury are reduced, and the fitting effect between the steel bar and the formwork is improved.
Patent Information
- Application Number
- CN202310521993.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-10
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2043-05-10
AI Technical Summary
After the existing wire tying device is completed, the wound knotted parts of the wire are often exposed above the steel bar level, which increases the probability of staff being injured and affects the fitting effect of the later template.
A steel wire tier including a guide rod, a winding frame and an extrusion piece was designed. Through a two-stage guide rod and a winding ring structure, the wire is automatically bending and twisted to ensure that the wound knotted part points to the steel bar level. Below, reduce the risk of injury for staff and improve the fitting effect of steel bars and formwork.
Through the two-stage guide rod and winding ring structure, labor intensity is reduced, the stability and efficiency of steel wire binding is improved, the wound knotted parts are ensured to point downward, the probability of staff being injured is reduced, and the fit between the template and the steel bar is improved. Effect.
Smart Images

Figure CN118933360A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of steel bar tying wires, in particular to a high-efficiency steel bar tying wire binding device for building construction. Background Art
[0002] Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. In engineering construction, in order to ensure the rigidity and stability of the foundation or support column, the reinforcement is combined together to form a complete grid, which is figuratively called "rebar cage", "rebar mesh", "rebar skeleton", etc. A complete steel grid is conducive to restraining concrete and improving the integrity of concrete components;
[0003] The formation and fixation of the steel skeleton is a cumbersome process. At present, the wire tying method is often used to connect and fix the steel bars. Since the wire tying work in the steel skeleton is large and the process is complicated, it is necessary to use a tying device to assist the wire tying operation to reduce the work intensity of the staff. However, the existing wire tying devices often have the following problems in actual use:
[0004] The specifications of existing wire binders are roughly the same. It is difficult for workers to select suitable binders according to their own height and the height of the binding work platform, and the effect of reducing labor intensity is not obvious. In addition, after the existing binders are used to bind the wires, the winding and knotted parts of the wires are often exposed above the steel bar layer, which increases the probability of workers being bumped and scratched when walking on the upper layer of the steel bars, and also increases the unevenness of the steel bar binding layer, affecting the support and fitting effect of the later formwork. Summary of the invention
[0005] The present invention provides a high-efficiency steel bar wire binding device for construction, so as to solve the technical problems that after the wire binding is completed, the winding and knotting parts of the steel wires of the existing binding devices are often exposed above the steel bar layer, which increases the probability of workers being bumped and scratched when walking on the upper layer of the steel bars, and affects the supporting and fitting effect of the later formwork.
[0006] The present invention adopts the following technical solution: an efficient steel bar wire binding device for construction, comprising steel bars and steel wires, wherein guide rods are symmetrically installed above the steel bars, and the steel wires are movably installed in the guide rods;
[0007] The guide rod is vertically installed at two opposite angles of the intersection of the steel bars, a lifting frame is fixedly installed on the upper part of the guide rod, a guide frame is fixedly installed on the middle part of the guide rod, the lifting frame and the guide frame are both rectangular frame structures, a winding frame is movably installed at the lower part of the guide rod, an extrusion sheet is commonly installed between the guide frame and the lifting frame, the extrusion sheet is parallel to the central axis of the guide rod and the extrusion sheets are respectively located at two opposite corners of the guide frame, a plug-in rod is fixedly installed on the side of the lifting frame, the plug-in rod is respectively located on both sides of the extrusion sheet, and the lower end of the extrusion sheet is fixedly connected to the plug-in rod, and a placement frame is slidably installed on the plug-in rod.
[0008] Preferably, the guide rod is a two-section structure, the upper half of the guide rod is an extension part, and the lower half of the guide rod is a fixed part. A gap is reserved between the extension part and the fixed part to cooperate with the steel wire, and the extension part and the fixed part are fixedly connected by a docking piece. The guide frame is located at the connecting position between the extension part and the fixed part, and hollow chambers that are interconnected and slidably cooperate with the steel wire are symmetrically opened in the fixed part and the extension part.
[0009] Preferably, the docking pieces are respectively located on both sides of the central axis of the guide rod, an annular hole that slides with the steel wire is provided in the middle of the docking piece, and guide pieces are symmetrically installed in the hollow chambers of the fixed part and the extended part close to the position of the docking piece. The guide piece is "V"-shaped, and the tip of the guide piece points to the central axis of the guide rod.
