Bolt-grouting coupling support method for soft rock roadway of overlying goaf
By dividing branch guard sections in soft rock tunnels and using a combination of anchor cables and grouting anchor cables, the problem of poor bearing capacity of soft rock tunnels is solved, ensuring the stability and safety of the tunnels and reducing maintenance costs.
Patent Information
- Application Number
- CN202411041907.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-12
AI Technical Summary
The poor load-bearing capacity of soft rock tunnels leads to excessive deformation of the surrounding rock in the tunnel, and the conventional support methods are prone to failure. Especially when the overlying goaf area causes damage to the bottom plate, it is difficult to support the lower working face tunnel.
The anchor injection coupling support method of soft rock tunnel in the overlying goaf is used. By judging the relationship between the tunnel excavation position and the overlying goaf position, the tunnel is divided into relatively difficult and easy sections of support, and the full-section anchor cable and The grouting anchor cable is circulating and supported to ensure the stability of the tunnel.
It has achieved more stable support for soft rock tunnels under the overlying goaf area, reduced the amount of later repairs and maintenance costs, improved the safety of the tunnel, and provided a solid foundation for safe mining of the working face.
Smart Images

Figure CN118934034A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel support, and in particular to an anchor-grouting coupling support method for a soft rock tunnel in an overlying goaf area. Background Art
[0002] Normally, soft rock tunnels have poor bearing capacity, large deformation and easy damage. In the process of tunnel support, the deformation of the tunnel surrounding rock is often too large, exceeding the allowable deformation of the support material, resulting in tunnel support failure. In addition, the mining range and depth of the mining area are constantly increasing, and the mining conditions are becoming more complex, especially with the completion of the mining of the shallow coal seam, turning to the mining of the lower coal seam, thus forming "the lower part is the working face being mined and excavated, and the overlying is the goaf area with coal pillars crisscrossing". When the upper working face is mined, it will cause certain damage to the bottom plate, causing the bottom plate rock layer, that is, the lower working face roof to be broken. When the lower working face tunnel is excavated, on the one hand, the overlying goaf coal pillars will cause abnormal concentration of stress, which is easy to cause deformation and damage of the tunnel. On the other hand, the lower tunnel roof is broken, causing the conventional support method to fail easily. The superposition of the above two forms makes it difficult to support the lower working face tunnel. Summary of the invention
[0003] In order to solve the technical problems mentioned in the background technology, the present invention provides an anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas.
[0004] The present invention adopts the following technical solution: a method for coupling support of soft rock tunnels in overlying goaf areas with anchoring and grouting, comprising the following steps:
[0005] Determine whether the tunnel to be excavated meets the excavation conditions required for the soft rock tunnel under the overlying goaf;
[0006] When the tunnel to be excavated meets the excavation conditions, the position relationship between the tunnel excavation position and the overlying goaf is determined, and the tunnel to be excavated is divided into a relatively difficult support section and a relatively easy support section according to the position relationship;
[0007] When the support is relatively difficult, two groups of full-section anchor cables are first arranged, followed by a group of grouting anchor cables, and the support is carried out in a circular manner along the tunnel excavation direction until the relatively difficult section of the tunnel is passed;
[0008] When supporting a relatively easy section, three groups of full-section anchor cables are first arranged, followed by a group of grouting anchor cables, and the support is carried out in a circular manner along the direction of tunnel excavation, until the relatively easy section of tunnel support is passed.
[0009] Furthermore, the excavation conditions for judging whether the tunnel to be excavated meets the requirements of the soft rock tunnel under the overlying goaf are:
[0010] When the coal mine has more than two coal seams and the upper coal seam has been mined, the interlayer spacing between the upper coal seam and the lower coal seam is l≤50m, and the strike lengths of the overlying mined working face and the lower excavation tunnel are not equal, then it can be judged that the conditions for excavation of soft rock tunnels in the overlying goaf are met.
