Mine mining stopping line out-of-mine wrong area pressure relief method

By conducting geological exploration and structural data analysis in the wrong areas outside the mine stop line, drilling parameters are determined and pre-crack blasting is implemented, the problem that roof blasting cannot effectively release potential energy is solved, the mining safety is improved and the impact ground pressure risk is reduced .

CN118933783APending Publication Date: 2024-11-12HUATING COAL GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411299770.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the mining process of mine, coal columns in the wrong area outside the stop mining line are difficult to effectively release the potential energy stored by the coal rock mass through the top plate blasting, increase the cracks of the top plate rock mass, damage the integrity of the top plate, and cannot effectively reduce the risk of impact ground pressure. There are safety hazards.

Method used

Through geological exploration and structural data analysis, drilling distance, drilling angle and blasting parameters are determined, and holes are drilled in the tunnel to form multiple sets of pressure relief holes on the solid coal side and section coal column side, and pre-set blasting parameters are implemented. Cracking and blasting achieves effective release and transfer of stress.

Benefits of technology

It improves the safety of mining operations, reduces the risk of impact ground pressure, avoids roof damage and safety hazards, and ensures stable production of the working face.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933783A_ABST
    Figure CN118933783A_ABST
Patent Text Reader

Abstract

The invention provides a pressure relief method for an out-of-line wrong area of a mine, and the method comprises the following steps: obtaining the geological state of the out-of-line wrong area of the mine, and determining the structural data of the out-of-line wrong area of the mine; based on the structural data, the distance between every two adjacent sets of drill holes, the drilling angles of the drill holes and blasting parameters are determined; according to the distance and the drilling angle, drilling is conducted on the solid coal side and the section coal pillar side from the roadway, so that multiple sets of solid coal side pressure relief holes and multiple sets of section coal pillar side pressure relief holes are obtained; and according to the blasting parameters, pre-splitting blasting is conducted on the solid coal side pressure relief holes and the section coal pillar side pressure relief holes. According to the pressure relief method for the mine mining stopping line outside wrong area, potential energy stored in coal and rock mass in the outside wrong area can be effectively released, effective prevention and treatment on the mining stopping line outside wrong area are achieved, and the risk of rock burst can be reduced easily.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mine pressure control and tunnel maintenance in mining engineering, and in particular relates to a method for decompression in an outer staggered area of ​​a mine stop mining line. Background Art

[0002] During the mining process, the external deviation area of ​​the stop mining line refers to the area where the final stopping mining position is offset from the stopping mining position of the adjacent working face during the working face mining process. This deviation area will produce additional stress concentration in the tunnel and increase the risk of impact ground pressure.

[0003] In the related technology, roof blasting is usually used to relieve the pressure of the segmented coal pillar in the area outside the stop mining line. However, the segmented coal pillar in the area outside the stop mining line is actually solid coal, not a simple segmented coal pillar. Only using roof blasting will increase the cracks in the roof rock mass, destroy the integrity and continuity of the roof, and cannot effectively release the potential energy stored in the coal and rock mass in the area outside the stop mining line, and cannot effectively reduce the impact danger of the area outside the stop mining line, which poses certain safety hazards to the production of the working face. Summary of the invention

[0004] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, an embodiment of the present invention proposes a method for decompression in the outer offset area of ​​the stop mining line of a mine, which can effectively release the potential energy stored in the coal and rock mass in the outer offset area, achieve effective prevention and control of the outer offset area of ​​the stop mining line, and help reduce the risk of rock burst.

[0005] The method for decompression in the outer staggered area of ​​a mine stop mining line provided by the embodiment of the present invention comprises the following steps:

[0006] Obtain the geological status of the area outside the stop mining line and determine the structural data of the area outside the stop mining line;

[0007] Based on the structural data, determining the spacing between two adjacent groups of boreholes, the drilling angles of the boreholes, and blasting parameters;

[0008] According to the spacing and the drilling angle, drilling holes are respectively conducted from the roadway to the solid coal side and the section coal pillar side to obtain multiple groups of solid coal side pressure relief holes and multiple groups of section coal pillar side pressure relief holes;

[0009] According to the blasting parameters, pre-splitting blasting is carried out on the solid coal side pressure relief holes and the section coal pillar side pressure relief holes.

