Percussion drill hole guiding device for steel pipe pile construction and construction method

By using electric retracting and laying reels, guide pulleys and mud pumps in the impact drilling and hole drilling device, the problems of low efficiency and unstability of existing impact drilling rigs are solved, and the construction of steel pipe piles is achieved efficient, stable and high. Mass drilling process.

CN118933625APending Publication Date: 2024-11-12SHANGHAI CIVIL ENG GRP SIXTH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411146422.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In the construction of steel pipe piles, the existing impact drilling rigs are inefficient and unstable, especially when encountering strong external winds and other factors, it is easy to cause the impact drill bit to shift, and it requires manual tedious slag cleaning work, wasting labor and time.

Method used

An impact drilling device including an electric retracting and retracting reel, a guide pulley, a support rod, an adjustable carriage assembly, an air supply pump, and a mud pump are designed to maintain the impact drill bit and the center of the pile hole through the pulley line and guide sleeve. In the same line, combined with a mud pump, it can drill and clear holes while driving, avoid offset and improve efficiency.

Benefits of technology

It improves the efficiency of steel pipe pile construction, reduces the need for manual slag cleaning, ensures the stability and drilling accuracy of impact drill bits, avoids impact drill bit offset, and improves the overall efficiency and quality of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933625A_ABST
    Figure CN118933625A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of steel pipe pile construction, and provides a percussion drill hole guiding device and method for steel pipe pile construction, the percussion drill hole guiding device comprises a base, an electric take-up and pay-off wheel, a guiding pulley and a supporting rod are installed on the upper surface of the base, a hoisting pulley is installed at the top end of the supporting rod, and a pulley line is arranged on the surface of the electric take-up and pay-off wheel; the pulley line penetrates through the guide pulley and the hoisting pulley and is connected with a percussion bit, and the percussion bit is a cross-shaped percussion bit with an arc cutter. Through the arrangement of an air supply pump, a mud pump and other structures, sludge in a hole can be extracted while the percussion drill is used for guiding the hole, so that hole cleaning is achieved, manual repeated slag extraction is not needed, use is convenient, the construction efficiency is improved, meanwhile, the first guide sliding sleeve and the second guide sliding sleeve are arranged in a matched mode, and when the percussion drill falls down, the drilling efficiency is improved. The percussion bit and the center of the pile hole can be always kept on the same straight line through the first guide sliding sleeve and the second guide sliding sleeve, and deviation of the percussion bit is avoided to a great extent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel pipe pile construction, in particular to an impact drill hole-guiding device and a construction method for steel pipe pile construction. Background Art

[0002] An impact drill is a machine that uses the impact force of an impact drill bit to punch and drill holes in rock formations. Punching holes is accomplished by raising a heavy impact drill bit (also known as a hammer) with a drill blade and relying on the impact force of free fall to cut through the rock formation.

[0003] During the construction of steel pipe piles, it is necessary to use an impact drill to drill holes in order to place steel pipe columns and pour underwater concrete. During the construction of steel pipe piles, manual cooperation is also required to carry out tedious slag removal work, which not only wastes a lot of labor but also has a relatively low efficiency in impact drilling. There are two types of impact drills: drill rod type and wire rope type. The former has a smaller hole diameter, lower efficiency, and is less used. Due to the large diameter of the punched holes in steel pipe pile construction, wire rope impact drills are generally used for punching holes. When punching holes, the impact drill bit is mainly fixed at one end of the wire rope, and the pulley group is used to pull the wire rope and the impact drill bit's own gravity potential energy to punch holes on the ground. However, the stability of the wire rope is not high enough, and it is difficult to ensure that the impact drill bit will not deviate when encountering external factors such as strong winds.