[0011] Furthermore, the positional relationship between the tunnel excavation position and the overlying goaf is determined, and based on the positional relationship, it is divided into a relatively difficult support section and a relatively easy support section, including: based on the deformation of the tunnel after support under similar conditions, when the advancement direction of the overlying goaf is opposite to the excavation direction of the lower coal seam tunnel, the tunnel excavation position is the relatively difficult support section in the range of 10-15m before and after entering and exiting the overlying goaf, and the tunnel excavation position is the relatively easy support section when it is below the overlying goaf.
[0012] Furthermore, each group of the full-section anchor cables includes one row of reinforced anchor cables and two rows of conventional anchor cables; each group of the grouting anchor cables includes one row of reinforced grouting anchor cables and two rows of conventional grouting anchor cables.
[0013] Furthermore, the specifications of the reinforced anchor cables and reinforced grouting anchor cables are Φ21.8×8200mm, the spacing d1 is 1200mm, and the row spacing d2 is 1600mm; the specifications of the conventional anchor cables and conventional grouting anchor cables are Φ21.8×4200mm, the spacing d3 is 800mm, and the row spacing d4 is 800mm.
[0014] Furthermore, the full-section anchor cable is to lay a steel mesh at the head position and install the full-section anchor cable for support immediately after one circle of excavation. The full-section anchor cable is divided into 5 reinforced anchor cables inserted in the top arch arc section, and conventional anchor cables are inserted in the top plate and both sides. The number n is calculated according to the section size, that is:
[0015] n = p / 0.8;
[0016] Where p is the circumference of the tunnel section and does not include the length of the bottom plate.
[0017] Further, arranging the full-section anchor cable includes the following steps:
[0018] Use drilling rig to drill holes, and the drilling is strictly carried out according to the length of reinforced anchor cables and conventional anchor cables;
[0019] Install anchoring agent and install corresponding medicine rolls strictly according to the design. For anchoring agent with specification of Φ21.8×8200mm, install 4 sections of anchoring agent, and for anchoring agent with specification of Φ21.8×4200mm, install 3 sections of anchoring agent;
[0020] Anchor the anchor cable according to the designed anchoring force. If the anchoring force is not reached, re-anchor it.
[0021] Furthermore, the grouting anchor cable is to lay a steel mesh at the head position and drive a grouting anchor cable for support immediately after the tunnel is excavated for one circle. The grouting anchor cable includes a reinforced grouting anchor cable and a conventional grouting anchor cable. The grouting is divided into 5 reinforced grouting anchor cables inserted at the top, and the number of conventional grouting anchor cables inserted at the top plate and the two sides is calculated according to the cross-sectional size, that is:
[0022] n = p / 0.8;
[0023] Where p is the circumference of the tunnel section and does not include the length of the bottom plate.
[0024] Further, the steps of arranging the grouting anchor cables are as follows:
[0025] Use drilling rig to drill holes, and the drilling is strictly carried out according to the length of reinforced grouting anchor cables and conventional grouting anchor cables;
[0026] Install anchoring agent, and install corresponding medicine rolls strictly according to the design, that is, install 4 sections of anchoring agent for anchor cable with specification of Φ21.8×8200mm, and install 3 sections of anchoring agent for anchor cable with specification of Φ21.8×4200mm;
[0027] Shotcrete the entire section of the tunnel, and spray the entire section of the tunnel at one time;
[0028] Grouting: Grouting is carried out in the tunnel according to the grouting ratio, and the grouting pressure is 5MPa;
[0029] Anchor the anchor cable according to the designed anchoring force. If the anchoring force is not reached, re-anchoring is required.
[0030] Compared with the prior art, the advantages of the present invention are: the anchor-grouting coupled support method for the soft rock tunnel in the overlying goaf area designed by the present invention can form a more stable support for the soft rock tunnel under the overlying goaf area, ensure the quality of tunnel support, reduce the amount of later repairs and tunnel maintenance costs, improve tunnel safety, and lay a solid foundation for safe mining of the working face. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the overall structure of the mining face of the soft rock tunnel in the overlying goaf area of the present invention;
[0032] Figure 2 It is a schematic plan view of the anchor-grouting coupling support method for the soft rock tunnel in the overlying goaf area of the present invention;
[0033] Figure 3 It is a schematic diagram of the support cross section of the present invention in a relatively difficult support section;
[0034] Figure 4 It is a schematic diagram of the support cross section of the present invention in a relatively easy-to-support section.