[0010] From the above, it can be seen that the method for decompression in the outer staggered area of ​​the mine stop mining line provided in an embodiment of the present invention first determines the drilling spacing, drilling angle and blasting parameters through geological exploration and structural data analysis; drilling operations are carried out in the tunnel to form multiple groups of solid coal side pressure relief holes and multiple groups of segmented coal pillar side pressure relief holes, and finally pre-splitting blasting is carried out according to preset blasting parameters to achieve effective release and transfer of stress, thereby improving the safety of mining operations and reducing the risk of safety accidents.

[0011] In some embodiments, the structural data of the offset area outside the stop mining line includes the current tunnel height, the section coal pillar width and the height of the adjacent tunnel.

[0012] In some embodiments, each group of the solid coal side pressure relief holes includes a first hole located at the shoulder of the tunnel and a second hole located at the lower middle part of the tunnel. The first holes are provided in plurality, and the plurality of the first holes are arranged in a fan shape. The second holes are perpendicular to the axial direction of the tunnel, and the inclination angle of the second holes is consistent with the inclination angle of the working face of the tunnel.

[0013] In some embodiments, the number of first holes in each group of solid coal side pressure relief holes is set to 2 to 4.

[0014] In some embodiments, the spacing between two adjacent groups of the solid coal side pressure relief holes is set to 10m to 20m, and the advance distance from each group of the solid coal side pressure relief holes to the tunnel working face is greater than or equal to 150m.

[0015] In some embodiments, the structural data also includes the machine mining height, the distance from the coal wall of the roadway to the peak point of stress concentration, and each group of coal pillar side pressure relief holes in the Su Souhu section includes a third hole located at the shoulder of the roadway and a fourth hole located in the lower middle part of the roadway. The drilling depth of the third hole is greater than 10m, the drilling depth of the fourth hole is greater than or equal to 3 to 5 times the machine mining height, and the drilling depth of the fourth hole is greater than or equal to the distance from the coal wall of the roadway to the peak point of stress concentration.

[0016] In some embodiments, the diameters of the solid coal side pressure relief holes and the section coal pillar side pressure relief holes are both set to 42 mm to 100 mm;

[0017] And / or, the spacing between two adjacent groups of the section coal pillar side pressure relief holes is set to 5m to 10m, and the leading distance from each group of the section coal pillar side pressure relief holes to the tunnel working face is greater than or equal to 150m.

[0018] In some embodiments, the step of performing pre-splitting blasting on the solid coal side pressure relief hole and the section coal pillar side pressure relief hole according to the blasting parameters comprises:

[0019] According to the blasting data, determining the blasting hole and filling the explosive roll;

[0020] Install detonators and lay busbars, the busbars have a conductor nominal cross-section greater than or equal to 1.0mm 2 The coal mine allows the use of double-core busbars;

[0021] Obtaining the depth of the blasting hole, and determining the sealing length according to the depth of the blasting hole;

[0022] According to the sealing length, sealing is performed using a sealing material;

[0023] The busbars are connected in parallel within the holes and in series between the holes, and then detonated.

[0024] In some embodiments, the sealing material is configured as taphole mud made of non-combustible, plastic loose material.

[0025] In some embodiments, the detonator is one of the instantaneous electric detonator permitted in coal mines, the millisecond delay electric detonator permitted in coal mines, and the digital electric detonator permitted in coal mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a flow chart of a method for decompression in an outer staggered area of ​​a mine stop production line provided by an embodiment of the present invention.

[0027] Figure 2 It is a schematic diagram of the layout of the boreholes in the tunnel in the method for decompression in the outer staggered area of ​​the mine stop mining line provided by an embodiment of the present invention.

