Gas extraction and outburst elimination method for upper and lower adjacent layers

By using L-shaped horizontal wells and branch wells combined with screening pipe technology in coal mines, the problem of gas treatment in upper and lower adjacent layers is solved, efficient gas extraction and eruption removal is achieved, cost reduction and improved gas treatment efficiency in coal seam groups.

CN118933991APending Publication Date: 2024-11-12HUAINAN MINING IND GRP
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411108011.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-13
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The prior art is difficult to effectively coordinate the management and mining of gas near the upper and lower layers, resulting in high cost and low efficiency of gas treatment in coal mines, and the inability to take into account both the protective layer and the protected layer gas extraction.

Method used

The L-shaped horizontal well is constructed on the ground, including straight well sections, inclined sections and horizontal sections. Multiple branch wells are drilled through the horizontal section to the roof plate of the protected layer, and screen pipes are entered into the branch wells to ensure that the extraction channel is not affected by mining. affects and extends service life.

Benefits of technology

Comprehensive management of gas near the upper and lower layers has been achieved, construction costs have been reduced, gas management efficiency has been improved, and the effect of "one well is used multiple times".

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933991A_ABST
    Figure CN118933991A_ABST
Patent Text Reader

Abstract

The invention provides an upper and lower adjacent layer gas extraction and outburst elimination method, which comprises the following steps that (1) an L-shaped horizontal well is constructed from the ground, the L-shaped horizontal well comprises a straight well section, an oblique construction section and a horizontal section, the straight well section, the oblique construction section and the horizontal section are communicated in sequence, and the horizontal section is positioned in a fissure zone above a protective layer; and (2) comb-shaped branch wells are drilled from the starting position of the horizontal section to the protected layer, the comb-shaped branch wells are drilled from the horizontal section to the protected top plate, and then the same comb-shaped branch wells are drilled at intervals till the final position of the horizontal section. Through the single ground L-shaped horizontal well and the multiple branch wells, outburst elimination and pre-extraction can be carried out on a protected layer in advance while extraction and empty gas extraction of the protected layer are carried out, fissure zone gas is extracted during and after extraction of the protected layer, comprehensive treatment of gas of an upper adjacent layer and a lower adjacent layer under the coal seam group extraction condition is achieved, and multiple purposes of one well are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal seam group gas extraction, and in particular to a method for gas extraction and elimination of upper and lower adjacent layers. Background Art

[0002] With the improvement of coal mining efficiency and scale, gas disaster management has always been one of the important tasks facing mines. As a mature gas extraction well type, the ground L-type well is used in major mining areas. In view of the problem of gas disaster management under the conditions of coal seam group mining, how to coordinate the gas management and mining connection of the upper and lower adjacent layers, reduce costs and increase efficiency while ensuring that gas management meets the standards, and ensure safe production in coal mines, the optimization design of extraction wells has received more and more attention.

[0003] At present, the gas control of coal seam groups generally adopts the method of pre-extraction and elimination of gas outbursts by layered fracturing of vertical wells on the ground. Although this method takes into account the integrated control of gas in the upper and lower adjacent layers, it only performs gas pre-extraction on coal seams and requires advanced planning and construction. For gas control during and after mining of protective layers, underground high-position drilling, ground-driven vertical wells and L-shaped mining wells are currently mostly used for extraction. Underground high-position drilling and L-shaped mining wells cannot take into account gas control of adjacent layers, while the extraction volume of ground vertical wells is large and the cost is high. The comb-shaped drilling holes on the roof or floor developed for the elimination of gas outbursts in broken and soft coal seams do not involve gas extraction from the protected layer.

[0004] There are three main methods for synchronous gas control of coal seam groups, especially the upper and lower adjacent layers: one is the directional long-hole segmented fracturing technology on the ground or underground, which connects the gas extraction channels of the adjacent layers through the fracturing cracks to achieve synchronous gas control of coal seam groups. It is called a joint and efficient gas extraction method for close-range coal seam groups, and its application number is CN115163023A. The fracturing construction cost of this method is relatively high, and the expansion of the fracturing cracks is greatly affected by the geological structure conditions, the crack expansion is uncontrollable, and the gas extraction channels are uneven; the second is to extract the gas of the protected layer through the deformed cracks formed after mining the protective layer, which is called a method of using pressure relief to increase permeability to achieve gas extraction of coal seam groups in the bottom drum deformation zone The extraction method, application number is CN114198140A. This method mainly uses the mining pressure relief effect of the upper coal seam to mine the coal seam group gas in the lower bottom drum deformation zone after the upper protective layer is mined. This method arranges holes in the mining bottom drum deformation zone, which is difficult to construct and the extraction channel is easily damaged by the bottom drum deformation; the third is to use long directional drilling holes underground to construct directional drilling holes in each coal seam to simultaneously extract the coal seam group gas. The name is "A method for extracting coal seam group gas in the layer using directional drilling", application number is CN108343400A. This method only targets a single coal seam in a single borehole, and cannot achieve dual extraction, and the drilling workload is large. Summary of the invention

[0005] The technical problem to be solved by the present invention is how to realize the extraction and elimination of the upper and lower adjacent layers.

[0006] The present invention solves the above technical problems through the following technical means:

[0007] The present invention provides a method for gas extraction and sudden elimination in upper and lower adjacent layers, comprising the following steps:

[0008] (1) constructing an L-shaped horizontal well from the ground, wherein the L-shaped horizontal well includes a vertical well section, an inclined well section and a horizontal section, wherein the vertical well section, the inclined well section and the horizontal section are connected in sequence, and the horizontal section is located in a fracture zone above the protective layer;

[0009] (2) Drilling multiple branch wells from the horizontal section to the protected layer, wherein the branch wells are drilled from the horizontal section to the top plate of the protected layer.

