Tunnel leakage sealing treatment equipment
By designing tunnel leakage sealing treatment equipment suitable for narrow tunnels, combined with push-pull mechanism, top pressure mechanism and camera assistance, the problem of insufficient sealing processing accuracy and stability in narrow tunnels by traditional pipeline robots is solved, and efficient sealing and Welding effect.
Patent Information
- Application Number
- CN202411301892.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In narrow tunnel pipes, traditional pipe robots with welding function are difficult to ensure the accuracy and stability of sealing treatment, especially during cleaning, glue coating and welding, the problems of slippage and rough welding are prone to occur.
A tunnel leakage sealing treatment equipment is designed, including a shell, a moving mechanism, a movable frame, an integrated cleaning and coating mechanism and a welding mechanism. The metal sheet is stabilized through the push-pull mechanism and a top pressure mechanism, and the camera assists Operation to ensure stable movement and sealing of the equipment within the tunnel.
It improves the quality and accuracy of welding seals at tunnel leakage, reduces the difficulty of sealing treatment, enhances the stability of the equipment in the tunnel, and ensures the smooth and smooth welding position and sealing effect.
Smart Images

Figure CN118933918A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of tunnel pipeline leakage treatment, and in particular relates to a tunnel leakage sealing treatment device. Background Art
[0002] Tunnel pipeline leakage prevention is a systematic project that requires comprehensive measures in various links such as design, construction and post-maintenance. Through reasonable structural design, efficient construction technology and meticulous post-maintenance, tunnel pipeline leakage can be effectively prevented to ensure the safe and stable operation of the pipeline. General treatment measures include waterproof membrane, waterproof coating, water stop and grouting reinforcement.
[0003] The above are measures taken before the completion of tunnel pipeline construction. When leakage occurs at a certain position on the inner wall of the tunnel pipeline, it is generally necessary to temporarily repair the position. The usual repair method is to first clean the pipeline leakage position, and then apply a layer of waterproof glue or sealant to the leakage position of the pipeline. The purpose is to temporarily seal the leakage point and reduce the penetration of water. Finally, on the basis of glue coating, a piece of metal sheet is covered on the leakage position and fixed to the pipeline by welding. By welding the metal sheet, the structural strength of the pipeline in this position can be enhanced, which helps to prevent further damage.
[0004] However, when constructing some narrow tunnels, personnel cannot enter to perform sealing. If a traditional pipeline robot equipped with welding function is used, it is difficult to ensure the accuracy of these sealing processes, which causes the problem of rough welding, because welding involves cleaning, gluing, and alignment and fixing of metal sheets. In addition, when traditional pipeline robots are performing welding work inside tunnel pipes, since the inner wall of the pipe is relatively smooth, although the mobile wheels equipped with existing pipeline robots are equipped with brake functions, they are affected by the interaction force during cleaning and gluing, and there is a high risk of slipping overall, and the stability needs to be improved. Summary of the invention
[0005] In view of the above problems, a tunnel leakage sealing processing equipment provided in an embodiment of the present application can be used to clean, glue, seal and weld the leakage location inside a narrow tunnel pipe. It is easy to use and improves the quality of welding sealing at the leakage point of the tunnel pipe.
[0006] In order to achieve the above-mentioned purpose, the embodiment of the present application provides the following technical solutions: The present invention provides a tunnel leakage sealing processing equipment, including a shell, a moving mechanism is arranged on the shell, and a movable frame which can be extended and retracted along the length direction of the shell is also arranged on the right side of the shell, a first motor is arranged on the movable frame, a rotating shaft is fixedly connected to the output shaft of the first motor, a first connecting plate and a second connecting plate are arranged on the surface of the rotating shaft, a push-pull mechanism is arranged on the first connecting plate and the second connecting plate, a cleaning and gluing integrated mechanism is arranged on the push-pull mechanism close to the first connecting plate, a pressing mechanism which can fix the metal sheet on the inner wall of the tunnel pipe leakage is arranged on the push-pull mechanism close to the second connecting plate, and a welding mechanism is also arranged on the pressing mechanism. The two push-pull mechanisms each include a mounting frame, the mounting frame close to the cleaning and gluing integrated mechanism is fixedly connected to the first connecting plate, the mounting frame close to the pressing mechanism is fixedly connected to the second connecting plate, the mounting frame is rotatably provided with a first screw on one side and both left and right sides away from the rotating shaft, one end of the first screw is threadedly connected to a top cylinder, three first screws are fixedly provided with a first gear, adjacent first gears are meshed and connected with each other, a second motor is provided inside the mounting frame, and the output shaft of the second motor is fixedly connected to one end of the first screw at the center position. The pressing mechanism includes a first guide frame, a top push plate is slidably provided inside the first guide frame, the left and right top cylinders in the push-pull mechanism close to the second connecting plate are fixedly connected to one side of the first guide frame, and the top cylinder at the center position is fixedly connected to one side of the top push plate, a second guide frame for accommodating a metal sheet is fixedly provided at the upper and lower ends of the front end of the first guide frame, and anti-slip pads are laid on the front and rear inner walls of the second guide frame.
[0007] According to a favorable embodiment, the welding mechanism includes a first electric push rod fixed on the left and right sides of the first guide frame, the telescopic end of the first electric push rod is connected to a third connecting plate, a third motor is fixed to the bottom of the third connecting plate, and a welding gun is fixed to the output shaft of the third motor.