[0028] Figure 3 It is a schematic diagram of the arrangement of boreholes in the outer offset area of ​​the mine stop production line in the pressure relief method of the outer offset area provided by an embodiment of the present invention.

[0029] Reference numerals:

[0030] 10. First goaf; 11. First stop mining line; 12. First upper drift; 13. Solid coal;

[0031] 20. Second goaf; 21. Second stop mining line; 23. Second lower drift; 231. Section coal pillar;

[0032] 31, first hole; 32, second hole; 33, third hole; 34, fourth hole;

[0033] 41. Top plate; 42. Bottom plate. DETAILED DESCRIPTION

[0034] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.

[0035] like Figures 1 to 3As shown, an embodiment of the present invention provides a method for decompression in an outer staggered area of ​​a mine stop mining line, which comprises the following steps:

[0036] S10, obtaining the geological state of the offset area outside the stop mining line and determining the structural data of the offset area outside the stop mining line.

[0037] In this step, geological surveys can be conducted on the area outside the stop mining line to obtain geological status information such as the geological structure, lithology distribution, fault direction, coal seam thickness and inclination of the area outside the stop mining line, and then an address structure model of the area outside the stop mining line can be constructed to determine the structural data of the area outside the stop mining line. The structural data includes but is not limited to the inclination of the coal seam, the current tunnel height, the section coal pillar width and the height of the adjacent tunnel.

[0038] S20, based on the structural data, determining the distance between two adjacent groups of boreholes, the drilling angle of the boreholes, and blasting parameters.

[0039] In this step, the spacing and blasting parameters between two adjacent groups of boreholes can be determined according to the length of the offset area outside the stop mining line in the excavation direction of the working face to ensure the effective superposition of blasting effects and the uniformity of stress release; at the same time, the drilling angle of each rotating hole can be calculated according to the current tunnel height, the width of the section coal pillar and the height of the adjacent tunnel to ensure that the drill hole can accurately penetrate the target area to achieve the best blasting effect. The blasting parameters may include the type of explosive roll, the charge, the detonation method, etc.

[0040] S30, drilling holes from the roadway toward the solid coal side and the section coal pillar side respectively according to the spacing and the drilling angle, so as to obtain multiple groups of solid coal side pressure relief holes and multiple groups of section coal pillar side pressure relief holes.

[0041] In this step, first ensure the ventilation, lighting and safety facilities in the tunnel, check the drilling equipment such as the drill rig, drill rod and drill bit to ensure that they are in the best working condition. According to the spacing and drilling angle, mark the starting point and target point of each borehole in the tunnel, and use measuring tools for precise positioning. During the drilling implementation process, first drill from the tunnel to the solid coal side, and start the drill rig to drill according to the preset drilling spacing and drilling angle. During the drilling process, pay close attention to the operating status of the drill rig and the drilling footage, and adjust the drilling pressure, speed and other parameters in time to ensure that the drilling trajectory meets the design requirements. At the same time, observe the drilling slag discharge, judge the physical and mechanical properties of the coal stratum, and provide a reference for subsequent blasting operations. After the drilling of the solid coal side is completed, move the drill rig to the other side of the tunnel, and drill to the side of the section coal pillar according to the above steps.

[0042] S40, performing pre-splitting blasting on the solid coal side pressure relief holes and the section coal pillar side pressure relief holes according to the blasting parameters.

[0043] To summarize, the method for decompression in the outer staggered area of ​​a mine stop-mining line provided in an embodiment of the present invention first determines the drilling spacing, drilling angle and blasting parameters through geological survey and structural data analysis; drilling operations are performed in the tunnel to form multiple groups of solid coal side pressure relief holes and multiple groups of segmented coal pillar side pressure relief holes; finally, pre-splitting blasting is performed according to preset blasting parameters to achieve effective release and transfer of stress, thereby improving the safety of mining operations and reducing the risk of safety accidents.