[0010] Beneficial effects: The present invention can, through a single L-shaped horizontal well on the ground and multiple branch wells, extract gas from the protective layer during mining and goaf, and pre-extract gas from the protected layer in advance, and extract gas from the fracture zone during and after mining the protected layer, thereby achieving comprehensive gas control in the upper and lower adjacent layers under the conditions of coal seam group mining, and also realizing "one well for multiple uses".

[0011] Preferably, after each branch well construction is completed, a screen pipe is placed in the comb-shaped branch well.

[0012] Preferably, after the construction of the horizontal section is completed, a screen pipe is placed in the horizontal section.

[0013] Beneficial effect: The present invention uses the flying pipe technology to lower the screen pipe into the horizontal section and each comb-shaped branch well, ensuring that the extraction channel is not deformed and blocked by mining, thereby extending the drilling and extraction service life.

[0014] Preferably, the length of the screen tube is adapted to the length of the comb-shaped branch well. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the well layout design of the present invention;

[0016] Figure 2 It is a schematic diagram of the wellbore structure of the present invention. DETAILED DESCRIPTION

[0017] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] Unless otherwise specified, the test materials and reagents used in the following examples can be obtained from commercial sources.

[0019] If no specific techniques or conditions are specified in the examples, they can be carried out according to the techniques or conditions described in the literature in the art or according to the product instructions.

[0020] Example 1

[0021] This embodiment provides a method for gas extraction and sudden elimination in upper and lower adjacent layers, such as Figure 1 and Figure 2 As shown, the specific steps include:

[0022] (1) An L-shaped horizontal well is constructed from the ground, wherein the L-shaped horizontal well comprises a vertical well section 1, an inclined well section 2 and a horizontal section 3, wherein the vertical well section 1, the inclined well section 2 and the horizontal section 3 are connected in sequence, wherein the end of the inclined well section 2 is located at the top of the fracture zone, and the horizontal section 3 extends forward along the fracture zone until it cannot extend forward any further.

[0023] (2) Drill multiple branch wells 4 from the horizontal section 3 to the protected layer. The branch wells 4 are drilled from the horizontal section to the top plate of the protected layer. The branch wells 4 are drilled sequentially from near to far from one end of the horizontal section 3 close to the vertical well section 1.

[0024] (3) After the construction of a branch well 4 is completed, a screen pipe 5 is lowered into the branch well 4. The length of the screen pipe 5 is adapted to the length of the branch well 4. In this embodiment, the screen pipe 5 is lowered by holding the pressure and lifting the drill. After the construction of the lower screen pipe 5 of the branch well 4 is completed, the lower screen pipe 5 is constructed in the horizontal section 3. The function of the screen pipe 5 is to ensure that the extraction channel is not deformed and blocked by the mining movement, thereby extending the service life of the drilling extraction.

[0025] The present invention uses an L-shaped horizontal well to extract gas from the mining area and the goaf area of ​​the protective layer, and simultaneously uses multiple branch wells 4 to pre-extract gas from the protected layer in advance, and extracts gas from the fracture zone during and after mining the protected layer, thereby realizing "one well for multiple uses" and improving the efficiency of gas control in coal seam groups.

[0026] Example 2

[0027] This embodiment provides a method for gas extraction and elimination of upper and lower adjacent layers. The difference between this embodiment and Example 1 is that the vertical well section 1 and the inclined section 2 of this embodiment are ground L-shaped wells left by protective layer mining of coal mines. This embodiment continues drilling on this basis, and the end of the inclined section 2 is located at the top of the fracture zone, and then the horizontal section 3 is drilled out by extending forward along the fracture zone.

[0028] The present invention proposes an L-shaped horizontal well that can take into account both gas extraction during protective layer mining and pre-extraction and outburst elimination in the protected layer during the protective layer mining process, providing a new method for synchronous gas control in upper and lower adjacent layers, thereby improving the gas control efficiency of coal seam groups.

[0029] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for gas extraction and sudden gas elimination in upper and lower adjacent layers, characterized in that: The following steps are involved: (1) constructing an L-shaped horizontal well from the ground, wherein the L-shaped horizontal well includes a vertical well section, an inclined well section and a horizontal section, wherein the vertical well section, the inclined well section and the horizontal section are connected in sequence, and the horizontal section is located in a fracture zone above the protective layer; (2) Drilling multiple branch wells from the horizontal section to the protected layer, wherein the branch wells are drilled from the horizontal section to the top plate of the protected layer.

2. The method for gas extraction and sudden elimination in upper and lower adjacent layers according to claim 1 is characterized in that: After each branch well construction is completed, a screen pipe is placed in the branch well.

3. The method for gas extraction and sudden relief in upper and lower adjacent layers according to claim 4 is characterized in that: The length of the screen tube is adapted to the length of the comb-shaped branch well.

4. The method for gas extraction and sudden elimination in upper and lower adjacent layers according to claim 1 is characterized in that: After the construction of the horizontal section is completed, a screen pipe is placed in the horizontal section.

Citation Information

Patent Citations

  • Ground bored well body structure for gas extraction

    CN101649740A

  • Well drilling method for jointly treating coal seam gas of upper and lower adjacent wells of coal mine

    CN114483159A