[0008] According to a favorable embodiment, the integrated cleaning and gluing mechanism includes a third guide frame, cleaning brushes are provided on the upper and lower sides of the third guide frame away from the rotating shaft, a gluing unit is provided inside the third guide frame, and the left and right top cylinders in the push-pull mechanism close to the first connecting plate are fixedly connected to one side of the third guide frame, and the top cylinder located in the center position is connected to the gluing unit.
[0009] According to a favorable embodiment, the glue coating unit includes a material storage box, one side of which is fixedly connected to the top cylinder at the center position, a duckbill-shaped discharge head is provided on the side of the material storage box away from the top cylinder, a plurality of conical discharge channels connected to the inside of the material storage box are provided inside the discharge head, a conical sealing rod is movably provided in the discharge channel, one end of the sealing rod away from the material storage box extends to the outside of the discharge channel, a cotton cloth piece is provided at the port of the discharge channel away from the material storage box, a rectangular extrusion block is provided inside the material storage box, one end of the plurality of sealing rods are fixedly connected to one side of the extrusion block, a spring is provided between the side of the extrusion block away from the sealing rod and the inner wall of the material storage box. The left and right sides of the extrusion block fit the left and right inner walls of the material storage box, and there is a gap between the upper and lower sides of the extrusion block and the upper and lower inner walls of the material storage box.
[0010] According to a favorable embodiment, a first guide rod is fixedly provided on both upper and lower sides of the first guide frame, a first guide plate is fixedly provided on both upper and lower sides of the mounting frame close to the first guide frame, one end of the first guide rod on the same side is movably plugged with the first guide plate, two second guide rods are fixedly provided on both upper and lower sides of the third guide frame, a second guide plate is fixedly provided on both upper and lower sides of the mounting frame close to the third guide frame, and the corresponding second guide rods on the same side are movably plugged with the second guide plate. Cameras are arranged on the upper side of the first guide frame, the upper side of the second guide frame, and the front and rear sides of the housing.
[0011] According to a favorable embodiment, the moving mechanism includes a first adjusting unit arranged on the left and right sides of the shell, two second adjusting units are arranged on the upper and lower sides of the right side of the shell, four electric wheels are arranged on the first adjusting unit on the left, four brake plates are arranged on the first adjusting unit on the right, and driven wheels are arranged on the four second adjusting units.
[0012] According to an advantageous embodiment, the first adjustment unit comprises four first slides, which are fixedly distributed on one side of the housing in a cross shape, and the four first slides are provided with a first slide groove on the side away from each other, and a second screw is rotatably arranged in the first slide groove, and a first slide plate slidably arranged in the first slide groove is threadedly connected to the second screw, and a gear box is fixed between the ends of the four first slides close to each other, and the upper and lower inner walls of the gear box are rotatably arranged with a first connecting shaft, and the ends of the two first connecting shafts away from each other are respectively fixed to one end of the upper and lower second screws, and the ends of the two first connecting shafts close to each other are both provided with a second gear, and the same second connecting shaft is rotatably arranged between the inner walls of the front and rear sides of the gear box, and the two ends of the second connecting shaft are respectively connected to one end of the front and rear second screws, and a third gear is arranged on the second connecting shaft, and a fourth motor is arranged on the surface of the gear box, and the output shaft of the fourth motor is fixedly connected to a fourth gear, and two third gears and one fourth gear are meshed and connected with the fourth gear. The four electric wheels are all arranged on the four first slide plates in the first adjustment unit on the left side of the housing, and the four brake plates are all arranged on the four first slide plates in the first adjustment unit on the right side of the housing.
[0013] According to a favorable embodiment, the second adjustment unit includes a second slide seat fixedly mounted on one side of the shell, a second slide groove is formed at the bottom of the second slide seat, a third screw rod is rotatably arranged in the second slide groove, a second slide plate is threadedly arranged on the third screw rod, the second slide plate is slidably arranged in the slide groove, and the driven wheel is fixed on the second slide plate.
[0014] According to a favorable embodiment, the movable frame includes two second electric push rods and two telescopic rods fixed on the right side of the shell, and a mounting plate is commonly connected between the telescopic ends of the two second electric push rods and the telescopic ends of the two telescopic rods. The two second electric push rods and the two telescopic rods are diagonally arranged, and the first motor is fixed on the left side of the mounting plate.
[0015] Compared with the prior art, the tunnel leakage sealing treatment device provided by the embodiment of the present invention has the following beneficial effects:
[0016] 1. In the present invention, when the welded metal sheet is transported, the two second guide frames on the top-pressing mechanism can quickly insert and fix the metal sheet in a specific position to keep it stable, and during welding, the corresponding push-pull mechanism cooperates with the top-pushing plate in the top-pressing mechanism to fix the metal sheet on the inner wall of the tunnel pipe for welding, which makes it easier for the metal sheet to be welded on the inner wall of the tunnel pipe, improves the welding accuracy, and makes the welding position smoother.
