Refracturing structure and method for coal bed gas casing horizontal well
Through the combined design of double seal single-card structure and sliding sand-filling device, the risk of sand buried pipe columns and construction risks in repeated fracturing of horizontal wells of coalbed methane casing is solved, safe and efficient repeated fracturing is achieved, and construction is improved. Efficiency and safety.
Patent Information
- Application Number
- CN202310539418.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-12
- Publication Date
- 2024-11-12
AI Technical Summary
Repeated fracturing of horizontal wells of coalbed methane casing has problems of high risk of sand buried pipe columns and construction risks, and the existing technology has not been effectively solved.
The fracturing pipe column design adopts a double seal single-card structure and a sliding-suited sandfiller. Through hydraulic safety hand loss, sliding-suited sandfiller, upper and lower packers and hydraulic anchors, it realizes highly targeted repeated fracturing. Reduce the risk of sand burial, and seal the holes in the old layer by injecting fracturing fluid and temporary plugging agent, and improve construction displacement with large-diameter oil pipes and sandblasters.
It has achieved safe and efficient repeated fracturing of coalbed methane casing horizontal wells, reduced underground accidents and improved construction efficiency and safety.
Smart Images

Figure CN118933690A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of coalbed methane development, and in particular to a coalbed methane casing horizontal well repeated fracturing structure and method thereof. Background Art
[0002] The L-type casing horizontal well of coalbed methane has become the main well type for coalbed methane high permeability blocks. The horizontal well body structure consists of three parts: the vertical well section, the inclined section and the horizontal section. The vertical well section and the inclined section are completed with steel casing. The horizontal section is located in the coal seam as the production layer, with a length of 600-1000 meters. The horizontal section needs to be fractured, with a section spacing of 80-100 meters. The fracturing process generally adopts hydraulic jet staged fracturing process, pumped bridge plug staged fracturing process, etc. However, as the production time gradually increases, the gas volume begins to decline, and the previous fracturing section needs to be reconstructed for a second time to increase production.
[0003] Repeated fracturing of coalbed methane casing horizontal wells has always been a technical problem. First of all, repeated fracturing of coalbed methane wells is generally optimized for vertical wells, and there is no method for L-shaped casing horizontal wells; the fracturing process generally uses a two-stage packer with a sandblaster for construction, and the fracturing process string generally uses a guide bottom ball + expansion sprayer + oil pipe + safety joint + oil pipe to the wellhead. The fracturing process string is not installed with a packer, and the fracturing process is not targeted, the fracturing fluid is easy to cross the layer, and there is a risk of sand stuck in the string that cannot be handled; the tool of guiding bottom ball + packer + sandblaster + oil pipe short section + packer + oil pipe hanging to the wellhead is also used. There is also a high probability of the string getting stuck in the repeated staged fracturing of the horizontal section of the coal seam, and the construction risk is high.
[0004] Comparative document CN104632167A designs a hydraulic jet double seal single card perforation fracturing integrated process string to achieve multi-layer or multi-stage drag fracturing of vertical wells in oil and gas fields. The patent uses the oil pipe to connect the safety release, upper packer, upper hydraulic ejector, lower hydraulic ejector, lower packer, sleeve seat, check valve, eye tube and guide wire plug from top to bottom through threads. The string structure combines the functions of hydraulic jet fracturing process and double seal single card fracturing process, and can realize the integrated operation of perforation and fracturing in one trip of the string, with the advantages of simple string structure, convenient operation, high efficiency and high safety.
[0005] Regarding the above-mentioned related technologies, the inventor believes that the comparative documents do not consider the risk of sand spitting out of old layers and burying the tubing string during secondary fracturing of horizontal wells. Summary of the invention
[0006] In order to reduce the risk of sand-buried pipe strings, achieve repeated fracturing of coalbed methane casing horizontal wells, reduce underground sticking accidents, and improve fracturing construction efficiency, the present application provides a coalbed methane casing horizontal well repeated fracturing structure and method.
