Hydropower station main shaft seal water supply system
By introducing a booster pump and hydraulic cyclone into the hydropower station spindle sealed water supply system, water source switching and sewage separation during the flood season are achieved, and the problem of unstable pressure or flow in the existing system is solved, extending the life of the water filter and improving the water filter The safety and environmental protection of the system.
Patent Information
- Application Number
- CN202410862978.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-11-12
AI Technical Summary
The existing hydropower station spindle sealed water supply system has a single water supply method during the aquatic and dry water periods. If the pressure or flow rate is not replaced in time, the unit will be shut down, and coarse mud and sand will block the water filter, resulting in seal wear and a reduced life of the water filter. Affects the safe and stable operation of the unit.
A main pipeline system including a booster pump, a hydraulic cyclone, a water filter and an electric valve was designed to switch water sources during the abundance period, and to separate and remove coarse particles from the sewage through a hydraulic cyclone, and extend filtration. Water appliance life increases the reliability and efficiency of the system.
Provide emergency water supply guarantee when flow or pressure is low, prevent spindle seal wear, extend the life of the water filter, improve water quality, enhance the safety and environmental protection of the system, and reduce maintenance needs.
Smart Images

Figure CN118934397A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydropower generation, in particular to a main shaft sealing water supply system for a hydropower station. Background Art
[0002] At present, the main shaft seal water supply system of hydropower stations is commonly divided into two water supply modes: clean water and technical water supply. Clean water is supplied by a high-level water tank, and technical water is supplied by the unit technical water supply pump. The two water sources are opened and closed by electric valves to supply water to the main shaft seal pipeline.
[0003] The commonly used main shaft seal water supply system simply uses clean water for water supply during the flood season and uses the unit technical water supply during the dry season. The two modes are switched manually, and the water supply mode is relatively single. If any water supply mode has low pressure and flow interruption, and the switch is not timely, it will cause the unit to shut down unexpectedly. At the same time, the heavier coarse-grained mud and sand in the unit's technical water supply will clog the water filter, reduce the life of the water filter, cause serious wear of the main shaft seal, and affect the safe and stable operation of the unit. Summary of the invention
[0004] In view of the above problems existing in the prior art, the present invention is proposed.
[0005] The present invention is therefore directed to improving the reliability and efficiency of water supply systems while reducing maintenance requirements and extending equipment life.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a main shaft seal water supply system for a hydropower station, comprising a main pipeline, including a booster pump, a hydrocyclone, a hydrocyclone bypass electric valve, a first water filter, a second water filter, a first water filter front end electric valve, a second water filter front end electric valve, an electromagnetic flowmeter, a pressure transmitter, and a main shaft seal. After the booster pump is connected to the hydrocyclone and the hydrocyclone bypass electric valve, the branch passes through the first water filter front end electric valve, the first water filter and the second water filter front end electric valve, and the second water filter, and then is collected and connected to the electromagnetic flowmeter, and then passes through the pressure transmitter and the main shaft seal. Connection; a high-level water tank pipeline, including a high-level water tank, a high-level water tank water supply electric valve, and a first boosting pump electric valve. The high-level water tank is connected to the high-level water tank water supply electric valve and then connected to the pipes at both ends of the boosting pump. The first boosting pump electric valve is arranged on the front-end pipe of the boosting pump; a technical water supply pump water source, including a technical water supply pump, a technical water supply electric valve, and a second boosting pump electric valve. The technical water supply pump is connected to the technical water supply electric valve and then connected to the pipes at both ends of the boosting pump. The second boosting pump electric valve is arranged on the front-end pipe of the boosting pump; a connecting unit, arranged at the connection of each pipeline, including a connecting end and a joint. The connecting end is snap-fitted with the joint.
[0007] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the connecting end includes a shell, a sealing platform, a clamping rod, and a rotating cylinder. The sealing platform is arranged in the middle of the shell, the rotating cylinder is rotatably matched with the inner wall of the shell, and the clamping rod is arranged on the side of the sealing platform.