[0044] In some embodiments, each group of the solid coal side pressure relief holes includes a first hole located at the shoulder of the tunnel and a second hole located at the lower middle part of the tunnel. The first holes are provided in plurality, and the plurality of the first holes are arranged in a fan shape. The second holes are perpendicular to the axial direction of the tunnel, and the inclination angle of the second holes is consistent with the inclination angle of the working face of the tunnel.

[0045] Among them, the first holes on the shoulder of the tunnel are arranged in a fan-shaped manner, which helps to expand the scope of the blasting effect and make the stress release more comprehensive and uniform. At the same time, the fan-shaped arrangement can also effectively avoid the occurrence of stress concentration and reduce the risk of mine pressure disasters. And multiple first holes are arranged in a tilted manner from the tunnel bottom plate toward the tunnel roof in sequence. In other words, each first hole extends from the tunnel shoulder to the tunnel roof along a specific angle, thereby forming a more complex crack network during blasting, so that stress can be released and transferred more evenly in different directions and levels.

[0046] Furthermore, the drilling depths of the first holes gradually decrease in the direction from the tunnel floor to the tunnel roof, thereby effectively relieving pressure while avoiding excessive damage to the roof or causing safety hazards such as roof collapse.

[0047] In some embodiments, the number of first holes in each group of the solid coal side pressure relief holes is set to 2 to 4, so that the cost and resource waste can be minimized while ensuring the pressure relief effect. In this embodiment, the number of first holes in each group of the solid coal side pressure relief holes is set to 4. The second hole is set to a single hole, that is, the second hole is set to 1.

[0048] In some embodiments, the spacing between each adjacent group of solid coal side pressure relief holes is set to 10m to 20m, which can effectively disperse and reduce the concentrated stress in the coal body, and avoid mutual interference or waste of resources caused by too close hole spacing. And the advance distance from each group of solid coal side pressure relief holes to the tunnel working face is greater than or equal to 150m, so that the coal body in front of the tunnel can be pre-pressure-relieved in advance, so that the coal body is in a relatively stable stress state before the mining operation. In this way, when the working face gradually advances to this area, the coal body can release energy more smoothly, greatly reducing the risk of sudden disasters.

[0049] In addition, sufficient advance distance also provides valuable buffer time for mining operations, allowing workers to calmly deal with various situations that may arise and ensure the safe and smooth progress of production operations.

[0050] In some embodiments, the structural data also includes the machine mining height, the distance from the roadway coal wall to the stress concentration peak point, and each group of the section coal pillar pressure relief holes includes a third hole located at the roadway shoulder and a fourth hole located at the middle and lower part of the roadway. The drilling depth of the third hole is greater than 10m, so that it can directly act on the high stress area of ​​the coal body, effectively release the concentrated stress of the roadway shoulder, and then slow down the deformation rate of the roadway top and both sides, and improve the stability and maintenance cycle of the roadway.

[0051] Furthermore, the drilling depth of the fourth hole is greater than or equal to 3 to 5 times the machine-mined height, which not only ensures that the pressure relief hole can penetrate the potential stress concentration zone, but also penetrates deeper into the relatively stable area inside the coal body, fundamentally changing the stress distribution state of the coal body and achieving a more significant pressure relief effect. At the same time, in order to ensure the maximization of the pressure relief effect, the drilling depth of the fourth hole is also required to be no less than the distance from the coal wall of the roadway to the peak point of stress concentration, so as to ensure that the pressure relief hole can accurately act on the stress peak area and achieve effective transfer and release of stress.

[0052] In some embodiments, the diameters of the solid coal side pressure relief holes and the section coal pillar side pressure relief holes are set to 42 mm to 100 mm. On the one hand, this range of diameters can meet the requirements of different geological conditions and coal body physical properties, ensuring the smooth progress of drilling construction. A smaller diameter may increase the difficulty of drilling and reduce construction efficiency; while an overly large diameter may cause problems such as coal body hole collapse and drill jamming, affecting the drilling quality.

[0053] On the other hand, the appropriate aperture can ensure the reasonable loading of blasting charge, so that the blasting energy can be fully released and evenly act on the coal body, thereby achieving more effective stress release. In addition, the aperture size is closely related to the expansion morphology of cracks after blasting, which in turn affects the permeability of the coal body, gas extraction efficiency and other subsequent work.

