Cast-in-situ bored pile construction equipment and construction method suitable for low-clearance operation environment

By adopting a detachable unit drilling rod and drive head system in the drilling pile construction equipment, combining rotation and lifting units, the concentricity problem of casting piles with high weight and large diameter is solved, and efficient drilling in low clearance environments is achieved construction.

CN118933554APending Publication Date: 2024-11-12CHINA MCC17 GRP CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411053673.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Existing drilling pile construction equipment cannot effectively ensure the concentricity of casting piles with high weight and large diameters. Especially in low clearance working environments, it is difficult to maintain the verticality and concentricity of the drill rod, which affects the construction quality.

Method used

A drilling pile construction equipment suitable for low clearance working environment is designed, using a detachable unit drilling rod and drive head system, the driving head and the drill head are realized through the rotating unit and the lifting unit, and the supporting unit is used. and adjust the unit to ensure the verticality and concentricity of the unit drill rod.

Benefits of technology

It realizes efficient drilling of cast-injected piles with high weight and large diameter in low clearance environments, ensuring the concentricity and construction quality of the drilling holes, and is suitable for structural projects such as bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933554A_ABST
    Figure CN118933554A_ABST
Patent Text Reader

Abstract

The invention discloses cast-in-situ bored pile construction equipment suitable for a low-clearance operation environment and a construction method, and belongs to the technical field of cast-in-situ bored pile construction.The cast-in-situ bored pile construction equipment comprises a driving head rotationally installed on a rack; the multiple sets of unit drill rods are arranged in the vertical direction, the unit drill rods are detachably connected and matched end to end, the upper end of the unit drill rod located at the uppermost position is detachably connected and matched with the lower end of the driving head, and the lower end of the unit drill rod located at the lowermost position is detachably connected and matched with the upper end of the drill bit. The rotating unit drives the driving head to rotate unidirectionally; the lifting unit drives the head to vertically lift; and the supporting unit is mounted below the driving head and is used for fixing the upper end of the unit drill rod. The low-clearance cast-in-place pile construction equipment can adapt to drilling operation in the area with the small vertical face height, and the cast-in-place pile construction efficiency in the low-clearance area can be remarkably improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bored cast-in-place pile construction, and more specifically, relates to bored cast-in-place pile construction equipment and a construction method suitable for a low-headroom working environment. Background Art

[0002] Bored piles refer to piles made by forming pile holes in the foundation soil by mechanical drilling, steel pipe squeezing or manual excavation at the construction site, placing steel cages in them, and pouring concrete. Due to its mature construction technology, high bearing capacity and wide application range, it has been widely used in the foundation of structural engineering such as roads, railway bridges, etc. In actual construction, the following steps are included: Positioning and setting out: According to the design drawings, use equipment such as total stations to set out the pile positions; Casing burial: Bury the casing to ensure its verticality and stability; Drilling rig in place: Move the drill rig to the designated position and adjust the drill bit to align with the pile position; Drilling: Turn on the drill rig to drill, pay attention to controlling the mud index and keep the hole wall stable; Hole cleaning: After the hole reaches the designed depth, clean the hole and remove the sediment at the bottom of the hole; Steel cage production and installation: Make the steel cage according to the design requirements and hoist it into the hole; Concrete pouring: Use the conduit method to pour concrete to ensure that the concrete fills the entire pile hole; Pile top treatment: After pouring, clean and cut the pile top.

[0003] However, for low-headroom working areas such as basements and tunnels, the existing drilling rigs require a relatively high vertical working space during the actual construction of cast-in-place piles. For the construction of deeper cast-in-place piles, the existing drilling rigs need to be improved to adapt to the drilling operations in low-headroom working areas.

[0004] After searching, patent CN 114458166 A discloses a spliced ​​hole-making device with a drill rod and a construction method thereof. The device includes a base platform, on which is provided a movable lifting system, a storage rack for placing spare drill rods, a drilling rig platform with a main rod erected thereon, and a pile planting system for implanting pile bodies; a lifting drilling assembly is provided on the main rod, and the drilling assembly includes a drill rod, a drill bit connected to the drill rod, and a drilling main machine for driving the drill rod to rotate. The drilling main machine and the drill rod are detachably connected, the drilling rig platform is rotatably connected to the base platform, and the storage rack is provided with a clamping assembly for pushing the spare drill rod to remain vertical. Patent CN106894773A discloses a drill rod replacement device, a rock drilling unit and a method for replacing a drill rod, wherein the replacement device comprises: a main body, which can be movably connected to the drilling unit; a first drill rod station, which is used to receive a single replaceable drill rod; a clamping device, which is located at the first drill rod station, and the clamping device allows clamping and releasing the drill rod located at the first drill rod station; and at least one transfer device, which is used to move the replacement device in a transverse direction relative to the longitudinal axis of the drilling unit.

[0005] However, the above patents are not applicable to heavy and large-diameter bored piles for bridges and other structures. To realize the construction of such bored piles, the drill rods used are also heavy and large in diameter. It is difficult to maintain verticality during the transfer process, which affects the concentricity between the drill rod and the drive head and the drill bit, and further affects the bored piles. Summary of the invention

[0006] 1. Problem to be solved

[0007] Aiming at the problem that the existing construction equipment cannot ensure the concentricity of cast-in-place piles with heavy weight and large diameter, the present invention provides a bored cast-in-place pile construction equipment suitable for low-headroom working environment, which is suitable for cast-in-place piles with heavy weight and large diameter.

[0008] 2. Technical solution

[0009] In order to solve the above problems, the technical solution adopted by the present invention is as follows:

[0010] The present invention discloses a bored pile construction equipment suitable for a low-headroom working environment, comprising:

[0011] A driving head is rotatably mounted on the frame;

[0012] The unit drill rods are provided with multiple groups in the vertical direction, the head and tail of the unit drill rods are detachably connected, and the upper end of the unit drill rod located at the uppermost position is detachably connected with the lower end of the driving head, and the lower end of the unit drill rod located at the lowermost position is detachably connected with the upper end of the drill bit;

[0013] The driving assembly includes a rotating unit and a lifting unit, which are connected to the driving head to drive the driving head to rotate and lift vertically;

[0014] A supporting unit is installed below the driving head, and the supporting unit fixes the upper end of the unit drill rod;

[0015] Drill bit: detachably connected to the drive head or the lower end of the unit drill rod.

