Efficient supporting structure for hollow prefabricated floor slab
By using a combination structure of steel cables and support members, providing a bottom-up support force, solving the problems of high cost and low installation efficiency of hollow prefabricated floor slab support, achieving efficient and economical floor slab support effect.
Patent Information
- Application Number
- CN202410999124.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-24
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-24
AI Technical Summary
The support method of the prior art hollow prefabricated floor slabs is costly and has low installation efficiency, requiring the use of high-end steel and crane equipment, which cannot meet the load needs of modern buildings.
Using at least two wire ropes and support members, the wire rope is tightened by fasteners to provide bottom-up support, simplifying the installation process and reducing steel use and equipment requirements.
An efficient support structure that meets the requirements of floor slab support is realized, reducing costs and installation time, improving construction efficiency, and simplifying the installation process.
Smart Images

Figure CN118933389A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of floor slab support, and in particular to a high-efficiency support structure for a hollow prefabricated floor slab. Background Art
[0002] In some old buildings that were built earlier, due to their age, the functional layout of the building has changed with the changes in user needs, and the increasing number of machines and equipment has led to an increasing load on the entire building, exceeding the original design load value. Most of the old buildings are hollow prefabricated floor slabs, which have insufficient reinforcement and poor integrity. They are connected to the frame structure only by the end lap joints, and the mid-span bending moment resistance performance is extremely poor. The seismic performance is far from meeting the requirements of current specifications. Therefore, it is currently necessary to carry out seismic reinforcement of the floor slabs to meet the support requirements of the floor slabs.
[0003] At present, the basic support method for hollow prefabricated floor slabs is to add steel beams at the bottom of the floor slabs. The steel beams need to be cut, lowered and rotated in the early stage so that the steel beams and the concrete structure beams can be fixed through post-embedded parts. In addition, the steel beams need to use higher-grade steel and need to be coated with rust-proof and fire-proof coatings. The overall material price is relatively expensive, and the overall steel material is heavy. During installation, it needs to be equipped with cranes and other handling equipment, which not only increases the cost, but also wastes time and effort, and reduces efficiency. Summary of the Invention
[0004] In response to the shortcomings of the existing technology, the present invention provides an efficient support structure for hollow prefabricated floor slabs, which solves the problem that the existing technology of using steel to support hollow prefabricated floor slabs is not only costly but also requires cranes and other handling equipment during installation, resulting in reduced efficiency.
[0005] According to an embodiment of the present invention, a hollow prefabricated floor slab high-efficiency support structure for supporting a prefabricated floor slab body comprises:
[0006] At least two steel cables, with supports provided between the steel cables and the prefabricated floor slab, the supports abutting against the middle of the prefabricated floor slab and mounted on each of the steel cables;
[0007] Two fasteners are respectively fixed at two ends of the prefabricated floor slab body and respectively connected to two ends of each steel cable for tightening the steel cable.
[0008] Compared with the prior art, the present invention has the following beneficial effects:
[0009] In this solution, two fasteners are respectively provided at both ends of the prefabricated floor slab, corresponding to the overlapped positions of the ends of the prefabricated floor slab, and a steel cable is connected between the two fasteners, so that the prefabricated floor slab, the fasteners and the steel cable form a closed space, and then the support is placed in this space, and the steel cable is tightened by the fasteners, so that the support is subjected to the force brought by the steel cable, and this force is transmitted to the bottom of the prefabricated floor slab, so that the middle part of the prefabricated floor slab is subjected to the supporting force from bottom to top, and when the middle part of the prefabricated floor slab is subjected to force, it can also be supported by the support at its bottom. The support is carried out and the force is transmitted to both ends of the prefabricated floor slab body, so that the prefabricated floor slab body forms a force-bearing main body, which meets the current floor slab support requirements. At the same time, the entire support structure is relatively simple. It is only necessary to install the fasteners and the steel cables between them to provide an installation position for the support members. The support members only need to abut against the middle part of the bottom end of the prefabricated floor slab body to complete the support of the prefabricated floor slab body. It not only reduces the use of steel, but also reduces the size of the steel. There is no need to use other lifting auxiliary equipment in conjunction with construction, which controls costs while improving work efficiency.