[0007] The present application provides a coalbed methane casing horizontal well repeated fracturing structure and method, which adopts the following technical solutions:
[0008] A coalbed methane casing horizontal well repeated fracturing structure, including an oil pipe, the lower end of the oil pipe is fixedly connected to a hydraulic safety release, the lower end of the hydraulic safety release is connected to a sliding sleeve sand flusher through the oil pipe, the lower end of the sliding sleeve sand flusher is fixedly connected to an upper packer, the lower end of the upper packer is fixedly connected to a throttling sand blaster through the oil pipe, the bottom end of the throttling sand blaster is fixedly connected to a lower packer, the lower end of the lower packer is fixedly connected to a hydraulic anchor, the lower end of the hydraulic anchor is fixedly connected to a check valve, and the lower end of the check valve is fixedly connected to a guide bottom ball.
[0009] By adopting the above technical scheme, the hydraulic safety release can be used to throw a ball to open the safety joint and pull out the upper fracturing string when the sand-buried string cannot be handled; the sliding sleeve sand flusher can be used to open the sliding sleeve by throwing a ball to establish a well washing channel and eliminate the risk of sand burial; the upper and lower packers can be used to ensure that the horizontal well repeated fracturing is targeted and reduce the fracturing fluid from entering the old layer to affect the fracturing effect; the fracturing string is set to a double-seal single-card structure + sliding sleeve sand flusher, which can complete The repeated fracturing of the old layer section of the casing horizontal well has strong targeted fracturing. A sliding sleeve sandblaster is designed to reduce the risk of sand burying the tubing. A targeted construction process is designed. First, the old layer section is filled with fracturing fluid to increase the energy of the old layer, and a temporary plugging agent is added to seal the holes of the old layer section. During construction, the annulus is slightly positively pressured to replenish fluid to prevent sand spitting out of the old layer. During fracturing, sand is added through the oil pipe, and large-diameter oil pipes and large-aperture sandblasters are used to increase the construction displacement, reduce the risk of sand burying the tubing, realize repeated fracturing of coalbed methane casing horizontal wells, reduce underground sticking accidents, and improve fracturing construction efficiency.
[0010] Optionally, the oil pipe includes a vertical portion arranged vertically, a horizontal portion is horizontally arranged at the bottom end of the vertical portion, the vertical portion and the horizontal portion are fixedly connected, and the horizontal portion adopts a couplingless oil pipe.
[0011] Optionally, the outer diameter of the oil pipe is 89 mm and the inner diameter is 73 mm.
[0012] By adopting the above technical solution, the construction displacement is increased, and the horizontal section uses coupling-free oil pipes to reduce the risk of sand jamming.
[0013] Optional, S01: Place the original well pipe string in order and straight on the bridge seat, check the pipe string condition, make records, and clean the wellbore, run the well gauge to the bottom of the artificial well, and clean the wellbore with clean water;
[0014] S02: Lower the fracturing string to the predetermined fracturing point in the horizontal well according to the needs and the secondary reformed layer section;
[0015] S03: Connect the surface tubing structure and the fracturing equipment, close the oil pipe outlet gate, open the oil casing annulus gate, inject fracturing fluid into the oil casing annulus at a low rate to fill the old layer deficit until the construction pressure rises, open the oil pipe gate, use a temporary plugging agent to backwash the well, and plug the holes in the old layer section to make the wellbore pressure-bearing;
[0016] S04: Repeat the reconstruction construction of the first section: the oil pipe is pressurized to seal the upper packer and the lower packer, the hydraulic anchor teeth are opened and work, the sliding sleeve sand flusher is not started during the fracturing process, at this time, the sliding sleeve sand flusher is not connected inside and outside, and the fracturing fluid passes through the oil pipe, the sliding sleeve sand flusher, the upper packer, and the throttling sand blaster to the formation at the fracturing point;
[0017] S05: After the first stage of fracturing operation is completed, the pump is stopped and the well is closed to expand the pressure. When the pressure reaches , the upper packer, the lower packer and the hydraulic anchor are automatically unsealed, and the pipe string is lifted to the second section to be reformed, so that the middle of the flow sandblaster in the lower section is aligned with the second section;
[0018] S06: repeat steps S03, S04, and S05 to complete the repeated fracturing operation of the remaining layers and pull out the fracturing string;
[0019] S07: After the well washing is completed, lift the tubing string.