[0016] The present invention discloses a detachable unit drill rod, which is provided with multiple groups in the vertical direction. The head and tail of the unit drill rod are detachably connected and matched, and the upper end of the unit drill rod located at the uppermost position is detachably connected and matched with the lower end of the driving head, and the lower end of the unit drill rod located at the lowermost position is detachably connected and matched with the upper end of the drill bit.

[0017] The upper end of the unit drill rod is provided with a first plug-in slot, and a first clamping slot perpendicular to the first plug-in vertical slot is provided near the bottom of the first plug-in slot in the circumferential direction, and the inner wall of the first plug-in slot is provided with a first plug-in vertical slot, and the first plug-in vertical slots are arranged in multiple groups at intervals along the circumference of the first plug-in slot, and the lower end of the first plug-in vertical slot is connected to the first clamping slot. The lower end of the unit drill rod is provided with a second plug-in end, and the second plug-in end is provided with a second locking claw in the circumferential direction.

[0018] A first plug-in end is provided at the lower end of the driving head, and a first locking claw is provided in the circumferential direction of the first plug-in end.

[0019] A second plug-in groove is provided at the upper end of the drill bit, and a second clamping groove perpendicular to the second plug-in vertical groove is provided circumferentially near the bottom of the second plug-in groove, and a second plug-in vertical groove is provided on the inner wall of the second plug-in groove. The second plug-in vertical grooves are arranged in multiple groups at intervals along the circumference of the second plug-in groove, and the lower end of the second plug-in vertical groove is connected to the second clamping groove.

[0020] Furthermore, the first plug-in slot and the second plug-in slot are overall in a trumpet shape, and the first plug-in end of the drive head and the second plug-in end of the unit drill rod are in a cone rod shape, which facilitates the plug-in connection between the drive head and the unit drill rod.

[0021] Furthermore, the driving head includes a driving cylinder and a first plug-in end slidably connected to the driving cylinder, the upper end of the first plug-in end is a vertical rod, and the vertical rod and the lower end of the driving cylinder form a sliding fit, and a first elastic member is sleeved on the vertical rod, and the upper and lower ends of the first elastic member respectively abut against the lower end of the driving cylinder and the upper end of the first plug-in end to achieve abutment or separation between the lower end of the driving cylinder and the upper end of the unit drill rod, and the first elastic member can be a spring or other elastic component.

[0022] The driving head is arranged above the frame and connected with the rotating unit and the lifting unit.

[0023] The rotating unit includes a lifting slider, the upper end of the driving cylinder is rotatably mounted on the lifting slider through a supporting bearing, a driven gear, a driving gear and a driving motor are arranged above the lifting slider, the driven gear passes through the lifting slider and is connected to the upper end of the driving cylinder, the driving gear is rotatably mounted on the lifting slider, the driving gear is meshed with the driven gear, and the rotating shaft of the driving motor is connected to the driving gear to drive the driving gear to rotate.

[0024] The lifting unit includes a lifting track, which is vertically installed on a frame. The lifting slider slides vertically on the lifting track. It also includes a lifting screw and a lifting motor. The lifting motor is located at the upper end of the lifting track. The upper end of the lifting screw is connected to the lifting motor, and the lower end of the lifting screw is connected to the frame.

[0025] The lifting slider is provided with a lifting nut and a vertical sliding rod passing through the lifting slider, the upper end of the vertical sliding rod is connected to the upper end of the lifting track, the lower end of the vertical sliding rod is connected to the frame, and the vertical sliding rod is parallel to the lifting screw rod.

[0026] A support unit is provided below the driving head, and the support unit includes a support arm provided below the driving head. A plurality of support arms are provided at intervals along the circumference of the driving head. The support arm is in the shape of a vertically arranged strip as a whole. A support flange is provided at the lower end of the inner wall of the support arm. A flange protruding outward is provided at the upper end of the unit drill rod. The support flange can cooperate with the flange at the upper end of the unit drill rod to prevent the unit drill rod from sliding down.

[0027] Furthermore, the supporting flange is made of a friction material, such as rubber, friction block, etc. The supporting arm is connected to the clamping unit, and the clamping unit drives the supporting arm to move along the radial direction of the driving head, so that the supporting arm approaches or moves away from the outer wall of the upper end of the unit drill rod.

[0028] Furthermore, the clamping unit includes a support frame and a support arm arranged at the lower end of the support frame, the upper end of the support arm is connected to the support frame, and the support arm moves along the radial direction of the driving head through the clamping unit. The clamping unit is arranged on the support frame, including a driving folding plate arranged on the support frame and a guide slide bar arranged at the upper end of the support arm, the guide slide bar is arranged along the radial direction of the driving head, the guide slide bar is slidably arranged on the support frame, one end of the guide slide bar passes through the support frame and is connected to the support arm, and the other end of the guide slide bar is provided with a driving ball, the driving ball abuts against the driving folding plate, and a guide spring is provided on the guide slide bar, the guide spring is arranged horizontally, and the two ends of the guide spring abut against the driving ball and the support frame respectively.

[0029] A linkage bracket is provided above the support frame, and a lifting cylinder is provided above the support frame. The lifting cylinder is vertical and fixed on the support frame, and the upper end of the driving folding plate is connected to the linkage bracket. The linkage bracket is connected to the piston rod of the lifting cylinder to adjust the height of the unit drill rod.

[0030] An adjustment unit is provided below the frame, and the adjustment unit is used to adjust the verticality of the drive head. The adjustment unit includes a first adjustment component and a second adjustment component which are perpendicular to each other, and the first adjustment component is located above the second adjustment component, and the first adjustment component includes:

[0031] A first adjustment bracket, the frame is hingedly arranged on the first adjustment bracket and the hinge axis is arranged horizontally,

[0032] Two groups of first adjusting inclined planes are provided on the lower bottom surface of the frame, and the two groups of first adjusting inclined planes are arranged in parallel and at intervals. A group of first adjusting rollers are respectively provided below the first adjusting inclined planes, and the two groups of first adjusting rollers are arranged below the first adjusting inclined planes and at intervals. The first adjusting rollers are arranged horizontally and perpendicular to the hinge axis of the frame, and the roller frame of the first adjusting roller is slidingly arranged on the first adjusting rail, and the first adjusting rail is horizontally arranged above the second adjusting assembly and perpendicular to the first adjusting roller. A first adjusting nut is provided on the roller frame of the first adjusting roller, and the first adjusting nut cooperates with the first adjusting screw rod, and the first adjusting screw rod is parallel to the first adjusting rail, and one end of the first adjusting roller is rotatably arranged on the first adjusting bracket.

