Ground rapid punching device for highway construction and punching method of ground rapid punching device

Through the hydraulically driven rapid hole punching device, combined with the circumcision head and the jet part, the stability and environmental problems of the traditional hole punching device are solved, efficient hole cleaning and environmental improvement are achieved, and construction efficiency and safety are improved.

CN118933568AInactive Publication Date: 2024-11-12ANHUI HEYU SURVEYING & MAPPING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411299083.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional ground hole drilling devices have problems such as low stability and accuracy, poor hole quality and harsh construction environment during construction, which affects efficiency and safety, and it is difficult to effectively clean hole burrs and debris.

Method used

A hydraulically driven fast hole drilling device is designed, using a rotatable drill rod and annular head combined with a hydraulic cylinder and a rotating member to clean the debris and automatically clean the hole burrs through the leaking groove and the cutting part, and remove it through the jet part. Dust during drilling.

Benefits of technology

It improves the stability and controllability of the hole punching process, improves the quality of the hole, improves the construction environment, reduces the subsequent processing needs, and improves the construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933568A_ABST
    Figure CN118933568A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of highway punching equipment, and particularly relates to a rapid ground punching device for highway construction and a punching method thereof.The rapid ground punching device comprises a rack, a plurality of hydraulic cylinders are installed on the inner top wall of the rack and arranged, and rotating pieces are installed at the bottoms of the hydraulic cylinders; a rotatable drill rod is installed at the position of the rotating piece, an annular cutting head is arranged at the bottom of the drill rod, and the drill bit is of a movable structure. The hydraulic cylinder is adopted to drive the drill rod to move up and down, rotation of the drill bit is achieved in combination with the rotating piece, and the punching process is more stable and controllable through the structural design. And meanwhile, scraps generated in the punching process can be removed in time through the design of the material leaking groove in the drilling rod, and the situation that the punching effect is affected by scrap accumulation is avoided. In addition, through the movable design of the drill bit and the cooperation of the drill bit and the annular cutting head, sampling and direct punching can be achieved according to needs during punching, and through the arrangement of a material leakage groove, the effect of collecting chippings is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of highway punching equipment, and in particular to a ground rapid punching device and a punching method for highway construction. Background Art

[0002] In the current highway construction, ground drilling is an indispensable part and is widely used in geological exploration, roadbed reinforcement, drainage system setting and other fields. However, traditional drilling devices often have problems such as unstable drilling process, low precision, poor hole quality and harsh construction environment. These problems not only affect the construction efficiency, but also increase the construction cost and safety risks. First of all, traditional drilling devices mostly use mechanical transmission, which has poor stability and controllability, and it is difficult to ensure the verticality and accuracy of drilling. Especially under complex geological conditions, deviations and irregular holes are prone to occur. In addition, the debris generated during the drilling process is often not removed in time, resulting in the accumulation of debris, which further affects the drilling effect. Secondly, the improvement of hole quality is also a major challenge faced by traditional drilling devices. The presence of hole burrs not only affects the appearance, but may also have an adverse effect on subsequent construction steps, such as increasing the difficulty of installation and reducing sealing performance. Therefore, a drilling device that can automatically clean the hole burrs and improve the hole quality is particularly important. Finally, the improvement of the construction environment is also an urgent need in the current highway construction. The debris and dust generated during the drilling process not only endanger the health of construction workers, but also reduce the cleanliness of the construction site and increase the workload of subsequent cleaning. Therefore, a drilling device that can effectively remove debris and dust and improve the construction environment is of great significance to improving construction efficiency and ensuring construction safety. Summary of the invention

[0003] In order to solve the above problems, the present invention proposes a ground rapid hole-punching device and a hole-punching method for highway construction, so as to more accurately solve the problems raised in the above background technology.

