Shield tunnel synchronous grouting intelligent monitoring system and application method
By using temperature and humidity, partitioning and vibration control devices in shield tunnel construction, the impact of grouting liquid solidification time and geological conditions on grouting pressure is solved, and efficient and safe grouting in shield tunnel construction is achieved, improving Construction efficiency and quality.
Patent Information
- Application Number
- CN202410993198.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
AI Technical Summary
In shield tunnel construction, the solidification time of the grouting liquid is affected by the ambient temperature and humidity, resulting in the gap being unable to be filled in time; the same grouting pressure under different geological conditions may lead to formation rupture or settlement; static grouting leads to a large amount of secondary grouting, Reduce construction efficiency.
An intelligent monitoring system for synchronous grouting of shield tunnels is designed, including temperature and humidity control device, partition control device and vibration control device. By real-time detection and regulation of temperature and humidity, partition grouting and vibration grouting, grouting parameters are optimized to adapt to Different geological conditions.
It has achieved the reduction of the solidification time of grouting liquid, avoiding formation rupture and settlement, reducing the secondary grouting volume, and improving construction efficiency and grouting quality.
Smart Images

Figure CN118933806A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction monitoring, and in particular to an intelligent monitoring system for synchronous grouting of a shield tunnel and an application method thereof. Background Art
[0002] Shield synchronous grouting is a key technology in shield construction. It is mainly used in the construction of underground projects such as subway tunnels, highway tunnels, and water supply tunnels. The basic principle of synchronous grouting is to inject slurry into the gap between the segments behind the shield machine and the surrounding strata through the grouting holes at the tail of the shield while the shield machine is moving forward. The main functions are as follows:
[0003] 1. Filling gaps: During the advancement of the shield machine, construction gaps will be left between the segments and the strata. Grouting can fill these gaps in time to prevent the strata from loosening and the tunnel from deforming.
[0004] 2. Control ground subsidence: By adjusting the grouting pressure and injection volume, ground subsidence can be effectively controlled to protect the buildings and infrastructure on the ground from being affected.
[0005] 3. Waterproofing and reinforcement: After solidification, the injected slurry can enhance the stability of the stratum and play a waterproofing role, ensuring the safety and long-term stability of the tunnel structure.
[0006] 4. Improve construction efficiency: Synchronous grouting and shield advancement can improve construction efficiency and reduce subsequent secondary grouting work.
[0007] The synchronous grouting process requires precise control of the grouting pressure, grouting speed and slurry ratio to adapt to different geological conditions and construction requirements. Commonly used slurries include cement slurry, chemical slurry or their mixed slurries. The selection of slurry type is usually based on the characteristics of the formation, groundwater conditions and engineering requirements. During construction, the effect of synchronous grouting will be affected by many factors, such as the propulsion speed of the shield machine, the permeability of the formation, the solidification time and expansion rate of the slurry. Therefore, synchronous grouting needs to be combined with on-site monitoring data to adjust parameters in a timely manner to ensure the best grouting effect.
[0008] After searching, the patent with application number CN202111360318.7 discloses an intelligent monitoring system for synchronous grouting of subway tunnel shield. By modifying the synchronous grouting system of the tunnel shield, a branch flow meter group, a ball valve group, and an emergency switching block device are arranged in sequence between the grouting pump output port and the shield tail according to the spatial relationship; the grouting liquid output port, the branch flow meter, the ball valve, the emergency switching block device, and the grouting port of the shield tail are connected in series in sequence to form a slurry conveying path; the branch flow meter can monitor the slurry consumption of the slurry conveying path in real time and accurately; when the grouting path fails due to a pipeline or pump failure, the emergency switching block device switches the slurry conveying path to complete logical judgment to locate the fault point, and at the same time, in the event of a pump failure, the system is guaranteed to maintain synchronous grouting in real time to control the safety of the on-site project. However, the following problems still exist:
[0009] (1) The solidification time of the grouting fluid is affected by the ambient temperature and humidity, resulting in different solidification times. If the solidification time is too long, the gap between the segment and the formation cannot be filled in a timely and effective manner.
[0010] (2) Overall annular grouting: the grouting pressure and grouting volume are the same, but the geological conditions at different locations are different. However, if the same grouting pressure is used for grouting, excessively high grouting pressure may cause the slurry to penetrate into undesirable locations and even cause stratum rupture; while excessively low pressure may not be able to effectively fill the gap between the shield segment and the stratum, thereby causing ground subsidence.