[0008] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the joint is provided with a connecting pipe, a ring platform, a baffle, and a sleeve ring. The ring platform is arranged on the outside of one end of the connecting pipe and is hollow inside. The baffle is partially arranged in the connecting pipe and partially arranged in the ring platform. The sleeve ring is arranged on the outer wall of the joint.
[0009] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the shell is provided with a channel, an annular groove, a radial groove, and a straight groove, the channel runs through the lower end of the shell, the annular groove is provided on the outside of the channel, the radial groove is provided on the end face of the shell, and the straight groove is provided on the inner wall of the shell; the side wall of the annular groove is also provided with a first spiral groove.
[0010] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the sealing platform is provided with a groove, a connecting rod, a circular ring, a protrusion, and a first spring. The groove is provided on the side wall of the sealing platform, the connecting rod is provided at the lower end of the sealing platform and connected to the circular ring, the circular ring is slidably matched with the annular groove, the protrusion is provided on the side wall of the circular ring and slidably matched with the first spiral groove, and the first spring is provided between the circular ring and the end face of the annular groove.
[0011] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the clamping rod is provided with a connecting block, a clamping block, and a second spring; the connecting block is arranged below the clamping rod and slidingly cooperates with the radial groove; the clamping block is arranged in the middle of the clamping rod and matches the groove; and the second spring is arranged between the connecting block and the end face of the radial groove.
[0012] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the rotating drum is provided with a hole, a second spiral groove, and a slide groove, the hole is provided on the outside of the annular groove, the second spiral groove is provided on the side wall of the rotating drum, and the slide groove is provided at the lower end of the rotating drum and slides with the clamping rod; the slide groove includes an arc segment and a diameter segment, the arc segment is connected to the end of the diameter segment away from the axis, the side wall of the arc segment is provided with a notch, and the notch slides with the clamping block.
[0013] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the connecting pipe is provided with a through groove, and the through groove is connected to the inside of the ring platform; the upper end of the ring platform is provided with a rod groove, and the lower end is provided with a groove, and the groove is divided into a straight wall, an inclined wall, and an annular wall, and the straight wall, the inclined wall, and the annular wall are connected end to end.
[0014] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the baffle is provided with a connecting rod, an outer ring, and a pressure rod. The connecting rod is arranged on the side wall of the baffle, connected to the inner wall of the outer ring, and slidingly matched with the through groove. The pressure rod is arranged at the upper end of the outer ring and slidingly matched with the rod groove.
[0015] As a preferred solution of the main shaft sealing water supply system of the hydropower station described in the present invention, the sleeve ring is rotatably matched with the ring platform, and a boss is arranged on the outer side of the sleeve ring.
[0016] The beneficial effects of the present invention are as follows: the present invention provides two water sources as water sources during the wet and dry seasons, and the pipeline booster pump is designed to be used for emergency response when low flow pressure occurs under normal water supply mode, and can also be operated for a long time, providing protection for the unit's main shaft seal to prevent burning of bearings; the hydraulic cyclone is designed to separate and remove heavier coarse particles such as mud and sand in sewage, to prevent particles in the main shaft sealing water from causing wear to the main shaft and bearings, and at the same time it can also improve water quality, extend the life of the water filter, and prevent the main shaft sealing water pressure flow rate from being low due to clogging of the water filter. In addition, the pipeline connection unit design in the present invention provides easy installation and maintenance, while ensuring the sealing of the system during disassembly and assembly and the effective use of water resources, further enhancing the safety and environmental protection of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. Among them:
[0018] Figure 1 This is a schematic diagram of the main shaft seal water supply system of a hydropower station.
[0019] Figure 2 Flow chart of the main shaft seal water supply system for a hydropower station.
[0020] Figure 3 This is the structural diagram of the connection unit of the main shaft seal water supply system of the hydropower station.
[0021] Figure 4 This is the terminal structure diagram of the main shaft seal water supply system of the hydropower station.