[0004] The present invention is achieved through the following technical solutions:

[0005] The present invention proposes a ground rapid drilling device for highway construction, comprising a frame, a plurality of hydraulic cylinders are installed on the inner top wall of the frame, the hydraulic cylinders are arranged in an array, a rotating part is installed at the bottom of the hydraulic cylinder, a rotatable drill rod is installed at the rotating part, a ring cutting head is arranged at the bottom of the drill rod, the drill bit is a movable structure, the drill bit can be inserted into the drill rod, the bottom of the drill rod is provided with a drill rod located on the surface of the drill bit, a pull rod is installed on the top of the drill bit, the pull rod is inserted into the drill rod from the bottom and passes through from the top, a limiting sleeve is installed on the top of the drill rod, the limiting sleeve and the pull rod are detachably connected, a leakage groove is opened at the bottom of the surface of the drill rod, and the leakage groove is used for the entry of debris.

[0006] Preferably, a connecting spring is installed at the limiting sleeve, a connecting piece is installed at the end of the connecting spring, an insert rod is installed on the side of the connecting piece, and the insert rod is connected through the pull rod and the limiting sleeve.

[0007] Preferably, a strip groove is provided on the surface of the drill rod, a cut-off portion is provided in the strip groove, and the cut-off portion is used to clean the burrs of the hole when the drill rod rotates.

[0008] Preferably, the cutting portion comprises a return spring installed in the strip groove and rotatably connected to the strip groove, a cutting knife is installed between the return spring and the strip groove, and a feed groove penetrating into the drill rod is opened at the strip groove.

[0009] Preferably, a sliding sleeve is provided on the surface of the drill rod, a cleaning part for cleaning the drill rod is provided in the sliding sleeve, and an air jet part is installed on the top of the drill rod, and the air jet part is used to supply air to the cleaning part.

[0010] Preferably, the jet part includes a piston sleeve installed on the top of the drill rod, a piston rod inserted into the bottom of the piston sleeve is installed, the piston rod is inserted into the drill rod, a push plate is installed at the end of the piston rod, the push plate slides with the inner wall of the drill rod, an air supply pipe is installed on the surface of the piston sleeve, the air supply pipe is used for gas discharge, and an air intake pipe is installed on the top of the piston sleeve, the air intake pipe is used for gas intake.

[0011] Preferably, a one-way valve 1 is installed on the surface of the air supply pipe, and a one-way valve 2 is installed on the surface of the air inlet pipe.

[0012] Preferably, the cleaning part comprises a connecting pipe installed in the sliding sleeve, an annular pipe is installed at the bottom of the connecting pipe, a nozzle is installed at the bottom of the annular pipe, a bellows is installed at the top of the connecting pipe, and the top of the bellows is connected to the air supply pipe.

[0013] Preferably, the rotating member includes a mounting plate installed at the bottom of the hydraulic cylinder, a motor is installed at the bottom of the mounting plate, a turntable 1 is installed at the output end of the motor, a turntable 2 is installed on the surface of the drill rod, and the turntable 1 and the turntable 2 are connected by a belt.

[0014] A drilling method of a ground rapid drilling device for highway construction, comprising the following steps:

[0015] When direct drilling is required without sampling, the pull rod and the limit sleeve are connected, and the drill bit is in a fixed state. The hydraulic cylinder moves the drill rod to a suitable position and starts, so that the rotating part drives the drill rod to rotate. During the rotation, the drill bit is constantly in contact with the road, thereby achieving the effect of drilling, and the debris after drilling enters the drill rod for temporary storage;

[0016] When it is necessary to take samples of the material after drilling, the limit sleeve and the pull rod are separated. After separation, the ring cutting head is squeezed into the drill rod as the drill rod rotates. At this time, the drill bit can play the role of ring cutting on the ground. The material after ring cutting moves down with the drill rod and enters the drill rod, thereby achieving the purpose of sampling.

[0017] Compared with the prior art, the present invention provides a ground rapid hole punching device for highway construction, which has the following beneficial effects:

[0018] The ground rapid drilling device for highway construction uses a hydraulic cylinder to drive the drill rod to move up and down, and combines the rotating parts to realize the rotation of the drill bit. This structural design makes the drilling process more stable and controllable. At the same time, the leakage trough design on the drill rod can timely remove the debris generated during the drilling process to prevent the accumulation of debris from affecting the drilling effect. In addition, by combining the movable design of the drill bit with the ring cutting head, it can be used for sampling and direct drilling as needed during drilling, and the leakage trough is set to collect the debris.