[0004] Therefore, in view of the above problems, an impact drill hole guiding device and a construction method for steel pipe pile construction are proposed. Summary of the invention

[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: an impact drill hole guiding device for steel pipe pile construction, comprising a base, an upper surface of the base is equipped with an electric wire retracting wheel, a guide pulley and a support rod, a lifting pulley is installed on the top of the support rod, a pulley line is arranged on the surface of the electric wire retracting wheel, the pulley line passes through the guide pulley and the lifting pulley and is connected with an impact drill bit, the impact drill bit is a cross impact drill bit with a circular arc knife, the outer surface of the pulley line is sleeved with a first guide sleeve and a second guide sleeve, the first guide sleeve is located above the second guide sleeve, the first guide sleeve is connected to the support rod through a bracket, the support rod is arranged in an inclined manner, and a guide rod is fixed between the support rod and the base, the guide rod is perpendicular to the base, and an adjustable slide assembly is arranged between the second guide sleeve and the guide rod; The device also includes an air supply pump, a mud pump and a mud-slag separator. An air supply port and a slag extraction port are provided on the surface of the impact drill bit. The slag extraction port is located directly above the air supply port. The air supply port is connected to the air supply pump through the internal channel of the impact drill bit. The mud pump is connected to the slag extraction port through the internal channel of the impact drill bit. The discharge end of the mud pump is connected to the mud-slag separator.

[0006] Preferably, the first guide sleeve and the second guide sleeve have the same structure, and balls are embedded in the inner walls of the first guide sleeve and the second guide sleeve.

[0007] Preferably, the adjustable slide assembly includes a sliding sleeve arranged on the outer surface of the guide rod, the surfaces of the sliding sleeve and the second guide sleeve are both fixed with fixed sleeves, a connecting rod is arranged between the two fixed sleeves, the surface of the fixed sleeve is provided with a plurality of openings, and the openings are connected to the connecting rod by locking bolts.

[0008] The construction method of impact drilling for steel pipe pile construction includes the following steps: S1. Before the impact drill is put into place, the main machines and supporting equipment should be inspected and repaired before installation. The base and top of the impact drill should be kept stable. The pulley line, impact drill bit and pile hole center of the impact drill should be kept on the same plumb line. The supporting pads of the impact drill should not be pressed on the hole casing. S2. Before impact, align the center of the impact drill bit with the center of the pile, and hammer at a low density with a stroke of 0.9 to 1.1 m in the casing and within 3m under the casing foot; S3. When drilling, the mud residue is promptly extracted by the mud pump, and the mud after the residue is removed is re-discharged to achieve drilling and hole cleaning at the same time; S4. During the drilling process, always maintain the water head pressure in the hole, pay attention to the changes in the soil layer, slow down the drilling speed, and use a hole checker to check the hole diameter and inclination after the hole reaches the designed depth; Preferably, the maximum stroke of the impact drilling in S2 should not exceed 3m.

[0009] Preferably, the outer diameter of the borehole detector in S4 is not less than the designed pile diameter, and the length is equal to 4 to 6 times the designed hole diameter. The shape of the borehole detector is a cylinder with conical ends. When it is manufactured, 10 threaded steel bars with a diameter of 20 are arranged in the circumferential direction, and a threaded steel bar reinforcing hoop with a diameter of 20 is arranged every 1.5m in the circumference.

[0010] Preferably, the hole inspection by the hole inspection device in S4 includes the following operation steps: a. Hole depth and bottom sediment detection: The hole depth and bottom sediment are detected by a standard measuring hammer to ensure that the hole depth is not less than the design and the sediment thickness is within the specification range. If the sediment still exceeds the standard, the air lift reverse circulation hole cleaning method is used to remove the sediment.

[0011] b. Measurement of hole diameter and hole shape: Make a borehole inspection device according to the designed pile diameter and insert it into the hole for inspection. During the inspection, lift the borehole inspection device so that the center of the cage and the center of the hole are consistent with the lifting rope, and slowly put it into the hole. If there is no obstruction up and down, it means that the hole diameter is larger than the designed cage diameter. If there is an obstruction in the middle, there may be a shrinkage or tilt at the obstructed part, and measures should be taken to eliminate it.

[0012] c. Pile position detection: Restore the pile position center through pile guards and use a total station for detection.