[0010] Preferably, the winding frame includes a fixed rod, a pushing rod and a winding ring, the fixed rod is fixedly installed at the lower end of the fixed part, the central axis of the fixed rod is parallel to the central axis of the guide rod, the pushing rod is perpendicular to the central axis of the fixed rod as a whole, a first sliding groove is opened at the front of the pushing rod, the lower end of the fixed rod slides through the first sliding groove, and a first spring is connected between the lower end outer wall of the fixed rod and the inner wall of the first sliding groove, and a winding ring is movably installed at the front of the pushing rod.
[0011] Preferably, a propulsion plate is fixedly installed at the front end of the propulsion rod, and the propulsion plate is a "bow"-shaped structure. The winding rings are respectively located at the upper and lower ends of the propulsion plate. A second slide groove is opened at the rear of the propulsion rod, and a tension rod is slidably installed in the second slide groove. A second spring is connected between the middle part of the tension rod and the inner wall of the second slide groove. Pull rings are installed on the fixed rod and the propulsion rod, and a toggle rod is slidably installed on the upper end of the fixed rod. A pull rope is connected between the toggle rod and the tension rod, and the middle part of the pull rope slides through the pull rings on the fixed rod and the propulsion rod respectively.
[0012] Preferably, the winding rings are all semi-circular ring structures with the same structure. A clamping groove matching with the steel wire is formed in the middle of the winding ring. A guiding plate is fixedly installed at the upper end of the pushing plate. An inclined surface is arranged in the upper middle part of the guiding plate, and the bottom of the inclined surface points to the clamping groove. Ring-shaped grooves are formed on both the upper and lower sides of the winding ring. A clamping shaft slidingly clamped with the ring-shaped groove is arranged on the pushing plate. A permanent magnet block is arranged at the end of the annular surface of the winding ring. The end faces of two winding rings arranged oppositely at the same height are complementary to each other.
[0013] Preferably, cross bars are installed at both the upper and lower ends of the tension rod through bearings. A torsion spring is connected between the cross bar and the tension rod. The end of the cross bar is slidably abutted against the side wall of the winding ring. A semi-toothed ring is arranged in the middle of the circular ring surface of the winding ring. A meshing tooth meshing with the semi-toothed ring is arranged on the side wall of the cross bar.
[0014] Preferably, the placement rack includes an operating rod, a "U"-shaped plate, a placement shaft and a compression spring. A "U"-shaped plate is jointly installed between the insertion rods on both sides of the extrusion sheet in a sliding fit manner. A connecting block is fixedly installed in the middle of the "U"-shaped plate. The operating rod is in a "匚"-shaped structure with an opening downward. The lower part of the operating rod is fixedly connected with the connecting block. The upper part of the operating rod is located in the lifting frame, and a permanent magnet sheet that adsorbs each other is arranged at the contact part between the upper part of the operating rod and the lifting frame. A placement shaft is jointly installed between the "U"-shaped plate and the connecting block in a sliding fit manner. The middle part of the placement shaft is connected with the "U"-shaped plate through a compression spring.
[0015] Preferably, a spherical block is fixedly arranged at the end of the placement shaft close to the extrusion sheet direction, and the spherical block is slidably abutted against the side wall of the extrusion sheet. A bent part away from the placement shaft direction is arranged at the upper end of the extrusion sheet.
[0016] Preferably, the placement shafts are respectively located on both sides of the central axis of the guiding rod, and the ends of two placement shafts arranged oppositely are in contact with each other. Pressing sheets are symmetrically installed up and down at the contact end of the placement shaft. The pressing sheet is in a "V"-shaped structure and is in contact with the steel wire.
[0017] Advantages of the present invention:
[0018] (1) For the high-efficiency steel bar tying wire binding device for building construction of the present invention, through the guiding rod with a two-stage design, the staff can complete the steel wire binding operation of the steel bar at a suitable height position, reducing the labor intensity. Through the staggered insertion and abutting action around the steel bar crossing part, the operation stability during the steel wire feeding and binding process can be enhanced. Through the operation mode of one-way pulling or pressing, the operation complexity during the steel wire binding process can be reduced. At the same time, the binding part of the steel wire and the steel bar can be adaptively bent and automatically positioned. The arranged pressing sheet can expand the bending arc of the steel wire and thereby increase the contact range when the steel wire is in contact with the steel bar, improving the stability of the connection part after binding.