[0019] The fast ground drilling device for highway construction, through the introduction of the cut-off part, especially the combination of the return spring and the cutting knife, can automatically clean the burrs of the holes after the drilling is completed, improving the finish and overall quality of the holes. This instant cleaning mechanism reduces the need for subsequent processing and improves construction efficiency. At the same time, the close cooperation between the strip groove and the cut-off part ensures the stability and effectiveness of the cleaning process.

[0020] The highway construction ground fast drilling device, through the combined action of the cleaning part and the jet part, effectively removes the debris and dust generated during the drilling process by jet cleaning, greatly improving the construction environment. This not only reduces the health risks of construction workers, such as inhalation of harmful dust, but also improves the cleanliness of the construction site, which is conducive to the smooth progress of subsequent construction steps. The detailed structural design of the jet part, such as the piston sleeve and piston rod, ensures the efficient use and stable output of gas, further enhancing the cleaning effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 This is a schematic diagram of the structure of a ground rapid hole-punching device for highway construction proposed by the present invention;

[0022] Figure 2 This is a schematic diagram of the structure of a rotating part of a ground rapid hole-punching device for highway construction proposed by the present invention;

[0023] Figure 3 This is a first-view structural schematic diagram of a drill rod of a ground rapid hole-punching device for highway construction proposed by the present invention;

[0024] Figure 4 A schematic structural diagram of a drill rod of a ground rapid hole-punching device for highway construction proposed by the present invention from a second perspective;

[0025] Figure 5 This is a structural front cross-sectional view of a drill rod of a ground rapid hole-punching device for highway construction proposed by the present invention;

[0026] Figure 6 A ground quick hole punching device for highway construction proposed by the present invention Figure 3 A magnified schematic diagram of the middle A area;

[0027] Figure 7 This is a top view of the structure of a drill rod of a ground rapid hole-punching device for highway construction proposed by the present invention;

[0028] Figure 8 A ground quick hole punching device for highway construction proposed by the present invention Figure 7 Enlarged schematic diagram of area B in the middle.

[0029] In the figure: 1. frame; 2. hydraulic cylinder; 3. rotating part; 31. mounting plate; 32. motor; 33. turntable 1; 34. turntable 2; 4. drill rod; 41. leakage trough; 42. limit sleeve; 43. strip groove; 431. feed trough; 44. connecting spring; 45. connecting piece; 46. plug rod; 5. circular cutting head; 6. drill bit; 61. pull rod; 7. sliding sleeve; 71. annular pipe; 72. connecting pipe; 73. bellows; 74. nozzle; 8. jet part; 81. piston sleeve; 82. piston rod; 83. push plate; 84. air supply pipe; 85. air intake pipe; 86. one-way valve 1; 87. one-way valve 2; 9. cutting part; 91. cutting knife; 92. reset spring. DETAILED DESCRIPTION

[0030] In order to more clearly and completely illustrate the technical solution of the present invention, the present invention is further described below in conjunction with the accompanying drawings.

[0031] Example

[0032] like Figure 1-Figure 8As shown, a ground rapid drilling device for highway construction proposed by an embodiment of the present invention includes a frame 1, a plurality of hydraulic cylinders 2 are installed at the inner top wall of the frame 1, the hydraulic cylinders 2 are arranged in an array, a rotating part 3 is installed at the bottom of the hydraulic cylinder 2, a rotatable drill rod 4 is installed at the rotating part 3, a ring cutting head 5 is arranged at the bottom of the drill rod 4, a drill bit 6 is a movable structure, the drill bit 6 can be inserted into the drill rod 4, the bottom of the drill rod 4 is located on the surface of the drill bit 6, a pull rod 61 is installed on the top of the drill bit 6, the pull rod 61 is inserted into the drill rod 4 from the bottom and penetrates from the top, a limiting sleeve 42 is installed on the top of the drill rod 4, the limiting sleeve 42 and the pull rod 61 are detachably connected, a leakage groove 41 is opened at the bottom of the surface of the drill rod 4, and the leakage groove 41 is used for the entry of debris.