[0011] (3) Static grouting often results in voids, which requires a large amount of secondary grouting and reduces construction efficiency. Summary of the invention
[0012] The purpose of the present invention is to provide an intelligent monitoring system for synchronous grouting in a shield tunnel and an application method thereof, so as to improve the efficiency and quality of synchronous grouting in a shield tunnel.
[0013] To achieve the above-mentioned objectives, the present invention provides an intelligent monitoring system and application method for synchronous grouting of a shield tunnel, comprising a control console arranged in a shield machine, a grouting device arranged in the tail shield of the shield machine, the grouting device being electrically connected to the control console, and also comprising a temperature and humidity control device, a partition control device and a vibration control device arranged on the tail shield; the temperature and humidity control device, the partition control device and the vibration control device are all electrically connected to the control console.
[0014] Preferably, the grouting device comprises a slurry storage tank, at the output end of which is provided with at least one grouting pump, the grouting pump is connected to an arc-shaped connecting pipe through a slurry supply pipe, a plurality of grouting pipes are distributed in an arc shape on the arc-shaped connecting pipe, and a flow meter and a pressure regulating valve are provided on the grouting pipe;
[0015] The slurry storage tank, grouting pump, flow meter and pressure regulating valve are all electrically connected to the control console.
[0016] Preferably, the temperature and humidity control device comprises a protective shell arranged on the circumferential side of the grouting pipe, a detection electric telescopic rod is arranged in the protective shell, the telescopic end of the detection electric telescopic rod is connected to a mounting tube, one end of the mounting tube passes through the first through hole at the top of the protective shell and is provided with a limit plate, a fixing plate is arranged inside the mounting tube, two rows of second through holes are opened on the circumferential side of the mounting tube, a heating rod, a humidifying column and a detection column are connected to the fixing plate through a return spring, the tops of the humidifying column, the heating rod and the detection column are arc-shaped and arranged opposite to the second through hole, the detection column is located at the front end of the mounting tube, and the humidifying column and the heating column are arranged alternately; a temperature and humidity sensor is arranged on the top of the detection column; a one-way air outlet valve is arranged on the top of the humidifying column, and the one-way air outlet valve is connected to the humidifier in the mounting tube through a moisture pipe;
[0017] The electric telescopic rod, the humidifier, the one-way air outlet valve, the heating rod and the temperature and humidity sensor are all electrically connected to the control console.
[0018] Preferably, the partition control device includes a plurality of telescopic partition mechanisms circumferentially distributed on the tail shield, the telescopic partition mechanism includes a flexible protective airbag, the flexible protective airbag is connected to a sealing air pump through an air pipe, a telescopic support assembly is arranged in the flexible protective airbag, the telescopic support assembly is connected to a partition electric telescopic rod, and the electric telescopic rod is arranged in the tail shield;
[0019] The sealed air pump and the partitioned electric telescopic rod are both electrically connected to the control console.
[0020] Preferably, the telescopic support assembly includes a plurality of U-shaped support sleeves which are slidably connected in sequence, a transverse slide groove is provided on the outer side of the U-shaped support sleeve, a transverse slider is provided on one side of the U-shaped support sleeve, the transverse slider is arranged in the transverse slide groove of the adjacent U-shaped support sleeve, a vertical slide groove is provided on the other side of the U-shaped support sleeve, an extension spring is provided in the vertical slide groove, one end of the extension spring is connected to the vertical slider, the vertical slider is connected to an extension plate, the extension plate, and an elastic positioning piece is provided in the vertical slider, and the elastic positioning piece is arranged relative to the positioning groove in the vertical slide groove.
[0021] Preferably, the elastic positioning member includes an installation threaded tube, a limiting ring is arranged at one end of the installation threaded tube, a retaining ball and a tightening spring are arranged in sequence in the installation threaded tube, the installation threaded tube is threadedly installed in the vertical slider and the retaining ball is arranged opposite to the positioning groove.