[0017] 2. In the present invention, when cleaning the inner wall of the tunnel pipe leakage, the cleaning brush on the integrated cleaning and gluing mechanism cooperates with the corresponding thrust mechanism, so that the cleaning brush is attached to the pipe leakage position, and then the cleaning brush is controlled to rotate with the center of the pipe to wipe the sealing area. At the same time, after the cleaning is completed, the push-pull mechanism can pull the cleaning brush in the opposite direction to separate it from the inner wall of the tunnel, and at the same time, the gluing unit can be abutted against the inner wall of the tunnel to perform the gluing operation, which reduces the difficulty of the early treatment of the inner wall of the tunnel pipe leakage and improves the sealing treatment efficiency.
[0018] 3. In the present invention, when the entire sealing processing equipment is moved to the vicinity of the pipeline leakage, the first adjustment unit cooperates with the four brake plates to abut against different positions of the pipeline, thereby improving the stability of the entire sealing processing equipment during the sealing processing operation, avoiding the problem of overall deviation during cleaning, gluing and welding, and further improving the sealing processing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is the external overall three-dimensional structure diagram of the present invention.
[0020] Figure 2 It is a structural diagram of the relative positions and connections of the movable frame, the integrated cleaning and gluing mechanism, and the pressing mechanism in the present invention.
[0021] Figure 3 This is a diagram showing the relative position connection structure of the push-pull mechanism, the top pressing mechanism and the welding mechanism in the present invention.
[0022] Figure 4 This is a structural diagram of the placement position of the metal sheet relative to the two second guide frames in the present invention.
[0023] Figure 5 This is a diagram showing the relative position connection structure of the push-pull mechanism and the integrated cleaning and gluing mechanism in the present invention.
[0024] Figure 6 It is a side sectional plan view of the gluing unit in the present invention.
[0025] Figure 7 This is a front structural diagram of the first adjustment unit in the present invention.
[0026] Figure 8 It is a cross-sectional structural diagram of the reverse side of the first adjustment unit in the present invention.
[0027] Fig. 9 for Figure 8 Schematic diagram of the enlarged structure of part A.
[0028] Fig.10 The external structure diagram of the second regulating unit in the present invention is
[0029] 1. The reference numerals in the figure are as follows: 1. housing; 2. moving mechanism; 201. first adjusting unit; 2011. first slide seat; 2012. second screw rod; 2013. first slide plate; 2014. gear box; 2015. second gear; 2016. third gear; 2017. fourth motor; 2018. fourth gear; 202. second adjusting unit; 2021. second slide seat; 2022. third screw rod; 2023. second slide plate; 203. electric wheel; 204. brake plate; 205. driven wheel; 3. movable frame; 301. second electric push rod; 302. telescopic rod; 303. mounting plate; 4. first motor; 5. rotating shaft; 6. first connecting plate; 7. second connecting plate; 8. push-pull mechanism; 801. mounting frame; 802. first screw rod Rod; 803, top cylinder; 804, first gear; 805, second motor; 9, cleaning and gluing integrated mechanism; 901, third guide frame; 902, cleaning brush; 903, gluing unit; 9031, material storage box; 9032, discharging head; 9033, discharging channel; 9034, sealing rod; 9035, cloth piece; 9036, extrusion block; 9037, spring; 10, pressing mechanism; 1001, first guide frame; 1002, pushing plate; 1003, second guide frame; 1004, anti-slip pad; 11, welding mechanism; 1101, first electric push rod; 1102, third connecting plate; 1103, third motor; 1104, welding gun; 12, first guide rod; 13, second guide rod; 14, camera; 15, metal sheet. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1-10 The present application is further described in detail.
[0031] Please refer to Figure 1 and Figure 2 , a tunnel leakage sealing treatment equipment, including a shell 1, a moving mechanism 2 is installed on the shell 1, and a movable frame 3 that can be extended and retracted along the length direction of the shell 1 is also installed on the right side of the shell 1, a first motor 4 is installed on the movable frame 3, a rotating shaft 5 is fixedly connected to the output shaft of the first motor 4, a first connecting plate 6 and a second connecting plate 7 are installed on the surface of the rotating shaft 5, a push-pull mechanism 8 is installed on the first connecting plate 6 and the second connecting plate 7, a cleaning and gluing integrated mechanism 9 is installed on the push-pull mechanism 8 close to the first connecting plate 6, and a top-pressing mechanism 10 that can fix a metal sheet 15 on the inner wall of a tunnel pipeline leakage is installed on the push-pull mechanism 8 close to the second connecting plate 7, and a welding mechanism 11 is also installed on the top-pressing mechanism 10. Move in the tunnel pipeline through the moving mechanism 2, and after moving to the specified position, perform preliminary treatment on the tunnel leakage through the cleaning and gluing integrated mechanism 9, and then press the metal sheet 15 on the inner wall of the tunnel leakage through the top-pressing mechanism 10, and then weld it through the welding mechanism 11.