[0010] Preferably, the fastener includes two fixed tubes mirror-imaged at the ends of the prefabricated floor slab, a connecting rod connecting the two fixed tubes, a fastening screw rotatably arranged on the connecting rod, and an L-shaped rod passed through the fixed tube, a threaded sleeve is fixed between the two L-shaped rods, the threaded sleeve is threadedly connected to the fastening screw, and a steel cable is arranged on the L-shaped rod.
[0011] Preferably, a reinforcing rod is fixed at the corner of the L-shaped rod, so that the cross section of the corner of the L-shaped rod is a closed triangular structure.
[0012] Preferably, the L-shaped rod is provided with a plurality of limiting rings, and the steel cable is arranged between two adjacent limiting rings.
[0013] Preferably, there are two steel cables, and the support member includes an I-beam and columns provided at both ends of the I-beam, the two columns are respectively mounted on the two steel cables, and the I-beam abuts against the middle of the prefabricated floor slab.
[0014] Preferably, the column includes support rods rotatably arranged on both sides of the I-beam web, the flange of the I-beam is provided with a limit seat, and the two support rods are respectively abutted against the two limit seats so that the two support rods have an angle.
[0015] Preferably, a mounting seat is rotatably provided at the end of the support rod, the mounting seat is provided with a groove, the groove is clamped to the steel cable, and a limiting bolt is passed through the mounting seat for limiting the steel cable in the groove.
[0016] Preferably, both end openings of the groove have arc-shaped surfaces.
[0017] Preferably, the I-beam is provided with slots corresponding to the plurality of support rods. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 2 is a schematic diagram of the main structure of an embodiment of the present invention.
[0019] Figure 2 2 is a bottom view structural diagram of an embodiment of the present invention.
[0020] Figure 3 Schematic diagram of the structure of a fastener in an embodiment of the present invention.
[0021] Figure 4 Schematic diagram of the structure of the support member in an embodiment of the present invention.
[0022] In the above drawings: 1. Prefabricated floor slab; 2. Steel cable; 3. Support member; 301. I-beam; 302. Support rod; 303. Mounting seat; 304. Limit bolt; 305. Slot; 306. Limit seat; 307. Arc surface; 4. Fastener; 401. Fixing tube; 402. Connecting rod; 403. Fastening screw; 404. L-shaped rod; 405. Reinforcing rod; 406. Limit ring; 407. Threaded sleeve. DETAILED DESCRIPTION
[0023] The technical solutions of the present invention are further described below with reference to the accompanying drawings and embodiments.
[0024] like Figure 1 and Figure 2 As shown, the embodiment of the present invention provides an efficient support structure for a hollow prefabricated floor slab, which is used to support a prefabricated floor slab body 1, comprising:
[0025] At least two steel cables 2, with support members 3 provided between the steel cables 2 and the prefabricated floor slab 1, the support members 3 abutting against the middle of the prefabricated floor slab 1 and mounted on each of the steel cables 2;
[0026] Two fasteners 4 are respectively fixed on both ends of the prefabricated floor slab 1 and connected to both ends of each steel cable 2 for tightening the steel cables 2 .