[0033] In the present invention, the frame 1 is the supporting structure of the entire device, which is designed to have sufficient strength and stability. The hydraulic cylinders 2 and multiple hydraulic cylinders 2 are installed side by side on the inner top wall of the frame 1. By controlling the extension and contraction of the hydraulic cylinders 2, the drill rod 4 is driven to move up and down. The rotating member 3 is installed at the bottom of the hydraulic cylinder 2 and is driven by a motor or other power source to rotate the drill rod 4. The drill rod 4 is a long strip structure, and a ring cutting head 5 is provided at the bottom. A leakage groove 41 is provided in the middle for debris to enter. A limiting sleeve 42 is provided on the top for fixing or releasing the drill bit 6. The drill bit 6 is designed as a movable structure, which is connected to the drill rod 4 through a pull rod 61 and can be inserted or pulled out of the drill rod 4 to achieve drilling or sampling with different functions. The pull rod 61 passes through the drill rod 4 from the top of the drill bit 6 to the top, and a detachable connection with the drill rod 4 is achieved through the limiting sleeve 42. The leakage groove 41 is opened at the bottom of the drill rod 4 to facilitate the debris generated during the drilling process to enter the inside of the drill rod.

[0034] A ground quick drilling device for highway construction includes a frame 1, a plurality of hydraulic cylinders 2 are installed on the inner top wall of the frame 1, the hydraulic cylinders 2 are arranged in an array, a rotating member 3 is installed at the bottom of the hydraulic cylinder 2, a rotatable drill rod 4 is installed at the rotating member 3, a ring cutting head 5 is arranged at the bottom of the drill rod 4, a drill bit 6 is a movable structure, the drill bit 6 can be inserted into the drill rod 4, the bottom of the drill rod 4 is located on the surface of the drill bit 6, and a pull rod 61 is installed on the top of the drill bit 6 The pull rod 61 is inserted into the drill rod 4 from the bottom and passes through from the top. A limiting sleeve 42 is installed on the top of the drill rod 4. The limiting sleeve 42 and the pull rod 61 are detachably connected. A leakage groove 41 is opened at the bottom of the surface of the drill rod 4. The leakage groove 41 is used for the entry of debris. A connecting spring 44 is installed at the limit sleeve 42. A connecting piece 45 is installed at the end of the connecting spring 44. An insertion rod 46 is installed on the side of the connecting piece 45. The insertion rod 46 is connected with the pull rod 61 and the limiting sleeve 42.

[0035] In the present invention, the connecting spring 44 is installed inside the limiting sleeve 42 to provide elastic force to fix the pull rod 61. The connecting piece 45 is connected to the end of the connecting spring 44 and moves with the expansion and contraction of the spring. The insertion rod 46 is installed on the side of the connecting piece 45. The detachable connection between the pull rod 61 and the limiting sleeve 42 is achieved by inserting or removing the insertion rod 46.

[0036] A fast ground drilling device for highway construction includes a frame 1, a plurality of hydraulic cylinders 2 are installed on the inner top wall of the frame 1, the hydraulic cylinders 2 are arranged in an array, a rotating part 3 is installed at the bottom of the hydraulic cylinder 2, a rotatable drill rod 4 is installed at the rotating part 3, a ring cutting head 5 is arranged at the bottom of the drill rod 4, a drill bit 6 is a movable structure, the drill bit 6 can be inserted into the drill rod 4, the bottom of the drill rod 4 is located on the surface of the drill bit 6, a pull rod 61 is installed on the top of the drill bit 6, the pull rod 61 is inserted into the drill rod 4 from the bottom and penetrates from the top, and a A limiting sleeve 42 is detachably connected to the pull rod 61, a leakage groove 41 is provided at the bottom of the surface of the drill rod 4, the leakage groove 41 is used for the entry of debris, a strip groove 43 is provided on the surface of the drill rod 4, a cutting portion 9 is provided in the strip groove 43, the cutting portion 9 is used to clean the burrs of the hole when the drill rod 4 rotates, the cutting portion 9 includes a reset spring 92 installed in the strip groove 43 and rotatably connected to the strip groove 43, a cutting knife 91 is installed between the reset spring 92 and the strip groove 43, and a feed groove 431 is provided at the strip groove 43 that penetrates into the drill rod 4. In the present invention, the connecting spring 44 is installed inside the limiting sleeve 42 to provide elastic force to fix the pull rod 61. The connecting piece 45 is connected to the end of the connecting spring 44 and moves with the expansion and contraction of the spring. The insertion rod 46 is installed on the side of the connecting piece 45. The detachable connection between the pull rod 61 and the limiting sleeve 42 is achieved by inserting or pulling out the insertion rod 46. The connecting spring 44 is installed inside the limiting sleeve 42 to provide elastic force to fix the pull rod 61. The connecting piece 45 is connected to the end of the connecting spring 44 and moves with the expansion and contraction of the spring. The insertion rod 46 is installed on the side of the connecting piece 45. The detachable connection between the pull rod 61 and the limiting sleeve 42 is achieved by inserting or pulling out the insertion rod 46.