[0033] The adjusting unit also includes a second adjusting component whose direction is perpendicular to the first adjusting component, the second adjusting component includes a second adjusting bracket, the second adjusting bracket is hingedly arranged below the first adjusting bracket, the second adjusting bracket is horizontally arranged, and two groups of second adjusting inclined planes arranged in parallel and spaced apart are arranged above the second adjusting bracket, the second adjusting inclined plane is the lower bottom surface of the first adjusting bracket, specifically, it includes two groups of second adjusting inclined planes, a second adjusting roller is arranged below the second adjusting inclined plane, the second adjusting roller is horizontal and perpendicular to the hinge axis of the first adjusting bracket, the roller frame of the second adjusting roller is slidably arranged on the second adjusting rail, the second adjusting rail is horizontally arranged on the second adjusting bracket and perpendicular to the second adjusting roller, the roller frame of the second adjusting roller is provided with a second adjusting nut, the second adjusting nut cooperates with the second adjusting screw, the second adjusting screw is arranged parallel to the second adjusting roller, and one end thereof is rotatably arranged on the second adjusting bracket.

[0034] The second adjustment bracket is hingedly arranged below the first adjustment bracket, and two groups of second adjustment inclined planes are arranged in parallel and at intervals on the lower bottom surface of the first adjustment bracket. A group of second adjustment rollers is arranged below each group of second adjustment inclined planes, and the second adjustment rollers are arranged at intervals along the length direction of the second adjustment inclined planes.

[0035] Furthermore, the second adjustment bracket is installed on a mobile platform and can be moved by the mobile platform.

[0036] The construction method using the low headroom cast-in-place pile construction equipment comprises the following steps:

[0037] S1. Adjust the drive head and the steel casing to keep them coaxial.

[0038] S2, installing the drill bit: starting the rotating unit to combine the drill bit with the driving head;

[0039] S3, drilling: start the lifting unit to make the rotating drill bit screw into the steel casing for drilling, and at the same time the supporting unit supports the upper end of the driving head;

[0040] S4, installing the unit drill rod: the rotating unit is reversed, the driving head is separated from the drill bit, the lifting unit is started, the unit drill rod is guided to the lower end position of the driving head, and the rotating unit and the lifting unit are started, so that the lower end of the driving head is combined with the upper end of the unit drill rod;

[0041] S5, drilling: start the lifting unit, so that the unit drill rod descends to engage with the drill bit at the lower position; start the lifting unit and the rotating unit, so that the drill bit rotates and drills;

[0042] S6, repeating steps S2-S5 until the drill bit drills into the set depth;

[0043] S7, disassembly: start the lifting unit, cooperate with the supporting unit, and make the rotating unit cooperate with the lifting unit, so that the unit drill rod is disassembled from the upper end section by section until the drill bit is disassembled, and the bored pile drilling construction is completed.

[0044] 3. Beneficial effects

[0045] Compared with the prior art, the present invention has the following beneficial effects:

[0046] (1) A low-headroom cast-in-place pile construction device of the present invention uses a driving unit to adjust the verticality of the driving head so that the driving head is parallel to the steel casing, and uses an adjustment unit to adjust the verticality of the bracket to achieve adjustment of the frame angle, so that the unit drill rod and the drill bit vertically enter the steel casing, thereby ensuring the concentricity of the cast-in-place pile with high weight and large diameter;

[0047] (2) A low-headroom cast-in-place pile construction device of the present invention uses a supporting unit to clamp the unit drill rod to prevent the upper end of the unit drill rod or the drill bit from rotating when it contacts the driving head, thereby ensuring the verticality of the unit drill rod;

[0048] (3) The low-headroom bored pile construction equipment of the present invention adopts a detachable unit drill rod, which is detachably connected to a driving head and a drill bit, and is suitable for drilling operations in areas with a small vertical surface height. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The technical solution of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments, but it should be understood that these drawings are designed only for explanation purposes and are not intended to limit the scope of the present invention. In addition, unless otherwise specified, these drawings are intended only to conceptually illustrate the structural configurations described herein and are not necessarily drawn to scale.

[0050] Figure 1 and Figure 2 Schematic diagram of the structure of low clearance cast-in-place pile construction equipment from two viewing angles in one embodiment of the present invention;

[0051] Figure 3 It is a front view of a low clearance cast-in-place pile construction device in one embodiment of the present invention;

[0052] Figure 4 It is a schematic structural diagram of a low-headroom bored pile construction device after the supporting mechanism is moved out in one embodiment of the present invention;

[0053] Figure 5 It is a structural schematic diagram of a supporting mechanism in one embodiment of the present invention;

[0054] Figure 6 A top view of a supporting mechanism in one embodiment of the present invention;

[0055] Figure 7 is a cross-sectional schematic diagram of a driving head 100 in one embodiment of the present invention;

[0056] Figure 8 and Fig. 9 Schematic diagram of the structure of the frame adjustment mechanism in one embodiment of the present invention from two viewing angles;

[0057] Fig.10 It is a front view of a frame adjustment mechanism in one embodiment of the present invention;

[0058] Fig.11 It is a schematic structural diagram of the cooperation between the unit drill rod 300 and the drill bit 800 in one embodiment of the present invention;

[0059] Fig.12 It is a cross-sectional structural diagram of the cooperation between the unit drill rod 300 and the drill bit 800 in one embodiment of the present invention;

[0060] In the figure:

[0061] 100, driving head; 110, first plug end; 111, first locking claw; 112, vertical rod; 113, spring; 120, driving cylinder;

[0062] 200, frame; 210, first adjustment slope;

[0063] 300, unit drill rod; 310, first plug-in slot; 320, first clamping slot; 330, first plug-in vertical slot; 340, second plug-in end; 350, second locking claw;

[0064] 400, rotating unit; 410, lifting slider; 411, lifting nut; 412, vertical slide bar; 420, driven gear; 430, driving gear; 440, driving motor;

[0065] 500, lifting unit; 510, lifting track; 520, lifting screw rod; 530, lifting motor;

[0066] 600, adjustment unit; 610, first adjustment bracket; 611, second adjustment inclined plane; 621, first adjustment roller; 630, first adjustment track; 641, first adjustment nut; 642, first adjustment screw rod; 650, second adjustment bracket; 660, second adjustment roller; 661, second adjustment nut; 662, second adjustment screw rod; 670, second adjustment track; 660, second adjustment roller;

[0067] 700, supporting unit; 710, supporting arm; 711, supporting flange; 720, guide slide bar; 721, driving ball;