[0022] Figure 5 This is an exploded view of the connection of the main shaft seal water supply system of the hydropower station.
[0023] Figure 6 This is an exploded view of the joints of the main shaft seal water supply system of the hydropower station.
[0024] Figure 7 This is the joint structure diagram of the main shaft seal water supply system of the hydropower station.
[0025] Figure 8 Cross-sectional view of the connection unit of the main shaft seal water supply system of the hydropower station. DETAILED DESCRIPTION
[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings.
[0027] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0028] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor is it an embodiment that is mutually exclusive with other embodiments, either individually or selectively.
[0029] Example 1
[0030] Reference Figure 1 and Figure 2 , which is the first embodiment of the present invention, and this embodiment provides a main shaft seal water supply system for a hydropower station, the main shaft seal water supply system for the hydropower station includes a main pipeline 100, a high-level water tank pipeline 200 and a technical water supply pump water source 300.
[0031] Specifically, the main pipeline 100 includes a booster pump 101, a hydrocyclone 102, a hydrocyclone bypass electric valve 103, a first water filter 104, a second water filter 105, a first water filter front end electric valve 104a, a second water filter front end electric valve 105a, an electromagnetic flowmeter 106, a pressure transmitter 107, and a spindle seal 108. After the booster pump 101 is connected to the hydrocyclone 102 and the hydrocyclone bypass electric valve 103, the branch passes through the first water filter front end electric valve 104a, the first water filter 104, the second water filter front end electric valve 105a, and the second water filter 105, and then is collected and connected to the electromagnetic flowmeter 106, and then connected to the spindle seal 108 through the pressure transmitter 107;
[0032] The hydrocyclone 102 is used to separate and remove the heavier coarse particles of mud and sand in the sewage to prevent the particles in the water of the main shaft seal 108 from causing wear on the main shaft and the bearing. It can also improve the water quality, extend the life of the water filter, and prevent the water filter from clogging and causing low water pressure and flow of the main shaft seal 108; the first water filter 104 and the second water filter 105 are used as the main and standby switches to prevent the unit from shutting down due to high differential pressure.
[0033] The high-level water tank pipeline 200 includes a high-level water tank 201, a high-level water tank water supply electric valve 201a, and a first booster pump electric valve 202. The high-level water tank 201 is connected to the high-level water tank water supply electric valve 201a and then connected to the pipelines at both ends of the booster pump 101. The first booster pump electric valve 202 is arranged on the front end pipeline of the booster pump 101.
[0034] The technical water supply pump water source 300 includes a technical water supply pump 301, a technical water supply electric valve 301a, and a second booster pump electric valve 302. The technical water supply pump 301 is connected to the technical water supply electric valve 301a and then connected to the pipelines at both ends of the booster pump 101. The second booster pump electric valve 302 is arranged on the front end pipeline of the booster pump 101.
[0035] The high-level water tank and technical water supply pump are two water sources, which are used for water source switching during the wet and dry seasons of the river. The electric valve control mode is divided into manual, cut-off, and automatic, and the operation is divided into open and closed. The booster pump control mode is divided into manual, cut-off, and automatic, and the operation is divided into start and stop. Each water source includes a normal water supply circuit and a booster pump water supply circuit. The booster pump circuit is used to solve the problem of low pressure and flow of the main shaft seal water in the normal circuit;
[0036] The connection unit 400 is arranged at the connection of each pipeline, and includes a connection end 401 and a connector 402 . The connection end 401 and the connector 402 are snap-fitted.
[0037] The connection end 401 and the joint 402 adopt an easy-to-disassemble structure, so that the pipeline can be quickly disassembled, cleaned and replaced, reducing the difficulty of later maintenance. The connection end 401 remains sealed when disassembled and does not hinder the normal operation of other undisassembled pipelines.