[0037] Among them, a ground rapid drilling device for highway construction includes a frame 1, a plurality of hydraulic cylinders 2 are installed at the inner top wall of the frame 1, the hydraulic cylinders 2 are arranged in an array, a rotating part 3 is installed at the bottom of the hydraulic cylinder 2, a rotatable drill rod 4 is installed at the rotating part 3, a ring cutting head 5 is arranged at the bottom of the drill rod 4, a drill bit 6 is a movable structure, the drill bit 6 can be inserted into the drill rod 4, the bottom of the drill rod 4 is located on the surface of the drill bit 6 and the drill rod 4 is installed, a pull rod 61 is installed on the top of the drill bit 6, the pull rod 61 is inserted into the drill rod 4 from the bottom and penetrates from the top, a limiting sleeve 42 is installed on the top of the drill rod 4, the limiting sleeve 42 and the pull rod 61 are detachably connected, a leakage groove 41 is opened at the bottom of the surface of the drill rod 4, the leakage groove 41 is used for the entry of debris, a sliding sleeve 7 is provided on the surface of the drill rod 4, a cleaning part for cleaning the drill rod 4 is arranged in the sliding sleeve 7, and an air jet part 8 is installed on the top of the drill rod 4, and the air jet part 8 is used to supply air to the cleaning part.

[0038] In the present invention, the sliding sleeve 7 is sleeved on the drill rod 4 and can move up and down with the drill rod 4. The cleaning part includes a connecting pipe 72, an annular pipe 71, a nozzle 74 and a bellows 73, which are used to clean the drill rod 4 and the surrounding area. The jet part 8 includes a piston sleeve 81, a piston rod 82, a push plate 83, an air supply pipe 84 and an air inlet pipe 85. The air pressure is generated by the movement of the piston, and the gas is sent into the cleaning part for spraying and cleaning.

[0039] Among them, a ground quick drilling device for highway construction includes a frame 1, a plurality of hydraulic cylinders 2 are installed on the inner top wall of the frame 1, the hydraulic cylinders 2 are arranged in an array, a rotating part 3 is installed at the bottom of the hydraulic cylinder 2, a rotatable drill rod 4 is installed at the rotating part 3, a ring cutting head 5 is arranged at the bottom of the drill rod 4, a drill bit 6 is a movable structure, the drill bit 6 can be inserted into the drill rod 4, the bottom of the drill rod 4 is located on the surface of the drill bit 6 and the drill rod 4 is installed, a pull rod 61 is installed on the top of the drill bit 6, the pull rod 61 is inserted into the drill rod 4 from the bottom and penetrates from the top, a limiting sleeve 42 is installed on the top of the drill rod 4, the limiting sleeve 42 and the pull rod 61 are detachably connected, and the drill rod A leakage groove 41 is provided at the bottom of the surface of 4, and the leakage groove 41 is used for the entry of debris. The jet part 8 includes a piston sleeve 81 installed on the top of the drill rod 4, and a piston rod 82 inserted therein is installed at the bottom of the piston sleeve 81. The piston rod 82 is inserted into the drill rod 4, and a push plate 83 is installed at the end of the piston rod 82. The push plate 83 slides with the inner wall of the drill rod 4, and an air supply pipe 84 is installed on the surface of the piston sleeve 81. The air supply pipe 84 is used for the discharge of gas. An air inlet pipe 85 is installed on the top of the piston sleeve 81. The air inlet pipe 85 is used for the entry of gas. A one-way valve 86 is installed on the surface of the air supply pipe 84, and a one-way valve 87 is installed on the surface of the air inlet pipe 85.