[0068] 730, support frame; 731, guide spring; 740, driving folding plate; 750, lifting cylinder; 760, linkage bracket;

[0069] 800, drill bit; 810, second plug-in slot; 820, second clamping slot; 830, second plug-in vertical slot. DETAILED DESCRIPTION

[0070] The following detailed description of exemplary embodiments of the present invention refers to the accompanying drawings, which form a part of the description, and in which exemplary embodiments of the present invention that can be implemented are shown as examples. Although these exemplary embodiments are described in sufficient detail to enable those skilled in the art to implement the present invention, it should be understood that other embodiments can be implemented and various changes can be made to the present invention without departing from the spirit and scope of the present invention. The following more detailed description of the embodiments of the present invention is not intended to limit the scope of the claimed invention, but is only for the purpose of illustrating and not limiting the description of the characteristics and features of the present invention, so as to propose the best mode for performing the present invention and to enable those skilled in the art to implement the present invention. Therefore, the scope of the present invention is limited only by the appended claims.

[0071] It should be understood that the following text is only used to describe one or several specific embodiments of the present invention, and does not strictly limit the scope of protection of the specific claims of the present invention. As used herein, the terms "parallel" and "perpendicular" are not limited to their strict geometric definitions, but include tolerances for reasonable and inconsistent machining or human errors.

[0072] The following is combined with Figures 1 to 12 , the low clearance cast-in-place pile construction equipment of the present invention is described in detail:

[0073] Example 1

[0074] During the actual construction of the bored pile, the base surface is processed in advance and a mud groove is constructed; then, the position of the bored pile is marked on the base surface, and the installation position of the steel casing is excavated by excavating equipment; the steel casing is hoisted to the drilling construction site by hoisting equipment and the steel casing is backfilled; the drilling equipment is set up above the steel casing, and the drill bit 800 of the drilling equipment drills downward along the steel casing to perform drilling operations below the steel casing; before the drill bit 800 is introduced into the steel casing, mud is introduced into the steel casing, and the mud pump and the drill bit 800 of the drilling equipment are started to perform the drilling operation until the set depth is reached; a steel cage is introduced into the borehole; when the steel cage is hoisted, the mud in the borehole is sucked out and the borehole is washed; concrete is introduced into the borehole to finally form a bored pile. The length of existing cast-in-place piles varies greatly depending on the characteristics of the foundation, generally between 10 and 20 meters. Therefore, in order to implement drilling operations, the drilling equipment also needs to reserve sufficient operating height. The drilling equipment has high requirements for the working surface during actual operation. When the drilling machinery performs drilling operations on the positioning point, it has high requirements for the height of the working surface. When cast-in-place piles are constructed on working surfaces such as complex urban interfaces, basements, and tunnels, the vertical working height is severely limited. Therefore, in actual construction, the construction of cast-in-place piles in low-headroom areas is limited, and the existing drilling equipment needs to be improved.

[0075] The present invention provides a bored pile construction equipment suitable for a low headroom working environment, comprising:

[0076] The driving head 100 is rotatably mounted on the frame 200;

[0077] The unit drill rods 300 are provided with multiple groups in the vertical direction. The head and tail of the unit drill rods 300 are detachably connected and matched, and the upper end of the unit drill rod 300 located at the uppermost position is detachably connected and matched with the lower end of the driving head 100, and the lower end of the unit drill rod 300 located at the lowermost position is detachably connected and matched with the upper end of the drill bit 800;

[0078] The driving assembly includes a rotating unit 400 and a lifting unit 500, which are connected to the driving head 100 to drive the driving head 100 to rotate and vertically lift;

[0079] A supporting unit 700 is installed below the driving head 100, and the supporting unit 700 is used to fix the upper end of the unit drill rod 300;

[0080] Drill bit 800: detachably connected to the driving head 100 or the lower end of the unit drill rod 300.

[0081] In one embodiment, in order to realize the drilling operation of the positioning point, a steel casing is pre-buried at the positioning point. When installing the construction equipment, the driving head 100 is kept coaxial with the steel casing, and then the drill bit 800 is installed on the driving head 100. The drill bit 800 is combined with the driving head 100 by starting the rotating unit 400, and the lifting unit 500 is started so that the rotating drill bit 800 is screwed into the steel casing and extends below the ground to achieve drilling, and then the support unit 700 is used to support the upper end of the driving head 100; when installing the unit drill rod 300, the rotating unit 400 is reversed, the driving head 100 is separated from the drill bit 800, the lifting unit 500 is started, so that the driving head 100 rises to a high position, the unit drill rod 300 is guided to the lower end position of the driving head 100, and the rotating unit is started again. 400 and the lifting unit 500, so that the lower end of the driving head 100 is combined with the upper end of the unit drill rod 300; the lifting unit 500 is started, so that the unit drill rod 300 is lowered to be combined with the drill bit 800 at the lower position, and the lifting unit 500 and the rotating unit 400 are started again to make the drill bit 800 rotate and drill. According to the above steps, the drilling operation is repeated until the drill bit 800 is drilled to a set depth; the lifting unit 500 is started, coordinated with the supporting unit 700, and the rotating unit 400 is coordinated with the lifting unit 500, so that the unit drill rod 300 is removed from the upper end section by section until the drill bit 800 is removed, and the drilling construction of a cast-in-place pile is completed, and then the steel cage is installed section by section, and then the hole is cleaned and concrete is poured, and finally a cast-in-place pile of a set length is formed.

[0082] In one embodiment, during the actual drilling operation, the drill bit 800 is divided into multiple stages, and the multiple stages can be quickly installed. The support unit 700 is used to position and support the segments drilled into the borehole, which can ensure the rapid installation of the segments and avoid separation of the segments. The unit drill rods 300 can quickly form a whole, and the unit drill rods 300 can also be quickly separated. This is suitable for drilling operations in places where the working surface height is limited.

[0083] The present invention discloses a detachable unit drill rod 300, which is provided with multiple groups in the vertical direction. The head and tail of the unit drill rod 300 are detachably connected and matched, and the upper end of the unit drill rod 300 located at the uppermost position is detachably connected and matched with the lower end of the driving head 100, and the lower end of the unit drill rod 300 located at the lowermost position is detachably connected and matched with the upper end of the drill bit 800.