[0054] In some embodiments, the spacing between two adjacent groups of the section coal pillar side pressure relief holes is set to 5m to 10m, which can ensure the effective release of coal body stress and avoid unnecessary waste of resources. Among them, too small a spacing may cause the pressure relief effects to overlap each other, resulting in waste of resources; while too large a spacing may leave a blind spot for stress release, affecting the overall pressure relief effect.

[0055] Furthermore, the lead distance from the side pressure relief holes of the coal pillars in each group of sections to the working face of the tunnel is greater than or equal to 150m, which can significantly reduce the stress level of the coal body in front of the tunnel and reduce the risk of catastrophic accidents such as coal and gas outbursts and rock burst during mining. In addition, sufficient lead distance also provides valuable buffer time for mining operations, allowing workers to calmly deal with various possible situations and ensure the safe and smooth progress of production operations.

[0056] In some embodiments, step S40, performing pre-splitting blasting on the solid coal side pressure relief hole and the section coal pillar side pressure relief hole according to the blasting parameters includes:

[0057] According to the blasting data, determining the blasting hole and filling the explosive roll;

[0058] Install detonators and lay busbars, the busbars have a conductor nominal cross-section greater than or equal to 1.0mm 2 The coal mine allows the use of double-core busbars;

[0059] Obtaining the depth of the blasting hole, and determining the sealing length according to the depth of the blasting hole;

[0060] According to the sealing length, sealing is performed using a sealing material;

[0061] The busbars are connected in parallel within the holes and in series between the holes, and then detonated.

[0062] Specifically, according to the pre-calculated and optimized blasting parameters, the location of each blasting hole is accurately selected and its depth is measured. Then, according to the hole diameter and depth of the blasting hole, the appropriate specifications of the explosive roll are selected for filling. The selection of the explosive roll needs to consider its blasting power, sensitivity and matching degree with the coal body properties to ensure the effective transfer and release of the blasting energy.

[0063] Next, insert the detonator into the cartridge and ensure that it is positioned accurately and fixed reliably. Then, lay the busbar for detonating the detonator. It is particularly emphasized here that the selected busbar must be a double-core busbar permitted in coal mines, and its conductor nominal cross-section should be greater than or equal to 1.0mm 2 To ensure the stability and safety of current transmission. During the busbar laying process, care should be taken to avoid direct contact with metal objects to prevent accidents caused by short circuits or electric sparks.

[0064] Next, the sealing length is calculated and determined according to the depth of the blast hole. The selection of the sealing length is crucial, as it directly affects the gathering and release of blasting energy. A sealing length that is too long or too short may lead to unsatisfactory blasting results and even cause safety accidents. Therefore, calculations and adjustments must be made strictly in accordance with established standards and empirical formulas.

[0065] After the sealing length is determined, the sealing operation phase begins. The technicians select appropriate sealing materials and fill the sealing materials evenly and tightly into the predetermined position in the blasting hole. During the sealing process, it is necessary to ensure that the sealing materials are full without voids and fit tightly to the coal body to effectively isolate the exchange of gas in the hole with the external environment and improve the blasting effect.

[0066] Finally, the busbar is connected in parallel in the hole and in series between holes. This method can not only ensure that each blasting hole can be effectively detonated, but also simplify the connection line and improve the efficiency and safety of the operation. After the connection is completed, the technicians will carefully check and confirm that there is no error before the detonation operation can be carried out. When detonating, it is necessary to strictly abide by the operating procedures and safety regulations to ensure that the personnel are evacuated to a safe area before the detonation can be carried out.

[0067] In this embodiment, the sealing material is set to be cannon mud made of non-combustible, plastic loose material, such as blister mud or clay cannon mud, to ensure that during the pre-splitting blasting process, it can effectively isolate the exchange of gas in the hole with the external environment, and can adapt to the morphological changes of the coal body hole wall, thereby improving the sealing effect.