[0022] Preferably, the vibration control device comprises a vibration drive motor, the vibration drive motor is connected to a sealed bearing arranged on the tail shield, a plurality of circumferentially distributed through holes are provided on the sealed bearing, a vibration rod is provided in the through holes, the plurality of vibration rods are fixed on a fixed ring, an annular slide groove is provided on the fixed ring, two guide sliders are provided in the annular slide groove, the two guide sliders are connected to a connecting rod, the two connecting rods are connected by a U-shaped connecting piece, and the U-shaped connecting piece is connected to a vibration telescopic electric push rod;
[0023] The vibration driving motor and the vibration telescopic electric push rod are both electrically connected to the control console.
[0024] An application method based on the above-mentioned intelligent monitoring system for synchronous grouting in a shield tunnel, the specific steps are as follows:
[0025] Step S1: constructing a three-dimensional engineering geological model based on field exploration data and test data;
[0026] Step S2: planning the shield trajectory according to the engineering geological three-dimensional model, and planning the travel parameters and grouting parameters through the console according to the shield trajectory;
[0027] Step S3: Perform tunnel construction according to the shield trajectory, travel parameters and grouting parameters, and detect and adjust the grouting parameters through the shield tunnel synchronous grouting intelligent monitoring system during tunnel construction.
[0028] Preferably, in step S2, the travel parameters include travel speed and travel direction;
[0029] The grouting parameters include the grouting pressure in each radial direction, the grouting volume, the temperature and humidity during grouting, the vibration duration, and the vibration speed.
[0030] Preferably, in step S3, the annular grouting gap is divided into a plurality of grouting parts in different radial directions according to the number of telescopic separation mechanisms, and when synchronous grouting is performed on the same circumference, the grouting pressures of adjacent grouting parts are compared, and when the grouting pressure difference of adjacent grouting parts is less than or equal to the set pressure difference, the telescopic separation mechanism between the adjacent grouting parts is not started, the flexible protective airbag is in a negative pressure state, and the partitioned electric telescopic rod is in a contracted state; when the grouting pressure difference of adjacent grouting parts is greater than the set pressure difference, the telescopic separation mechanism between the adjacent grouting parts is started, the flexible protective airbag is in a positive pressure state, and the partitioned electric telescopic rod is in an extended state, so as to isolate the two grouting parts;
[0031] During synchronous grouting, the temperature and humidity are detected by the temperature and humidity sensor, and the temperature and humidity detection data are compared with the set temperature and humidity values. The functions of the humidifier and the heating rod are controlled according to the difference between the temperature and humidity detection data and the set temperature and humidity values. As the synchronous grouting progresses, the detection electric telescopic rod changes from an extended state to a contracted state. When the synchronous grouting is completed, the humidifying column, the heating rod and the detection column are completely installed in the installation tube and installed in the protective shell.
[0032] After the synchronous grouting is completed, the activated telescopic separation mechanism is turned to the closed state, the flexible protective airbag is changed from the positive pressure state to the negative pressure state, and the partition electric telescopic rod is changed from the extended state to the retracted state;
[0033] After the synchronous grouting is completed, the vibrating telescopic electric push rod changes from the telescopic state to the extended state, the vibrating drive motor is started, and after vibrating for a set time, the vibrating telescopic electric push rod changes from the extended state to the telescopic state;
[0034] Finally, start the grouting device again to carry out additional grouting.
[0035] Therefore, the present invention adopts the above-mentioned intelligent monitoring system and application method for synchronous grouting in a shield tunnel, which has the following beneficial effects:
[0036] (1) A temperature and humidity control device is provided to detect and regulate the temperature and humidity, reduce the solidification time of the grouting liquid, and effectively fill the gap between the pipe segment and the formation in time.
[0037] (2) A zoning control device is provided to enable grouting at different grouting pressures in different radial directions according to actual geological conditions, thereby avoiding grouting at the same circumference with the same grouting pressure, which may cause stratum rupture or ground subsidence.
[0038] (3) A vibration control device is provided to vibrate the grouting body in time, quickly discharge the air in the grouting body, reduce the voids, thereby reducing the amount of secondary grouting and improving construction efficiency.
[0039] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a schematic diagram of the structure of an intelligent monitoring system for synchronous grouting in a shield tunnel according to the present invention;
[0041] Figure 2 It is a schematic diagram of the structure of the grouting device of the present invention;
[0042] Figure 3 It is a schematic diagram of the structure of the temperature and humidity control device of the present invention;
[0043] Figure 4 This is a schematic diagram of the installation pipe structure of the present invention;
[0044] Figure 5 This is a schematic diagram of the structure of the partition control device of the present invention;
[0045] Figure 6 This is a schematic diagram of the U-shaped support sleeve structure of the present invention;
[0046] Figure 7 It is a schematic diagram of the structure of the elastic positioning member of the present invention;
[0047] Figure 8 It is a schematic structural diagram of the vibration control device of the present invention.