[0027] In the embodiment of the present invention, the fasteners 4 are first installed and installed at both ends of the prefabricated floor body 1 respectively, so that their installation positions correspond to the end overlap positions of the prefabricated floor body 1. When the fasteners 4 are subjected to force, the fasteners 4 transmit the force to the end overlap of the prefabricated floor body 1. Then the steel cable 2 is erected and the steel cable 2 is placed between the two fasteners 4 and connected, so that the prefabricated floor body 1, the fasteners 4 and the steel cable 2 form a closed space. Then the support 3 is placed in this space. In the initial installation state of the steel cable 2, the distance between the middle part and the middle part of the prefabricated floor body 1 is greater than the height of the support 3. Therefore, by adjusting the fasteners 4, the two fasteners 4 pull the two ends of the steel cable 2, so that the steel cable 2 is gradually tightened and exerts force on the support 3, so that this force is transmitted to the bottom of the prefabricated floor body 1, so that the middle part of the prefabricated floor body 1 is supported from bottom to top.
[0028] After the fasteners 4, steel cables 2 and support members 3 are installed, when the middle part of the precast floor slab body 1 is subjected to force, the bottom of the precast floor slab body 1 can be supported, and the force can be transferred to both ends of the precast floor slab body 1, so that the precast floor slab body 1 forms a force-bearing main body, which meets the current floor slab support requirements. Moreover, the entire support structure is simple and easy to install, and it is only necessary to install the fasteners 4 and the steel cables 2 therebetween to provide an installation position for the support members 3, and the support members 3 only need to abut against the middle part of the bottom end of the precast floor slab body 1 to complete the support of the precast floor slab body 1, which not only reduces the use of steel, but also reduces the size of the steel. There is no need to use other lifting auxiliary equipment in conjunction with construction, which controls costs while improving work efficiency. In order to ensure good support for the support members 3, the number of steel cables 2 arranged is greater than two.
[0029] Based on the above scheme, if Figure 1 and Figure 3 As shown, the fastener 4 includes two fixed cylinders 401 mirror-imaged at the ends of the prefabricated floor slab body 1, a connecting rod 402 connecting the two fixed cylinders 401, a fastening screw 403 rotatably arranged on the connecting rod 402, and an L-shaped rod 404 passing through the fixed cylinder 401, a threaded sleeve 407 is fixed between the two L-shaped rods 404, the threaded sleeve 407 is threadedly connected to the fastening screw 403, and the steel cable 2 is arranged on the L-shaped rod 404.
[0030] First, install the fasteners 4. During installation, the prefabricated floor slab body 1 is positioned and drilled. The drilling positions are offset from the original steel bar layout positions of the prefabricated floor slab body 1 to avoid structural damage. After drilling, use a steel brush to remove the loose layer in the hole, and then use an air compressor to blow out the dust in the hole to ensure that the hole is clean and dust-free. After cleaning the holes, seal the clean holes with cotton yarn to prevent secondary pollution, thereby improving project efficiency. The opening direction of the holes is inclined, which not only adapts to the layout direction of the steel cable 2, but also increases the contact area between the prefabricated floor slab body 1 and the L-shaped rod 404. Then put the chemical anchoring agent into the hole, and slowly insert the fixing tubes 401 at both ends of the connecting rod 402 into the hole. It is appropriate to have a little glue overflow on the surface. Before the chemical anchoring agent is cured, the fixing tubes 401 must not be disturbed. After the fixing tubes 401 at both ends of the prefabricated floor body 1 are fixedly installed, the two ends of the steel cable 2 can be fixedly installed on the L-shaped rod 404 provided on the fixing tube 401. The installation method includes but is not limited to welding and winding. After the support member 3 is erected on the two steel cables 2, the tightening screw 403 is tightened by rotating it. 403 is rotatably arranged on the connecting rod 402 so that it can only rotate on the connecting rod 402 and will not move. Therefore, the threaded sleeve 407 drives the L-shaped rods 404 at both ends to move synchronously into the fixed cylinder 401 under the transmission of the fastening screw 403. While the L-shaped rod 404 moves, the steel cable 2 installed on it is pulled until the steel cable 2 is tightened and the fastening screw 403 can no longer be adjusted. The adjustment of the fastening screw 403 is then canceled, thereby ensuring that the support member 3 is firmly in contact with the bottom of the prefabricated floor slab body 1, completing the installation of the support member 3.