[0019] (2) The invention discloses a high-efficiency steel wire tie for construction, which can automatically cross and twist the steel wires in a bent state through a docking winding ring, thereby improving the efficiency of the steel bar tying operation. By tying the steel wire ends downward, the winding and knotting parts of the tying can be directed below the steel bar layer, thereby improving the flatness of the upper layer of the steel bars and reducing the probability of workers being bumped and scratched when walking on the upper layer of the steel bars. At the same time, the fitting effect between the formwork and the steel bars in the later pouring process is increased. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0021] Figure 1 It is a schematic diagram of a first working state of the present invention;
[0022] Figure 2 It is a schematic diagram of a second working state of the present invention;
[0023] Figure 3 For the present invention Figure 2 A top view schematic diagram of
[0024] Figure 4 It is a partial cross-sectional plan view schematic diagram of the present invention;
[0025] Figure 5 It is a schematic diagram of the positional relationship between the guide rod and the steel wire of the present invention;
[0026] Figure 6 It is a partial cross-sectional three-dimensional structural schematic diagram of the present invention;
[0027] Figure 7 For the present invention Figure 6 A magnified schematic diagram of point A;
[0028] Figure 8 It is a schematic diagram of the positional relationship among the plug-in rod, the guide frame and the placement shaft of the present invention;
[0029] Fig. 9 It is a schematic diagram of the positional relationship among the fixing rod, the fixing part and the steel wire of the present invention;
[0030] Fig.10 For the present invention Fig. 9 An enlarged schematic diagram of point B;
[0031] Fig.11It is a schematic diagram of the positional relationship among the fixing rod, the propulsion rod and the propulsion plate of the present invention;
[0032] In the figure: 00, steel bar; 01, steel wire; 1, guide rod; 2, lifting frame; 3, guide frame; 4, winding frame; 5, extrusion sheet; 6, plug-in rod; 7, placement frame; 11, extension part; 12, fixing part; 13, docking sheet; 14, guide sheet; 41, fixing rod; 42, push rod; 43, winding ring; 421, first slide groove; 422, first spring; 423, push plate; 424, second slide groove; 425, tension rod ; 426, second spring; 411, pull ring; 412, toggle rod; 413, pull rope; 428, guide plate; 431, annular groove; 432, clamping shaft; 433, permanent magnet block; 427, cross bar; 434, half gear ring; 71, operating rod; 72, "U"-shaped plate; 73, placement shaft; 74, compression spring; 721, connecting block; 711, permanent magnet sheet; 731, spherical block; 51, bending portion; 732, pressing sheet. DETAILED DESCRIPTION
[0033] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0034] An embodiment of the present invention is shown in Figures 1 to 3 A high-efficiency steel bar 00 wire binding device for construction includes a steel bar 00 and a steel wire 01. A guide rod 1 is symmetrically installed above the steel bar 00, and the steel wire 01 is movably installed in the guide rod 1.
[0035] As an embodiment of the present invention, Figure 2 , Figure 4 and Figure 5As shown, the guide rod 1 is vertically installed at two opposite angles of the intersection of the steel bars 00, a lifting frame 2 is fixedly installed on the upper part of the guide rod 1, a guide frame 3 is fixedly installed in the middle part of the guide rod 1, the lifting frame 2 and the guide frame 3 are both rectangular frame structures, a winding frame 4 is movably installed at the lower part of the guide rod 1, an extrusion sheet 5 is installed between the guide frame 3 and the lifting frame 2, the extrusion sheet 5 is parallel to the central axis of the guide rod 1 and the extrusion sheet 5 is respectively located at two opposite corners of the guide frame 3, a plug-in rod 6 is fixedly installed on the side of the lifting frame 2, the plug-in rod 6 is respectively located on both sides of the extrusion sheet 5, and the lower end of the extrusion sheet 5 is fixedly connected to the plug-in rod 6, a placement frame 7 is slidably installed on the plug-in rod 6, the guide rod 1 is a two-section structure, and the upper half of the guide rod 1 is The extension part 11, the lower half of the guide rod 1 is the fixed part 12, a gap is reserved between the extension part 11 and the fixed part 12 to match the steel wire 01, and the extension part 11 and the fixed part 12 are fixedly connected by a docking piece 13, the guide frame 3 is located at the connecting position of the extension part 11 and the fixed part 12, and hollow chambers that are interconnected and slidably matched with the steel wire 01 are symmetrically opened in the fixed part 12 and the extension part 11, the docking piece 13 is respectively located on both sides of the central axis of the guide rod 1, and an annular hole that slides with the steel wire 01 is provided in the middle of the docking piece 13, and guide pieces 14 are symmetrically installed in the hollow chambers of the fixed part 12 and the extension part 11 near the position of the docking piece 13, the guide piece 14 is "V"-shaped, and the tip of the guide piece 14 points to the central axis of the guide rod 1.