[0048] Reference numerals
[0049] 1. Control console; 2. Grouting device; 21. Slurry storage tank; 22. Grouting pump; 23. Slurry supply pipe; 24. Arc connecting pipe; 25. Grouting pipe; 3. Temperature and humidity control device; 31. Protective shell; 32. Detection electric telescopic rod; 33. Mounting pipe; 34. Limiting plate; 35. Fixing plate; 36. Return spring; 37. Heating rod; 38. Humidification column; 39. Detection column; 4. Partition control device; 41. Partition electric telescopic rod; 42. Flexible protective airbag; 43. Sealing air pump; 44. Telescopic support assembly; 441. U-shaped support sleeve; 442. lateral slide groove; 443. lateral slider; 444. vertical slide groove; 445. extension spring; 446. vertical slider; 447. extension plate; 448. positioning groove; 449. installation threaded pipe; 4410. cardan ball; 4411. tightening spring; 5. vibration control device; 51. vibration drive motor; 52. sealed bearing; 53. vibration rod; 54. fixing ring; 55. annular slide groove; 56. connecting rod; 57. U-shaped connecting piece; 58. vibration telescopic electric push rod. DETAILED DESCRIPTION
[0050] Example
[0051] In the description of the present invention, it should be noted that the terms "upper", "lower", "inside", "outside", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, or the positions or positional relationships in which the invented product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In the description of the present invention, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0052] The embodiments of the present invention are described in detail below in conjunction with the accompanying drawings.
[0053] like Figure 1 As shown, an intelligent monitoring system for synchronous grouting of a shield tunnel comprises a control console 1 arranged in a shield machine, a grouting device 2 is arranged in the tail shield of the shield machine, and the grouting device 2 is electrically connected to the control console 1.
[0054] like Figure 2As shown, the grouting device 2 includes a slurry storage tank 21, and four grouting pumps 22 are arranged at the output end of the slurry storage tank 21. The grouting pumps 22 are connected to an arc-shaped connecting pipe 24 through a slurry supply pipe 23. Three grouting pipes 25 are distributed in an arc shape on the arc-shaped connecting pipe 24. The grouting pipes 25 are provided with a flow meter and a pressure regulating valve (not shown in the figure). The slurry storage tank 21, the grouting pump 22, the flow meter and the pressure regulating valve are all electrically connected to the console 1. The output pressure and flow rate of each grouting pipe 25 can be adjusted according to the actual geological conditions.
[0055] like Figure 3-Figure 4 As shown, in order to detect and control the grouting temperature and humidity, a temperature and humidity control device 3 is provided on the tail shield, and the temperature and humidity control device 3 includes a protective shell 31 arranged on the circumferential side of the grouting pipe 25, and a detection electric telescopic rod 32 is arranged in the protective shell 31, and the telescopic end of the detection electric telescopic rod 32 is connected to a mounting tube 33, and one end of the mounting tube 33 passes through a first through hole at the top of the protective shell 31 and is provided with a limiting plate 34, and a sealing ring is provided in the first through hole, and the mounting tube 33 is limited and sealed when it is retracted into the protective shell 31, and a sealing ring is also provided on the limiting plate 34 to improve the sealing performance. A fixing plate 35 is arranged inside the mounting tube 33, and two rows of second through holes are opened on the circumferential side of the mounting tube 33. A heating rod 37, a humidifying column 38 and a detection column 39 are connected to the fixing plate 35 through a return spring 36. The tops of the humidifying column 38, the heating rod 37 and the detection column 39 are arc-shaped and arranged opposite to the second through holes. The detection column 39 is located at the front end of the mounting tube 33, and the humidifying column 38 and the heating column are arranged alternately. A temperature and humidity sensor is arranged on the top of the detection column 39; a one-way air outlet valve is arranged on the top of the humidifying column 38, and the one-way air outlet valve is connected to the humidifier in the mounting tube 33 through a wet air pipe. The electric telescopic rod, the humidifier, the one-way air outlet valve, the heating rod 37 and the temperature and humidity sensor are all electrically connected to the console 1.