[0040] In the present invention, the piston sleeve 81 is installed on the top of the drill pipe 4, and the piston rod 82 is accommodated inside. The piston rod 82 is pushed by an external force such as a spring or a mechanical drive and moves up and down in the piston sleeve 81. The push plate 83 is installed at the bottom of the piston rod 82, slides with the movement of the piston rod 82, and compresses or releases the gas. The air supply pipe 84 delivers the compressed gas to the cleaning part. The air intake pipe 85 will complete the unfinished supplement. The air intake pipe 85 is installed on the top of the piston sleeve 81 and is used to introduce external compressed air or cleaning gas into the piston sleeve 81. The air intake pipe 85 is usually connected to an external gas source, such as a compressed air tank or an air pump, to ensure a continuous and stable gas supply. When the piston rod 82 moves downward in the piston sleeve 81, the push plate 83 compresses the gas in the piston sleeve 81, causing the gas pressure to increase. At this time, since the air supply pipe 84 is connected to the cleaning part, high-pressure gas will enter the cleaning part through the air supply pipe 84, and be sprayed out through the annular tube 71 and the nozzle 74 to spray and clean the drill rod 4 and the surrounding area, effectively removing the debris and dust generated during the drilling process.

[0041] In addition, in order to control the flow direction of the gas, a one-way valve 86 and a one-way valve 87 are usually installed on the air inlet pipe 85 and the air delivery pipe 84 to ensure that the gas can only flow in one direction and prevent gas backflow and leakage. The provision of the one-way valve 86 and the one-way valve 87 can further improve the working efficiency and safety of the jet unit 8.

[0042] A fast ground drilling device for highway construction includes a frame 1, a plurality of hydraulic cylinders 2 are installed on the inner top wall of the frame 1, the hydraulic cylinders 2 are arranged in an array, a rotating member 3 is installed at the bottom of the hydraulic cylinder 2, a rotatable drill rod 4 is installed at the rotating member 3, a ring cutting head 5 is arranged at the bottom of the drill rod 4, a drill bit 6 is a movable structure, the drill bit 6 can be inserted into the drill rod 4, the bottom of the drill rod 4 is located on the surface of the drill bit 6, and a pull rod 61 is installed on the top of the drill bit 6, and the pull rod 61 is inserted from the bottom The drill rod 4 is inserted into the drill pipe 4 and passes through from the top. A limit sleeve 42 is installed on the top of the drill pipe 4. The limit sleeve 42 and the pull rod 61 are detachably connected. A leakage groove 41 is opened at the bottom of the surface of the drill pipe 4. The leakage groove 41 is used for the entry of debris. The cleaning part includes a connecting pipe 72 installed in the sliding sleeve 7. An annular pipe 71 is installed at the bottom of the connecting pipe 72. A nozzle 74 is installed at the bottom of the annular pipe 71. A bellows 73 is installed on the top of the connecting pipe 72. The top of the bellows 73 is connected to the air supply pipe 84.

[0043] In the present invention, when the cleaning part is used, the bellows 73 is provided so that when the position of the hole 7 changes with the continuous drilling, the conduction between the air supply pipe 84 and the connecting pipe 72 is effectively guaranteed.