[0036] During the specific work, the staff first connects and assembles the extension part 11 and the fixed part 12 to make the guide rod 1 reach the optimal operating length when the user is working. After the connection is completed, the connecting part between the extension part 11 and the fixed part 12 is locked by the docking piece 13, thereby locking the overall length of the guide rod 1. Subsequently, the staff pre-cuts the steel wire 01 to be tied into small sections of predetermined length.
[0037] As an embodiment of the present invention, Figures 6 to 8As shown in the figure, the placement frame 7 includes an operating rod 71, a "U"-shaped plate 72, a placement shaft 73, and a compression spring 74. A "U"-shaped plate 72 is jointly installed between the insertion rods 6 located on both sides of the extrusion piece 5 in a sliding fit manner. A connecting block 721 is fixedly installed in the middle of the "U"-shaped plate 72. The operating rod 71 is in a "匚"-shaped structure with an opening facing downwards. The lower part of the operating rod 71 is fixedly connected to the connecting block 721. The upper part of the operating rod 71 is located inside the lifting frame 2, and permanent magnet pieces 711 that attract each other are arranged at the contact part between the upper part of the operating rod 71 and the lifting frame 2. A placement shaft 73 is jointly installed between the "U"-shaped plate 72 and the connecting block 721 in a sliding fit manner. The middle part of the placement shaft 73 is connected to the "U"-shaped plate 72 through a compression spring 74. A spherical block 731 is fixedly arranged at the end of the placement shaft 73 close to the extrusion piece 5, and the spherical block 731 slides and abuts against the side wall of the extrusion piece 5. A bent part 51 that extends away from the placement shaft 73 is arranged at the upper end of the extrusion piece 5. The placement shafts 73 are respectively located on both sides of the central axis of the guiding rod 1, and the ends of the two opposing placement shafts 73 are in contact with each other. Pressing pieces 732 are symmetrically installed above and below the contact end of the placement shaft 73. The pressing pieces 732 are in a "V"-shaped structure, and the pressing pieces 732 are in contact with the steel wire 01.
[0038] During specific operation, in the initial working condition, the "U"-shaped plate 72 is located below the insertion rods 6. At this time, the upper end of the operating rod 71 is in contact with the upper end surface of the lifting frame 2, and the permanent magnet pieces 711 symmetrically arranged at the contact part between the operating rod 71 and the lifting frame 2 are in a state of attracting each other. Subsequently, when the preparation work is completed, the operating rod 71 is lifted by the staff. Under the adsorption action of the permanent magnet pieces 711, the lifting frame 2 is lifted synchronously. Through the handling of the staff, the guiding rod 1 and its accessories reach above the intersection of the reinforcing bars 00 to be tied. Subsequently, the operating rod 71 is lowered, and the insertion rods 6 are moved towards the reinforcing bars 00 through the lifting frame 2. When the insertion rods 6 are lowered to the predetermined height position, the lower ends of the insertion rods 6 pass through the intersection of the reinforcing bars 00 to the lower side of the reinforcing bars 00, and the side walls of the two insertion rods 6 respectively abut against the side walls of the two intersecting reinforcing bars 00. During the downward movement of the insertion rods 6, the fixing parts 12 move downward synchronously and enter the other two included angle positions of the intersecting part of the reinforcing bars 00. At this time, under the four-directional limiting and separating action of the fixing parts 12 and the insertion rods 6, the positions among the fixing parts 12, the insertion rods 6, and the reinforcing bars 00 are in a relatively locked state;
[0039] The staff then continues to push the operating rod 71 downward until the placement shaft 73 abuts against the outer wall of the reinforcing bar 00. Then, the staff inserts the pre-cut small section of steel wire 01 into the annular hole in the middle of the docking piece 13. After entering, the steel wire 01 horizontally passes through the gap between the extension portion 11 and the fixing portion 12, and passes out from the annular hole in the middle of the docking piece 13 on the other side. Then, the fixing portion 12 and the plug-in rod 6 are kept in a vertical placement state at the predetermined position, and the operating rod 71 is pulled up to release the mutual adsorption of the permanent magnetic sheet 711 between the operating rod 71 and the lifting frame 2. Through the staff's upward pull, the operating rod 71 drives the "U"-shaped plate 72 to slide upward on the plug-in rod 6. At this time, under the push of the elastic force of the compression spring 74, the spherical block 731 at the end of the placement shaft 73 When the lever 72 is in the unlocked position, the locking cam 732 is in the unlocked position, and ...