[0013] The present invention provides an impact drill hole-guiding device and a construction method for steel pipe pile construction, which has the following beneficial effects: The present invention can extract mud and residue in the hole while drilling the hole through the impact drill by arranging structures such as the air supply pump and the mud pump, thereby realizing hole cleaning. It does not need to manually remove the residue multiple times, which is convenient to use and improves the construction efficiency. At the same time, with the arrangement of the first guide sleeve and the second guide sleeve, when the impact drill bit falls, the first guide sleeve and the second guide sleeve can keep the impact drill bit and the center of the pile hole always in the same straight line, thus avoiding the deviation of the impact drill bit to a great extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a front view of the impact drilling and hole-guiding device for steel pipe pile construction of the present invention; Figure 2 It is a cross-sectional view of the second guide sleeve in the impact drill hole guiding device for steel pipe pile construction of the present invention; Figure 3 It is an enlarged view of A in the impact drill hole guiding device for steel pipe pile construction of the present invention; Figure 4 It is a schematic diagram of a hole detector in the impact drill hole construction method for steel pipe pile construction of the present invention.

[0015] Reference numerals: 1. Base; 2. Electric retractable and retractable wheel; 3. Support rod; 4. Lifting pulley; 5. First guide sleeve; 6. Pulley line; 7. Guide rod; 8. Impact drill bit; 9. Air supply pump; 10. Mud pump; 11. Mud and slag separator; 12. Second guide sleeve; 13. Opening; 14. Ball; 15. Connecting rod; 16. Locking bolt; 17. Sliding sleeve; 18. Fixed sleeve; 19. Slag extraction port; 20. Air supply port. DETAILED DESCRIPTION

[0016] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0017] Embodiment 1:

[0018] like Figure 1-Figure 3As shown, an embodiment of the present invention provides an impact drilling and hole-guiding device for steel pipe pile construction, comprising a base 1, an electric wire-retracting wheel 2, a guide pulley and a support rod 3 are installed on the upper surface of the base 1, a lifting pulley 4 is installed on the top of the support rod 3, a pulley line 6 is arranged on the surface of the electric wire-retracting wheel 2, the pulley line 6 passes through the guide pulley and the lifting pulley 4 and is connected with an impact drill bit 8, the impact drill bit 8 is a cross impact drill bit with a circular arc knife, and the punching effect is good, the outer surface of the pulley line 6 is sleeved with a first guide sleeve 5 and a second guide sleeve 12, the first guide sleeve 5 is located above the second guide sleeve 12, the first guide sleeve 5 is connected to the support rod 3 through a bracket, the support rod 3 is inclined, and a guide rod 7 is fixed between the support rod 3 and the base 1, the guide rod 7 is perpendicular to the base 1, and an adjustable slide assembly is arranged between the second guide sleeve 12 and the guide rod 7; The first guide sleeve 5 and the second guide sleeve 12 have the same structure. The inner walls of the first guide sleeve 5 and the second guide sleeve 12 are both embedded with balls 14, which can reduce friction and make the pulley line 6 move more smoothly in the first guide sleeve 5 and the second guide sleeve 12.

[0019] The adjustable slide assembly includes a sliding sleeve 17 which is arranged on the outer surface of the guide rod 7. A fixed sleeve 18 is fixed on the surface of the sliding sleeve 17 and the second guide sleeve 12. A connecting rod 15 is arranged between the two fixing sleeves 18. A plurality of openings 13 are opened on the surface of the fixing sleeve 18. The openings 13 and the connecting rod 15 are connected by locking bolts 16 for easy assembly.

[0020] Specifically, when the impact drill bit 8 moves downward, the pulley line 6 is first guided by the first guide sleeve 5, and the second guide sleeve 5 moves downward as the impact drill bit 8 descends, so that the second guide sleeve 12 can always guide the direction of the impact drill bit 8 to avoid deviation. When the impact drill bit 8 enters the pile hole, the sliding sleeve 17 contacts the base 1, and the second guide sleeve 12 no longer moves downward.