[0038] When in use, the high-level water tank 201 is selected for water supply during the flood season. When the main shaft seal water supply system receives the start-up order, the high-level water tank water supply electric valve 201a is opened, the electric valve 104a at the front end of the first water filter is opened, and the water flows through the hydrocyclone 102, the first water filter 104, the electromagnetic flowmeter 106, and the pressure sensor 107 to reach the main shaft seal 108. When either the flow rate or the pressure is less than the set value, the booster pump 101 is opened with a delay, and the booster pump 101 is linked to the first booster pump electric valve 202 to open to ensure the water supply pressure and flow rate; when the differential pressure of the first water filter 104 is high, the electric valve 105a at the front end of the second water filter is opened, and the electric valve 104a at the front end of the first water filter is closed at the same time. When the main shaft seal water supply system receives the exit order, the electric valves on the water supply pipeline of the high-level water tank are all closed. In the dry season, the technical water supply 300 is selected. When the main shaft seal water supply system receives the start-up order, the technical water supply electric valve 301a is opened, the electric valve 104a at the front end of the first water filter is opened, and the water flows through the hydrocyclone 102, the first water filter 104, the electromagnetic flowmeter 106, and the pressure sensor 107 to reach the main shaft seal 108. When the flow rate and pressure are either less than the set value, the booster pump 101 is opened with a delay, and the booster pump 101 is linked to the second booster pump electric valve 302 to open to ensure the water supply pressure and flow rate; when the differential pressure of the first water filter 104 is high, the electric valve 105a at the front end of the second water filter is opened, and the electric valve 104a at the front end of the first water filter is closed at the same time. When the main shaft seal water supply system receives the exit order, the electric valves on the technical water supply pipeline are all closed.
[0039] Example 2
[0040] Reference Figure 2 to Figure 8 , which is the second embodiment of the present invention, and this embodiment is based on the previous embodiment.
[0041] Specifically, the connection end 401 includes a shell 403 , a sealing platform 404 , a clamping rod 405 , and a rotating drum 406 . The sealing platform 404 is disposed in the middle of the shell 403 . The rotating drum 406 is rotatably matched with the inner wall of the shell 403 . The clamping rod 405 is disposed on the side of the sealing platform 404 .
[0042] The sealing platform 404 can open and close the water inlet of the connecting end 401. The clamping rod 405 limits the movement of the sealing platform 404 in the initial state to keep the connecting end 401 sealed and limits the disconnection of the joint 402 when connected. The rotating drum 406 limits the movement of the clamping rod 405 in the initial state and cooperates with the clamping rod 405 to limit the disconnection of the joint 402 when connected.
[0043] Specifically, the joint 402 is provided with a pipe 402a, a ring platform 407, a baffle 408, and a collar 409. The ring platform 407 is provided on the outside of one end of the pipe 402a, and its interior is hollow. The baffle 408 is partially provided in the pipe 402a and partially provided in the ring platform 407. The collar 409 is provided on the outer wall of the joint 402.
[0044] It is worth noting that the outer diameter of the baffle 408 located at the connecting pipe 402a is smaller than the inner diameter of the connecting pipe 402a, which is convenient for water to flow through. The ring 409 cooperates with the rotating drum 406 to drive the rotating drum 406 to rotate. When the baffle 408 is disengaged, it squeezes the sealing platform 404 to reset it and close the connecting end channel. When the ring platform 407 is disengaged, it cooperates with the clamping rod 405 to reset it.
[0045] Specifically, the shell 403 is provided with a channel 403a, an annular groove 403b, a radial groove 403c, and a straight groove 403d. The channel 403a passes through the lower end of the shell 403, the annular groove 403b is arranged on the outside of the channel 403a, the radial groove 403c is arranged on the end face of the shell 403, and the straight groove 403d is arranged on the inner wall of the shell 403; the side wall of the annular groove 403b is also provided with a first spiral groove 403e.