[0040] Then, when the placing shaft 73 drives the bent steel wire 01 to move upward synchronously, when the spherical block 731 slides to the position of the bending portion 51 of the extrusion sheet 5, the spherical block 731 slides into the bending portion 51 under the elastic force of the compression spring 74. At this time, the two placing shafts 73 in the fitted state move away from each other and gradually release the bottom support for the steel wire 01. Then, under the action of gravity, the steel wire 01 slides downward along the hollow chamber of the extension portion 11 and reaches the lower position of the placing shaft 73. Then, the cylinder staff presses the operating rod 71 downward again, and drives the placing shaft 73 to move downward through the operating rod 71. In the process of the placing shaft 73 moving downward, the spherical block 731 moves out of the bending portion 51 again, and the two opposing placing shafts 73 are again Approach and fit, then, under the further pushing action of the staff, the placing shaft 73 approaches the steel wire 01 below and gradually abuts against the bending part of the steel wire 01, then, the placing shaft 73 pushes the steel wire 01 to move downward synchronously, and the guide piece 14 arranged at the connecting part of the fixed part 12 and the extension part 11 can guide the end of the steel wire 01 so that it can smoothly transition in the hollow chamber of the fixed part 12 and the extension part 11. When the steel wire 01 descends to a predetermined height position, its bending part abuts against the upper side wall of the steel bar 00, and at this time, the operating rod 71 and the lifting frame 2 are again adsorbed and fixed by the permanent magnet piece 711, and the set pressing piece 732 can expand the bending curvature of the steel wire 01, thereby improving the contact range when the steel wire 01 and the steel bar 00 are fitted.
[0041] As an embodiment of the present invention, Figure 3 , Fig. 9 , Fig.10 and Fig.11As shown, the winding frame 4 includes a fixed rod 41, a pushing rod 42 and a winding ring 43. The fixed rod 41 is fixedly installed at the lower end of the fixed part 12. The central axis of the fixed rod 41 is parallel to the central axis of the guide rod 1. The pushing rod 42 is perpendicular to the central axis of the fixed rod 41 as a whole. A first slide groove 421 is opened at the front of the pushing rod 42. The lower end of the fixed rod 41 slides through the first slide groove 421, and a first spring 422 is connected between the outer wall of the lower end of the fixed rod 41 and the inner wall of the first slide groove 421. The front part of the pushing rod 42 is movably installed with a winding ring 43, and the front end of the pushing rod 42 is fixedly installed with a pushing plate 423, and the pushing plate 423 is " The winding rings 43 are semicircular ring structures with the same structure, and the winding rings 43 are respectively located at the upper and lower ends of the push plate 423. The upper and lower sides of the winding ring 43 are provided with annular grooves 431. The push plate 423 is provided with a clamping shaft 432 that is slidably engaged with the annular groove 431. The annular surface end of the winding ring 43 is provided with a permanent magnet block 433. The end faces of the two winding rings 43 that are oppositely arranged at the same height are complementary. A clamping groove that matches the steel wire 01 is provided in the middle of the winding ring 43. The upper end of the push plate 423 is fixedly installed with a guide plate 428. The middle and upper part of the guide plate 428 is provided with an inclined surface, and the bottom of the inclined surface points to the clamping groove.
[0042] A second slide groove 424 is provided at the rear of the push rod 42, a tension rod 425 is slidably installed in the second slide groove 424, a second spring 426 is connected between the middle of the tension rod 425 and the inner wall of the second slide groove 424, a pull ring 411 is installed on both the fixed rod 41 and the push rod 42, a toggle rod 412 is slidably installed on the upper end of the fixed rod 41, a pull rope 413 is connected between the toggle rod 412 and the tension rod 425, and the pull rope 413 The middle part slides through the pull ring 411 on the fixed rod 41 and the push rod 42 respectively, and the upper and lower ends of the tension rod 425 are installed with cross bars 427 through bearings. A torsion spring is connected between the cross bar 427 and the tension rod 425, and the end of the cross bar 427 slides against the side wall of the winding ring 43. A half gear ring 434 is provided in the middle of the annular surface of the winding ring 43, and the side wall of the cross bar 427 is provided with meshing teeth meshing with the half gear ring 434.