[0044] A fast ground drilling device for highway construction includes a frame 1, a plurality of hydraulic cylinders 2 are installed on the inner top wall of the frame 1, the hydraulic cylinders 2 are arranged in an array, a rotating member 3 is installed at the bottom of the hydraulic cylinder 2, a rotatable drill rod 4 is installed at the rotating member 3, a ring cutting head 5 is arranged at the bottom of the drill rod 4, a drill bit 6 is a movable structure, the drill bit 6 can be inserted into the drill rod 4, the bottom of the drill rod 4 is located on the surface of the drill bit 6, and a pull rod 61 is installed on the top of the drill bit 6, and the pull rod 61 is inserted from the bottom The drill rod 4 is provided with a limit sleeve 42 on the top thereof, and the limit sleeve 42 and the pull rod 61 are detachably connected. A leakage groove 41 is provided at the bottom of the surface of the drill rod 4, and the leakage groove 41 is used for the entry of debris. The rotating member 3 includes a mounting plate 31 mounted on the bottom of the hydraulic cylinder 2, a motor 32 is mounted on the bottom of the mounting plate 31, a turntable 1 33 is mounted on the output end of the motor 32, and a turntable 2 34 is mounted on the surface of the drill rod 4, and the turntable 1 33 and the turntable 2 34 are connected by a belt.

[0045] In the present invention, when the rotating member 3 is used, the motor 32 is started to drive the turntable 1 33 to rotate, and then the turntable 1 33 drives the turntable 2 34 to rotate, so as to achieve the effect of driving the drill rod 4 to rotate.

[0046] A drilling method of a ground rapid drilling device for highway construction, comprising the following steps:

[0047] When direct drilling is required without sampling, the pull rod 61 and the limit sleeve 42 are connected, and the drill bit 6 is in a fixed state. The hydraulic cylinder 2 moves the drill rod 4 to a suitable position and then starts, so that the rotating member 3 drives the drill rod 4 to rotate. During the rotation, the drill bit 6 is constantly in contact with the road, thereby achieving the effect of drilling, and the debris after drilling enters the drill rod 4 for temporary storage;

[0048] When it is necessary to take samples of the material after drilling, the limit sleeve 42 and the pull rod 61 are disengaged. After the disengagement, the ring cutting head 5 is squeezed into the drill rod 4 as the drill rod 4 rotates. At this time, the drill bit 6 can play the role of ring cutting on the ground. The material after ring cutting moves downward with the drill rod 4, thereby entering the drill rod 4, thereby achieving the purpose of sampling.

[0049] Finally, it should be noted that the basic concepts have been described above. Obviously, for those skilled in the art, the above detailed disclosure is only an example and does not constitute a limitation of this specification. Although it is not explicitly stated here, those skilled in the art may make various modifications, improvements and corrections to this specification. Such modifications, improvements and corrections are suggested in this specification, so such modifications, improvements and corrections still belong to the spirit and scope of the exemplary embodiments of this specification. At the same time, this specification uses specific words to describe the embodiments of this specification. For example, "one embodiment", "one embodiment", and / or "some embodiments" refer to a certain feature, structure or characteristic related to at least one embodiment of this specification. Therefore, it should be emphasized and noted that "one embodiment" or "one embodiment" or "an alternative embodiment" mentioned twice or more in different positions in this specification does not necessarily refer to the same embodiment. In addition, certain features, structures or characteristics in one or more embodiments of this specification can be appropriately combined. In addition, unless explicitly stated in the claims, the order of processing elements and sequences described in this specification, the use of alphanumeric characters, or the use of other names are not used to limit the order of the processes and methods of this specification.

[0050] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A ground rapid hole-punching device for highway construction, comprising a frame (1), characterized in that: A plurality of hydraulic cylinders (2) are installed on the inner top wall of the frame (1). The hydraulic cylinders (2) are arranged in an array. A rotating part (3) is installed at the bottom of the hydraulic cylinder (2). A rotatable drill rod (4) is installed at the rotating part (3). A ring cutting head (5) is arranged at the bottom of the drill rod (4). The drill bit (6) is a movable structure. The drill bit (6) can be inserted into the drill rod (4). The bottom of the drill rod (4) is provided with a drill rod (4) located on the surface of the drill bit (6). A pull rod (61) is installed on the top of the drill bit (6). The pull rod (61) is inserted into the drill rod (4) from the bottom and penetrates from the top. A limiting sleeve (42) is installed on the top of the drill rod (4). The limiting sleeve (42) and the pull rod (61) are detachably connected. A leakage groove (41) is provided at the bottom of the surface of the drill rod (4). The leakage groove (41) is used for the entry of debris.