[0046] Specifically, the sealing platform 404 is provided with a groove 404a, a connecting rod 404b, a ring 404c, a protrusion 404d, and a first spring 404e. The groove 404a is provided on the side wall of the sealing platform 404. The connecting rod 404b is provided at the lower end of the sealing platform 404 and connected to the ring 404c. The ring 404c is slidably matched with the annular groove 403b. The protrusion 404d is provided on the side wall of the ring 404c and is slidably matched with the first spiral groove 403e. The first spring 404e is provided between the end surface of the ring 404c and the annular groove 403b.
[0047] The outer diameter of the sealing platform 404 completely covers the annular groove 403b, and a sealing ring is provided at the lower end of the sealing platform 404. In the initial state, the first spring 404e is in a compressed state, and the protrusion 404d is at the lower end of the first spiral groove 403e. At this time, the sealing platform 404 completely covers the channel 403a, so that the connecting end 401 is in a closed state, and the groove 404a is located directly above 403c.
[0048] Specifically, the clamping rod 405 is provided with a connecting block 405a, a clamping block 405b, and a second spring 405c. The connecting block 405a is provided below the clamping rod 405 and slides with the radial groove 403c. The clamping block 405b is provided in the middle of the clamping rod 405 and matches with the groove 404a. The second spring 405c is provided between the connecting block 405a and the end surface of the radial groove 403c.
[0049] In the initial state, the second spring 405c is in a compressed state, the clamping block 405b is clamped with the groove 404a, and the sealing platform 404 cannot move upward.
[0050] Specifically, the rotating drum 406 is provided with a hole 406a, a second spiral groove 406b, and a slide groove 406c. The hole 406a is provided on the outside of the annular groove 403b, the second spiral groove 406b is provided on the side wall of the rotating drum 406, and the slide groove 406c is provided at the lower end of the rotating drum 406 to slide with the clamping rod 405; the slide groove 406c includes an arc segment 406d and a diameter segment 406e, the arc segment 406d is connected to the end of the diameter segment 406e away from the axis, and the side wall of the arc segment 406d is provided with a notch 406f, and the notch 406f slides with the clamping block 405b.
[0051] It is worth noting that the annular groove 403b is concentric with the rotating drum 406. In the initial state, the end of the rotating drum 406 is flush with the upper end of the sealing platform 404, and in the initial state, the clamping rod 405 is located at the end of the arc segment 406d away from the radial segment 406e. At this time, the clamping rod 405 cannot move, and the opening above the second spiral groove 406b is aligned with the opening at the upper end of the straight groove 403d. In order to maintain this state, a torsion spring can be arranged between the rotating drum 406 and the shell 403. This is a prior art and will not be elaborated here.
[0052] Specifically, the connecting pipe 402a is provided with a through groove 402b, and the through groove 402b is connected to the ring platform 407; the upper end of the ring platform 407 is provided with a rod groove 407a, and the lower end is provided with a groove 407b, and the groove 407b is divided into a straight wall 407c, an inclined wall 407d, and an annular wall 407e, and the straight wall 407c, the inclined wall 407d, and the annular wall 407e are connected end to end.
[0053] It is worth noting that the length of the straight wall 407c matches the diameter section 406e, and the annular wall 407e is concentric with the connecting pipe 402a.
[0054] Specifically, the baffle 408 is provided with a connecting rod 408a, an outer ring 408b, and a pressure rod 408c. The connecting rod 408a is provided on the side wall of the baffle 408, connected to the inner wall of the outer ring 408b, and slidably matched with the through groove 402b. The pressure rod 408c is provided at the upper end of the outer ring 408b, and slidably matched with the rod groove 407a.
[0055] It is worth noting that a sealing ring is provided between the pressure rod 408c and the rod groove 407a, and a sealing ring is also provided between the outer ring 408b and the inner wall of the ring platform 407 to prevent water from flowing out of the rod groove 407a during connection.
[0056] Specifically, the collar 409 is rotatably matched with the ring platform 407, and a boss 409a is provided on the outer side of the collar 409;
[0057] It is worth noting that a torsion spring (not shown) may be provided between the collar 409 and the ring platform 407 to ensure that when the connector 402 is connected to the connecting end 401 , the straight wall 407 c of the groove 407 b overlaps with the radial groove 403 c .