[0035] in:
[0036] 1-overlying goaf, 2-relatively difficult section to support, 3-working face of the coal seam to be mined, 4-tunnel under excavation, 5-mined working face of the lower coal seam, 6-conventional anchor cables, 7-reinforced anchor cables, 8-schematic area of relatively difficult section to support, 9-schematic area of relatively easy section to support, 10-conventional grouting anchor cables, 11-reinforced grouting anchor cables, 12-relatively easy section to support. DETAILED DESCRIPTION
[0037] In order to facilitate those skilled in the art to understand the technical solution of the present invention, further description will be given below with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention.
[0038] In the following detailed description, for ease of explanation, many specific details are set forth to provide a comprehensive understanding of embodiments of the present invention. However, it is apparent that one or more embodiments may be implemented without these specific details. In addition, in the following description, descriptions of known structures and techniques are omitted to avoid unnecessary confusion of concepts of the present invention.
[0039] like Figure 1 As shown, it is a schematic diagram of the overall structure of the mining face of the soft rock tunnel in the overlying goaf area of the present invention. The anchor-grouting coupling support method for the soft rock tunnel in the overlying goaf area designed by the present invention comprises the following steps:
[0040] 1) Determine whether the tunnel to be excavated meets the excavation conditions required for the soft rock tunnel under the overlying goaf. In specific implementation, the judgment method is: when the coal mine has more than two coal seams and the upper coal seam has been mined, the interlayer distance between the upper coal seam and the lower coal seam is l≤50m, and the strike length of the overlying mined working face and the lower excavation tunnel is not equal, then it can be judged that the conditions for excavation of the soft rock tunnel under the overlying goaf are met.
[0041] 2) When the tunnel to be excavated meets the excavation conditions, the positional relationship between the tunnel excavation position and the overlying goaf is determined, and the tunnel to be excavated is divided into a relatively difficult to support section and a relatively easy to support section according to the positional relationship.
[0042] Please continue to refer to Figure 1 , in specific implementation, including according to the deformation of the tunnel after support under similar conditions, when the advancing direction of the overlying goaf is opposite to the tunnel driving direction of the lower coal seam, the tunnel driving position is 10-15m before and after entering and exiting the overlying goaf as the relatively difficult support section, and the tunnel driving position is below the overlying goaf as the relatively easy support section. The figure takes 10m before and after entering and exiting the overlying goaf as an example to show the area where the relatively difficult support section is located.
[0043] like Figure 2As shown, in actual operation, each group of full-section anchor cables includes one row of reinforced anchor cables and two rows of conventional anchor cables, and each group of grouting anchor cables includes one row of reinforced grouting anchor cables and two rows of conventional grouting anchor cables. The specifications of the reinforced anchor cables and reinforced grouting anchor cables are both Φ21.8×8200mm, the spacing d1 is 1200mm, and the row spacing d2 is 1600mm; the specifications of the conventional anchor cables and conventional grouting anchor cables are Φ21.8×4200mm, the spacing d3 is 800mm, and the row spacing d4 is 800mm.
[0044] 3) When supporting a relatively difficult section, first arrange two groups of full-section anchor cables, then arrange a group of grouting anchor cables, and then carry out cyclic support in the same way along the direction of tunnel excavation until the relatively difficult section of tunnel support is passed.
[0045] like Figure 3 As shown, in the specific implementation, the full-section anchor cable is to lay a steel mesh at the head position immediately after one circle of excavation and install the full-section anchor cable for support. The full-section anchor cable is divided into 5 reinforced anchor cables inserted in the top arch arc section, and conventional anchor cables are inserted in the top plate and both sides. The number n is calculated according to the section size, that is:
[0046] n = p / 0.8;
[0047] Where p is the circumference of the tunnel section and does not include the length of the bottom plate.