[0032] See also Figure 1 , Figure 7-10 The moving mechanism 2 includes a first adjustment unit 201 installed on the left and right sides of the housing 1, and two second adjustment units 202 are installed on the upper and lower sides of the right side of the housing 1. Four electric wheels 203 are installed on the first adjustment unit 201 on the left side, and four brake plates 204 are installed on the first adjustment unit 201 on the right side. A driven wheel 205 is installed on each of the four second adjustment units 202. The first adjustment unit 201 includes four first slides 2011, and the four first slides 2011 are fixedly distributed on one side of the housing 1 in a cross shape. The four first slides 2011 are each provided with a first slide groove on the side away from each other, and a second screw rod 2012 is rotatably installed in the first slide groove. A first slide plate 2013 slidably installed in the first slide groove is threadedly connected to the second screw rod 2012. A gear box 2014 is fixed between the ends of the four first slides 2011 that are close to each other, and the upper and lower inner walls of the gear box 2014 are both rotatably installed with first connecting shafts, and the ends of the two first connecting shafts that are away from each other are respectively connected to the upper and lower One end of the two second screw rods 2012 is fixedly connected, and the ends of the two first connecting shafts close to each other are both installed with a second gear 2015. The same second connecting shaft is rotatably installed between the inner walls of the front and rear sides of the gear box 2014. The two ends of the second connecting shaft are respectively connected to one end of the two second screw rods 2012 in front and back. The third gear 2016 is installed on the second connecting shaft. The fourth motor 2017 is installed on the surface of the gear box 2014. The output shaft of the fourth motor 2017 is fixedly connected with a fourth gear 2018. The two third gears 2016 and the one fourth gear 2018 are meshed and connected with the fourth gear 2018. The electric wheels 203 are all installed on the four first slides 2013 in the first adjustment unit 201 on the left side of the housing 1, and the four brake plates 204 are all installed on the four first slides 2013 in the first adjustment unit 201 on the right side of the housing 1.
[0033] In order to improve the stability of the entire device when it moves inside the tunnel and performs subsequent sealing treatment, the fourth motor 2017 drives the fourth gear 2018 to rotate, so that the third gear 2016 rotates to drive the second connecting shaft to rotate, and the third gear 2016 also synchronously drives the two second gears 2015 to rotate, so that the two first connecting shafts rotate, and the two first connecting shafts drive the upper and lower second screws 2012 to rotate, and at the same time, a second connecting shaft drives the front and rear second screws 2012 to rotate, so that the four second screws 2012 synchronously drive the corresponding first slide plate 2013 to move. Therefore, the four electric wheels 203 in different directions can be adjusted according to the diameter of the tunnel pipe, ensuring that the electric wheels 203 can abut against the inner wall of the tunnel pipe, and the brake plate 204 can also abut against the inner wall of the tunnel to brake after moving to the specified position.
[0034] See also Figure 1 and Fig.10 The second adjustment unit 202 includes a second slide seat 2021 fixedly mounted on one side of the housing 1, a second slide slot is provided at the bottom of the second slide seat 2021, a third screw rod 2022 is rotatably mounted in the second slide slot, a second slide plate 2023 is threadedly mounted on the third screw rod 2022, the second slide plate 2023 is slidably mounted in the slide slot, and a driven wheel 205 is fixedly mounted on the second slide plate 2023. The second slide plate 2023 is moved by manually rotating the third screw rod 2022, and the driven wheel 205 is brought into contact with the inner wall of the tunnel, thereby ensuring the stability of the overall movement process.
[0035] See also Figure 2 , Figure 3 and Figure 5 The two push-pull mechanisms 8 each include a mounting frame 801. The mounting frame 801 close to the integrated cleaning and gluing mechanism 9 is fixedly connected to the first connecting plate 6, and the mounting frame 801 close to the top pressing mechanism 10 is fixedly connected to the second connecting plate 7. The first screw 802 is rotatably mounted on one side of the mounting frame 801 away from the rotating shaft 5 and on both left and right sides. One end of the first screw 802 is threadedly connected to a top cylinder 803. First gears 804 are fixedly mounted on the three first screws 802, and adjacent first gears 804 are meshedly connected to each other. A second motor 805 is installed inside the mounting frame 801, and the output shaft of the second motor 805 is fixedly connected to one end of the first screw 802 at the center position. The second motor 805 can drive the first screw 802 in the center to rotate, and the three first screws 802 are all equipped with a first gear 804, so that the first screw 802 at the center position can rotate forward while the two first screws 802 on the left and right can reverse. When the corresponding three top cylinders 803 are limited, the top cylinder 803 in the center is directed toward the inner wall of the tunnel through the first screw 802, and the two top cylinders 803 on the left and right will move in the opposite direction toward the inner wall of the tunnel under the drive of the corresponding first screw 802.
[0036] See also Figure 2 , Figure 5 and Figure 6The integrated cleaning and gluing mechanism 9 includes a third guide frame 901. A cleaning brush 902 is installed on the upper and lower sides of the third guide frame 901 away from the rotating shaft 5. A gluing unit 903 is installed inside the third guide frame 901. The left and right top cylinders 803 in the push-pull mechanism 8 close to the first connecting plate 6 are fixedly connected to one side of the third guide frame 901, and the top cylinder 803 located at the center is connected to the gluing unit 903. The gluing unit 903 includes a storage box 9031. One side of the storage box 9031 is fixedly connected to the top cylinder 803 at the center. A duckbill-shaped discharging head 9032 is installed on the side of the storage box 9031 away from the top cylinder 803. A plurality of conical discharging channels 9033 are provided inside the discharging head 9032, which are connected to the inside of the storage box 9031. A conical sealing rod 9034 is movably installed in the discharging channel 9033. The sealing rod 9034 is far away from the top cylinder 803. One end of the material storage box 9031 extends to the outside of the material discharging channel 9033, and a cotton cloth piece 9035 is installed at the port of the material discharging channel 9033 away from the material storage box 9031. A rectangular extrusion block 9036 is installed inside the material storage box 9031, and one end of a plurality of sealing rods 9034 is fixed to one side of the extrusion block 9036. A spring 9037 is installed between the side of the extrusion block 9036 away from the sealing rod 9034 and the inner wall of the material storage box 9031. The left and right sides of the extrusion block 9036 are in contact with the left and right inner walls of the material storage box 9031, and there is a gap between the upper and lower sides of the extrusion block 9036 and the upper and lower inner walls of the material storage box 9031.