[0056] like Figure 5-Figure 7As shown, in order to achieve different grouting pressures in different radial directions, in this embodiment, a partition control device 4 is provided between adjacent arc-shaped connecting pipes 24. The partition control device 4 includes a plurality of telescopic partition mechanisms circumferentially distributed on the tail shield. The telescopic partition mechanism includes a flexible protective airbag 42. The flexible protective airbag 42 is connected to a sealed air pump 43 through an air pipe. A telescopic support assembly 44 is provided in the flexible protective airbag 42. The telescopic support assembly 44 is connected to a partition electric telescopic rod 41. The electric telescopic rod is provided in the tail shield. The sealed air pump 43 and the partition electric telescopic rod 41 are both electrically connected to the console 1. The telescopic support assembly 44 includes a plurality of U-shaped support sleeves 441 that are slidably connected in sequence, a transverse groove 442 is provided on the outer side of the U-shaped support sleeve 441, a transverse slider 443 is provided on one side of the U-shaped support sleeve 441, the transverse slider 443 is arranged in the transverse groove 442 of the adjacent U-shaped support sleeve 441, a vertical groove 444 is provided on the other side of the U-shaped support sleeve 441, an extension spring 445 is provided in the vertical groove 444, one end of the extension spring 445 is connected to the vertical slider 446, the vertical slider 446 is connected to an extension plate 447, the extension plate 447, an elastic positioning piece is provided in the vertical slider 446, and the elastic positioning piece is arranged opposite to the positioning groove 448 in the vertical groove 444. The elastic positioning member includes a mounting threaded tube 449, a limiting ring is arranged at one end of the mounting threaded tube 449, a locking ball 4410 and a tightening spring 4411 are arranged in sequence in the mounting threaded tube 449, the mounting threaded tube 449 is threadedly installed in the vertical slider 446 and the locking ball 4410 is arranged opposite to the positioning groove 448.
[0057] like Figure 8 As shown, in order to discharge the bubbles generated by grouting, a vibration control device 5 is provided, and the vibration control device 5 includes a vibration drive motor 51, and the vibration drive motor 51 is connected to a sealed bearing 52 arranged on the tail shield, and the sealed bearing 52 is provided with a plurality of circumferentially distributed through holes, and a vibration rod 53 is arranged in the through holes, and the plurality of vibration rods 53 are all fixed on a fixed ring 54, and an annular groove 55 is provided on the fixed ring 54, and two guide sliders are arranged in the annular groove 55, and the two guide sliders are connected with a connecting rod 56, and the two connecting rods 56 are connected by a U-shaped connecting piece 57, and the U-shaped connecting piece 57 is connected with a vibration telescopic electric push rod 58, and the vibration drive motor 51 and the vibration telescopic electric push rod 58 are both electrically connected to the control console 1.
[0058] An application method based on the above-mentioned intelligent monitoring system for synchronous grouting in a shield tunnel, the specific steps are as follows:
[0059] Step S1: construct an engineering geological three-dimensional model based on field exploration data and test data. The construction of geological three-dimensional models in this field belongs to the prior art and will not be described in detail here.
[0060] Step S2: Plan the shield track according to the engineering geological three-dimensional model, and plan the travel parameters and grouting parameters according to the shield track through the console 1. The travel parameters include the travel speed and travel direction, and the grouting parameters include the grouting pressure in each radial direction, the grouting amount, the temperature and humidity during grouting, the vibration duration, and the vibration speed.
[0061] Step S3: Perform tunnel construction according to the shield trajectory, travel parameters and grouting parameters, and detect and adjust the grouting parameters through the shield tunnel synchronous grouting intelligent monitoring system during tunnel construction.
[0062] According to the number of telescopic separation mechanisms, the annular grouting gap is divided into several grouting parts in different radial directions. When synchronous grouting is carried out on the same circumference, the grouting pressures of adjacent grouting parts are compared. When the grouting pressure difference between adjacent grouting parts is less than or equal to the set pressure difference, the telescopic separation mechanism between the adjacent grouting parts is not started, the flexible protective airbag 42 is in a negative pressure state, and the partition electric telescopic rod 41 is in a contracted state; when the grouting pressure difference between adjacent grouting parts is greater than the set pressure difference, the telescopic separation mechanism between the adjacent grouting parts is started, the flexible protective airbag 42 is in a positive pressure state, and the partition electric telescopic rod 41 is in an extended state, so as to isolate the two grouting parts.