[0084] The structure of the unit drill rod 300 is as follows: Fig.11 and Fig.12 As shown, in order to realize the combination of the lower end of the driving head 100 and the upper end of the unit drill rod 300, the lower end of the driving head 100 is provided with a first plug-in end 110, and the first plug-in end 110 is provided with a first locking claw 111 in the circumferential direction, and the upper end of the unit drill rod 300 is provided with a first plug-in groove 310, and a first clamping groove 320 perpendicular to the first plug-in vertical groove 330 is provided in the circumferential direction near the bottom of the groove of the first plug-in groove 310, and the inner wall of the first plug-in groove 310 is provided with a first plug-in vertical groove 330, and a plurality of first plug-in vertical grooves 330 are arranged in a circumferential interval along the first plug-in groove 310, and the lower end of the first plug-in vertical groove 330 is connected with the first clamping groove 320. When the lower end of the driving head 100 forms a plug-in fit with the upper end of the unit drill rod 300 , the first locking claw 111 passes through the first plug-in vertical groove 330 , and the driving head 100 rotates so that the first locking claw 111 is introduced into the first clamping groove 320 .

[0085] In order to realize the combination of the lower end of the unit drill rod 300 and the drill bit 800, the upper end of the drill bit 800 is provided with a second plug-in groove 810, and a second clamping groove 820 perpendicular to the second plug-in vertical groove 830 is provided near the bottom of the second plug-in groove 810 in the circumferential direction. The inner wall of the second plug-in groove 810 is provided with a second plug-in vertical groove 830, and the second plug-in vertical groove 830 is arranged in multiple groups at intervals along the circumference of the second plug-in groove 810, and the lower end of the second plug-in vertical groove 830 is connected to the second clamping groove 820; the lower end of the unit drill rod 300 is provided with a second plug-in end 340, and the second plug-in end 340 is provided with a second locking claw 3 in the circumferential direction 50, start the lifting unit 500, so that the second plug-in end 340 of the lower end of the unit drill rod 300 is plugged into the second plug-in groove 810, and start the rotating unit 400, so that the second locking claw 350 extends into the second plug-in vertical groove 830. Under the driving force of the lifting unit 500, the second locking claw 350 extends into the second plug-in vertical groove 830, start the rotating unit 400, the second locking claw 350 extends into the second clamping groove 820, the second locking claw 350 is combined and locked with the upper end of the drill bit 800, continue to start the rotating unit 400, drive the head 100 to rotate the drill bit 800, and implement preliminary drilling operations.

[0086] When the driving head 100 is combined with the unit drill rod 300, the lifting unit 500 is started so that the first locking claw 111 of the driving head 100 extends into the first plug-in vertical groove 330, and the rotating unit 400 is started so that the first locking claw 111 extends into the first clamping groove 320, so that the first locking claw 111 is combined and locked with the upper end of the drill bit 800.

[0087] When the driving head 100 is disengaged from the unit drill rod 300, the driving head 100 is reversely rotated by starting the rotating unit 400, so that the first locking claw 111 rotates in the first clamping groove 320, and the first locking claw 111 slides along the first plug-in vertical groove 330. Under the action of the lifting unit 500, the first locking claw 111 is separated from the driving head 100, completing the separation of the unit drill rod 300 and the lower end of the driving head 100.

[0088] When the unit drill rod 300 is combined with the drill bit 800, the second plug-in end 340 extends into the plug-in groove of the drill bit 800, the rotating unit 400 drives the unit drill rod 300 to rotate, and the second locking claw 350 extends into the plug-in vertical groove of the drill bit 800, so that the second locking claw 350 is combined and locked with the upper end of the drill bit 800.

[0089] When the driving head 100 is disengaged from the drill bit 800, the driving head 100 is rotated in the opposite direction by starting the rotating unit 400, so that the second locking claw 350 rotates in the second clamping groove 820 and slides along the second plug-in vertical groove 830. Under the action of the lifting unit 500, the second locking claw 350 is separated from the driving head 100, completing the separation of the drill bit 800 and the lower end of the driving head 100.

[0090] Specifically, the first plug-in slot 310 and the second plug-in slot 810 are overall in a trumpet shape, and the first plug-in end 110 of the drive head 100 and the second plug-in end 340 of the unit drill rod 300 are in a cone rod shape, which facilitates the plug-in connection between the drive head 100 and the unit drill rod 300.

[0091] When the entire drill bit 800 and the unit drill rod 300 are lowered to the lowest position and the drilling operation is completed, the unit drill rod 300 is lifted by the lifting unit 500, and the unit drill rod 300 located at the lower position is supported by the supporting unit 700 to limit the unit drill rod 300 at the lower position; the rotating unit 400 is started to separate the driving head 100 from the upper unit drill rod 300, and then the upper unit drill rod 300 is rotated to separate the upper unit drill rod 300 from the lower unit drill rod 300, and the disassembled unit drill rod 300 is guided out, and then the lifting unit 500 and the rotating unit 400 are started to combine with the unit drill rod 300 at the lower position again, and the lower unit drill rod 300 is lifted up again, and according to the above steps, the unit drill rod 300 is disassembled from the lower unit drill bit 800 again, until the unit drill rod 300 and the drill bit 800 located in the borehole are completely disassembled from the borehole, and a drilling operation is completed.

[0092] Furthermore, if Figure 7 As shown, the drive head 100 includes a drive cylinder 120 and a first plug-in end 110 slidably connected to the drive cylinder 120, the upper end of the first plug-in end 110 is a vertical rod 112, and the vertical rod 112 forms a sliding fit with the lower end of the drive cylinder 120. A spring 113 is sleeved on the vertical slide rod, and the upper and lower ends of the spring 113 respectively abut against the lower end of the drive cylinder 120 and the upper end of the first plug-in end 110, so as to realize the abutment or separation between the lower end of the drive cylinder 120 and the upper end of the unit drill rod 300, and it can also be other elastic components.

[0093] When the driving head 100 is combined with the drill bit 800 or the upper end of the unit drill rod 300, the driving head 100 descends and is plugged into the notch of the first plug-in slot 310 or the second plug-in slot 810 as a whole, compressing the spring 113 until the first locking claw 111 extends into the first clamping slot 320 or the second clamping slot 820. Under the elastic force of the spring, the first plug-in end 110 extends into the first plug-in slot 310 or the second plug-in slot 810, and the driving head 100 is rotated with the rotating unit 400 until the first locking claw 111 is clamped into the first plug-in vertical slot 330 or the second plug-in vertical slot 830, thereby realizing the combination between the driving head 100 and the drill bit 800 or the unit drill rod 300. With the unidirectional rotation of the rotating unit 400, in cooperation with the lifting unit 500, the drilling operation in the steel casing can be realized until the loaded length of the entire drill bit 800 and the unit drill rod 300 meets the designed drilling depth, thereby completing the drilling operation section by section.