[0031] Specifically, such as Figure 2 As shown, a reinforcing rod 405 is fixed at the corner of the L-shaped rod 404 so that the cross-section at the corner of the L-shaped rod 404 is a closed triangular structure; after the L-shaped rod 404 is processed, a reinforcing rod 405 is welded at the corner position of the L-shaped rod 404. When the L-shaped rod 404 is subjected to the tension of the steel cable 2, the structural strength can be increased by the action of the reinforcing rod 405, and a triangular structure can be formed, thereby improving the compressive strength of the L-shaped rod 404 and ensuring an efficient support effect.
[0032] Specifically, such as Figure 2 As shown, the L-shaped rod 404 is provided with a plurality of limiting rings 406, and the steel cable 2 is arranged between two adjacent limiting rings 406; the two adjacent limiting rings 406 form an installation position for installing the steel cable 2. When the steel cable 2 is installed between the two limiting rings 406, it will not be in a lateral position on the L-shaped rod 404, thereby ensuring the stability of the steel cable 2 after installation.
[0033] Based on the above scheme, if Figure 1 and Figure 4As shown, there are two steel cables 2, and the support member 3 includes an I-beam 301 and columns arranged at both ends of the I-beam 301. The two columns are respectively mounted on the two steel cables 2, and the I-beam 301 abuts the middle part of the prefabricated floor slab body 1. Taking the arrangement of two steel cables 2 as an example, the steel cables 2 are respectively arranged on both sides of the prefabricated floor slab body 1. At the same time, when the flange of the I-beam 301 abuts the bottom center of the prefabricated floor slab body 1, and the columns at both ends of the I-beam 301 are respectively mounted on the two steel cables 2, the I-beam 301 and the columns are generally T-shaped, so that the steel cables 2 form a V-shape after being straightened, ensuring the normal force transmission effect of the steel cables 2 and indirectly improving the stability of the support of the prefabricated floor slab body 1.
[0034] Secondly, if Figure 4 When the support member 3 is erected, the two support rods 302 are opened and the support rods 302 are opened, so that the support rods 302 have an included angle.
[0035] like Figure 2 As shown, a mounting seat 303 is rotatably provided at the end of the support rod 302, and the mounting seat 303 is provided with a groove, which is engaged with the steel cable 2, and a limiting bolt 304 is passed through the mounting seat 303 to limit the steel cable 2 in the groove; the mounting seat 303 is provided with a groove to make its shape U-shaped, and when it is installed on the steel cable 2, the groove can be engaged with the steel cable 2, so that the steel cable 2 will not move when supporting the entire support member 3, so that the steel cable 2 is always in the groove, thereby improving the stability of the installation, and after the steel cable 2 is placed in the groove, the limiting bolt 304 is passed through the groove to improve the limiting effect of the steel cable 2, so that the support member 3 will not fall.
[0036] Specifically, such as Figure 2 As shown, both end openings of the groove have arc-shaped surfaces 307 , which guide the steel cable 2 at the opening of the groove and increase the contact area between the groove opening and the steel cable 2 , thereby preventing the steel cable 2 from breaking.
[0037] Specifically, such as Figure 2As shown, the I-beam 301 is provided with slots 305 corresponding to the support rods 302; with the cooperation of the slots 305, the support rods 302 can be directly snapped into the slots 305, thereby reducing the occupied area of the support member 3, and after batch processing is completed, it can be convenient for its storage and transportation.
[0038] In summary, this solution can transfer the pressure on the middle part of the prefabricated floor slab body 1 to the two ends of the prefabricated floor slab body 1 through the action of the steel cable 2 and the support 3, and then the load is carried by the lap beams at both ends of the prefabricated floor slab body 1, so that the prefabricated floor slab body 1 becomes a load-bearing main body, thereby improving the load-bearing effect of the entire prefabricated floor slab body 1 and meeting the use requirements. In addition, the various structures used are all materials commonly used in civil construction and structural reinforcement construction (I-beam 301, bolts, etc.), and have a simple structure, low operation difficulty, and are convenient for construction workers to construct. The overall space occupied is small, the noise is small, and the pollution is small.