[0020] Optionally, in S01, if the formation leakage is serious, a water-soluble temporary plugging agent is injected to plug the fracture opening, and then a large-volume well flushing is performed. When the inlet and outlet flows are consistent, the pump is stopped and the wellbore string is pulled out.
[0021] Optionally, in S03, the pressure bearing capacity is higher than the casing pressure of the casing annulus replenishment and lower than the oil pressure during the tubing fracturing.
[0022] By adopting the above technical solution, the later fracturing is not affected, and the holes in the old layer and the annulus between the casing and the wellbore are blocked through backwash injection of the fracturing string.
[0023] Optionally, in S04, the casing annulus is slightly positively pressured and injected to balance the formation pressure. The annulus construction pressure does not exceed the maximum bearing pressure of the temporary plugging agent, and the casing pressure difference is maintained to complete the first stage of repeated fracturing operations.
[0024] By adopting the above technical solution, the sand spitting of the first fracturing layer is reduced and the separator unsealing is reduced.
[0025] Optionally, in S06, if the upper pipe string is stuck after fracturing and it is difficult to unblock it, and circulation cannot be established, it is judged that sand is stuck in the pipe string or the packer cannot be unblocked, then a steel ball of a corresponding size of the sliding sleeve sand flusher is dropped from the wellhead, the sliding sleeve sand flusher is started, and circulation is established by forward and backwashing to ensure that there is no quartz sand or the like deposited from the upper packer to the wellhead.
[0026] Optionally, in S06, after each set of tools has completed a section of construction, the tools are removed for inspection, and if the tools are severely damaged, they are replaced with new ones.
[0027] Optionally, in S07, if the jam is released successfully, all tools are removed, the sliding sleeve sand flusher is replaced, and the tubing string and tools are re-inserted to implement the next stage of fracturing; if the jam is unsuccessful, the active jam release is continued until the packer is successfully unblocked; if the tool cannot be released at all, the steel ball corresponding to the hydraulic safety release is continuously put in, the oil pipe is pressurized, the hydraulic safety release is disengaged, the oil pipe above the hydraulic safety release is removed, and the overhaul and salvage are started.
[0028] In summary, the present application includes at least one of the following beneficial technical effects:
[0029] 1. The fracturing string is a double-seal single-card structure + sliding sleeve sand flusher, which can complete repeated fracturing of old layer sections in casing horizontal wells, and the fracturing is highly targeted.
[0030] 2. A sliding sleeve sandblaster is designed to reduce the risk of sand burying the pipe.
[0031] 3. A targeted construction process was designed. First, the old layer section was filled with fracturing fluid to increase the energy of the old layer, and temporary plugging agents were added to seal the holes in the old layer section. During the construction, the annulus was slightly positively pressured to replenish fluid to prevent sand spitting out of the old layer.
[0032] 4. Adding sand through the tubing during fracturing, combined with large-diameter tubing and large-aperture sandblasters, can increase the construction displacement, ultimately achieving repeated fracturing of coalbed methane casing horizontal wells with high construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It is a structural schematic diagram of a coalbed methane casing horizontal well repeated fracturing structure in an embodiment of the present application.
[0034] Explanation of the reference numerals: 1. Oil pipe; 2. Hydraulic safety release; 3. Sliding sleeve sandblaster; 4. Upper packer; 5. Throttling sandblaster; 6. Lower packer; 7. Hydraulic anchor; 8. Check valve; 9. Guide bottom ball. DETAILED DESCRIPTION
[0035] The following is combined with Figure 1 This application is described in further detail.
[0036] The present application embodiment discloses a coalbed methane casing horizontal well repeated fracturing structure. Figure 1 A coalbed methane casing horizontal well repeated fracturing structure includes an oil pipe 1. The oil pipe 1 is an "L" structure. The oil pipe 1 includes a vertical part arranged vertically and a horizontal part arranged horizontally. The vertical part and the horizontal part are fixedly connected. The oil pipe 1 can adopt a body with an outer diameter of 89mm and an inner diameter of 73mm. The horizontal part adopts a coupling-free oil pipe 1.