[0094] The driving head 100 is disposed above the frame 200 and connected to the rotating unit 400 and the lifting unit 500 .

[0095] like Figure 1 and Figure 2As shown, in order to implement the rotation of the drive head 100, the rotating unit 400 includes a lifting slider 410, and the upper end of the driving cylinder 120120 is rotatably mounted on the lifting slider 410 through a supporting bearing. A driven gear 420, a driving gear 430 and a driving motor 440 are provided above the lifting slider 410. The driven gear 420 passes through the lifting slider 410 and is connected to the upper end of the driving cylinder 120120. The driving gear 430 is rotatably mounted on the lifting slider 410, and the driving gear 430 is meshed with the driven gear 420. The rotating shaft of the driving motor 440 is connected to the driving gear 430, so as to drive the driving gear 430 to rotate.

[0096] The driving motor 440 is started, and the driving gear 430 rotates, which in turn drives the driven gear 420 meshing therewith to rotate, and drives the driving cylinder 120 below the driven gear 420 to rotate, thereby realizing the rotation of the entire driving head 100 .

[0097] like Figure 3 and Figure 4 As shown, in order to implement the lifting and lowering of the drive head 100, the lifting unit 500 includes a lifting rail 510, and the lifting rail 510 is vertically installed on the frame 200. The lifting slider 410 slides vertically on the lifting rail 510, and also includes a lifting screw rod 520 and a lifting motor 530. The lifting motor is located at the upper end of the lifting rail 530, the upper end of the lifting screw rod 520 is connected to the lifting motor 530, and the lower end of the lifting screw rod 520 is connected to the frame 200.

[0098] In order to realize the vertical sliding of the lifting slider 410 on the lifting rail 510, the lifting slider 410 is provided with a lifting nut 411 and a vertical slide bar 412 passing through the lifting slider 410, the upper end of the vertical slide bar 412 is connected to the upper end of the lifting rail 510, the lower end of the vertical slide bar 412 is connected to the frame 200, and the vertical slide bar 412 is parallel to the lifting screw rod 520.

[0099] By starting the lifting motor 530, the lifting screw 520 is driven to move, which drives the lifting slider 410 to slide along the lifting track 510, so that the drive head 100 is vertically lifted along the lifting track 510, thereby realizing the vertical drive of the drive head 100, and then driving the unit drill rod 300 and the drill bit 800 to move in the vertical direction.

[0100] In order to realize the positioning of the drill bit 800 at the lower end of the driving head 100 and the unit drill rod 300 , a supporting unit 700 is provided below the driving head 100 .

[0101] like Figure 5-6As shown, the supporting unit 700 includes a supporting arm 710 arranged below the driving head 100, and a plurality of supporting arms 710 are arranged at intervals along the circumference of the driving head 100. The supporting arm 710 is in the shape of a vertically arranged strip as a whole, and a supporting flange 711 is provided at the lower end of the inner wall of the supporting arm 710. The upper end of the unit drill rod 300 is provided with a flange protruding outward, and the supporting flange 711 can cooperate with the flange at the upper end of the unit drill rod 300 to prevent the unit drill rod 300 from sliding down. Furthermore, the supporting flange is a friction material, such as rubber, friction block, etc. The supporting arm 710 is connected to the clamping unit, and the clamping unit drives the supporting arm 710 to move along the radial direction of the driving head 100, so that the supporting arm 710 is close to or away from the outer wall of the upper end of the unit drill rod 300.

[0102] In one embodiment of the support arm, the support arm 710 is in the shape of an arc plate as a whole and is arranged at intervals along the circumference of the lower end of the driving head 100. Multiple groups of support arms 710 are enclosed to form a semicircle. When the unit drill rod 300 or the drill bit 800 is guided, the guide frame is used to guide the drill bit 800 and the unit drill rod 300 to the bottom of the driving head 100. The gaps between the multiple groups of support arms 710 can form an avoidance for the drill bit 800 or the unit drill rod 300 pushed horizontally by the guide frame, so that the drill bit 800 or the unit drill rod 300 reaches the lower position of the driving head 100, and the driving head 100 maintains a coaxial state with the drill bit 800 or the unit drill rod 300. When the lifting unit 500 drives the driving head 100 to descend, the support arms 710 approach synchronously, so that the support flange 711 abuts against the outer wall of the upper end of the drill bit 800 or the unit drill rod 300, the drive head 100 is plugged into the upper end of the drill bit 800 or the unit drill rod 300, and the rotating unit 400 drives the drive head 100 to rotate, so that the drive head 100 and the upper end of the drill bit 800 or the unit drill rod 300 are combined into one, and then the lifting unit 500 and the rotating unit 400 are started again to implement the drilling operation; similarly, when the upper end of the drill bit 800 or the unit drill rod 300 and the lower end of the drive head 100 are disassembled, the support arm 710 is used to achieve the limit clamping of the drill bit 800 or the unit drill rod 300 in the lower position, so as to achieve the disassembly of the unit drill rod 300 in the upper position, and the drill bit 800 or the unit drill rod 300 is gradually disassembled by using the guide frame.

[0103] Specifically, in order to clamp the upper outer wall of the drill bit 800 or the unit drill rod 300, the clamping unit includes a support frame 730 and a support arm 710 arranged at the lower end of the support frame 730, and the upper end of the support arm 710 is connected to the support frame 730, and the support arm 710 moves along the radial direction of the drive head 100 through the clamping unit. The clamping unit is arranged on the support frame 730, including a driving folding plate 740 arranged on the support frame 730 and a guide slide bar 720 arranged at the upper end of the support arm 710. The guide slide bar 720 is arranged along the radial direction of the driving head 100. The guide slide bar 720 is slidably arranged on the support frame 730. One end of the guide slide bar 720 passes through the support frame 730 and is connected to the support arm 710. A driving ball 721 is provided at the other end of the guide slide bar 720. The driving ball 721 abuts against the driving folding plate 740. A guide spring 731 is provided on the guide slide bar 720. The guide spring 731 is horizontally arranged, and its two ends respectively abut against the driving ball 721 and the support frame 730.

[0104] A linkage bracket 760 is provided above the support frame 730, and a lifting cylinder 750 is provided above the support frame 730. The lifting cylinder 750 is vertically fixed on the support frame 730, and the upper end of the driving folding plate 740 is connected to the linkage bracket 760. The linkage bracket 760 is connected to the piston rod of the lifting cylinder 750 to adjust the height of the unit drill rod 300.