[0043] During specific operation, under the initial conditions, the second spring 426 has a better anti-deformation ability than the first spring 422. At this time, under the push of the elastic force of the first spring 422, the fixing rod 41 is located at the front end position of the first slide groove 421. At this time, the slot in the middle of the winding ring 43 is located on the central axis of the hollow chamber in the fixing portion 12, and the tension rod 425 is at the rear end position of the second slide groove 424 under the push of the elastic force of the second spring 426. When the steel wire 01 moves downward under the push of the placement shaft 73, its end portion directly enters the slot in the middle of the winding ring 43 under the inclined guiding action of the guide plate 428. When the steel wire 01 is dropped, the staff pulls the toggle rod 412 to move upward on the fixing rod 41, and then pulls the rope The connecting action of 413 pulls the tension rod 425. At this time, the deformation of the first spring 422 is greater than the second spring 426, so that the propulsion rod 42 gradually moves in the horizontal pulling direction of the pull rope 413, and then the propulsion plate 423 and the winding ring 43 are driven to move synchronously through the propulsion rod 42. The winding ring 43 makes a secondary bend in the steel wire 01 on its moving path through the slot until the two winding rings 43 arranged opposite to each other fit together. Through the adsorption action of the permanent magnet block 433, the two winding rings 43 in the fitted state can complement each other to form a complete circular ring, and at this time, the two ends of the steel wire 01 are cross-clamped in the slot in the middle of the winding ring 43. When the winding ring 43 is fitted, the relative position between the propulsion rod 42 and the fixed rod 41 is also locked.
[0044] Subsequently, as the staff continues to pull the toggle rod 412, the deformation of the second spring 426 increases significantly. At this time, the tension rod 425 gradually slides from the rear end to the front end of the second slide groove 424, and drives the cross bar 427 to move synchronously during the sliding process. At the same time, during the movement of the cross bar 427, the meshing teeth arranged on the side wall of the cross bar 427 mesh with the half gear ring 434 on the winding ring 43, and the winding ring 43 is rotated in the pushing plate 423. Through the clamping cooperation between the annular groove 431 and the clamping shaft 432, The rotation path of the winding ring 43 is limited and guided. During the rotation of the winding ring 43, the steel wires 01 in the crossed state are twisted and entangled with each other synchronously, thereby completing the binding of the steel bars 00. When the binding of the steel wires 01 is completed, the pulling effect on the toggle rod 412 is released, and then the winding frame 4 is reset under the elastic reset push of the first spring 422 and the second spring 426. Then, the staff lifts the lifting frame 2 to the next working position and repeats the above operations to complete the binding operation of multiple steel bars 00.
[0045] When working,
[0046] Step 1: First, the staff connects and assembles the extension part 11 and the fixing part 12 so that the guide rod 1 reaches the optimal operating length when the user is working. After the connection is completed, the connecting part between the extension part 11 and the fixing part 12 is locked by the docking piece 13, thereby locking the overall length of the guide rod 1. Subsequently, the staff pre-cuts the steel wire 01 to be tied into small sections of predetermined length;
[0047] The second step: the staff holds and lifts the operating rod 71, and under the adsorption effect of the permanent magnetic sheet 711, the lifting frame 2 is lifted synchronously, and the guide rod 1 and its accessories are carried by the staff to reach the top of the intersection of the steel bars 00 to be tied, and then the operating rod 71 is lowered, and the plug-in rod 6 is moved in the direction close to the steel bars 00 through the lifting frame 2. When the plug-in rod 6 is lowered to a predetermined height position, the lower end of the plug-in rod 6 passes from the intersection of the steel bars 00 to the bottom of the steel bars 00, and the side walls of the two plug-in rods 6 respectively abut against the side walls of the two intersecting steel bars 00. In the process of the plug-in rod 6 moving downward, the fixing part 12 moves downward synchronously and enters the other two angle positions of the staggered part of the steel bars 00. At this time, under the action of the four-way limiting barrier of the fixing part 12 and the plug-in rod 6, the positions of the fixing part 12, the plug-in rod 6 and the steel bars 00 are in a relatively locked state;
[0048] Step 3: The staff inserts the pre-cut small section of steel wire 01 into the annular hole in the middle of the docking piece 13. After entering, the steel wire 01 horizontally passes through the gap between the extension part 11 and the fixing part 12, and passes through the annular hole in the middle of the docking piece 13 on the other side. Pull up the operating rod 71, so that the placement shaft 73 drives the middle part of the steel wire 01 to move upward synchronously through the abutment effect. At this time, the two ends of the steel wire 01 are respectively limited and clamped by the docking pieces 13 on both sides. Under the upward push of the placement shaft 73, the middle part of the steel wire 01 gradually bends, and during the bending process, the two ends of the steel wire 01 gradually enter the hollow chamber of the extension part 11 until the steel wire 01 forms an inverted "U" shape as a whole.