[0037] The oil pipe 1 includes a first pipe section, the lower end of the first pipe section is fixedly connected to a hydraulic safety release 2, and the end of the hydraulic safety release 2 away from the first pipe section is fixedly connected to a second pipe section, and the diameters of the first pipe section and the second pipe section are the same. When the sand-buried pipe string cannot be handled, a ball can be thrown to open the safety joint and the upper fracturing pipe string can be pulled out.
[0038] The end of the second pipe section away from the hydraulic safety release 2 is fixedly connected with a sliding sleeve sand flusher 3. When the pipe column is buried in sand, the sliding sleeve can be opened by throwing a ball to establish a well washing channel to eliminate the risk of sand burial. The end of the sliding sleeve sand flusher 3 away from the second pipe section is fixedly connected with an upper packer 4. The end of the upper packer 4 away from the first pipe section is horizontally provided with a throttling sand blaster 5. The end of the throttling sand blaster 5 close to the upper separator is horizontally provided with a third pipe section. One end of the third pipe section is fixedly connected to the upper packer 4, and the other end of the third pipe section is fixedly connected to the throttling sand blaster 5. The end of the throttling sand blaster 5 away from the third pipe section is horizontally provided with a fourth pipe section. The fourth pipe section is fixedly connected to the throttling sand blaster 5. The end of the fourth pipe section away from the throttling sand blaster 5 is horizontally provided with a lower packer 6. The lower packer 6 is fixedly connected to the fourth pipe section.
[0039] By providing the upper packer 4 and the lower packer 6, the repeated fracturing of the horizontal well is targeted, and the fracturing fluid is reduced from entering the old layer section to affect the fracturing effect.
[0040] One end of the lower packer 6 away from the fourth pipe section is fixedly connected to a hydraulic anchor 7, one end of the hydraulic anchor 7 away from the fourth pipe section is fixedly connected to a check valve 8, and one end of the check valve 8 away from the hydraulic anchor 7 is fixedly connected to a guide bottom ball 9.
[0041] This embodiment also discloses a method for repeated fracturing of a coalbed methane casing horizontal well, which specifically includes the following steps:
[0042] S01: Lift the original well string, place it straight on the bridge seat in order, check the string condition, make records, and clean the wellbore. Run the well gauge to the bottom of the artificial well, and use clean water to backwash the well to clean the wellbore. If the formation leakage is serious, inject a water-soluble temporary plugging agent to seal the fracture opening, and then perform large-volume well cleaning. When the inlet and outlet flows are consistent, stop the pump and lift out the well string.
[0043] S02: Lower the fracturing string to the predetermined fracturing point in the horizontal well according to the needs and the layer section to be secondary transformed.
[0044] S03: Connect the surface tubing structure and fracturing equipment, close the outlet gate of tubing 1, open the gate of casing annulus, inject fracturing fluid into the casing annulus at a low displacement to fill the old layer deficit, until the construction pressure rises, open the gate of tubing 1, use water-soluble temporary plugging agent to backwash the well, use degradable temporary plugging agent, the pressure bearing capacity of temporary plugging agent is selected according to the site needs, reduce the damage to the reservoir in the later stage, and plug the holes of the old layer section to make the wellbore pressure-bearing. The pressure bearing capacity is higher than the casing pressure of the casing annulus filling fluid, lower than the oil pressure during tubing 1 fracturing, and does not affect the later fracturing. The holes of the old layer section and the annulus between the casing and the wellbore are plugged by backwashing injection of the fracturing string.
[0045] S04: Repeated reconstruction construction of the first section is carried out: the oil pipe 1 is pressurized to seal the upper packer 4 and the lower packer 6, and the anchor teeth of the hydraulic anchor 7 are opened and work. The sliding sleeve sand flusher 3 is not started during the fracturing process. At this time, the sliding sleeve sand flusher 3 is not connected inside and outside. The fracturing fluid passes through the oil pipe 1, the sliding sleeve sand flusher 3, the upper packer 4, and the throttling sand blaster 5 to the formation at the fracturing point. At the same time, the oil casing annulus is slightly positively injected with fluid to balance the formation pressure and prevent sand from spitting out in the first fracturing layer. The construction pressure of the annulus does not exceed the maximum bearing pressure of the temporary plugging agent. Pay attention to maintaining the oil casing pressure difference to avoid the separator from being unsealed; complete the first section of repeated fracturing operation according to the construction design.