[0037] In order to quickly clean and glue the leaking parts of the tunnel inner wall before welding, one of the push-pull mechanisms 8 can cooperate with the integrated glue coating mechanism to realize the cleaning and gluing operations. Specifically, the corresponding top cylinders 803 on the left and right sides can drive the cleaning brush 902 to fit the inner wall of the tunnel, and at the same time, the gluing unit 903 in the center moves in the opposite direction. After the cleaning brush 902 fits the inner wall of the tunnel, the rotating shaft 5 is driven to rotate by the first motor 4, so that the cleaning brush 902 cleans the area to be sealed on the inner wall of the tunnel pipe. After completion, the top cylinder 803 in the center drives the cleaning brush 902 away from the inner wall of the tunnel, and at the same time, the gluing unit 903 will move toward the inner wall of the tunnel to perform the gluing operation. When applying glue, the discharge head 9032 at the front end of the storage box 9031 will abut against the inner wall of the tunnel, causing the sealing rod 9034 that was originally sealed with the discharge channel 9033 to move toward the inside of the storage box 9031, pushing the extrusion block 9036 inside the storage box 9031 to move. The extrusion block 9036 moves inside the storage box 9031. The sealant in the storage box 9031 will converge toward the discharge channel 9033 due to the extrusion of the extrusion block 9036 and finally be squeezed out to the outside of the discharge head 9032, so that the cloth piece 9035 is soaked with the sealant, and then the first motor 4 drives the rotating shaft 5 to rotate, so that the discharge head 9032 rotates, and the sealant is coated on the inner wall of the tunnel through the cloth piece 9035 for pretreatment.
[0038] See also Figure 2 , Figure 3 and Figure 4 The pressing mechanism 10 includes a first guide frame 1001, and a push plate 1002 is slidably installed inside the first guide frame 1001. The left and right push tubes 803 in the push-pull mechanism 8 close to the second connecting plate 7 are fixedly connected to one side of the first guide frame 1001, and the push tube 803 located in the center is fixedly connected to one side of the push plate 1002. A second guide frame 1003 for accommodating a metal sheet 15 is fixedly provided at the upper and lower front ends of the first guide frame 1001, and anti-slip pads 1004 are laid on the front and rear inner walls of the second guide frame 1003.
[0039] In order to facilitate the fast and tight fixing of the metal sheet 15 on the inner wall of the tunnel leakage for welding, the metal sheet 15 is inserted between the two second guide frames 1003. Since the front and rear inner walls of the second guide frames 1003 are both provided with anti-slip pads 1004, the metal sheet 15 can be stably stuck between the upper and lower second guide frames 1003. After the metal sheet 15 is aligned with the position to be covered, one of the push-pull mechanisms 8 can cooperate with the top pressure mechanism 10 to apply pressure to the metal sheet 15. Specifically, the top cylinder 803 in the center of the push-pull mechanism 8 is pushed forward to push the top push plate 1002 toward the metal sheet 15, so that the top push plate 1002 and the metal sheet 15 are aligned. The center position of the metal sheet 15 abuts against the metal sheet 15, and forces the metal sheet 15 to undergo elastic deformation from the center position (the metal sheet 15 is an elastic metal sheet). At the same time, the push plate 1002 continues to push the metal sheet 15, so that the outer wall of the depressed and deformed part of the metal sheet 15 abuts against the inner wall of the tunnel. At the same time, the top cylinder 803 on the left and right sides will pull the first guide frame 1001 in the opposite direction, so that the upper and lower ends of the metal sheet 15 will gradually move from the inside of the second guide frame 1003 to the outside, and ensure that when the outer wall of the depressed and deformed part of the metal sheet 15 abuts against the inner wall of the tunnel, the upper and lower ends of the metal sheet 15 are about to separate from the two second guide frames 1003. Then, the welding mechanism 11 is used to spot-weld the connection positions on both sides of the outer wall of the concave and deformed part of the metal sheet 15 and the inner wall of the tunnel. After the spot welding is completed, the first motor 4 drives the rotating shaft 5 to rotate forward, which will cause the push plate 1002 to rotate upward with the center position of the metal sheet 15 as the starting point. The upward rotation of the push plate 1002 will gradually push the upper half of the metal sheet 15 to fit the inner wall of the tunnel. At this time, the welding mechanism 11 will synchronously weld the fitting position of the metal sheet 15 and the inner wall of the tunnel. After the welding of the edges on both sides of the upper half of the metal sheet 15 is completed, the welding mechanism 11 is at the uppermost position of the metal sheet 15. Then, the movable frame 3 is extended and retracted along the central axis of the tunnel pipe, so that the welding mechanism 11 can weld the uppermost surface of the metal sheet 15 to the inner wall of the tunnel, completing the welding of the upper half of the metal sheet 15. The welding of the lower half of the metal sheet 15 can be completed by the same method.