[0021] The device also includes an air supply pump 9, a mud pump 10 and a mud-slag separator 11. An air supply port 20 and a slag extraction port 19 are provided on the surface of the impact drill bit 8. The slag extraction port 19 is located directly above the air supply port 20. The air supply port 20 is connected to the air supply pump 9 through the internal channel of the impact drill bit 8. The mud pump 10 is connected to the slag extraction port 19 through the internal channel of the impact drill bit 8. The discharge end of the mud pump 10 is connected to the mud-slag separator 11. When used specifically, Figure 1 As shown, the air supply pump 9 is first ventilated to blow up the debris in the muddy water, and then the debris is pumped out together with the muddy water through the mud pump 10.

[0022] Embodiment 2:

[0023] The construction method of impact drilling for steel pipe pile construction includes the following steps: S1. Before the impact drill is put into place, the main machines and supporting equipment shall be inspected and repaired before installation. The base 1 and top of the impact drill shall be kept stable to prevent displacement and sinking. The pulley line 6 of the impact drill, the impact drill bit 8 and the center of the pile hole shall be kept on the same plumb line. The supporting pads of the impact drill shall not be pressed on the casing of the hole mouth; S2. Before impact, align the center of the impact drill bit 8 with the center of the pile, and hammer at a low density with a stroke of 0.9 to 1.1 m in the casing and within 3 m under the casing foot; S3. When drilling, the mud residue is promptly extracted by the mud pump, and the mud after the residue is removed is re-discharged to achieve drilling and hole cleaning at the same time; S4. During the drilling process, always maintain the water head pressure in the hole, pay attention to the changes in the soil layer, slow down the drilling speed, and use a hole checker to check the hole diameter and inclination after the hole reaches the designed depth; The maximum stroke of the impact drill in S2 should not exceed 3m to prevent the drill from getting stuck, damaging the hole wall or causing the hole wall to be out of round. In order to control the stroke of the lifting hammer, it is advisable to mark the wire rope.

[0024] The outer diameter of the borehole detector in S4 is not less than the designed pile diameter, and the length is equal to 4 to 6 times the designed hole diameter. Figure 4 As shown, the shape of the hole detector is a cylinder with conical ends. When it is made, 10 threaded steel bars with a diameter of 20 are arranged in the circumferential direction, and a threaded steel bar reinforcing hoop with a diameter of 20 is arranged every 1.5m in the circumference.

[0025] The hole inspection of S4 includes the following steps: a. Hole depth and bottom sediment detection: The hole depth and bottom sediment are detected by a standard measuring hammer to ensure that the hole depth is not less than the design and the sediment thickness is within the specification range. If the sediment still exceeds the standard, the air lift reverse circulation hole cleaning method is used to remove the sediment.

[0026] b. Measurement of hole diameter and hole shape: Make a borehole inspection device according to the designed pile diameter and insert it into the hole for inspection. During the inspection, lift the borehole inspection device so that the center of the cage and the center of the hole are consistent with the lifting rope, and slowly put it into the hole. If there is no obstruction up and down, it means that the hole diameter is larger than the designed cage diameter. If there is an obstruction in the middle, there may be a shrinkage or tilt at the obstructed part, and measures should be taken to eliminate it.

[0027] c. Pile position detection: Restore the pile position center through pile guards and use a total station for detection.

[0028] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An impact drill hole guiding device for steel pipe pile construction, comprising a base (1), an electric wire retracting wheel (2), a guide pulley and a support rod (3) being mounted on the upper surface of the base (1), a lifting pulley (4) being mounted on the top of the support rod (3), a pulley line (6) being arranged on the surface of the electric wire retracting wheel (2), the pulley line (6) passing through the guide pulley and the lifting pulley (4) and being connected to an impact drill bit (8), characterized in that: The impact drill bit (8) is a cross impact drill bit with a circular arc cutter. The outer surface of the pulley line (6) is provided with a first guide sleeve (5) and a second guide sleeve (12). The first guide sleeve (5) is located above the second guide sleeve (12). The first guide sleeve (5) is connected to the support rod (3) through a bracket. The support rod (3) is arranged in an inclined manner. A guide rod (7) is fixed between the support rod (3) and the base (1). The guide rod (7) is perpendicular to the base (1). An adjustable slide assembly is provided between the second guide sleeve (12) and the guide rod (7). The device further comprises an air supply pump (9), a mud extraction pump (10) and a mud-slag separator (11); an air supply port (20) and a mud extraction port (19) are provided on the surface of the impact drill bit (8); the mud extraction port (19) is located directly above the air supply port (20); the air supply port (20) is connected to the air supply pump (9) through an internal channel of the impact drill bit (8); the mud extraction pump (10) is connected to the mud extraction port (19) through an internal channel of the impact drill bit (8); and the discharge end of the mud extraction pump (10) is connected to the mud-slag separator (11).