[0046] S05: After completing the first stage of fracturing operation, stop the pump, shut down the well and expand the pressure. When the pressure reaches 0, the upper packer 4, the lower packer 6 and the hydraulic anchor 7 are automatically unsealed, and the pipe string is lifted to the second section to be modified, so that the middle part of the lower throttling sandblaster 5 is aligned with the second section.
[0047] S06: Repeat steps S03, S04, and S05 to complete the repeated fracturing operation of the remaining layers, pull out the fracturing string, and pull out the tools for inspection after each set of tools has been constructed for 3-4 sections. If the tools are seriously damaged, replace them with new ones.
[0048] When the pipe string is stuck after fracturing and it is difficult to unblock it, and circulation cannot be established, it is judged that sand is stuck in the pipe string or the packer cannot be unblocked, then a steel ball of corresponding size of the sliding sleeve sand flusher 3 is put into the wellhead, the sliding sleeve sand flusher 3 is started, and the circulation is established by forward and reverse washing to ensure that there is no quartz sand and the like deposited from the upper packer 4 to the wellhead.
[0049] S07: After the well washing is completed, the tubing is lifted up. If the jam is successfully released, all tools are pulled out, the sliding sleeve sand flusher 3 is replaced, and the tubing and tools are re-entered to carry out the next stage of fracturing. If the jam is unsuccessful, the active release is continued until the packer is successfully released. If the tool cannot be released, the steel ball corresponding to the hydraulic safety release 2 is continuously put in, the oil pipe 1 is pressurized, the hydraulic safety release 2 is disengaged, and the oil pipe 1 above the hydraulic safety release 2 is pulled out, and the overhaul and salvage are carried out.
[0050] The implementation principle of a coalbed methane casing horizontal well repeated fracturing structure and method in the embodiment of the present application is as follows: by setting the fracturing string as a combination of a double-seal single-card structure and a sliding sleeve sandblaster 3, repeated fracturing of the old layer section of the casing horizontal well can be completed, and the fracturing is highly targeted; by installing the sliding sleeve sprayer, the situation of sand burying the string can be reduced, and through a targeted construction process, the old layer section is first filled with fracturing fluid to increase the energy of the old layer, and a temporary plugging agent is added to plug the holes of the old layer section. During construction, the annulus is slightly positively pressured to replenish fluid to reduce sand spitting in the old layer. Sand is added through the oil pipe 1 during fracturing, and the large-diameter oil pipe 1 and the large-aperture sandblaster can be used to increase the construction displacement, and finally the coalbed methane casing horizontal well repeated fracturing is achieved, and the construction safety is relatively high.
[0051] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A coalbed methane casing horizontal well repeated fracturing structure, characterized by: The invention comprises an oil pipe (1), the lower end of which is fixedly connected to a hydraulic safety release (2), the lower end of which is connected to a sliding sleeve sand blaster (3) through the oil pipe (1), the lower end of which is fixedly connected to an upper packer (4), the lower end of which is fixedly connected to a throttling sand blaster (5) through the oil pipe (1), the bottom end of which is fixedly connected to a lower packer (6), the lower end of which is fixedly connected to a hydraulic anchor (7), the lower end of which is fixedly connected to a check valve (8), and the lower end of which is fixedly connected to a guide bottom ball (9).
2. A coalbed methane casing horizontal well repeated fracturing structure as claimed in claim 1, characterized in that: The oil pipe (1) comprises a vertical portion arranged vertically, a horizontal portion is arranged horizontally at the bottom end of the vertical portion, the vertical portion and the horizontal portion are fixedly connected, and the horizontal portion adopts a coupling-free oil pipe.
3. A coalbed methane casing horizontal well repeated fracturing structure as claimed in claim 1, characterized in that: The oil pipe (1) has an outer diameter of 89 mm and an inner diameter of 73 mm.