[0068] In this embodiment, the detonator is one of the instantaneous electric detonator permitted in coal mines, the millisecond delay electric detonator permitted in coal mines, and the digital electric detonator permitted in coal mines. That is, the most suitable detonator type can be selected for operation according to specific blasting requirements and operating environment.

[0069] Specifically, the instantaneous electric detonator permitted for coal mines is known for its fast and direct detonation characteristics. It can detonate the explosive volume in a very short time and generate powerful blasting energy. This detonator is suitable for blasting operations with strict requirements on the detonation time. It can ensure the rapid appearance of the blasting effect, but at the same time, it also requires precise control of the detonation time to avoid safety accidents caused by misoperation.

[0070] The millisecond delay electric detonator for coal mines achieves precise control of the detonation time through the built-in delay device. In blasting operations, different delay times can be set as needed to detonate each blasting hole in sequence or in groups, thereby optimizing the blasting effect and reducing adverse factors such as vibration and flying rocks. This type of detonator is particularly suitable for blasting operations under complex geological conditions and can significantly improve operating efficiency and safety.

[0071] The digital electric detonator for coal mines is a new type of detonator that has emerged in recent years with the rapid development of electronic technology. It uses digital technology to control the detonation process, with higher accuracy and reliability. Through the preset blasting program, it can achieve precise control of multiple blasting holes, including parameters such as detonation time, detonation sequence, and detonation energy. This detonator not only improves the intelligence level of blasting operations, but also provides a more powerful technical guarantee for coal mine safety production.

[0072] In this embodiment, if Figure 2 and Figure 3 As shown, during the coal mine excavation process, during the current working face mining process, the position of the expected stop mining line is offset relative to the stop mining line position of the adjacent working face. That is, the first stop mining line 11 of the first goaf 10 is offset compared to the second stop mining line 21 of the second goaf 20, so that one side of the first upper drift 12 of the first goaf 10 is a segmented coal pillar 231, and the other side is solid coal 13. And a segmented coal pillar 231 is set between the second lower drift 23 of the second goaf 20 and the first upper drift 12 of the first goaf 10. The first upper drift 12 and the second lower drift 23 can also be understood as tunnels. Figure 2 The middle arrow A indicates the advancement direction of the working face in the first goaf 10 .

[0073] Among them, during the drilling arrangement process, the first hole 31 of the solid coal side pressure relief hole is located at the shoulder of the first upper flume 12, and the multiple first holes 31 are arranged in a fan shape, and the drilling depth of the multiple first holes 31 gradually decreases in the direction from the bottom plate 42 to the top plate 41. In the height direction of the first upper flume 12, the second hole 32 is located in the middle of the first upper flume 12, and the second hole 32 is arranged perpendicular to the axial direction of the second upper flume.

[0074] In addition, the third hole 33 in the section coal pillar side pressure relief hole is located at the shoulder of the first upper flume 12, and the third hole 33 is arranged obliquely from the shoulder of the third upper flume toward the tunnel roof 41. The fourth hole 34 is arranged obliquely from the middle of the first upper flume 12 toward the roof 41, and the inclination angle of the fourth hole 34 is determined according to the width of the section coal pillar 231 and the height of the second lower flume 23, so that the fourth hole 34 passes through the top of the second upper flume.

[0075] It should be noted that the explosive rolls use coal mine permitted explosives with a safety level of not less than level 2, the single-hole charge in the first and third holes does not exceed 100kg, and the single-hole charge in the second and fourth holes does not exceed 5kg; the detonators use coal mine permitted instantaneous electric detonators, coal mine permitted millisecond delay electric detonators or coal mine permitted digital electric detonators, with no less than 2 per hole, and the connection is generally in parallel within the hole and series between holes; the charge decoupling coefficient should not be greater than 1.5; the blasting busbar is a coal mine permitted double-core busbar with a conductor nominal section of not less than 1.0mm2, and the busbar length should meet the distance for avoiding bombs; the sealing material is blister mud, clay gun mud or other non-combustible, plastic loose material made of gun mud, the sealing length should not be less than 1 / 3 of the hole depth, and should not be less than 5m.