[0039] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and are not limiting. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the purpose and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A hollow prefabricated floor slab high-efficiency support structure for supporting a prefabricated floor slab body (1), characterized in that: include: at least two steel cables (2), a support member (3) being provided between the steel cables (2) and the prefabricated floor slab body (1), the support member (3) being in contact with the middle of the prefabricated floor slab body (1) and being mounted on each of the steel cables (2); Two fasteners (4), the two fasteners (4) are respectively fixed at the two ends of the prefabricated floor slab body (1), and are respectively connected to the two ends of each steel cable (2), and are used to tighten the steel cable (2).
2. The hollow prefabricated floor high-efficiency support structure according to claim 1 is characterized in that: The fastener (4) comprises two fixing tubes (401) mirror-imaged at the ends of the prefabricated floor slab body (1), a connecting rod (402) connecting the two fixing tubes (401), a fastening screw (403) rotatably arranged on the connecting rod (402), and an L-shaped rod (404) passing through the fixing tube (401), a threaded sleeve (407) is fixedly arranged between the two L-shaped rods (404), the threaded sleeve (407) is threadedly connected to the fastening screw (403), and the steel cable (2) is arranged on the L-shaped rod (404).
3. The hollow prefabricated floor high-efficiency support structure according to claim 2 is characterized in that: A reinforcing rod (405) is fixedly provided at the corner of the L-shaped rod (404), so that the cross section of the corner of the L-shaped rod (404) presents a closed triangular structure.
4. The hollow prefabricated floor high-efficiency support structure according to claim 2 is characterized in that: The L-shaped rod (404) is provided with a plurality of limiting rings (406), and the steel cable (2) is arranged between two adjacent limiting rings (406).
5. The hollow prefabricated floor high-efficiency support structure according to claim 1 is characterized in that: There are two steel cables (2), and the support member (3) comprises an I-beam (301) and columns arranged at both ends of the I-beam (301), the two columns are respectively mounted on the two steel cables (2), and the I-beam (301) is abutted against the middle part of the prefabricated floor slab body (1).
6. The hollow prefabricated floor high-efficiency support structure according to claim 5, characterized in that: The column comprises support rods (302) rotatably arranged on both sides of the web of the I-beam (301); the flange of the I-beam (301) is provided with a limit seat (306); the two support rods (302) are respectively abutted against the two limit seats (306) so that the two support rods (302) have an angle.
7. The hollow prefabricated floor high-efficiency support structure according to claim 6, characterized in that: A mounting seat (303) is rotatably provided at the end of the support rod (302), and the mounting seat (303) is provided with a groove, the groove is clamped to the steel cable (2), and a limiting bolt (304) is passed through the mounting seat (303) for limiting the steel cable (2) in the groove.
8. The hollow prefabricated floor high-efficiency support structure according to claim 7, characterized in that: Both end openings of the groove have arc-shaped surfaces (307).
9. A hollow prefabricated floor high-efficiency support structure according to any one of claims 5 to 8, characterized in that: The I-beam (301) is provided with slots (305) corresponding to the plurality of support rods (302).
Citation Information
Patent Citations
External pre-stressed reinforcing structure for removing supporting column and construction method
CN110331868A
Dismountable beam string type floor support plate temporary support structure
CN110630014A
Green and environment-friendly assembly type deformation-reducing building structure with reasonable stress
CN216587816U
Multi-degree-of-freedom adjustable secondary tensioning type CFRP plate forward tensioning anchoring device
CN219794702U
A Simultaneous Strengthen Device For A Shear And Extension Of Beam
KR200291546Y1