[0063] During the synchronous grouting, the temperature and humidity are detected by the temperature and humidity sensor, and the detected data are compared with the set temperature and humidity values. The functions of the humidifier and the heating rod 37 are controlled according to the difference between the detected data and the set temperature and humidity values. As the synchronous grouting progresses, the electric telescopic rod 32 is detected to change from an extended state to a contracted state. When the synchronous grouting is completed, the humidifying column 38, the heating rod 37 and the detection column 39 are completely inserted into the installation tube 33 and installed into the protective shell 31.
[0064] After the synchronous grouting is completed, the activated telescopic separation mechanism is turned into a closed state, the flexible protective airbag 42 is changed from a positive pressure state to a negative pressure state, and the partition electric telescopic rod 41 is changed from an extended state to a contracted state.
[0065] After the synchronous grouting is completed, the vibrating telescopic electric push rod 58 is changed from the telescopic state to the extended state, and the vibration drive motor 51 is started. After vibrating for a set time, the vibrating telescopic electric push rod 58 is changed from the extended state to the telescopic state.
[0066] Finally, the grouting device is started again to carry out additional grouting to fill the space occupied by the telescopic partition mechanism.
[0067] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. An intelligent monitoring system for synchronous grouting of a shield tunnel, comprising a control console arranged in a shield machine, a grouting device arranged in the tail shield of the shield machine, and the grouting device being electrically connected to the control console, characterized in that: It also includes a temperature and humidity control device, a partition control device and a vibration control device arranged on the tail shield; the temperature and humidity control device, the partition control device and the vibration control device are all electrically connected to the control console.
2. According to claim 1, a shield tunnel synchronous grouting intelligent monitoring system is characterized by: The grouting device comprises a slurry storage tank, at least one grouting pump is arranged at the output end of the slurry storage tank, the grouting pump is connected to an arc-shaped connecting pipe through a slurry supply pipe, a plurality of grouting pipes are distributed in an arc shape on the arc-shaped connecting pipe, and a flow meter and a pressure regulating valve are arranged on the grouting pipe; The slurry storage tank, grouting pump, flow meter and pressure regulating valve are all electrically connected to the control console.
3. According to claim 1, the intelligent monitoring system for synchronous grouting of a shield tunnel is characterized by: The temperature and humidity control device comprises a protective shell arranged on the circumferential side of the grouting pipe, a detection electric telescopic rod is arranged in the protective shell, the telescopic end of the detection electric telescopic rod is connected with a mounting pipe, one end of the mounting pipe passes through the first through hole at the top of the protective shell and is provided with a limit plate, a fixing plate is arranged inside the mounting pipe, two rows of second through holes are opened on the circumferential side of the mounting pipe, a heating rod, a humidifying column and a detection column are connected on the fixing plate through a return spring, the tops of the humidifying column, the heating rod and the detection column are arc-shaped and arranged opposite to the second through holes, the detection column is located at the front end of the mounting pipe, and the humidifying column and the heating column are arranged alternately; a temperature and humidity sensor is arranged on the top of the detection column; a one-way air outlet valve is arranged on the top of the humidifying column, and the one-way air outlet valve is connected to the humidifier in the mounting pipe through a moisture pipe; The electric telescopic rod, the humidifier, the one-way air outlet valve, the heating rod and the temperature and humidity sensor are all electrically connected to the control console.
4. The intelligent monitoring system for synchronous grouting of a shield tunnel according to claim 1 is characterized in that: The partition control device includes a plurality of telescopic partition mechanisms circumferentially distributed on the tail shield, the telescopic partition mechanism includes a flexible protective airbag, the flexible protective airbag is connected to a sealing air pump through an air pipe, a telescopic support assembly is arranged in the flexible protective airbag, the telescopic support assembly is connected to a partition electric telescopic rod, and the electric telescopic rod is arranged in the tail shield; The sealed air pump and the partitioned electric telescopic rod are both electrically connected to the control console.