[0058] When in use, align the boss 409a with the openings of the straight groove 403d and the second spiral groove 406b, and move downward. During the movement, the rotating drum 406 rotates, and the clamping rod 405 moves from one end of the arc segment 406d to one end of the radial segment 406e. When the boss 409a moves to the lower end of the second spiral groove 406b, the lower end of the joint 402 fits with the end surface of the rotating drum 406. At this time, the radial segment 406e moves to the top of the radial groove 403c. Under the action of the second spring 405c, the clamping rod 405 moves to the end of the radial groove 403c, the radial segment 406e and the straight wall 407c away from the axis. At this time, the rotating drum 406 cannot rotate, so the joint 401 is locked, and the clamping block 405b is disengaged from the groove 404a. Under the action of the first spring 404e Under the action of the screwdriver, the sealing platform 404 can spirally rise and enter the pipe 402a, and push up the baffle 408, so that the outer ring 408b is fitted with the upper end of the ring platform 407. At this point, the water supply pipeline of the sealing platform 404 is opened; when it is necessary to disengage, the pressure rod 408c is first pressed downward, and the baffle 408 squeezes the sealing platform 404 to reset it, and then the pipe 408c is rotated. At this time, the inclined wall 407c of the groove 407b squeezes the clamping rod 405 to move toward the radial section 403c, the radial section 406e and the end of the straight wall 407c close to the axis. When the clamping rod 405 is reset, the clamping block 405b is re-engaged with the groove 404a, and then the pipe 408c is pulled out to complete the disengagement. When disengaging, the water supply channel of the connecting end 401 is closed first, effectively avoiding leakage of the water source.
[0059] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the scope of the claims of the present invention.
Claims
1. A main shaft seal water supply system for a hydropower station, Features: include, The main pipeline (100) comprises a booster pump (101), a hydrocyclone (102), a hydrocyclone bypass electric valve (103), a first water filter (104), a second water filter (105), a front end electric valve (104a) of the first water filter, a front end electric valve (105a) of the second water filter, an electromagnetic flowmeter (106), a pressure transmitter (107), and a main shaft seal (108). After the booster pump (101) is connected to the hydrocyclone (102) and the hydrocyclone bypass electric valve (103), the branched flow passes through the front end electric valve (104a) of the first water filter, the first water filter (104), the front end electric valve (105a) of the second water filter, and the second water filter (105), and then converges, is connected to the electromagnetic flowmeter (106), and then is connected to the main shaft seal (108) through the pressure transmitter (107); The high-level water tank pipeline (200) comprises a high-level water tank (201), a high-level water tank water supply electric valve (201a), and a first booster pump electric valve (202); the high-level water tank (201) is connected to the high-level water tank water supply electric valve (201a) and then connected to the pipelines at both ends of the booster pump (101); the first booster pump electric valve (202) is arranged on the front end pipeline of the booster pump (101); A technical water supply pump water source (300) comprises a technical water supply pump (301), a technical water supply electric valve (301a), and a second booster pump electric valve (302); the technical water supply pump (301) is connected to the technical water supply electric valve (301a) and then connected to the pipelines at both ends of the booster pump (101); the second booster pump electric valve (302) is arranged on the front end pipeline of the booster pump (101); The connection unit (400) is arranged at the connection point of each pipeline, and comprises a connection end (401) and a connector (402), wherein the connection end (401) and the connector (402) are snap-fitted.
2. The main shaft seal water supply system of a hydropower station as claimed in claim 1, Features: The connecting end (401) comprises a shell (403), a sealing platform (404), a clamping rod (405), and a rotating drum (406); the sealing platform (404) is arranged in the middle of the shell (403); the rotating drum (406) is rotatably matched with the inner wall of the shell (403); and the clamping rod (405) is arranged on the side of the sealing platform (404).