[0076] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0077] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0078] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0079] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0080] In the present invention, the terms "one embodiment", "some embodiments", etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art can combine and combine different embodiments or examples described in this specification and the features of different embodiments or examples without contradiction.

[0081] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A method for decompression in the outer staggered area of ​​a mine stop mining line, characterized in that: The steps include: Obtain the geological status of the area outside the stop mining line and determine the structural data of the area outside the stop mining line; Based on the structural data, determining the spacing between two adjacent groups of boreholes, the drilling angles of the boreholes, and blasting parameters; According to the spacing and the drilling angle, drilling holes are respectively conducted from the roadway to the solid coal side and the section coal pillar side to obtain multiple groups of solid coal side pressure relief holes and multiple groups of section coal pillar side pressure relief holes; According to the blasting parameters, pre-splitting blasting is carried out on the solid coal side pressure relief holes and the section coal pillar side pressure relief holes.

2. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 1, characterized in that: The structural data of the offset area outside the stop mining line includes the current tunnel height, the section coal pillar width and the height of the adjacent tunnel.

3. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 1, characterized in that: Each group of the solid coal side pressure relief holes includes a first hole located at the shoulder of the tunnel and a second hole located at the lower middle part of the tunnel. The first holes are provided in plurality, and the plurality of the first holes are arranged in a fan shape. The second holes are perpendicular to the axial direction of the tunnel, and the inclination angle of the second holes is consistent with the inclination angle of the tunnel working surface.

4. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 3, characterized in that: The number of first holes in each group of solid coal side pressure relief holes is set to 2 to 4.

5. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 3, characterized in that: The spacing between two adjacent groups of the solid coal side pressure relief holes is set to 10m to 20m, and the leading distance from each group of the solid coal side pressure relief holes to the tunnel working face is greater than or equal to 150m.

6. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 1, characterized in that: The structural data also includes the machine mining height and the distance from the coal wall of the tunnel to the peak point of stress concentration. Each group of the section coal pillar pressure relief holes includes a third hole located at the shoulder of the tunnel and a fourth hole located at the lower middle part of the tunnel. The drilling depth of the third hole is greater than 10m, and the drilling depth of the fourth hole is greater than or equal to 3 to 5 times the machine mining height, and the drilling depth of the fourth hole is greater than or equal to the distance from the coal wall of the tunnel to the peak point of stress concentration.

7. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 1, characterized in that: The diameters of the solid coal side pressure relief holes and the section coal pillar side pressure relief holes are both set to 42 mm to 100 mm; And / or, the spacing between two adjacent groups of the section coal pillar side pressure relief holes is set to 5m to 10m, and the leading distance from each group of the section coal pillar side pressure relief holes to the tunnel working face is greater than or equal to 150m.

8. The method for decompression in the outer staggered area of ​​a mine stop mining line according to any one of claims 1 to 7, characterized in that: The step of performing pre-splitting blasting on the solid coal side pressure relief hole and the section coal pillar side pressure relief hole according to the blasting parameters comprises: According to the blasting data, determining the blasting hole and filling the explosive roll; Install detonators and lay busbars, the busbars have a conductor nominal cross-section greater than or equal to 1.0mm 2 The coal mine allows the use of double-core busbars; Obtaining the depth of the blasting hole, and determining the sealing length according to the depth of the blasting hole; According to the sealing length, sealing is performed using a sealing material; The busbars are connected in parallel within the holes and in series between the holes, and then detonated.

9. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 8, characterized in that: The sealing material is taphole mud made of non-combustible, plastic loose material.

10. The method for decompression in the outer staggered area of ​​a mine stop mining line according to claim 8, characterized in that: The detonator is one of the instantaneous electric detonator permitted in coal mines, the millisecond delay electric detonator permitted in coal mines and the digital electric detonator permitted in coal mines.