[0040] See also Figure 2 and Figure 3 The welding mechanism 11 includes a first electric push rod 1101 fixedly mounted on the left and right sides of the first guide frame 1001, a third connecting plate 1102 is connected to the telescopic end of the first electric push rod 1101, a third motor 1103 is fixedly mounted on the bottom of the third connecting plate 1102, and a welding gun 1104 is fixedly mounted on the output shaft of the third motor 1103. The welding gun 1104 can be driven to approach the inner wall of the tunnel by the first electric push rod 1101, and the welding gun 1104 can be driven to rotate and adjust the angle of the welding gun 1104 by the third motor 1103, thereby ensuring that the welding gun 1104 can be aligned with the connection between the metal sheet 15 and the inner wall of the tunnel.
[0041] It should be noted that the welding gun 1104 may be a non-contact welding gun, a laser welding gun or a plasma welding gun.
[0042] See also Figure 1 and Figure 2 The movable frame 3 includes two second electric push rods 301 and two telescopic rods 302 fixed on the right side of the housing 1. A mounting plate 303 is commonly connected between the telescopic ends of the two second electric push rods 301 and the telescopic ends of the two telescopic rods 302. The two second electric push rods 301 and the two telescopic rods 302 are installed diagonally. The first motor 4 is fixed on the left side of the mounting plate 303. The mounting plate 303 is driven to move along the central axis of the tunnel pipe by the two second electric push rods 301, and the two telescopic rods 302 are used for limiting and guiding.
[0043] See also Figure 3 and Figure 5 A first guide rod 12 is fixedly provided on both upper and lower sides of the first guide frame 1001, a first guide plate is fixedly provided on both upper and lower sides of the installation frame 801 close to the first guide frame 1001, and one end of the first guide rod 12 on the same side is movably plugged with the first guide plate, and two second guide rods 13 are fixedly provided on both upper and lower sides of the third guide frame 901, a second guide plate is fixedly provided on both upper and lower sides of the installation frame 801 close to the third guide frame 901, and the corresponding second guide rods 13 on the same side are movably plugged with the second guide plates. Cameras 14 are installed on the upper side of the first guide frame 1001, the upper side of the second guide frame 1003, and the front and rear sides of the shell 1. The camera 14 is used to assist the backstage personnel in observing the inside of the tunnel pipe. The first guide frame 1001 and the installation frame 801 are movably connected by the first guide rod 12, and the third guide frame 901 is connected to the corresponding installation frame 801 by the second guide rod 13, so as to improve the stability of the structure.
[0044] During specific work, the electric wheel 203 is adjusted according to the diameter of the construction tunnel pipe, and the spacing between the four electric wheels 203 is adjusted by the first adjustment mechanism to ensure that the electric wheel 203 can stably abut against the inner wall of the tunnel pipe. At the same time, the second slide 2023 is moved by manually rotating the third screw 2022 to abut the driven wheel 205 against the inner wall of the tunnel, so that the entire device is stably placed in the tunnel pipe, and then the electric wheel 203 drives the entire device to move toward the designated position. The background personnel understand the internal situation of the pipeline through the camera 14. After the equipment reaches the designated position, the first adjustment units 201 corresponding to the four brake plates 204 are used to make the four brake plates 204 abut against the inner wall of the tunnel pipe respectively.
[0045] The cleaning and gluing process is driven by the first motor 4 to rotate the rotating shaft 5, and the cleaning and gluing integrated mechanism 9 is rotated to the leakage position of the inner wall of the tunnel. The top cylinder 803 on the left and right sides of the corresponding push-pull mechanism 8 can drive the cleaning brush 902 to fit the inner wall of the tunnel, and at the same time, the gluing unit 903 at the center position moves in the opposite direction. After the cleaning brush 902 fits the inner wall of the tunnel, the rotating shaft 5 is driven to rotate by the first motor 4, so that the cleaning brush 902 cleans the area to be sealed on the inner wall of the tunnel pipe. After the end, the top cylinder 803 in the center drives the cleaning brush 902 away from the inner wall of the tunnel, and at the same time, the gluing unit 903 moves toward the inner wall of the tunnel to perform the gluing operation. When applying glue, the discharge head 9032 at the front end of the storage box 9031 will abut against the inner wall of the tunnel, causing the sealing rod 9034 that was originally sealed with the discharge channel 9033 to move toward the inside of the storage box 9031, pushing the extrusion block 9036 inside the storage box 9031 to move. The extrusion block 9036 moves inside the storage box 9031. The sealant in the storage box 9031 will converge toward the discharge channel 9033 due to the extrusion of the extrusion block 9036 and finally be squeezed out to the outside of the discharge head 9032, so that the cloth piece 9035 is soaked with the sealant, and then the first motor 4 drives the rotating shaft 5 to rotate, so that the discharge head 9032 rotates, and the sealant is coated on the inner wall of the tunnel through the cloth piece 9035 for pretreatment.