3. The main shaft seal water supply system of a hydropower station as claimed in claim 2, Features: The joint (402) is provided with a connecting pipe (402a), a ring platform (407), a baffle (408), and a collar (409); the ring platform (407) is provided on the outer side of one end of the connecting pipe (402a) and is hollow inside; the baffle (408) is partially provided inside the connecting pipe (402a) and partially provided inside the ring platform (407); and the collar (409) is provided on the outer wall of the joint (402).
4. The main shaft seal water supply system of a hydropower station as claimed in claim 3, Features: The shell (403) is provided with a channel (403a), an annular groove (403b), a radial groove (403c), and a straight groove (403d); the channel (403a) passes through the lower end of the shell (403); the annular groove (403b) is provided on the outer side of the channel (403a); the radial groove (403c) is provided on the end surface of the shell (403); and the straight groove (403d) is provided on the inner wall of the shell (403); The side wall of the annular groove (403b) is also provided with a first spiral groove (403e).
5. The main shaft seal water supply system of a hydropower station as claimed in claim 4, Features: The sealing platform (404) is provided with a groove (404a), a connecting rod (404b), a ring (404c), a protrusion (404d), and a first spring (404e). The groove (404a) is provided on the side wall of the sealing platform (404). The connecting rod (404b) is provided at the lower end of the sealing platform (404) and connected to the ring (404c). The ring (404c) is slidably matched with the annular groove (403b). The protrusion (404d) is provided on the side wall of the ring (404c) and is slidably matched with the first spiral groove (403e). The first spring (404e) is provided between the end face of the ring (404c) and the annular groove (403b).
6. The main shaft seal water supply system of a hydropower station as claimed in claim 5, Features: The clamping rod (405) is provided with a connecting block (405a), a clamping block (405b), and a second spring (405c); the connecting block (405a) is arranged below the clamping rod (405) and slidingly cooperates with the radial groove (403c); the clamping block (405b) is arranged in the middle of the clamping rod (405) and matches the groove (404a); the second spring (405c) is arranged between the connecting block (405a) and the end face of the radial groove (403c).
7. The main shaft seal water supply system of a hydropower station as claimed in claim 6, Features: The rotating cylinder (406) is provided with a hole (406a), a second spiral groove (406b), and a slide groove (406c), wherein the hole (406a) is provided on the outside of the annular groove (403b), the second spiral groove (406b) is provided on the side wall of the rotating cylinder (406), and the slide groove (406c) is provided at the lower end of the rotating cylinder (406) and is slidably matched with the clamping rod (405); The slide groove (406c) comprises an arc segment (406d) and a diameter segment (406e), the arc segment (406d) is connected to an end of the diameter segment (406e) away from the axis, and a notch (406f) is provided on the side wall of the arc segment (406d), and the notch (406f) is slidably matched with the block (405b).
8. The main shaft seal water supply system of a hydropower station as claimed in claim 7, Features: The connecting pipe (402a) is provided with a through groove (402b), and the through groove (402b) is connected to the inside of the ring platform (407); The upper end of the ring platform (407) is provided with a rod groove (407a), and the lower end is provided with a groove (407b), and the groove (407b) is divided into a straight wall (407c), an inclined wall (407d), and an annular wall (407e), and the straight wall (407c), the inclined wall (407d), and the annular wall (407e) are connected end to end.
9. The main shaft seal water supply system of a hydropower station as claimed in claim 8, Features: The baffle (408) is provided with a connecting rod (408a), an outer ring (408b), and a pressure rod (408c). The connecting rod (408a) is arranged on the side wall of the baffle (408), connected to the inner wall of the outer ring (408b), and slidingly cooperates with the through groove (402b). The pressure rod (408c) is arranged at the upper end of the outer ring (408b) and slidingly cooperates with the rod groove (407a).
10. The main shaft seal water supply system of a hydropower station as claimed in claim 9, Features: The sleeve ring (409) is rotatably matched with the ring platform (407), and a boss (409a) is provided on the outer side of the sleeve ring (409).