2. A fast ground drilling device for highway construction according to claim 1, characterized in that: A connecting spring (44) is installed at the limiting sleeve (42), a connecting piece (45) is installed at the end of the connecting spring (44), an insert rod (46) is installed on the side of the connecting piece (45), and the insert rod (46) is connected to the pull rod (61) and the limiting sleeve (42) through.

3. A fast ground drilling device for highway construction according to claim 1, characterized in that: The surface of the drill rod (4) is provided with a strip groove (43), and a cut-off portion (9) is provided in the strip groove (43). The cut-off portion (9) is used to clean the burrs of the hole when the drill rod (4) rotates.

4. A fast ground drilling device for highway construction according to claim 1, characterized in that: The cutting portion (9) comprises a return spring (92) installed in the strip groove (43) and rotatably connected to the strip groove (43); a cutting knife (91) is installed between the return spring (92) and the strip groove (43); and a feed groove (431) penetrating into the drill rod (4) is provided at the strip groove (43).

5. A fast ground drilling device for highway construction according to claim 1, characterized in that: The surface of the drill rod (4) is sleeved with a sliding sleeve (7), a cleaning portion for cleaning the drill rod (4) is arranged inside the sliding sleeve (7), and an air jet portion (8) is installed at the top of the drill rod (4), and the air jet portion (8) is used to supply air to the cleaning portion.

6. A fast ground drilling device for highway construction according to claim 4, characterized in that: The jet part (8) comprises a piston sleeve (81) installed on the top of the drill rod (4); a piston rod (82) inserted into the piston sleeve (81) is installed at the bottom of the piston sleeve (81); the piston rod (82) is inserted into the drill rod (4); a push plate (83) is installed at the end of the piston rod (82); the push plate (83) slides with the inner wall of the drill rod (4); an air supply pipe (84) is installed on the surface of the piston sleeve (81); the air supply pipe (84) is used for exhausting gas; an air intake pipe (85) is installed on the top of the piston sleeve (81); the air intake pipe (85) is used for intake of gas.

7. A fast ground drilling device for highway construction according to claim 5, characterized in that: A one-way valve (86) is installed on the surface of the air supply pipe (84), and a two-way valve (87) is installed on the surface of the air intake pipe (85).

8. A fast ground drilling device for highway construction according to claim 6, characterized in that: The cleaning part comprises a connecting pipe (72) installed in the sliding sleeve (7), an annular pipe (71) is installed at the bottom of the connecting pipe (72), a nozzle (74) is installed at the bottom of the annular pipe (71), a bellows (73) is installed at the top of the connecting pipe (72), and the top of the bellows (73) is connected to the air supply pipe (84).

9. A fast ground drilling device for highway construction according to claim 1, characterized in that: The rotating member (3) comprises a mounting plate (31) mounted on the bottom of the hydraulic cylinder (2); a motor (32) is mounted on the bottom of the mounting plate (31); a turntable 1 (33) is mounted on the output end of the motor (32); a turntable 2 (34) is mounted on the surface of the drill rod (4); and the turntable 1 (33) and the turntable 2 (34) are connected via a belt.

10. The drilling method of the ground rapid drilling device for highway construction according to claim 1, characterized in that: The following steps are involved: When direct drilling is required without sampling, the pull rod (61) and the limit sleeve (42) are connected, and the drill bit (6) is in a fixed state. The hydraulic cylinder (2) moves the drill rod (4) to a suitable position and then starts, so that the rotating member (3) drives the drill rod (4) to rotate. During the rotation, the drill bit (6) is constantly in contact with the road, thereby achieving the effect of drilling, and the debris after drilling enters the drill rod (4) for temporary storage; When it is necessary to sample the material after drilling, the limiting sleeve (42) and the pull rod (61) are separated. After separation, the ring cutting head (5) is squeezed into the drill rod (4) as the drill rod (4) rotates. At this time, the drill bit (6) can perform ring cutting on the ground. The material after ring cutting moves downward with the drill rod (4) and enters the drill rod (4), thereby achieving the purpose of sampling.