[0046] During welding, after the glue coating is completed, the first motor 4 drives the rotating shaft 5 to rotate, and the pressing mechanism 10 is rotated to the glue coating position. The metal sheet 15 is pre-inserted between the two second guide frames 1003. Since the front and rear inner walls of the second guide block are paved with anti-skid pads 1004, the metal sheet 15 can be stably stuck between the upper and lower second guide frames 1003. After the metal sheet 15 is aligned with the position to be covered, the top cylinder 803 at the center position of the push-pull mechanism 8 is pushed forward to push the push plate 1002 toward the metal sheet 15, so that the push plate 1002 abuts against the center position of the metal sheet 15, and forces the metal sheet 15 to move. Bending occurs from the center position, and at the same time, the push plate 1002 continues to push the metal sheet 15, so that the concave deformed part of the metal sheet 15 finally abuts against the inner wall of the tunnel, and at the same time, the top tube 803 located on the left and right sides will pull the first guide frame 1001 in the opposite direction, so that the upper and lower ends of the metal sheet 15 will gradually move from the inside to the outside of the second guide frame 1003, and ensure that when the concave deformed part of the metal sheet 15 abuts against the inner wall of the tunnel, the upper and lower ends of the metal sheet 15 will be separated from the corresponding second guide frame 1003. Then, the welding mechanism 11 is used to spot-weld the connection positions between the concave and deformed parts of the metal sheet 15 and the inner wall of the tunnel on both sides. After the spot welding is completed, the first motor 4 drives the rotating shaft 5 to rotate forward, which will cause the push plate 1002 to rotate upward with the center position of the metal sheet 15 as the starting point. The upward rotation of the push plate 1002 will gradually push the upper half of the metal sheet 15 to fit the inner wall of the tunnel. At this time, the welding mechanism 11 will synchronously weld the fitting position of the metal sheet 15 and the inner wall of the tunnel. After the welding of the edges of both sides of the upper half of the metal sheet 15 is completed, the welding mechanism 11 is at the uppermost position of the metal sheet 15. Then, the movable frame 3 is extended and retracted along the central axis of the tunnel pipe, so that the welding mechanism 11 can weld the uppermost surface of the metal sheet 15 to the inner wall of the tunnel, completing the welding of the upper half of the metal sheet 15. The welding of the lower half of the metal sheet 15 can be completed by the same method.
[0047] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A tunnel leakage sealing treatment device, comprising a housing (1), characterized in that: The shell (1) is provided with a moving mechanism (2), and a movable frame (3) capable of extending and retracting along the length direction of the shell (1) is also provided on the right side of the shell (1), the movable frame (3) is provided with a first motor (4), the output shaft of the first motor (4) is fixedly connected with a rotating shaft (5), the surface of the rotating shaft (5) is provided with a first connecting plate (6) and a second connecting plate (7), the first connecting plate (6) and the second connecting plate (7) are both provided with a push-pull mechanism (8), the push-pull mechanism (8) close to the first connecting plate (6) is provided with an integrated cleaning and gluing mechanism (9), the push-pull mechanism (8) close to the second connecting plate (7) is provided with a pressing mechanism (10) capable of fixing a metal sheet (15) on the inner wall of a tunnel pipeline leakage location, and the pressing mechanism (10) is also provided with a welding mechanism (11); The two push-pull mechanisms (8) each comprise a mounting frame (801), the mounting frame (801) close to the integrated cleaning and gluing mechanism (9) is fixedly connected to the first connecting plate (6), and the mounting frame (801) close to the pressing mechanism (10) is fixedly connected to the second connecting plate (7), a first screw rod (802) is rotatably arranged on one side and both left and right sides of the mounting frame (801) away from the rotating shaft (5), one end of the first screw rod (802) is threadedly connected to a top cylinder (803), three first screw rods (802) are fixedly provided with a first gear (804), adjacent first gears (804) are meshedly connected to each other, a second motor (805) is arranged inside the mounting frame (801), and an output shaft of the second motor (805) is fixedly connected to one end of the first screw rod (802) at the center position; The pressing mechanism (10) comprises a first guide frame (1001), a pushing plate (1002) is slidably arranged inside the first guide frame (1001), two left and right pushing cylinders (803) in the push-pull mechanism (8) close to the second connecting plate (7) are fixedly connected to one side of the first guide frame (1001), and the pushing cylinder (803) located at the center is fixedly connected to one side of the pushing plate (1002), a second guide frame (1003) for accommodating a metal sheet (15) is fixedly arranged at the upper and lower front ends of the first guide frame (1001), and anti-slip pads (1004) are laid on the front and rear inner walls of the second guide frame (1003).
2. The tunnel leakage sealing treatment equipment according to claim 1, characterized in that: The welding mechanism (11) comprises a first electric push rod (1101) fixedly arranged on the left and right sides of a first guide frame (1001), the telescopic end of the first electric push rod (1101) is connected to a third connecting plate (1102), a third motor (1103) is fixedly arranged at the bottom of the third connecting plate (1102), and a welding gun (1104) is fixedly connected to the output shaft of the third motor (1103).
3. The tunnel leakage sealing treatment equipment according to claim 1, characterized in that: The integrated cleaning and gluing mechanism (9) comprises a third guide frame (901), a cleaning brush (902) is arranged on the upper and lower sides of the third guide frame (901) away from the rotating shaft (5), a gluing unit (903) is arranged inside the third guide frame (901), and two left and right top cylinders (803) in the push-pull mechanism (8) close to the first connecting plate (6) are fixedly connected to one side of the third guide frame (901), and the top cylinder (803) located at the center is connected to the gluing unit (903).