[0105] By starting the lifting cylinder 750, multiple groups of supporting arms 710 are linked to synchronously approach the radial direction of the driving head 100, so that the supporting flange 711 is abutted against the outer wall of the upper end of the unit drill rod 300 or the upper end of the drill bit 800, so as to achieve clamping of the upper end of the unit drill rod 300 or the upper end of the drill bit 800, avoid rotation of the upper end of the unit drill rod 300 or the drill bit 800 when contacting the driving head 100, and facilitate the installation and disassembly of the upper end of the unit drill rod 300 or the drill bit 800; combined with the lifting unit 500 to drive the supporting arm 710 to rise and fall vertically, it can adapt to the clamping operation of the upper end of the unit drill rod 300 or the drill bit 800 of different lengths.

[0106] Furthermore, in order to ensure that the steel casing and the driving head 100 are in a coaxial state, and thus ensure that the final drilled hole can remain coaxial with the steel casing, an adjustment unit 600 is provided on the frame 200. The adjustment unit 600 is used to adjust the verticality of the driving head 100, and then the driving head 100 is adjusted to be parallel to the steel casing. By adjusting the position of the driving head 100, it can be ensured that the driving head 100 and the steel casing remain in a concentric state, and then the rotating unit 400 and the lifting unit 500 are started to install the drill bit 800 and the unit drill rod 300, and drilling operations are performed under the steel casing.

[0107] An adjustment unit 600 is disposed below the frame 200, and the adjustment unit 600 is used to adjust the verticality of the drive head 100. Figure 8-10 As shown, the adjustment unit 600 includes a first adjustment component and a second adjustment component which are perpendicular to each other, the first adjustment component is located above the second adjustment component, and the first adjustment component includes:

[0108] The first adjustment bracket 610, the frame 200 is hingedly arranged on the first adjustment bracket 610 and the hinge axis is arranged horizontally,

[0109] Two groups of first adjusting inclined planes 210 are provided on the bottom surface of the frame 200, and the two groups of first adjusting inclined planes 210 are arranged in parallel and spaced apart. A group of first adjusting rollers 621 are respectively provided below the first adjusting inclined planes 210, and the two groups of first adjusting rollers 621 are spaced apart below the first adjusting inclined planes 210. The first adjusting rollers 621 are horizontally arranged and perpendicular to the hinge axis of the frame 200. The roller frame of the first adjusting roller 621 is slidingly arranged on the first adjusting rail 630. The first adjusting rail 630 is horizontally arranged above the second adjusting component and perpendicular to the first adjusting roller 621. The roller frame of the first adjusting roller 621 is provided with a first adjusting nut 641, and the first adjusting nut 641 cooperates with the first adjusting screw rod 642. The first adjusting screw rod 642 is parallel to the first adjusting rail 630, and one end thereof is rotatably arranged on the first adjusting bracket 610.

[0110] The first adjusting roller 621 can effectively support the frame 200 to avoid deflection of the frame 200 on the hinge axis. When adjusting the hinge angle of the frame 200, the position of the first adjusting roller 621 below the first adjusting inclined plane 210 is adjusted by rotating the adjusting hand wheel at the end of the first adjusting screw rod 642, thereby adjusting the active angles on both sides of the hinge axis to adjust the angle within a coordinate plane.

[0111] The adjustment unit 600 further includes a second adjustment component which is perpendicular to the first adjustment component. The second adjustment component includes a second adjustment bracket 650, which is hingedly arranged below the first adjustment bracket 610. The second adjustment bracket 650 is horizontally arranged. Two groups of second adjustment inclined planes 611 arranged in parallel and spaced apart are arranged above the second adjustment bracket 650. The second adjustment inclined plane 611 is the lower bottom surface of the first adjustment bracket 610. Specifically, the second adjustment inclined planes 611 include two groups of second adjustment inclined planes. A second adjustment roller 660 is arranged below the second adjustment inclined plane 611. The second adjusting roller 660 is horizontal and perpendicular to the hinge axis of the first adjusting bracket 610. The roller frame of the second adjusting roller 660 is slidably arranged on the second adjusting rail 670. The second adjusting rail 670 is horizontally arranged on the second adjusting bracket 650 and perpendicular to the second adjusting roller 660. The roller frame of the second adjusting roller 660 is provided with a second adjusting nut 661. The second adjusting nut 661 cooperates with the second adjusting screw rod 662. The second adjusting screw rod 662 is arranged parallel to the second adjusting roller 660, and one end thereof is rotatably arranged on the second adjusting bracket 650.

[0112] Similarly, in order to adjust the angle of another coordinate plane, the second adjustment bracket 650 is hingedly arranged below the first adjustment bracket 610. Two groups of second adjustment inclined surfaces 611 are arranged in parallel and at intervals on the lower bottom surface of the first adjustment bracket 610. A group of second adjustment rollers 660 is arranged below each group of second adjustment inclined surfaces 611. The second adjustment rollers 660 are arranged at intervals along the length direction of the second adjustment inclined surfaces 611. The second adjustment rollers 660 can effectively provide reliable support for the first adjustment bracket 610 to avoid deflection problems. When adjusting the hinge angle of the first adjustment bracket 610, the adjustment handwheel at the end of the second adjustment screw rod 662 is rotated to adjust the position of the second adjustment roller 660 below the second adjustment inclined surface 611, thereby adjusting the active angles on both sides of the hinge shaft to adjust the angle within the coordinate plane. In conjunction with the adjustment of the angle of the above-mentioned frame 200, the verticality of the drive head 100 can be adjusted.

[0113] In one practicable manner, the second adjustment bracket 650 is installed on a mobile platform, and the driving head 100 can be adjusted to maintain a coaxial state with the steel casing by moving the mobile platform to ensure that the borehole opening maintains a coaxial state with the steel casing.

[0114] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

[0115] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope involved in the present application is not limited to the technical solution formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the inventive concept, such as a technical solution formed by replacing the above-mentioned features with (but not limited to) technical features with similar functions disclosed in this application.

[0116] Except for the technical features described in the specification, the remaining technical features are known technologies to those skilled in the art. In order to highlight the innovative features of the present invention, the remaining technical features will not be described here in detail.