[0048] 4) When supporting a relatively easy section, first arrange three groups of full-section anchor cables, then arrange a group of grouting anchor cables, and then carry out cyclic support in the same way along the direction of tunnel excavation until the relatively easy section of tunnel support is passed.
[0049] like Figure 4 As shown, in the specific implementation, the grouting anchor cable is to lay a steel mesh at the head position and drive the grouting anchor cable for support immediately after the tunnel is excavated for one circle. The grouting anchor cable includes a reinforced grouting anchor cable and a conventional grouting anchor cable. The grouting is divided into 5 reinforced grouting anchor cables inserted at the top, and the number n of conventional grouting anchor cables inserted at the top plate and the two sides is calculated according to the cross-sectional size, that is:
[0050] n = p / 0.8;
[0051] Where p is the circumference of the tunnel section and does not include the length of the bottom plate.
[0052] The steps of arranging the full-section anchor cable are as follows:
[0053] a) Use drilling rig to drill holes, and the drilling should be carried out strictly according to the length of reinforced anchor cables and conventional anchor cables;
[0054] b) Install anchoring agent, and install corresponding medicine rolls strictly according to the design. For anchor cables with specifications of Φ21.8×8200mm, install 4 sections of anchoring agent, and for anchor cables with specifications of Φ21.8×4200mm, install 3 sections of anchoring agent;
[0055] c) Anchor the anchor cables according to the designed anchoring force. If the anchoring force is not reached, re-anchoring is required.
[0056] The steps for arranging grouting anchor cables are as follows:
[0057] a) Use a drilling rig to drill holes, and the drilling should be carried out strictly in accordance with the length of the reinforced grouting anchor cable and the conventional grouting anchor cable;
[0058] b) Install anchoring agent, and install corresponding medicine rolls strictly according to the design, that is, 4 sections of anchoring agent are installed for anchor cables with specifications of Φ21.8×8200mm, and 3 sections of anchoring agent are installed for anchor cables with specifications of Φ21.8×4200mm;
[0059] c) Shotcrete the entire section of the tunnel. Shotcrete the entire section of the tunnel at one time;
[0060] d) Grouting: Grouting is performed on the tunnel according to the grouting ratio, and the grouting pressure is 5MPa;
[0061] e) Anchor cable: Anchor according to the designed anchoring force. If the anchoring force is not reached, re-anchoring is required.
[0062] To sum up, the anchor-grouting coupled support method for the soft rock tunnel in the overlying goaf area designed in the present invention can provide more stable support for the soft rock tunnel under the overlying goaf area, ensure the quality of tunnel support, reduce the amount of later repairs and tunnel maintenance costs, improve tunnel safety, and lay a solid foundation for safe mining of the working face.
[0063] The above embodiments are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A method for coupling support of soft rock tunnels in overlying goaf, characterized in that: The steps include: Determine whether the tunnel to be excavated meets the excavation conditions required for the soft rock tunnel under the overlying goaf; When the tunnel to be excavated meets the excavation conditions, the position relationship between the tunnel excavation position and the overlying goaf is determined, and the tunnel to be excavated is divided into a relatively difficult support section and a relatively easy support section according to the position relationship; When the support is relatively difficult, two groups of full-section anchor cables are first arranged, followed by a group of grouting anchor cables, and the support is carried out in a circular manner along the tunnel excavation direction until the relatively difficult section of the tunnel is passed; When supporting a relatively easy section, three groups of full-section anchor cables are first arranged, followed by a group of grouting anchor cables, and the support is carried out in a circular manner along the direction of tunnel excavation, until the relatively easy section of tunnel support is passed.
2. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 1 is characterized in that: The excavation conditions for judging whether the tunnel to be excavated meets the requirements of the soft rock tunnel under the overlying goaf are: When the coal mine has more than two coal seams and the upper coal seam has been mined, the interlayer spacing between the upper coal seam and the lower coal seam is l≤50m, and the strike lengths of the overlying mined working face and the lower excavation tunnel are not equal, then it can be judged that the conditions for excavation of soft rock tunnels in the overlying goaf are met.
3. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 2 is characterized in that: Determine the positional relationship between the tunnel excavation position and the overlying goaf, and divide it into a relatively difficult support section and a relatively easy support section according to the positional relationship, including: according to the deformation of the tunnel after support under similar conditions, when the advancement direction of the overlying goaf is opposite to the excavation direction of the lower coal seam tunnel, the tunnel excavation position is the relatively difficult support section in the range of 10-15m before and after entering and exiting the overlying goaf, and the tunnel excavation position is the relatively easy support section when it is below the overlying goaf.
4. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 3 is characterized in that: Each group of the full-section anchor cables includes one row of reinforced anchor cables and two rows of conventional anchor cables; each group of the grouting anchor cables includes one row of reinforced grouting anchor cables and two rows of conventional grouting anchor cables.
5. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 4 is characterized in that: The specifications of the reinforced anchor cables and reinforced grouting anchor cables are Φ21.8×8200mm, the spacing d1 is 1200mm, and the row spacing d2 is 1600mm; the specifications of the conventional anchor cables and conventional grouting anchor cables are Φ21.8×4200mm, the spacing d3 is 800mm, and the row spacing d4 is 800mm.
6. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 5 is characterized in that: The full-section anchor cable is to lay a steel mesh at the head position and install the full-section anchor cable for support immediately after one circle of excavation. The full-section anchor cable is divided into 5 reinforced anchor cables inserted in the top arch arc section, and conventional anchor cables are inserted in the top plate and both sides. The number n is calculated according to the section size, that is: n = p / 0.8; Where p is the circumference of the tunnel section and does not include the length of the bottom plate.
7. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 6 is characterized in that: The steps of laying the full-section anchor cable are as follows: Use drilling rig to drill holes, and the drilling is strictly carried out according to the length of reinforced anchor cables and conventional anchor cables; Install anchoring agent and install corresponding medicine rolls strictly according to the design. For anchoring agent with specification of Φ21.8×8200mm, install 4 sections of anchoring agent, and for anchoring agent with specification of Φ21.8×4200mm, install 3 sections of anchoring agent; Anchor the anchor cable according to the designed anchoring force. If the anchoring force is not reached, re-anchor it.
8. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 7 is characterized in that: Arrangement of grouting anchor cables means that after one circle of tunnel excavation, steel mesh is immediately laid at the head position and grouting anchor cables are installed for support. Grouting anchor cables include reinforced grouting anchor cables and conventional grouting anchor cables. Grouting is divided into 5 reinforced grouting anchor cables inserted at the top, and conventional grouting anchor cables inserted at the top plate and both sides. The number n is calculated according to the cross-sectional size, that is: n = p / 0.8; Where p is the circumference of the tunnel section and does not include the length of the bottom plate.
9. The anchor-grouting coupling support method for soft rock tunnels in overlying goaf areas according to claim 8 is characterized in that: The steps for arranging grouting anchor cables are as follows: Use drilling rig to drill holes, and the drilling is strictly carried out according to the length of reinforced grouting anchor cables and conventional grouting anchor cables; Install anchoring agent, and install corresponding medicine rolls strictly according to the design, that is, install 4 sections of anchoring agent for anchor cable with specification of Φ21.8×8200mm, and install 3 sections of anchoring agent for anchor cable with specification of Φ21.8×4200mm; Shotcrete the entire section of the tunnel, and spray the entire section of the tunnel at one time; Grouting: Grouting is carried out in the tunnel according to the grouting ratio, and the grouting pressure is 5MPa; Anchor the anchor cable according to the designed anchoring force. If the anchoring force is not reached, re-anchoring is required.