4. The tunnel leakage sealing treatment equipment according to claim 3, characterized in that: The glue coating unit (903) comprises a material storage box (9031), one side of which is fixedly connected to the top cylinder (803) at the center, a duckbill-shaped discharge head (9032) is arranged on the side of the material storage box (9031) away from the top cylinder (803), a plurality of conical discharge channels (9033) which are connected to the inside of the material storage box (9031) are arranged inside the discharge channel (9033), a conical sealing rod (9034) is movably arranged inside the discharge channel (9033), and the sealing rod (9034) is provided with a plurality of conical discharge channels (9033) which are connected to the inside of the material storage box (9031). ) extends from one end of the material storage box (9031) to the outside of the material discharge channel (9033); a cotton cloth piece (9035) is provided at the end of the material discharge channel (9033) away from the material storage box (9031); a rectangular extrusion block (9036) is provided inside the material storage box (9031); one end of a plurality of sealing rods (9034) is fixedly connected to one side of the extrusion block (9036); a spring (9037) is provided between the side of the extrusion block (9036) away from the sealing rod (9034) and the inner wall of the material storage box (9031); The left and right sides of the extrusion block (9036) fit with the left and right inner walls of the material storage box (9031), and there is a gap between the upper and lower sides of the extrusion block (9036) and the upper and lower inner walls of the material storage box (9031).
5. The tunnel leakage sealing treatment equipment according to claim 3, characterized in that: A first guide rod (12) is fixedly provided on both upper and lower sides of the first guide frame (1001); a first guide plate is fixedly provided on both upper and lower sides of the mounting frame (801) close to the first guide frame (1001); one end of the first guide rod (12) on the same side is movably plugged with the first guide plate; two second guide rods (13) are fixedly provided on both upper and lower sides of the third guide frame (901); a second guide plate is fixedly provided on both upper and lower sides of the mounting frame (801) close to the third guide frame (901); the corresponding second guide rods (13) on the same side are movably plugged with the second guide plates; Cameras (14) are arranged on the upper side of the first guide frame (1001), the upper side of the second guide frame (1003), and the front and rear sides of the shell (1).
6. The tunnel leakage sealing treatment equipment according to claim 1, characterized in that: The moving mechanism (2) comprises a first adjustment unit (201) arranged on the left and right sides of the shell (1); two second adjustment units (202) are arranged on the upper and lower sides of the right side of the shell (1); four electric wheels (203) are arranged on the first adjustment unit (201) on the left side; four brake plates (204) are arranged on the first adjustment unit (201) on the right side; and driven wheels (205) are arranged on the four second adjustment units (202).
7. The tunnel leakage sealing treatment equipment according to claim 6, characterized in that: The first adjustment unit (201) comprises four first slides (2011), the four first slides (2011) are fixedly arranged on one side of the housing (1) in a cross shape, a first slide groove is provided on the side of the four first slides (2011) away from each other, a second screw rod (2012) is rotatably arranged in the first slide groove, a first slide plate (2013) slidably arranged in the first slide groove is threadedly connected to the second screw rod (2012), a gear box (214) is fixedly arranged between the ends of the four first slides (2011) close to each other, the upper and lower inner walls of the gear box (2014) are rotatably arranged with first connecting shafts, and the ends of the two first connecting shafts away from each other are respectively connected to the upper and lower inner walls. One end of the two second screw rods (2012) is fixedly connected, and the ends of the two first connecting shafts close to each other are each provided with a second gear (2015); a second connecting shaft is rotatably provided between the front and rear inner walls of the gear box (2014); the two ends of the second connecting shaft are respectively connected to one end of the front and rear second screw rods (2012); a third gear (2016) is provided on the second connecting shaft; a fourth motor (2017) is provided on the surface of the gear box (2014); the output shaft of the fourth motor (2017) is fixedly connected with a fourth gear (2018); the two third gears (2016) and the one fourth gear (2018) are both meshed and connected with the fourth gear (2018); The four electric wheels (203) are all arranged on four first slide plates (2013) in the first adjustment unit (201) on the left side of the shell (1), and the four brake plates (204) are all arranged on four first slide plates (2013) in the first adjustment unit (201) on the right side of the shell (1).
8. The tunnel leakage sealing treatment equipment according to claim 7, characterized in that: The second adjustment unit (202) comprises a second slide seat (2021) fixedly mounted on one side of the housing (1); a second slide groove is provided at the bottom of the second slide seat (2021); a third screw rod (2022) is rotatably mounted in the second slide groove; a second slide plate (2023) is threadedly mounted on the third screw rod (2022); the second slide plate (2023) is slidably mounted in the slide groove; and the driven wheel (205) is fixedly mounted on the second slide plate (2023).
9. The tunnel leakage sealing treatment equipment according to claim 1, characterized in that: The movable frame (3) comprises two second electric push rods (301) fixedly mounted on the right side of the housing (1) and two telescopic rods (302); a mounting plate (303) is commonly connected between the telescopic ends of the two second electric push rods (301) and the telescopic ends of the two telescopic rods (302); the two second electric push rods (301) and the two telescopic rods (302) are both arranged diagonally; and the first motor (4) is fixedly mounted on the left side of the mounting plate (303).
Citation Information
Cited By
Underground tunnel structure deformation monitoring and early warning device
CN121739967A
A device for monitoring and early warning of deformation of underground tunnel structure
CN121739967B