[0049] Step 4: When the placement shaft 73 drives the bent steel wire 01 to move upward synchronously, when the spherical block 731 slides to the position of the bent portion 51 of the extrusion sheet 5, the spherical block 731 slides into the bent portion 51 under the elastic force of the compression spring 74. At this time, the two placement shafts 73 in the fitted state move away from each other and gradually release the bottom support for the steel wire 01. Subsequently, under the action of gravity, the steel wire 01 slides downward along the hollow chamber of the extension portion 11 and reaches the lower position of the placement shaft 73. Subsequently, the cylinder staff presses the operating rod 71 downward again, and then the placement shaft 73 pushes the steel wire 01 to move downward synchronously, so that its bent portion abuts against the upper side wall of the steel bar 00.
[0050] Step 5: After the steel wire 01 has been dropped, the staff member pulls the toggle rod 412 to move upward on the fixed rod 41 until the two oppositely arranged winding rings 43 are fitted together. Through the adsorption effect of the permanent magnet block 433, the two winding rings 43 in the fitted state can complement each other to form a complete ring, and at this time, the two ends of the steel wire 01 are cross-engaged in the slots in the middle of the winding rings 43. When the winding rings 43 are fitted together, the relative position between the push rod 42 and the fixed rod 41 is also locked;
[0051] Step 6: As the staff continues to pull the toggle rod 412, the tension rod 425 gradually slides from the rear end of the second slide groove 424 to the front end thereof, and drives the cross bar 427 to move synchronously during the sliding process. At the same time, during the movement of the cross bar 427, the meshing teeth arranged on its side wall mesh with the half gear ring 434 on the winding ring 43, and causes the winding ring 43 to rotate in the push plate 423. During the rotation of the winding ring 43, the steel wires 01 in the crossed state are twisted synchronously and entangled with each other, thereby completing the binding of the steel bars 00. When the binding of the steel wires 01 is completed, the pulling action on the toggle rod 412 is released, and then the winding frame 4 is reset under the elastic reset push of the first spring 422 and the second spring 426. Then, the lifting frame 2 is lifted to the next working position by the staff, and the above operations are repeated to complete the binding operation of multiple steel bars 00.
[0052] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. An efficient steel bar wire binding device for construction, comprising a steel bar (00) and a steel wire (01), characterized in that: A guide rod (1) is symmetrically installed above the steel bar (00), and the steel wire (01) is movably installed in the guide rod (1); The guide rod (1) is vertically installed at two opposite angles of the intersection of the steel bars (00); a lifting frame (2) is fixedly installed on the upper part of the guide rod (1); a guide frame (3) is fixedly installed in the middle part of the guide rod (1); the lifting frame (2) and the guide frame (3) are both rectangular frame structures; a winding frame (4) is movably installed at the lower part of the guide rod (1); an extrusion sheet (5) is installed between the guide frame (3) and the lifting frame (2); the extrusion sheet (5) is parallel to the central axis of the guide rod (1) and the extrusion sheet (5) is respectively located at two opposite corners of the guide frame (3); a plug-in rod (6) is fixedly installed on the side of the lifting frame (2); the plug-in rod (6) is respectively located on both sides of the extrusion sheet (5), and the lower end of the extrusion sheet (5) is fixedly connected to the plug-in rod (6); a placement frame (7) is slidably installed on the plug-in rod (6).
2. The high-efficiency steel bar tie wire binding device for construction according to claim 1, characterized in that: The guide rod (1) is a two-section structure, the upper half of the guide rod (1) is an extension part (11), and the lower half of the guide rod (1) is a fixed part (12). A gap is reserved between the extension part (11) and the fixed part (12) to match the steel wire (01), and the extension part (11) and the fixed part (12) are fixedly connected by a docking piece (13). The guide frame (3) is located at the connection position between the extension part (11) and the fixed part (12), and hollow chambers that are interconnected and slidably matched with the steel wire (01) are symmetrically opened in the fixed part (12) and the extension part (11).
3. The high-efficiency steel bar tie wire binding device for construction according to claim 2, characterized in that: The docking piece (13) is located on both sides of the central axis of the guide rod (1), and an annular hole is provided in the middle of the docking piece (13) for slidingly cooperating with the steel wire (01). Guide pieces (14) are symmetrically installed in the hollow chambers of the fixing part (12) and the extension part (11) near the docking piece (13). The guide piece (14) is "V"-shaped, and the tip of the guide piece (14) points to the central axis of the guide rod (1).
4. The high-efficiency steel bar tie wire binding device for construction according to claim 1, characterized in that: The winding frame (4) comprises a fixed rod (41), a pushing rod (42) and a winding ring (43); the fixed rod (41) is fixedly installed at the lower end of the fixed part (12); the central axis of the fixed rod (41) is parallel to the central axis of the guide rod (1); the pushing rod (42) is perpendicular to the central axis of the fixed rod (41); a first sliding groove (421) is provided at the front of the pushing rod (42); the lower end of the fixed rod (41) slides through the first sliding groove (421); a first spring (422) is connected between the lower end outer wall of the fixed rod (41) and the inner wall of the first sliding groove (421); and a winding ring (43) is movably installed at the front of the pushing rod (42).