2. The impact drilling device for steel pipe pile construction according to claim 1 is characterized in that: The first guide sleeve (5) and the second guide sleeve (12) have the same structure, and inner walls of the first guide sleeve (5) and the second guide sleeve (12) are both embedded with balls (14).

3. The impact drilling device for steel pipe pile construction according to claim 1 is characterized in that: The adjustable slide assembly comprises a sliding sleeve (17) which is arranged on the outer surface of the guide rod (7); a fixing sleeve (18) is fixed to the surface of the sliding sleeve (17) and the second guide sleeve (12); a connecting rod (15) is arranged between the two fixing sleeves (18); a plurality of openings (13) are formed on the surface of the fixing sleeve (18); and the openings (13) and the connecting rod (15) are connected via locking bolts (16).

4. A method for drilling holes for steel pipe pile construction using an impact drill, according to any one of claims 1 to 3, characterized in that: The steps are as follows: S1. Before the impact drill is put into place, the main machines and supporting equipment shall be inspected and repaired before installation. The base (1) and top of the impact drill shall be kept stable. The pulley line (6), impact drill bit (8) and the center of the pile hole shall be kept on the same plumb line. The supporting pads of the impact drill shall not be pressed on the hole casing. S2. Before impact, align the center of the impact drill bit (8) with the center of the pile, and strike with a low-density hammer at a stroke of 0.9 to 1.1 m in the casing and within 3 m of the casing foot; S3. When drilling, the mud residue is promptly pumped out by the mud pump, and the mud after the residue removal is re-discharged to achieve drilling and hole cleaning at the same time; S4. During the drilling process, always maintain the water head pressure in the hole, pay attention to the changes in the soil layer, slow down the drilling speed, and after the hole reaches the designed depth, use a hole tester to check the hole diameter and inclination.

5. The method for drilling holes for steel pipe pile construction according to claim 3, characterized in that: The maximum stroke of the impact drill in S2 should not exceed 3m.

6. The method for drilling holes with an impact drill for steel pipe pile construction according to claim 3, characterized in that: The outer diameter of the borehole detector in S4 is not less than the designed pile diameter, and the length is equal to 4 to 6 times the designed hole diameter. The borehole detector is in the shape of a cylinder with conical ends. When it is manufactured, 10 threaded steel bars with a diameter of 20 are arranged in the circumferential direction, and a threaded steel bar reinforcing hoop with a diameter of 20 is arranged every 1.5m in the circumference.

7. The method for drilling holes for steel pipe pile construction according to claim 3, characterized in that: The hole inspection by the hole inspection device in S4 includes the following operation steps: a. Hole depth and bottom sediment detection: Hole depth and bottom sediment are detected by standard measuring hammer to ensure that the hole depth is not less than the design and the sediment thickness is within the specification range. If the sediment still exceeds the standard, the sediment is removed by air lift reverse circulation hole cleaning method; b. Hole diameter and hole shape measurement: According to the designed pile diameter, make a borehole detector to test the hole. During the test, lift the borehole detector so that the center of the cage and the center of the hole are consistent with the lifting rope, and slowly put it into the hole. If there is no obstruction up and down, it means that the hole diameter is larger than the designed cage diameter. If there is an obstruction in the middle, there may be a shrinkage or tilt phenomenon at the obstructed part, and measures should be taken to eliminate it; c. Pile position detection: Restore the pile position center through pile guards and use a total station for detection.