5. The intelligent monitoring system for synchronous grouting of a shield tunnel according to claim 1 is characterized in that: The telescopic support assembly includes a plurality of U-shaped support sleeves that are slidably connected in sequence, a transverse slide groove is provided on the outer side of the U-shaped support sleeve, a transverse slider is provided on one side of the U-shaped support sleeve, the transverse slider is arranged in the transverse slide groove of the adjacent U-shaped support sleeve, a vertical slide groove is provided on the other side of the U-shaped support sleeve, an extension spring is provided in the vertical slide groove, one end of the extension spring is connected to the vertical slider, the vertical slider is connected to an extension plate, the extension plate, and an elastic positioning piece is provided in the vertical slider, and the elastic positioning piece is arranged relative to the positioning groove in the vertical slide groove.
6. The intelligent monitoring system for synchronous grouting of a shield tunnel according to claim 1, characterized in that: The elastic positioning member comprises a mounting threaded tube, one end of which is provided with a limiting ring, a clamping ball and a tightening spring are sequentially arranged in the mounting threaded tube, the mounting threaded tube is threadedly installed in the vertical slider and the clamping ball is arranged opposite to the positioning groove.
7. The intelligent monitoring system for synchronous grouting of a shield tunnel according to claim 1 is characterized in that: The vibration control device includes a vibration drive motor, which is connected to a sealed bearing arranged on the tail shield, and a plurality of circumferentially distributed through holes are provided on the sealed bearing, and vibration rods are provided in the through holes, and the plurality of vibration rods are fixed on a fixed ring, and an annular slide groove is provided on the fixed ring, and two guide sliders are provided in the annular slide groove, and the two guide sliders are connected to a connecting rod, and the two connecting rods are connected by a U-shaped connecting piece, and the U-shaped connecting piece is connected to a vibration telescopic electric push rod; The vibration driving motor and the vibration telescopic electric push rod are both electrically connected to the control console.
8. An application method of the intelligent monitoring system for synchronous grouting in a shield tunnel according to claim 7, characterized in that: The specific steps are as follows: Step S1: constructing a three-dimensional engineering geological model based on field exploration data and test data; Step S2: planning the shield trajectory according to the engineering geological three-dimensional model, and planning the travel parameters and grouting parameters through the console according to the shield trajectory; Step S3: Perform tunnel construction according to the shield trajectory, travel parameters and grouting parameters, and detect and adjust the grouting parameters through the shield tunnel synchronous grouting intelligent monitoring system during tunnel construction.
9. An application method according to claim 8, characterized in that: In step S2, the travel parameters include travel speed and travel direction; The grouting parameters include the grouting pressure in each radial direction, the grouting volume, the temperature and humidity during grouting, the vibration duration, and the vibration speed.
10. An application method according to claim 9, characterized in that: In step S3, the annular grouting gap is divided into several grouting parts in different radial directions according to the number of telescopic separation mechanisms. When synchronous grouting is performed on the same circumference, the grouting pressures of adjacent grouting parts are compared. When the grouting pressure difference between adjacent grouting parts is less than or equal to the set pressure difference, the telescopic separation mechanism between the adjacent grouting parts is not started, the flexible protective airbag is in a negative pressure state, and the partition electric telescopic rod is in a contracted state; when the grouting pressure difference between adjacent grouting parts is greater than the set pressure difference, the telescopic separation mechanism between the adjacent grouting parts is started, the flexible protective airbag is in a positive pressure state, and the partition electric telescopic rod is in an extended state to isolate the two grouting parts. During synchronous grouting, the temperature and humidity are detected by the temperature and humidity sensor, and the temperature and humidity detection data are compared with the set temperature and humidity values. The functions of the humidifier and the heating rod are controlled according to the difference between the temperature and humidity detection data and the set temperature and humidity values. As the synchronous grouting progresses, the detection electric telescopic rod changes from an extended state to a contracted state. When the synchronous grouting is completed, the humidifying column, the heating rod and the detection column are completely installed in the installation tube and installed in the protective shell. After the synchronous grouting is completed, the activated telescopic separation mechanism is turned to the closed state, the flexible protective airbag is changed from the positive pressure state to the negative pressure state, and the partition electric telescopic rod is changed from the extended state to the retracted state; After the synchronous grouting is completed, the vibrating telescopic electric push rod changes from the telescopic state to the extended state, the vibrating drive motor is started, and after vibrating for a set time, the vibrating telescopic electric push rod changes from the extended state to the telescopic state; Finally, start the grouting device again to carry out additional grouting.