5. The high-efficiency steel bar tie wire binding device for construction according to claim 4 is characterized in that: A push plate (423) is fixedly installed at the front end of the push rod (42). The push plate (423) is in a "bow" - shaped structure. Winding rings (43) are respectively located at the upper and lower ends of the push plate (423). A second chute (424) is opened at the rear part of the push rod (42). A tension rod (425) is slidably installed in the second chute (424). A second spring (426) is connected between the middle part of the tension rod (425) and the inner wall of the second chute (424). Pulling rings (411) are installed on both the fixed rod (41) and the push rod (42). A toggle rod (412) is slidably installed at the upper end of the fixed rod (41). A pull rope (413) is connected between the toggle rod (412) and the tension rod (425), and the middle part of the pull rope (413) slidably penetrates through the pulling rings (411) on the fixed rod (41) and the push rod (42) respectively.
6. The high-efficiency steel bar tie wire binding device for construction according to claim 5, characterized in that: The winding rings (43) are both semi - circular ring structures with the same structure. A card slot matching with the steel wire (01) is opened in the middle of the winding ring (43). A guiding plate (428) is fixedly installed at the upper end of the push plate (423). An inclined surface is arranged at the upper middle part of the guiding plate (428), and the bottom of the inclined surface points to the card slot. Ring - shaped grooves (431) are opened on both the upper and lower sides of the winding ring (43). A card shaft (432) slidably clamped with the ring - shaped groove (431) is arranged on the push plate (423). A permanent magnet block (433) is arranged at the end of the circumferential surface of the winding ring (43). The end faces of two winding rings (43) arranged oppositely at the same height are complementary.
7. The high-efficiency steel bar tie wire binding device for construction according to claim 5, characterized in that: Cross bars (427) are installed at both the upper and lower ends of the tension rod (425) through bearings. A torsion spring is connected between the cross bar (427) and the tension rod (425), and the end of the cross bar (427) slidably abuts against the side wall of the winding ring (43). A semi - gear ring (434) is arranged in the middle of the circular surface of the winding ring (43). Meshing teeth meshing with the semi - gear ring (434) are arranged on the side wall of the cross bar (427).
8. The high-efficiency steel bar tie wire binding device for construction according to claim 1, characterized in that: The placement rack (7) includes an operating rod (71), a "U" - shaped plate (72), a placement shaft (73) and a compression spring (74). A "U" - shaped plate (72) is jointly installed between the insertion rods (6) on both sides of the extrusion piece (5) in a sliding fit manner. A connecting block (721) is fixedly installed in the middle of the "U" - shaped plate (72). The operating rod (71) is in a "匚" - shaped structure with the opening downward. The lower part of the operating rod (71) is fixedly connected to the connecting block (721). The upper part of the operating rod (71) is located in the lifting frame (2), and permanent magnet sheets (711) that adsorb each other are arranged at the contact part between the upper part of the operating rod (71) and the lifting frame (2). A placement shaft (73) is jointly installed between the "U" - shaped plate (72) and the connecting block (721) in a sliding fit manner. The middle part of the placement shaft (73) is connected to the "U" - shaped plate (72) through a compression spring (74).
9. The high-efficiency steel bar tie wire binding device for construction according to claim 8, characterized in that: A spherical block (731) is fixedly arranged at the end of the placement shaft (73) close to the extrusion sheet (5), and the spherical block (731) slides against the side wall of the extrusion sheet (5), and the upper end of the extrusion sheet (5) is provided with a bent portion (51) away from the placement shaft (73).
10. The high-efficiency steel bar tie wire binding device for construction according to claim 9, characterized in that: The placement shafts (73) are respectively located on both sides of the central axis of the guide rod (1), and the ends of the two placement shafts (73) arranged opposite to each other are fitted together. The fitting ends of the placement shafts (73) are symmetrically installed with pressing plates (732) in the upper and lower parts. The pressing plates (732) are of a "V"-shaped structure, and the pressing plates (732) are fitted together with the steel wire (01).
Citation Information
Patent Citations
Steel bar binding tool and method
CN113187246A
House building column binding steel bar binding device
CN114856207A
Fabricated building reinforcement cage binding device
CN217142155U
string binding tools for binding together the steel frame
KR1020110045432A
Reinforcing bar binding machine
US5983473A