4. A coalbed methane casing horizontal well repeated fracturing method as claimed in claim 1, characterized in that: S01: Place the original well pipe string in order on the bridge seat, check the pipe string condition, make records, and clean the wellbore. Run the well gauge to the bottom of the artificial well, and clean the wellbore with clean water; S02: Lower the fracturing string to the predetermined fracturing point in the horizontal well according to the needs and the secondary reformed layer section; S03: Connect the surface pipe string structure and the fracturing equipment, close the outlet gate of the oil pipe (1), open the oil casing annulus gate, inject fracturing fluid into the oil casing annulus at a low rate to fill the old layer deficit until the construction pressure rises, open the oil pipe (1) gate, use a temporary plugging agent to backwash the well, and plug the holes in the old layer section to make the wellbore pressure-bearing; S04: Repeated reconstruction construction of the first stage is performed: the oil pipe (1) is pressurized to seal the upper packer (4) and the lower packer (6), the anchor teeth of the hydraulic anchor (7) are opened and work, the sliding sleeve sand flusher (3) is not started during the fracturing process, at this time, the inside and outside of the sliding sleeve sand flusher (3) are not connected, and the fracturing fluid passes through the oil pipe (1), the sliding sleeve sand flusher (3), the upper packer (4), and the throttling sand blaster (5) to the formation at the fracturing point; S05: After the first stage of fracturing operation is completed, the pump is stopped, the well is shut down and the pressure is expanded. When the pressure reaches 0, the upper packer (4), the lower packer (6) and the hydraulic anchor (7) are automatically unsealed, and the pipe string is lifted to the second section to be modified, so that the middle part of the flow sandblaster (5) in the lower section is aligned with the second section; S06: repeat steps S03, S04, and S05 to complete the repeated fracturing operation of the remaining layers and pull out the fracturing string; S07: After the well washing is completed, lift the tubing string.
5. A coalbed methane casing horizontal well repeated fracturing method according to claim 2, characterized in that: In S01, if the formation leakage is serious, a water-soluble temporary plugging agent is injected to seal the fracture opening, and then a large-volume well wash is performed. When the inlet and outlet flows are consistent, the pump is stopped and the wellbore string is pulled out.
6. A coalbed methane casing horizontal well repeated fracturing method according to claim 2, characterized in that: In S03, the pressure bearing capacity is higher than the casing pressure of the casing annulus filling fluid, and lower than the oil pressure during the fracturing of the oil pipe (1).
7. A coalbed methane casing horizontal well repeated fracturing method according to claim 2, characterized in that: In S04, the casing annulus is injected with fluid at a slight positive pressure to balance the formation pressure. The annulus construction pressure does not exceed the maximum bearing pressure of the temporary plugging agent, and the casing pressure difference is maintained to complete the first stage of repeated fracturing operations.
8. A coalbed methane casing horizontal well repeated fracturing method according to claim 2, characterized in that: In S06, if the pipe string is stuck after fracturing and it is difficult to unblock it, and circulation cannot be established, it is judged that sand is stuck in the pipe string or the packer cannot be unblocked, then a steel ball of a corresponding size is dropped into the sliding sleeve sand flusher (3) from the wellhead, the sliding sleeve sand flusher (3) is started, and circulation is established by forward and reverse washing to ensure that there is no quartz sand or the like deposited from the upper packer (4) to the wellhead.
9. A coalbed methane casing horizontal well repeated fracturing method according to claim 2, characterized in that: In S06, each set of tools is removed for inspection after 3-4 sections of construction. If the tool is seriously damaged, it is replaced with a new one.
10. A coalbed methane casing horizontal well repeated fracturing method according to claim 2, characterized in that: In S07, if the jam is released successfully, all tools are pulled out, the sliding sleeve sand flusher (3) is replaced, and the pipe string and tools are re-entered to carry out the next stage of fracturing; if the jam is not released successfully, the active jam release is continued until the packer is successfully released; if the tool cannot be released, the steel ball corresponding to the hydraulic safety release (2) is continuously put in, the oil pipe (1) is pressurized, the hydraulic safety release (2) is disengaged, the hydraulic safety release (2) is pulled out, and the oil pipe (1) above the hydraulic safety release (2) is turned over to overhaul and salvage.
Citation Information
Patent Citations
Hydraulic jet double-seal single-blockage perforation and fracturing integrated process pipe string
CN104632167A