Claims

1. A bored pile construction equipment suitable for low headroom working environment, characterized in that: include: A driving head (100) is rotatably mounted on a frame (200); A frame (200), wherein an adjustment unit (600) is provided below the frame (200); A unit drill rod (300), wherein the upper end of the unit drill rod (300) is detachably connected to the lower end of the driving head (100), and the lower end of the unit drill rod (300) is detachably connected to the upper end of the drill bit (800); A driving assembly, comprising a rotating unit (400) and a lifting unit (500), connected to the driving head (100), driving the driving head (100) to rotate and vertically lift; The drill bit (800) is detachably connected to the lower end of the driving head (100) or the unit drill rod (300).

2. The construction equipment according to claim 1, characterized in that: The regulating unit (600) comprises a first regulating component, wherein the first regulating component comprises: A first adjustment bracket (610), the frame (200) is hinged on the first adjustment bracket (610) and the hinge axis is arranged horizontally, the lower surface of the frame (200) is provided with a first adjustment inclined plane (210), a first adjustment roller (621) is provided below the first adjustment inclined plane (210), the first adjustment roller (621) is arranged horizontally and is perpendicular to the hinge axis of the frame (200), the roller frame of the first adjustment roller (621) is slidably arranged on a first adjustment rail (630), the first adjustment rail (630) is horizontally arranged on the first adjustment bracket (610), and the first adjustment rail (630) is perpendicular to the first adjustment roller (621).

3. The construction equipment according to claim 2, characterized in that: The invention also includes a second adjustment component, which is located below the first adjustment component and includes a second adjustment bracket (650). The second adjustment bracket (650) is hinged below the first adjustment bracket (610). The lower bottom surface of the first adjustment bracket (610) is provided with a second adjustment inclined surface (611). A second adjustment roller (660) is provided below the second adjustment inclined surface (611). The second adjustment roller (660) is horizontal and perpendicular to the hinge axis of the first adjustment bracket (610). The roller frame of the second adjustment roller (660) is slidably arranged on a second adjustment track (670). The second adjustment track (670) is horizontally arranged on the second adjustment bracket (650) and perpendicular to the second adjustment roller (660).

4. The construction equipment according to claim 1, characterized in that: It also includes a supporting unit (700), which is installed below the driving head (100) and fixes the upper end of the unit drill rod (300).

5. The construction equipment according to claim 4, characterized in that: The supporting unit (700) comprises a supporting arm (710) arranged below the driving head (100), the supporting arm (710) being arranged at intervals along the circumference of the driving head (100), and the supporting arm (710) being connected to the clamping unit, and the supporting arm (710) is driven by the clamping unit to move radially along the driving head (100).

6. The construction equipment according to claim 5, characterized in that: The upper end of the supporting arm (710) is connected to the supporting frame (730), and the clamping unit is arranged on the supporting frame (730), including a driving folding plate (740) and a guide slide bar (720), the upper end of the driving folding plate (740) is connected to the supporting frame (730), and the guide slide bar (720) is slidably arranged on the supporting frame (730), one end of the guide slide bar (720) passes through the supporting frame (730) and is connected to the supporting arm (710), and the other end of the guide slide bar (720) is provided with a driving ball (721), and the driving ball (721) is abutted against the driving folding plate (740), and a guide spring (731) is provided on the guide slide bar (720), and the two ends of the guide spring (731) are respectively abutted against the driving ball (721) and the supporting frame (730).

7. The construction equipment according to claim 1, characterized in that: The upper end of the unit drill rod (300) is provided with a first plug-in groove (310), the inner wall of the first plug-in groove (310) is provided with a first plug-in vertical groove (330), and the bottom of the groove near the first plug-in groove (310) is provided with a first clamping groove (320) perpendicular to the first plug-in vertical groove (330), and the lower end of the first plug-in vertical groove (330) is connected to the first clamping groove (320); the lower end of the unit drill rod (300) is provided with a second plug-in end (340), and the second plug-in end (340) is circumferentially provided with a second locking claw (350); The lower end of the driving head (100) is provided with a first plug end (110), and the first plug end (110) is circumferentially provided with a first locking claw (111); The drill bit (800) is provided with a second plug-in groove (810) at the upper end, a second plug-in vertical groove (830) is provided on the inner wall of the second plug-in groove (810), a second clamping groove (820) perpendicular to the second plug-in vertical groove (830) is provided near the bottom of the second plug-in groove (810), and the lower end of the second plug-in vertical groove (830) is connected to the second clamping groove (820).

8. The construction equipment according to claim 1, characterized in that: The rotating unit (400) comprises a lifting slider (410); the upper end of the driving head (100) is rotatably mounted below the lifting slider (410); a driven gear (420), a driving gear (430) and a driving motor (440) are arranged above the lifting slider (410); the driven gear (420) passes through the lifting slider (410) and is connected to the upper end of the driving cylinder (120); the driving gear (430) is rotatably mounted on the lifting slider (410); the driving gear (430) is meshed with the driven gear (420); and the driving gear (430) is driven by the driving motor (440).

9. The construction equipment according to claim 8, characterized in that: The lifting unit (500) comprises a lifting rail (510), wherein the lifting rail (510) is vertically mounted on the frame (200), and the lifting slider (410) vertically slides on the lifting rail (510).

10. A construction method using the construction equipment according to any one of claims 1 to 9, characterized in that: Includes steps: S1. Adjust the driving head (100) to keep it coaxial with the steel casing; S2, installing the drill bit (800): starting the rotating unit (400) to combine the drill bit (800) with the driving head (100); S3, drilling: start the lifting unit (500) to make the drill bit (800) drill into the steel casing, and the supporting unit (700) supports the upper end of the driving head (100); S4, installing the unit drill rod (300): the rotating unit (400) is reversed, the driving head (100) is separated from the drill bit (800), the lifting unit (500) is started, the unit drill rod (300) is guided to the lower end position of the driving head (100), and the rotating unit (400) and the lifting unit (500) are started to make the lower end of the driving head (100) and the upper end of the unit drill rod (300) combined; S5, drilling: starting the lifting unit (500) so that the unit drill rod (300) descends to engage with the drill bit (800); starting the lifting unit (500) and the rotating unit (400) so that the drill bit (800) rotates and drills; S6, repeating steps S2-S5 until the drill bit (800) drills to a set depth; S7, disassembly: start the rotating unit (400) and the lifting unit (500), cooperate with the supporting unit (700), and disassemble the unit drill rod (300) section by section until the drill bit (800) is disassembled, thereby completing the bored pile drilling construction.

Citation Information

Cited By

  • Low-clearance rotary drilling rig and method

    CN119900464A

  • Low-clearance rotary drill and method

    CN119900464B